AI Technical Summary
During tunnel maintenance operations, the used feng shui pipes are often placed in a mess, resulting in chaos on-site pipelines, which are inconvenient to manage during use and storage, and wastes a lot of time to organize the pipelines every time you go to and from get off work.
A Fengshui pipe rack is designed, including a base, winding assembly and lifting assembly. The lifting assembly is fixed and limiting the winding assembly to ensure that the winding pipe is neatly rolled, easy to manage and save space.
It realizes neat storage of feng shui pipes, reduces the chaos in the on-site pipelines, simplifies the management and sorting process, improves work efficiency, prevents the automatic rotation of the winding components, and ensures stability after winding.
Smart Images

Figure CN222023807U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of racks, in particular to a feng shui pipe rack. Background Art
[0002] Tunnel maintenance work refers to the daily inspection, maintenance and repair work of tunnels in underground projects such as coal mines, tunnels, subways, etc., in order to ensure the normal operation of the project and the safety of workers. Tunnel maintenance work mainly includes checking the structural integrity of the tunnel, including whether there are cracks, subsidence, deformation, etc. in the roof, floor and side walls of the tunnel, and checking whether the ventilation, drainage, lighting and other facilities in the tunnel are operating normally to ensure that the air quality, water level and lighting in the tunnel meet the requirements.
[0003] However, during the existing tunnel maintenance work, the Feng Shui pipes used underground are often placed in a messy manner and are inconvenient to prevent impact. During the use and storage process, personnel are likely to cause chaos in the on-site pipelines, which is inconvenient to manage. At the same time, a lot of time is wasted in tidying up the pipelines every time going to and from get off work. Therefore, we proposed a Feng Shui pipe rack to solve the above-mentioned problems. Utility Model Content
[0004] In view of the shortcomings of the existing technology, the utility model provides a Feng Shui pipe rack, which solves the problem that Feng Shui pipes used in the mine are often placed in a messy manner and are inconvenient to prevent impact, and personnel easily cause chaos in the on-site pipes during use and storage, which is inconvenient to manage, and a lot of time is wasted in tidying up the pipes every time going to and from get off work.
[0005] To achieve the above purpose, the utility model is implemented through the following technical solutions: a feng shui pipe rack, including a base, and also including:
[0006] A winding assembly, the winding assembly is arranged above the middle of the base, and the winding assembly is used to wind up the Feng Shui pipe; and
[0007] The lifting assembly is provided with two lifting assemblies, the two lifting assemblies are respectively provided at the two ends of the winding assembly, and the bottom ends of the two lifting assemblies are respectively connected to the two sides of the bottom surface of the base, and the lifting assembly is used to lift and limit the winding assembly.
[0008] Preferably, the winding assembly comprises a winding drum, both ends of which are fixedly provided with blocking frames, a shaft rod is fixedly provided at the center position of the outer walls of the two blocking frames, and one end of the shaft rod passes through the supporting assembly.
[0009] Preferably, the winding assembly further comprises a pipe clamp rack, at least one of which is provided, and the pipe clamp rack is arranged on the inner wall of the blocking rack and close to the edge.
[0010] Preferably, the lifting assembly comprises a column arranged on one side of the top surface of the base, and a notch for engaging the shaft rod is provided in the middle of the top of the column;
[0011] A limiting portion is arranged at the top of the column, and internal thread grooves for installing the limiting portion are arranged on the top surface of the column and on both sides of the notch.
[0012] Preferably, the limiting portion comprises a limiting seat arranged at the top end of the column, through holes are opened on both sides of the top surface of the limiting seat, locking screws are inserted into the inner cavities of the two through holes, and the bottom ends of the two locking screws are rotatably connected to the two internal thread grooves respectively;
[0013] An internal thread hole is provided in the middle of the top surface of the limiting seat, and a fixing screw is rotatably connected to the inner cavity of the internal thread hole.
[0014] Preferably, the lifting assembly further comprises an oblique support rod, wherein two oblique support rods are provided, the two oblique support rods are respectively provided on two side walls of the column, and the bottom ends of the two oblique support rods are connected to the top surface of the base.
