Anchoring device for high-performance rope net engineering assembly

By designing an anchoring device in the assembly of high-performance rope mesh engineering, using a combined structure of flexible eye rings and rigid shackles, the safety and reliability of the rope installation in high-altitude operations are solved, and the efficient and safe fixation of the rope is achieved. Reduced operational risks.

CN222026219UActive Publication Date: 2024-11-19SHANDONG LAIWEI NEW MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420748742.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-11-19
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

In the assembly of high-performance rope mesh projects, especially in high-altitude operations, the prior art is difficult to ensure the safety and reliability of installation operations, especially in the case of large rope specifications, accurate length requirements, and tension force above 5 tons. Under the severity of protective performance and huge loss risk of escaping and seedlings.

Method used

An anchoring device is designed, by setting a flexible eye ring at the tail end of the rope and pulling the rigid shackle to the welding point of the frame structure for fixing and assembly, using a combination of fixing and projecting parts. Ensure that the rope is not cut and squeezed during installation, and use a rigid shackle as a transition piece for easy and precise fixation.

Benefits of technology

It improves the assembly safety and reliability of high-performance rope mesh, avoids rope damage, simplifies the operation process, enhances the safety guarantee of high-altitude operations, and is suitable for large-scale applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026219U_ABST
    Figure CN222026219U_ABST
Patent Text Reader

Abstract

The utility model discloses an anchoring device for engineering assembly of a high-performance rope net, which relates to the technical field of engineering assembly of a high-performance fiber rope net and comprises a fixing piece (1) and a protruding piece (2), the structure is simple, the fixing piece structure effectively ensures that a rigid shackle drives a rope to be stretched and installed, and the fixing piece structure is simple. In the process, it is guaranteed that the rope is not damaged due to cutting and extrusion of the fixing piece, and the installation and use safety of the rope net is guaranteed; the rigid shackle is used as an assembly transition piece between the flexible eye ring and the frame structure, operation is more convenient and faster, the size of the rigid shackle is larger than that of the flexible eye ring, accurate fixed installation is easier, meanwhile, more safety guarantee is added for use of the high-performance rope net, and the rope net is suitable for large-scale application and popularization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering assembly of high-performance fiber rope nets, in particular to an anchoring device used for engineering assembly of high-performance rope nets. Background Art

[0002] Generally speaking, deep-sea aquaculture equipment includes a frame system, a rope net system and an anchoring system: the frame structure is composed of rigid structures such as metal and fiberglass composite materials. The high-performance rope net system determines the overall shape of the net, mesh size, diameter, length, number and arrangement of the horizontal and vertical lines according to its service environment. The net system is assembled and connected to the frame system through the anchoring system. The three systems interact and work closely together to ensure the quality of the project. Due to the high strength, large specifications and low elongation of high-performance rope net products, large-tonnage pulling equipment is required in engineering assembly and anchoring operations. In large and complex engineering installations, especially in high-altitude assembly operations, the construction is more difficult and the risk factor is higher. Once the assembly and anchoring are damaged, there will be huge losses such as reduced protection performance and escape of aquaculture seedlings.

[0003] In the prior art, after the net system is assembled as a whole in the factory, a rope with an eyelet connector is left at the tail end, and the net system is installed on site on the frame system. Generally, the whole net is lifted and installed with the help of an electric hoist and a crane. In the installation of super-large net boxes with segmented nets and more complex protective nets, the operation position is high and the operation is difficult, especially for installation operations with large rope specifications, accurate length requirements, and tensioning forces of more than 5 tons, which puts higher requirements on the safety and reliability of the installation operation. Summary of the invention

[0004] In order to solve the above-mentioned technical problems, the utility model provides an anchoring device for high-performance rope net engineering assembly, which makes the assembly of high-performance rope nets more convenient and quick, and especially provides greater operation safety guarantee in high-altitude operations.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is:

