Fabricated building wall butt joint structure
By adopting a combined structure of flared grooves, slots and spring trapezoidal rods in prefabricated building walls, the wall is quickly aligned and fixed, solving the problem of low alignment efficiency in the prior art, and improving the installation efficiency and portability.
Patent Information
- Application Number
- CN202420921988.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-29
AI Technical Summary
The existing prefabricated building wall structures are inefficient when aligning and installing, and require manual support to avoid inclination and gaps, which affects construction efficiency.
A prefabricated building wall docking structure is designed, using a combination of flared grooves, slots and spring trapezoidal rods to achieve rapid alignment through the linkage of insert plates and bolts, and portability is improved through the sliding groove plates, rollers and threaded rods. and stability.
It realizes rapid alignment and fixation of prefabricated walls, improves installation efficiency, saves manpower, and improves the portability of the walls and the stability of the ground placement.
Smart Images

Figure CN222025289U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled buildings, in particular to an assembled building wall butt joint structure. Background Art
[0002] Prefabricated buildings refer to buildings that are assembled on site using prefabricated parts and components. The production method of this type of building is based on the prefabrication of components in the factory and on-site assembly installation. It is characterized by standardized design, factory production, assembly construction, integrated decoration and information management. At present, when constructing prefabricated buildings, prefabricated building walls are often used. Prefabricated building walls refer to walls assembled on site using prefabricated components. They have the advantages of higher production efficiency, shorter construction period, lower energy consumption and less waste emissions.
[0003] At present, when assembling prefabricated walls, it is first necessary to align the two walls. However, the existing prefabricated building wall structure is relatively simple, which is not convenient for quick alignment. In addition, when using bolts for installation, it is necessary to manually support the wall to avoid tilting or gaps at the wall joint during installation, which affects the installation efficiency. Therefore, it is necessary to design a prefabricated building wall joint structure to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide a prefabricated building wall butt joint structure to solve the problems raised by the above-mentioned background technology.
[0005] To achieve the above object, the utility model provides the following technical solution: an assembled building wall docking structure, comprising an assembled wall, a flared groove is opened on the left side of the assembled wall, a slot is opened on the right side of the inner cavity of the flared groove, and a plug plate is fixedly installed on the right side of the assembled wall;
[0006] A linkage groove is provided at the top of the inner cavity of the expansion groove, a spring is welded at the top of the inner cavity of the linkage groove, a trapezoidal rod is welded at the bottom end of the spring, a trapezoidal groove is provided at the top of the plug plate for use with the trapezoidal rod, and a sealing gasket is bonded to the right side of the assembled wall.
[0007] Preferably, connecting plates are fixedly installed on the upper and lower parts of the right side of the surface of the prefabricated wall through openings, and bolts are connected to the surface of the connecting plates through slotted threads. Connecting grooves are provided on the upper and lower parts of the left side of the surface of the prefabricated wall, and threaded holes for use with bolts are provided at the rear part of the inner cavity of the connecting groove.
[0008] Preferably, a slide plate is fixedly mounted on the surface of the assembled wall, a slider is slidably connected inside the slide plate, a traction plate is fixedly mounted on the surface of the slider, and rollers are rotatably connected to both sides of the traction plate surface via bearings.
[0009] Preferably, a threaded sleeve is fixedly mounted on the surface of the assembled wall via a bracket.
[0010] Preferably, the internal thread of the threaded sleeve is connected with a threaded rod.
[0011] Preferably, the bottom end of the threaded rod is rotatably connected to the top of the traction plate via a bearing member.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The prefabricated building wall docking structure is achieved by placing two prefabricated walls side by side, and then pushing the left prefabricated wall toward the right prefabricated wall. At this time, the plug plate on the right side of the left prefabricated wall can be quickly inserted into the slot opened in the left prefabricated wall through the expansion groove. After the plug plate enters the slot, the trapezoidal rod can be pushed downward by the elastic force of the spring, so that the plug plate is completely inserted into the interior of the slot, thereby achieving the effect of quickly aligning and tightening the two prefabricated walls, and then by rotating the bolt, the bolt is threadedly connected with the threaded hole, so as to achieve the effect of quickly fixing the two prefabricated walls, thereby improving the installation efficiency of the prefabricated walls and saving manpower.
