Fixing and mounting device for building heating and ventilation pipeline

By using fixed installation devices of walking wheel lifting devices, impact drills and rotating components in building HVAC installation, the installation process of the boom is simplified, the problem of low construction efficiency in traditional methods is solved, and a more efficient installation process is achieved. .

CN222021925UActive Publication Date: 2024-11-19SHANDONG JIAYU PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323527321.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-19
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

During the installation of HVAC in existing buildings, the traditional method of fixing booms is cumbersome and the workload is large, resulting in low construction efficiency.

Method used

A fixed installation device including a walking wheel lifting device, an impact drill, an installation assembly and a rotary assembly is designed. The installation process is simplified by drilling holes through an impact drill, the installation assembly is installed, and the expansion screw is used to fix the suspension rod by rotating the expansion screw.

Benefits of technology

It reduces the workload of construction workers, improves installation efficiency, and saves more time and effort. It is suitable for buildings of different heights.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222021925U_ABST
    Figure CN222021925U_ABST
Patent Text Reader

Abstract

The utility model discloses a fixed installation device for a building heating and ventilation pipeline, and mainly relates to the technical field of building heating and ventilation. Comprising a lifting device with walking wheels mounted at the bottom, a percussion drill used for punching the top of a building and a mounting assembly used for mounting a suspender are arranged at the top of the lifting device, the mounting assembly is located on the rear side of the percussion drill, and a containing cavity used for containing the suspender is vertically formed in the mounting assembly; the top of the mounting assembly is provided with a containing opening used for containing an expansion screw on a suspender, and the mounting assembly is provided with a rotating assembly used for rotating the expansion screw. According to the utility model, the workload of constructors is reduced, the working efficiency is improved, and more time and labor are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building HVAC, in particular to a fixing and installing device for building HVAC pipelines. Background Art

[0002] HVAC is an important part of a building, which includes heating, ventilation, and air conditioning. In the existing HVAC pipe installation process, hangers are usually used as brackets to fix HVAC pipes. However, the traditional solution for the use of hangers is basically to use through-thread screws, which are fixed to the top wall by means of expansion screws, and then connected to the enclosing frame. For construction workers, installing hangers requires first drawing lines on the top wall, then drilling holes with impact drills, and finally inserting expansion screws into the holes, and rotating the expansion screws to fix the hangers. This process is inconvenient for construction and requires a lot of work. Utility Model Content

[0003] The purpose of the utility model is to solve the problems existing in the prior art and provide a fixed installation device for building HVAC pipelines, which reduces the workload of construction workers, improves work efficiency, and saves time and effort.

[0004] In order to achieve the above-mentioned purpose, the utility model is realized through the following technical solutions:

[0005] A fixed installation device for building HVAC pipelines, comprising a lifting device with walking wheels installed at the bottom, an impact drill for drilling holes on the top of a building and an installation assembly for installing a hanger rod are provided on the top of the lifting device, the installation assembly is located on the rear side of the impact drill, a receiving cavity for placing the hanger rod is vertically provided on the installation assembly, a receiving opening for placing expansion screws on the hanger rod is provided on the top of the installation assembly, and a rotating assembly for rotating the expansion screws is provided on the installation assembly.

[0006] Preferably, the number of the impact drill and the number of the installation components are both two, one impact drill and an installation component located at the rear side of the impact drill constitute a construction unit, and the distance between the two construction units is adjustable.

[0007] Preferably, an operating platform is provided on the top of the lifting device, two sliding plates are provided in the operating platform, a construction unit is installed on each of the sliding plates, and a push-pull device is provided between the two sliding plates.

[0008] Preferably, a slide groove adapted to the construction unit is provided on the top of the operating platform.

[0009] Preferably, the operating platform is slidably connected to the lifting device, and a translation device for driving the operating platform to move is provided on the lifting device.

[0010] Preferably, the bottom of the impact drill and the mounting assembly are both provided with a height adjustment device.

[0011] Preferably, a hexagonal hole adapted to the expansion screw is provided on the rotating assembly, a driving motor is provided on one side of the rotating assembly, and gear transmission is adopted between the driving motor and the rotating assembly.

[0012] Preferably, the lifting device is provided with a controller.

[0013] Compared with the prior art, the beneficial effects of the present invention are:

[0014] The overall height of the utility model is adjustable and can be suitable for buildings of different heights. The impact drill is used to drill holes in the top of the building, and the installation component is used to install the hanger. The rotating component rotates the expansion screw to fix the expansion screw in the hole drilled by the impact drill, thereby completing the installation of the hanger, reducing the workload of construction workers, improving work efficiency, and making the installation of the hanger more time-saving and labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 It is a structural diagram of the operating table;

[0017] Figure 3 It is a schematic diagram of the structure of the installation components;

[0018] Figure 4 It is a schematic diagram of the transmission structure of the rotating component;

[0019] Figure 5 It is a structural diagram of the boom;

[0020] Figure 6 It is a schematic diagram of the structure for placing the rod;

[0021] Figure 7 yes Figure 6 A magnified view of part A;

[0022] Numbers in the attached drawings: 1. Traveling wheel; 2. Lifting device; 3. Impact drill; 4. Hanging rod; 41. Expansion screw; 42. Connector; 43. Fixing groove; 44. Limit hole; 5. Mounting assembly; 51. Rotating assembly; 52. Driving motor; 6. Operating table; 61. Sliding plate; 62. Push-pull device; 63. Slide groove; 64. Translation device; 7. Height adjustment device; 8. Placement rod; 81. Connector; 82. Limit screw; 83. Adjustment piece. DETAILED DESCRIPTION

[0023] The present invention is further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the present application.