[0006] An anchoring device for high-performance rope net engineering assembly, the anchoring device is used to fix the tail end of the high-performance rope net on the frame structure of the engineering assembly, each tail end of the rope of the high-performance rope net is provided with a flexible eye ring, and the anchoring device is driven by a drafting device to pull the flexible eye ring to the welding point of the frame structure for fixed assembly, comprising a fixing part and a protruding part, the fixing part is set as a metal block structure with a U-shaped hollow structure at one end and a cylindrical hollow structure in the middle of the other end, the U-shaped hollow structure and the cylindrical hollow structure are connected, and the protruding part is provided with a U-shaped hollow structure at one end and a cylindrical hollow structure at the middle of the other end, and the U-shaped hollow structure and the cylindrical hollow structure are connected. There are two parts, which are symmetrically arranged on both sides of the fixing part, and are used to hang the traction rope and connect with the stretching device. Stoppers are respectively arranged at the outer ends of the two protruding parts. A rigid shackle is fixedly connected to the flexible eye ring at the tail end of the rope. The rigid shackle is arranged as a rigid annular structure. The maximum diameter of the U-shaped hollow structure is set to be smaller than the maximum cross-sectional diameter of the rigid shackle, and the minimum diameter of the cylindrical hollow structure is set to be larger than the maximum diameter of the flexible eye ring of the rope net after stretching. During assembly, the rigid shackle is pulled to the assembly point of the frame structure by the stretching device for fixed assembly.

[0007] The middle parts of the tail ends on both sides of the U-shaped hollow structure of the fixing piece are provided with arc-shaped recesses for accommodating and fixing the annular shoulders of the rigid shackle.

[0008] As an implementation mode, the fixing member is configured as a detachable structure composed of two symmetrical parts assembled together, and the rope end is inserted and fixedly connected by bolt-like parts.

[0009] As another embodiment, the fixing member is provided as an integrally formed structure.

[0010] The fixing piece is configured as a metal annular structure with a notch on one side, a cylindrical hollow structure is configured on the front longitudinal section of the fixing piece to accommodate the rope and the flexible eye ring, and a U-shaped hollow structure is configured on the rear longitudinal section to clamp the rigid shackle, and the two are connected to each other, and the side notch of the fixing piece is horizontally connected to the cylindrical hollow structure and the U-shaped hollow structure to place the rope end into the cylindrical hollow structure of the fixing piece, and horn-shaped protruding structures are integrally formed on the upper and lower sides of the annular body of the fixing piece to form a protruding piece and a stopper.

[0011] The side surfaces of the fixing member and the tail ends of both sides of the U-shaped hollow structure are provided with arc-shaped recesses for accommodating and fixing the annular shoulders of the rigid shackle.

[0012] The drafting device is composed of a weight block, a hydraulic cylinder or an electric hoist which can provide a component or system of traction.

[0013] The utility model has a simple structure, and the fixing part structure effectively ensures that the rigid shackle drives the rope to be stretched and installed, and ensures that the rope is not damaged by cutting and squeezing of the fixing part during the process, thereby ensuring the safety of installation and use of the rope net; using the rigid shackle as an assembly transition piece between the flexible eye ring and the frame structure makes the operation more convenient and quick, and the volume of the rigid shackle is larger than that of the flexible eye ring, so it is easier to accurately fix and install, and at the same time adds more safety guarantees for the use of high-performance rope nets, which is suitable for large-scale promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the top view structure of the utility model;

[0015] Figure 2 It is a schematic diagram of the side structure of the utility model;

[0016] Figure 3 This is a three-dimensional diagram of the fixing structure of the utility model;

[0017] Figure 4 This is a schematic diagram of the top view of the fixing member of the utility model;

[0018] Figure 5 This is a schematic diagram of the side structure of the fixing member of the utility model;

[0019] Figure 6 It is a top view of the integrated structure of the fixing member of the utility model;

[0020] Figure 7 It is a side view of the integrated structure of the fixing piece of the utility model. DETAILED DESCRIPTION

[0021] The utility model is described in detail below with reference to the accompanying drawings and specific embodiments:

[0022] like Figure 1-5As shown, the anchoring device for high-performance rope net engineering assembly, the anchoring device is used to fix the tail end of the high-performance rope net on the frame structure of the engineering assembly, each tail end of the rope of the high-performance rope net is provided with a flexible eye ring 3, and the anchoring device is driven by a drafting device to pull the flexible eye ring 3 to the welding point of the frame structure for fixed assembly, comprising a fixing part 1, a protruding part 2 and a rigid shackle 4, the fixing part 1 is configured as a metal block structure with a U-shaped hollow structure 11 at one end and a cylindrical hollow structure 12 in the middle of the other end, the U-shaped hollow structure 11 and the cylindrical hollow structure 12 are connected, The protruding parts 2 are provided in two numbers, which are symmetrically arranged on both sides of the fixing part 1 for hanging the traction rope and connecting with the stretching device. The outer ends of the two protruding parts 2 are provided with stoppers 21 respectively. A rigid shackle 4 is fixedly connected to the flexible eye ring 3 at the tail end of the rope. The rigid shackle 4 is provided with a rigid annular structure. The maximum diameter of the U-shaped hollow structure 11 is provided to be smaller than the maximum cross-sectional diameter of the rigid shackle 4. The minimum diameter of the cylindrical hollow structure 12 is provided to be larger than the maximum diameter of the flexible eye ring 3 of the rope net rope after stretching. During assembly, the rigid shackle 4 is pulled to the assembly point of the frame structure by the stretching device for fixed assembly.