[0014] 2. The prefabricated building wall docking structure can achieve the effect of facilitating the movement of the prefabricated wall on the ground by arranging rollers, thereby improving the portability of the prefabricated wall. When the prefabricated wall does not need to be moved, the threaded rod can be rotated, and the threaded rod can be raised through the threaded sleeve. The rising of the threaded rod can drive the traction plate to rise, and the rising of the traction plate drives the roller to rise. After the roller is raised, it is no longer in contact with the ground, thereby improving the stability of the prefabricated wall placed on the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the structure of the expansion groove, slot and slide plate of the utility model;
[0017] Figure 3 It is a cross-sectional view of the assembled wall and plug-in plate structure of the utility model;
[0018] Figure 4 This is a schematic diagram of the structure of the slider, traction plate and threaded rod of the utility model.
[0019] In the figure: 1. assembled wall; 2. flared groove; 3. slot; 4. plug-in plate; 5. linkage groove; 6. spring; 7. trapezoidal rod; 8. trapezoidal groove; 9. connecting plate; 10. bolt; 11. connecting groove; 12. threaded hole; 13. slide plate; 14. slider; 15. traction plate; 16. roller; 17. threaded sleeve; 18. threaded rod; 19. sealing gasket. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] Embodiment 1
[0022] Please refer to Figure 1-4 As shown, the utility model provides a prefabricated building wall docking structure, including a prefabricated wall 1, a flared groove 2 is opened on the left side of the prefabricated wall 1, a slot 3 is opened on the right side of the inner cavity of the flared groove 2, and a plug plate 4 is fixedly installed on the right side of the prefabricated wall 1;
[0023] Specifically, a linkage groove 5 is provided at the top of the inner cavity of the expansion groove 2, and a spring 6 is welded at the top of the inner cavity of the linkage groove 5. The spring 6 is an industrial-grade spring with good fatigue resistance, can be repeatedly stretched for long-term use, and can be replaced after long-term use. A trapezoidal rod 7 is welded at the bottom end of the spring 6, and a trapezoidal groove 8 used in conjunction with the trapezoidal rod 7 is provided at the top of the plug plate 4. By setting the spring 6 and placing the two assembled walls 1 side by side, and then pushing the left assembled wall 1 toward the right assembled wall 1, at this time The plug plate 4 on the right side of the left assembled wall 1 can be quickly inserted into the slot 3 opened in the left assembled wall 1 through the expanded groove 2. After entering the slot 3, the plug plate 4 can push the trapezoidal rod 7 upward by contacting the inclined surface on the left side of the trapezoidal rod 7. When the plug plate 4 drives the trapezoidal groove 8 to move to the bottom of the trapezoidal rod 7, the trapezoidal rod 7 can be pushed downward by the elastic force of the spring 6, and the plug plate 4 is completely pushed into the interior of the slot 3 by contacting the inclined surface of the trapezoidal groove 8, thereby achieving the effect of quickly aligning and sticking the two assembled walls 1 together.
[0024] Wherein: a sealing gasket 19 is bonded to the right side of the assembled wall 1, and the sealing gasket 19 is made of rubber. By arranging the sealing gasket 19, the two assembled walls 1 can be sealed after being pressed tightly together.
[0025] Wherein: connecting plates 9 are fixedly installed on the upper and lower parts of the right side of the surface of the assembled wall 1 through openings, and bolts 10 are connected to the surface of the connecting plate 9 through slotted threads. Connecting grooves 11 are provided on the upper and lower parts of the left side of the surface of the assembled wall 1. The rear part of the inner cavity of the connecting groove 11 is provided with a threaded hole 12 used in conjunction with the bolt 10. By setting the bolt 10, the movement of the left assembled wall 1 can drive the connecting plate 9 to move into the connecting groove 11. After the connecting plate 9 moves into the connecting groove 11, the bolt 10 can be rotated to thread the bolt 10 with the threaded hole 12, thereby achieving the effect of quickly fixing the two assembled walls 1.
[0026] Specifically, a slide plate 13 is fixedly installed on the surface of the assembled wall 1, and a slider 14 is slidably connected inside the slide plate 13. A traction plate 15 is fixedly installed on the surface of the slider 14. Both sides of the surface of the traction plate 15 are rotatably connected with rollers 16 through bearings. A threaded sleeve 17 is fixedly installed on the surface of the assembled wall 1 through a bracket. A threaded rod 18 is threadedly connected to the inner thread of the threaded sleeve 17. The bottom end of the threaded rod 18 is rotatably connected to the top of the traction plate 15 through a bearing. By arranging the roller 16, the effect of facilitating the movement of the assembled wall 1 on the ground can be achieved, thereby improving the portability of the assembled wall 1. When the assembled wall 1 does not need to be moved, the threaded rod 18 can be rotated, and the threaded rod 18 can be raised through the threaded sleeve 17 when it rotates. The rising of the threaded rod 18 can drive the traction plate 15 to rise, and the rising of the traction plate 15 drives the roller 16 to rise. After the roller 16 rises, it no longer contacts the ground, thereby improving the stability of the assembled wall 1 placed on the ground.