[0015] Preferably, the lifting assembly further comprises a handle, and the handle is arranged at an upper middle position of the outer wall of the column.
[0016] Preferably, it also includes brake casters, and four brake casters are provided, and the four brake casters are respectively arranged at the four corners of the bottom surface of the base.
[0017] Beneficial Effects
[0018] The utility model provides a feng shui pipe rack. Compared with the prior art, it has the following beneficial effects:
[0019] The feng shui pipe rack can install and fix two holding components through the base, and then the two holding components can not only stably hold up the winding component so that the winding component can rotate flexibly, but also limit the rotating winding component. Therefore, when the feng shui pipe needs to be wound up, the staff will first wrap the feng shui pipe around the winding component, and then rotate the winding component, so that the subsequent feng shui pipes can be neatly wound up, so that the staff will not easily cause the pipeline to be placed in a mess when using and storing it, which is convenient for daily anti-collision management and saves space. At the same time, it reduces the time for arranging pipelines during commuting to and from work, improves work efficiency, and through the holding component, the winding component can be locked and limited after winding up, so as to prevent the winding component from rotating automatically, thereby ensuring the stability of the winding component after winding up the feng shui pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2 It is a schematic diagram of the side structure of the utility model;
[0022] Figure 3 This is a schematic diagram of the structure of the winding component of the utility model;
[0023] Figure 4 This is a schematic diagram of the structure of the lifting component of the utility model;
[0024] Figure 5 It is a schematic diagram of the explosion structure of the limiting part of the utility model.
[0025] In the figure: 1. base; 2. winding assembly; 21. winding drum; 22. blocking frame; 23. shaft rod; 24. pipe clamp frame; 3. lifting assembly; 31. column; 32. notch; 33. limit part; 331. limit seat; 332. through hole; 333. locking screw; 334. internal thread hole; 335. fixing screw; 34. internal thread groove; 35. diagonal support rod; 36. handle; 4. brake caster. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] See also Figure 1-2 The utility model provides a technical solution: a Feng Shui pipe rack, including a base 1, and also including: a winding assembly 2, the winding assembly 2 is arranged above the middle of the base 1, and the winding assembly 2 is used to wind up the Feng Shui pipe; and a lifting assembly 3, two lifting assemblies 3 are provided, the two lifting assemblies 3 are respectively arranged at both ends of the winding assembly 2, and the bottom ends of the two lifting assemblies 3 are respectively connected to the two sides of the bottom surface of the base 1, and the lifting assembly 3 is used to lift and limit the winding assembly 2;
[0028] The two lifting components 3 can be installed and fixed through the base 1, and then the two lifting components 3 can not only stably lift the winding component 2 so that the winding component 2 can rotate flexibly, but also limit the winding component 2 after rotation. Therefore, when the Feng Shui pipe needs to be rolled up, the staff will first wrap the Feng Shui pipe around the winding component 2, and then rotate the winding component 2, so that the subsequent Feng Shui pipes can be continued to be rolled up neatly, so that when the staff use and store them, it is not easy to cause the pipeline to be placed in a mess, which is convenient for daily anti-collision management and saves space. At the same time, it reduces the time for arranging pipelines during commuting and working, and improves work efficiency. In addition, the winding component 2 can be locked and limited through the lifting component 3, so as to prevent the winding component 2 from rotating automatically, thereby ensuring the stability of the winding component 2 after rolling up the Feng Shui pipe.
[0029] See also Figure 2 , Figure 3 The winding assembly 2 includes a winding drum 21, and blocking frames 22 are fixedly arranged at both ends of the winding drum 21. A shaft 23 is fixedly arranged at the center position of the outer wall of the two blocking frames 22, and one end of the shaft 23 passes through the supporting assembly 3. The winding assembly 2 also includes a pipe clamp frame 24, and at least one pipe clamp frame 24 is arranged. The pipe clamp frame 24 is arranged on the inner wall of the blocking frame 22 and close to the edge position;
[0030] Through the winding drum 21 in the winding component 2, the Feng Shui pipe can be wound up in cooperation with the two blocking frames 22, and through the two shaft rods 23, it can be installed on the outside of the two blocking frames 22, and can also be plugged into the two supporting components 3, so that the winding drum 21 can rotate flexibly, and then through the pipe clamping frame 24, it can be fixed on the blocking frame 22, and the end of the Feng Shui pipe after winding can be clamped and limited, thereby improving the neatness of the winding of the Feng Shui pipe.