[0024] The structure of the suspension rod used in the utility model is as shown in the attached Figure 5 As shown, an expansion screw 41 is provided on the top of the suspension rod 4, and a connecting piece 42 is provided on the bottom. A fixing groove 43 is vertically provided on the connecting piece 42, and two limiting holes 44 are provided on the inner wall of the fixing groove 43.

[0025] The structure of the placement rod used in the utility model is as shown in the attached Figure 6-7 As shown, both ends of the placement rod 8 are provided with a plug-in member 81 extending downward, the plug-in member 81 is inserted into the fixing groove 43, and the left and right sides of the plug-in member 81 are provided with a limit screw 82. The plug-in member 81 is provided with a threaded hole adapted to the limit screw 82, one end of the plug-in member 81 is inserted into the plug-in member 81, and the end of the plug-in member 81 inserted into the plug-in member 81 is provided with a bevel gear, and an adjustment member 83 is provided at the bottom end of the plug-in member 81, and the adjustment member 83 is rotatably connected with the plug-in member 81, and the top end of the adjustment member 83 is inserted into the plug-in member 81, and the end of the adjustment member 81 inserted into the plug-in member 81 is provided with a bevel gear, and the adjustment member 81 is rotated, and the limit screw 82 can be driven to rotate through the bevel gear transmission, and the limit screw 82 can be translated while rotating, and can be inserted into the limit hole 44 or pulled out from the limit hole 44. After the limit screw 82 is inserted into the limit hole 44, it can prevent the placement rod 8 from falling off from the fixing groove 43.

[0026] One end of the hanger 4 is fixedly connected to the ceiling wall by an expansion screw 41, and the other end is detachably connected to the connecting piece 42 by a thread. There are two hangers 4, and the two ends of the placement rod 8 are respectively connected to the connecting pieces 42 of the two hangers 2. The two vertically installed hangers 4 and the horizontally placed placement rod 8 form a U-shaped frame, which makes it convenient to combine the components of multiple HVAC pipes and fix them under the ceiling wall.

[0027] Example: As attached Figure 1-4As shown, the utility model is a fixed installation device for building HVAC pipelines, including a lifting device 2 with a walking wheel 1 installed at the bottom, the lifting device 2 can adopt a scissor-type lifting mechanism, the top of the lifting device 2 is provided with an impact drill 3 for drilling holes on the top of the building, and an installation component 5 for installing a hanger 4, the installation component 5 is located on the rear side of the impact drill 3, and a receiving cavity for placing the hanger 4 is vertically provided on the installation component 5, the top of the installation component 5 is provided with a receiving opening for placing the expansion screw 41 on the hanger 4, and a rotating component 51 for rotating the expansion screw 41 is provided on the installation component 5, the rotating component 51 is tubular, and the receiving opening is located on the rotating component 51.

[0028] Preferably, in order to further improve work efficiency, the number of the impact drill 3 and the installation component 5 are both two, and one impact drill 3 and an installation component 5 located at the rear side of the impact drill 3 form a construction unit. The distance between the two construction units is adjustable, and the installation of two expansion screws 41 can be completed at the same time, and the distance between the two construction units can be adjusted according to the distance between the installation positions of the two expansion screws 41.

[0029] Preferably, in order to facilitate the adjustment of the distance between the two construction units, an operating platform 6 is provided on the top of the lifting device 2, two sliding plates 61 are provided inside the operating platform 6, a construction unit is installed on each sliding plate 61, and a push-pull device 62 is provided between the two sliding plates 61, and the push-pull device 62 can adopt an electric push rod.

[0030] Furthermore, in order to improve the movement stability of the construction unit, a slide groove 63 adapted to the construction unit is provided on the top of the operating platform 6 .

[0031] After the impact drill 3 completes drilling, the lifting device 2 can be moved to move the rear mounting assembly 5 to directly below the hole. Preferably, the operating table 6 is slidably connected to the lifting device 2, and a translation device 64 for driving the operating table 6 to move is provided on the lifting device 2. The translation device 64 can adopt an electric push rod, and there is no need to move the utility model as a whole, which can reduce energy consumption.