[0027] Working principle: The utility model is a prefabricated building wall docking structure, which is achieved by placing two prefabricated walls 1 side by side, and then pushing the left prefabricated wall 1 toward the right prefabricated wall 1. At this time, the plug plate 4 on the right side of the left prefabricated wall 1 can be quickly inserted into the slot 3 opened in the left prefabricated wall 1 through the flared slot 2. After entering the slot 3, the plug plate 4 can push the trapezoidal rod 7 upward by contacting the inclined surface on the left side of the trapezoidal rod 7. When the plug plate 4 drives the trapezoidal slot 8 to move to the bottom of the trapezoidal rod 7, the trapezoidal rod 7 can be pushed downward by the elastic force of the spring 6, and the plug plate 4 is completely pushed into the inside of the slot 3 by contacting the inclined surface of the trapezoidal slot 8, thereby achieving the effect of quickly aligning and sticking the two prefabricated walls 1, and the movement of the left prefabricated wall 1 can bring The movable connecting plate 9 moves to the inside of the connecting groove 11. After the connecting plate 9 moves to the inside of the connecting groove 11, the bolt 10 can be rotated to make the bolt 10 threadedly connected with the threaded hole 12, so as to achieve the effect of quickly fixing the two assembled wall bodies 1, thereby improving the installation efficiency of the assembled wall body 1. At the same time, by setting the roller 16, the assembled wall body 1 can be easily moved on the ground, thereby improving the portability of the assembled wall body 1. When the assembled wall body 1 does not need to be moved, the threaded rod 18 can be rotated, and the threaded rod 18 can be raised by the threaded sleeve 17. The rising of the threaded rod 18 can drive the traction plate 15 to rise, and the rising of the traction plate 15 drives the roller 16 to rise. After the roller 16 rises, it no longer contacts the ground, thereby improving the stability of the assembled wall body 1 placed on the ground.
[0028] The contents not described in detail in this specification belong to the prior art known to professionals in this field.
[0029] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A prefabricated building wall joint structure, comprising a prefabricated wall (1), Features: The left side of the assembled wall (1) is provided with an expansion groove (2), the right side of the inner cavity of the expansion groove (2) is provided with a slot (3), and the right side of the assembled wall (1) is fixedly provided with an inserting plate (4); A linkage groove (5) is provided at the top of the inner cavity of the expansion groove (2), a spring (6) is welded to the top of the inner cavity of the linkage groove (5), a trapezoidal rod (7) is welded to the bottom end of the spring (6), a trapezoidal groove (8) for use with the trapezoidal rod (7) is provided at the top of the plug plate (4), and a sealing gasket (19) is bonded to the right side of the assembled wall (1).
2. The assembled building wall joint structure according to claim 1, Features: A connection plate (9) is fixedly installed on the upper and lower sides of the right side of the surface of the assembled wall (1) through openings, and a bolt (10) is connected to the surface of the connection plate (9) through a slotted thread. A connection groove (11) is provided on the upper and lower sides of the left side of the surface of the assembled wall (1), and a threaded hole (12) used in conjunction with the bolt (10) is provided at the rear of the inner cavity of the connection groove (11).
3. The assembled building wall butt joint structure according to claim 1, Features: A slide plate (13) is fixedly mounted on the surface of the assembled wall (1), a slider (14) is slidably connected inside the slide plate (13), a traction plate (15) is fixedly mounted on the surface of the slider (14), and rollers (16) are rotatably connected to both sides of the surface of the traction plate (15) via bearings.
4. The assembled building wall butt joint structure according to claim 3, Features: A threaded sleeve (17) is fixedly mounted on the surface of the assembled wall (1) via a bracket.
5. The assembled building wall butt joint structure according to claim 4, Features: The inner thread of the threaded sleeve (17) is connected with a threaded rod (18).
6. The assembled building wall butt joint structure according to claim 5, Features: The bottom end of the threaded rod (18) is rotatably connected to the top of the traction plate (15) via a bearing member.