[0031] See also Figure 3-Figure 5The lifting assembly 3 includes a column 31 arranged on one side of the top surface of the base 1, and a notch 32 for engaging the shaft rod 23 is opened in the middle of the top of the column 31; a limiting portion 33 is arranged at the top of the column 31, and internal thread grooves 34 for installing the limiting portion 33 are opened on the top surface of the column 31 and on both sides of the notch 32. The limiting portion 33 includes a limiting seat 331 arranged at the top of the column 31, and through holes 332 are opened on both sides of the top surface of the limiting seat 331. Locking screws 333 are inserted into the inner cavities of the two through holes 332. The two locks The bottom ends of the tightening screws 333 are rotatably connected to the two internal thread grooves 34 respectively; an internal thread hole 334 is opened in the middle position of the top surface of the limiting seat 331, and a fixing screw 335 is rotatably connected to the inner cavity of the internal thread hole 334. The lifting component 3 also includes an inclined support rod 35, and two inclined support rods 35 are provided. The two inclined support rods 35 are respectively arranged on the two side walls of the column 31, and the bottom ends of the two inclined support rods 35 are connected to the top surface of the base 1. The lifting component 3 also includes a handle 36, which is arranged at the upper middle position of the outer wall of the column 31;
[0032] The column 31 in the supporting assembly 3 can be fixed on one side of the top surface of the base 1, and space can be provided for the notch 32 and the two internal thread grooves 34. Then, the locking screw 333 can be passed through the through hole 332 and installed in the internal thread groove 34, so that the limit seat 331 can be stably installed on the top of the column 31, so that the shaft rod 23 can rotate stably in the notch 32. Then, by rotating the fixing screw 335 in the internal thread hole 334, the shaft rod 23 in the notch 32 can be locked and limited, so as to prevent the winding drum 21 from rotating after winding the wind and water pipe. The two diagonal support rods 35 can enhance the stability of the connection between the column 31 and the base 1. At the same time, the handle 36 can facilitate the staff to carry and move the equipment.
[0033] See also Figure 1 , Figure 2 , and also includes brake casters 4, four brake casters 4 are provided, and the four brake casters 4 are respectively arranged at the four corners of the bottom surface of the base 1;
[0034] The four brake casters 4 can be stably fixed at the four corners of the bottom surface of the base 1, and can also be conveniently and flexibly moved with the base 1, so that the equipment can be moved.
[0035] During operation, the two lifting components 3 can be installed and fixed through the base 1, and then the two lifting components 3 can not only stably lift the winding component 2 so that the winding component 2 can rotate flexibly, but also limit the rotation of the winding component 2. Therefore, when the Feng Shui pipe needs to be rolled up, the staff will first wrap the Feng Shui pipe around the winding component 2, and then rotate the winding component 2, so that the subsequent Feng Shui pipes can be continued to be rolled up neatly, so that when the staff use and store them, it is not easy to cause the pipeline to be placed in a mess, which is convenient for daily anti-collision management and saves space. At the same time, it reduces the time for arranging pipelines during commuting to and from get off work, improves work efficiency, and through the lifting component 3, the winding component 2 can be locked and limited, so as to prevent the winding component 2 from rotating automatically, thereby ensuring the stability of the winding component 2 after rolling up the Feng Shui pipe.
[0036] Through the winding drum 21 in the winding component 2, the Feng Shui pipe can be wound up in cooperation with the two blocking frames 22, and through the two shaft rods 23, it can be installed on the outside of the two blocking frames 22, and can also be plugged into the two supporting components 3, so that the winding drum 21 can rotate flexibly, and then through the pipe clamping frame 24, it can be fixed on the blocking frame 22, and the end of the Feng Shui pipe after winding can be clamped and limited, thereby improving the neatness of the winding of the Feng Shui pipe.