[0023] As a preferred embodiment, arc-shaped recesses 111 for accommodating and fixing the annular shoulders of the rigid shackle 4 are provided at the middle of the tail ends of both sides of the U-shaped hollow structure 11 of the fixing member 1 .

[0024] As an implementation mode of the present utility model, the fixing member 1 is configured as a detachable structure composed of two symmetrical parts assembled together, and the rope end is inserted and fixedly connected by bolt-like parts.

[0025] In this embodiment, the protruding member 2 is configured as a rod-shaped structure fixedly welded on both sides of the fixing member 1, and the stoppers 21 are fixed at both ends. Of course, the protruding member 2 can also be directly configured as a rod with a bent structure at the end directly fixed on both sides of the fixing member 1, and the bent part is used as the stopper 21, which mainly serves to prevent the traction rope from slipping during operation.

[0026] As another implementation mode of the present invention, Figure 6-7 As shown, the fixing member 1 is configured as an integrally formed structure.

[0027] In this embodiment, the fixing part 1 is configured as a metal annular structure with a notch 13 on one side, a cylindrical hollow structure 12 is provided on the front end longitudinal section of the fixing part 1 to accommodate the rope and the flexible eye ring 3, and a U-shaped hollow structure 11 is provided on the rear end longitudinal section to clamp the rigid shackle 4, and the two are connected to each other, and the side notch 13 of the fixing part 1 is horizontally connected to the cylindrical hollow structure 12 and the U-shaped hollow structure 11 to place the end of the rope into the cylindrical hollow structure 12 of the fixing part 1, and the upper and lower sides of the annular body of the fixing part 1 are respectively integrally formed with horn-shaped protruding structures to form a protruding part 2 and a stopper 21.

[0028] Preferably, arc-shaped recesses 111 (not shown in the figure) for accommodating and fixing the annular shoulder of the rigid shackle 4 are provided on the side surfaces of the fixing member 1 and the tail ends of both sides of the U-shaped hollow structure 11 .

[0029] As a preferred embodiment, the drafting device described in the embodiment is composed of components or systems that can provide traction force, such as a weight block, a hydraulic cylinder or an electric hoist. The components or systems can be selected according to actual working conditions and are not limited here.

[0030] In the utility model, the structural design of the U-shaped hollow structure 11 and the cylindrical hollow structure 12 of the fixing part 1 is intended to allow the rigid shackle 4 to be stuck outside the U-shaped hollow structure 11 during the installation and stretching process, while the rope passes through the fixing part 1 but does not contact any position of the fixing part 1, thereby avoiding the metal cutting and squeezing of the rope by the fixing part 1 during the process, thereby causing damage to the rope, affecting the performance and service life of the rope net, and providing higher safety protection. When the utility model is used for engineering assembly operations, after the high-performance rope net is connected to the anchor device, the protruding parts 2 on both sides of the fixing part 1 are hung by the traction rope, and the stretching device is connected for stretching and elongation, and the anchor device, the high-performance rope net, the eye ring and the rigid shackle are controlled to maintain a straight line with the center of the welding point of the engineering frame structure until the rigid shackle is connected to the welding point of the engineering frame, and the installation is completed.