[0032] During the process of drilling a hole by the impact drill 3 or installing the expansion screw 41 by the installation component 5, the lifting and lowering can be controlled by the lifting device 2. Preferably, a height adjustment device 7 is provided at the bottom of the impact drill 3 and the installation component 5. The height adjustment device can adopt an electric push rod, which does not require overall lifting and lowering, and can reduce energy consumption.

[0033] Preferably, in order to facilitate the rotation of the expansion screw, a hexagonal hole adapted to the expansion screw 41 is provided on the rotating assembly 51, a driving motor 52 is provided on one side of the rotating assembly, and a gear transmission is adopted between the driving motor 52 and the rotating assembly.

[0034] Preferably, the lifting device 2 is provided with a controller, a signal transmitter and a signal receiver, and the signal transmitter, the signal receiver, the impact drill 3, and the installation component 5 are all electrically connected to the controller. By setting up the signal transmitter and the signal receiver and connecting with the control terminal through a wireless signal, it is convenient for construction personnel to control the utility model from outside the utility model to perform drilling and installation of the suspension rod 4, and the automatic control of the equipment is realized by setting up the controller.

[0035] The controller can use the AT89S51 chip, which is a low-power, high-performance CMOS 8-bit processor. The chip integrates a general 8-bit central processing unit and an ISP Flash storage unit, which can process the received information in a timely and effective manner. The controller can be an integrated circuit chip with signal processing capabilities. The controller can be a general processor, including a central processing unit, a network processor, etc.; it can also be a digital signal processor, an application-specific integrated circuit, a field programmable gate array or other programmable logic device, a discrete gate or transistor logic device, a discrete hardware component. It is not limited to the AT89S51 chip in this embodiment.

[0036] Optionally, the signal receiving module is wirelessly connected to the control terminal via ZigBEE, which is also called ZigBEE, a low-speed, short-distance transmission wireless network protocol, the bottom layer of which is a media access layer and a physical layer that adopt the IEEE 802.15.4 standard. The main features are low speed, low power consumption, low cost, support for a large number of online nodes, support for a variety of online topologies, low complexity, fast, reliable, and safe.

[0037] When installing the hanger 4, the construction workers plan the path of the HVAC pipe, determine the installation position of the hanger 4, put the hanger 4 into the installation assembly 5, start the lifting device 2, and make the impact drill 3 and the installation assembly 5 close to the top wall. First, use the impact drill 3 to turn two spaced holes in the top wall, and then use the installation assembly 5 to insert the end of the hanger 4 with the expansion screw 41 into the hole, and rotate the expansion screw 41 through the rotating assembly 51 to expand the expansion screw 41, so that the hanger 4 is fixed to the top wall, which reduces the workload of the construction workers, improves work efficiency, and saves time and effort.

Claims

1. A fixed installation device for building HVAC pipelines, characterized in that: The invention comprises a lifting device (2) with a walking wheel (1) installed at the bottom, an impact drill (3) for drilling a hole on the top of a building and a mounting assembly (5) for mounting a suspension rod (4) are arranged on the top of the lifting device (2), the mounting assembly (5) is located at the rear side of the impact drill (3), a receiving cavity for placing the suspension rod (4) is vertically arranged on the mounting assembly (5), a receiving opening for placing an expansion screw (41) on the suspension rod (4) is arranged on the top of the mounting assembly (5), and a rotating assembly (51) for rotating the expansion screw (41) is arranged on the mounting assembly (5).

2. A fixed installation device for building HVAC pipelines according to claim 1, characterized in that: The number of the impact drill (3) and the number of the mounting assembly (5) are both two; one impact drill (3) and one mounting assembly (5) located at the rear side of the impact drill (3) form a construction unit; and the distance between the two construction units is adjustable.

3. A fixed installation device for building HVAC pipelines according to claim 2, characterized in that: An operating platform (6) is provided on the top of the lifting device (2), two sliding plates (61) are provided inside the operating platform (6), a construction unit is installed on each of the sliding plates (61), and a push-pull device (62) is provided between the two sliding plates (61).

4. A fixed installation device for building HVAC pipelines according to claim 3, characterized in that: The top of the operating platform (6) is provided with a slide groove (63) adapted to the construction unit.

5. A fixed installation device for building HVAC pipelines according to claim 3, characterized in that: The operating platform (6) is slidably connected to the lifting device (2), and a translation device (64) for driving the operating platform (6) to move is provided on the lifting device (2).

6. A fixed installation device for building HVAC pipelines according to claim 1, characterized in that: The bottoms of the impact drill (3) and the mounting assembly (5) are both provided with height adjustment devices (7).

7. A fixed installation device for building HVAC pipelines according to claim 1, characterized in that: The rotating assembly (51) is provided with a hexagonal hole adapted to the expansion screw (41), a driving motor (52) is provided on one side of the rotating assembly, and a gear transmission is adopted between the driving motor (52) and the rotating assembly.

8. The fixed installation device for building HVAC pipelines according to claim 1, characterized in that: The lifting device (2) is provided with a controller.