[0037] The support column 31 in the lifting assembly 3 can be fixed to one side of the top surface of the base 1, and space can be provided for the notch 32 and the two internal thread grooves 34. Then, the locking screw 333 can be passed through the through hole 332 and installed in the internal thread groove 34, so that the limit seat 331 can be stably installed on the top of the column 31, so that the shaft rod 23 can be stably rotated in the notch 32. Then, by rotating the fixing screw 335 in the internal thread hole 334, the shaft rod 23 in the notch 32 can be locked and limited, so as to prevent the winding drum 21 from rotating after winding the wind and water pipe. The two diagonal support rods 35 can strengthen the stability of the connection between the column 31 and the base 1. At the same time, the handle 36 can facilitate the staff to carry and move the equipment. The four brake casters 4 can not only be stably fixed to the four corners of the bottom surface of the base 1, but also facilitate the flexible movement of the base 1, so that the equipment can be moved.
[0038] In summary, the device can neatly store used Feng Shui pipes. When on-site personnel use and store them, it is not easy to cause the pipes to be placed in a mess, which is convenient for daily anti-collision management and saves space. At the same time, it reduces the time for tidying up the pipes during commuting and improving work efficiency.
[0039] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
Claims
1. A feng shui pipe rack, comprising a base (1), characterized in that: Also includes: A winding assembly (2), the winding assembly (2) being arranged above the middle of the base (1), and the winding assembly (2) being used to wind up the Feng Shui pipe; as well as A lifting component (3), wherein two lifting components (3) are provided, and the two lifting components (3) are respectively provided at the two ends of the winding component (2), and the bottom ends of the two lifting components (3) are respectively connected to the two sides of the bottom surface of the base (1), and the lifting component (3) is used to lift and limit the winding component (2).
2. The feng shui pipe rack according to claim 1, characterized in that: The winding assembly (2) comprises a winding drum (21), both ends of which are fixedly provided with blocking frames (22), and the center positions of the outer walls of the two blocking frames (22) are fixedly provided with shaft rods (23), and one end of the shaft rods (23) passes through the supporting assembly (3).
3. A Feng Shui pipe rack according to claim 2, characterized in that: The winding assembly (2) further comprises a pipe clamp rack (24), at least one of which is provided, and the pipe clamp rack (24) is arranged on the inner wall of the blocking rack (22) and close to the edge.
4. The feng shui pipe rack according to claim 2, characterized in that: The supporting assembly (3) comprises a column (31) arranged on one side of the top surface of the base (1), and a notch (32) for engaging the shaft (23) is provided in the middle of the top of the column (31); A limiting portion (33) is disposed at the top of the column (31), and internal thread grooves (34) for mounting the limiting portion (33) are provided on the top surface of the column (31) and on both sides of the notch (32).
5. The feng shui pipe rack according to claim 4, characterized in that: The limiting portion (33) comprises a limiting seat (331) arranged at the top end of the column (31), through holes (332) are provided on both sides of the top surface of the limiting seat (331), locking screws (333) are inserted into the inner cavities of the two through holes (332), and the bottom ends of the two locking screws (333) are rotatably connected to the two internal thread grooves (34) respectively; An internal threaded hole (334) is provided in the middle of the top surface of the limiting seat (331), and a fixing screw (335) is rotatably connected to the inner cavity of the internal threaded hole (334).
6. The feng shui pipe rack according to claim 4, characterized in that: The supporting assembly (3) further comprises an oblique support rod (35), wherein two oblique support rods (35) are provided, and the two oblique support rods (35) are respectively provided on the two side walls of the column (31), and the bottom ends of the two oblique support rods (35) are connected to the top surface of the base (1).
7. The feng shui pipe rack according to claim 4, characterized in that: The lifting assembly (3) further comprises a handle (36), and the handle (36) is arranged at an upper middle portion of the outer wall of the column (31).
8. The feng shui pipe rack according to claim 1, characterized in that: It also includes brake casters (4), four of which are provided, and the four brake casters (4) are respectively provided at the four corners of the bottom surface of the base (1).