[0031] Example 1: The horizontal rope of the rope net system in the deep-sea aquaculture cage project is connected to the frame system structure. The rope is made of ultra-high molecular weight polyethylene. The flexible eye ring 3 at the end of the rope is connected to the metal ring as a rigid shackle 4. The fixing part 1 of the anchoring device is set as an integrated structure. After installing one end of the horizontal rope, the other end of the horizontal rope is placed in the cylindrical hollow structure 12 and the U-shaped hollow structure 11 through the side notch, so that the rigid shackle 4 is stuck in the outer arc-shaped depression 111 of the fixing part 1, and the traction rope is hung on the protruding part 2 and passed through the pulley, changing from the horizontal direction to the vertical direction and connecting the drafting device. The drafting device uses a 5-ton weight block to stretch downward by its own weight. After stretching, when the metal ring is stretched between the ear plates of the frame system, it is connected with a pin.

[0032] Embodiment 2: The vertical line of the rope net system in the deep-sea aquaculture cage project is connected to the frame system structure. The line rope is made of ultra-high molecular weight polyethylene material, the flexible eye ring 3 at the end of the rope is connected to the hook as a rigid shackle 4, and the fixing part 1 of the anchoring device is set as a symmetrical detachable structure. After the lower end of the vertical line rope is installed, the upper end of the vertical line rope passes through the disassembled fixing part 1, and then the fixing part 1 is fixed with screws. At this time, the flexible eye ring 3 and the rope are in the cylindrical hollow structure 12, and the hook (rigid shackle 4) is stuck in the arc-shaped depression 111 outside the U-shaped hollow structure 11 of the fixing part 1. After the traction rope is hung on the protruding part 2, it is stretched in the vertical direction without passing through the pulley as a guide. The stretching device is set as a 3-ton hydraulic crane. After stretching, the hook (rigid shackle 4) is connected and fixed to the hanging point of the frame system.

[0033] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. An anchoring device for high-performance rope net engineering assembly, the anchoring device is used to fix the tail end of the rope of the high-performance rope net to the frame structure of the engineering assembly, each rope tail end of the high-performance rope net is provided with a flexible eye ring (3), and the anchoring device is driven by a drafting device to pull the flexible eye ring (3) to the welding point of the frame structure for fixed assembly, characterized in that: The invention comprises a fixing member (1) and a protruding member (2), wherein the fixing member (1) is configured as a metal block structure having a U-shaped hollow structure (11) at one end and a cylindrical hollow structure (12) in the middle of the other end, the U-shaped hollow structure (11) and the cylindrical hollow structure (12) being connected, the protruding member (2) being configured as two and symmetrically arranged on both sides of the fixing member (1) for hanging a traction rope and connecting it with a drawing device, and the outer ends of the two protruding members (2) are respectively provided with a stopper (21), a rigid shackle (4) is fixedly connected to the flexible eye ring (3) at the tail end of the rope, and the rigid shackle (4) is configured as a rigid annular structure, the maximum diameter of the U-shaped hollow structure (11) is configured to be smaller than the maximum cross-sectional diameter of the rigid shackle (4), and the minimum diameter of the cylindrical hollow structure (12) is configured to be larger than the maximum diameter of the flexible eye ring (3) of the rope net rope after being stretched, and during assembly, the rigid shackle (4) is pulled to the assembly point of the frame structure by the drawing device for fixed assembly.

2. The anchoring device for high-performance rope net engineering assembly according to claim 1, characterized in that: The middle parts of the tail ends on both sides of the U-shaped hollow structure (11) of the fixing piece (1) are provided with arc-shaped recesses (111) for accommodating and fixing the annular shoulders of the rigid shackle (4).

3. The anchoring device for high-performance rope net engineering assembly according to claim 1, characterized in that: The fixing member (1) is configured as a detachable structure composed of two symmetrical parts assembled together, and the rope end is inserted into the structure and fixedly connected via bolt-like parts.

4. The anchoring device for high-performance rope net engineering assembly according to claim 1, characterized in that: The fixing member (1) is provided as an integrally formed structure.

5. The anchoring device for high-performance rope net engineering assembly according to claim 4, characterized in that: The fixing member (1) is configured as a metal annular structure having a notch (13) on one side. The front longitudinal section of the fixing member (1) is provided with a cylindrical hollow structure (12) for accommodating a rope and a flexible eyelet (3). The rear longitudinal section is provided with a U-shaped hollow structure (11) for clamping a rigid shackle (4). The two are interconnected. The side notch (13) of the fixing member (1) is laterally connected to the cylindrical hollow structure (12) and the U-shaped hollow structure (11) so as to place the end of the rope into the cylindrical hollow structure (12) of the fixing member (1). The upper and lower sides of the annular body of the fixing member (1) are respectively integrally formed with horn-shaped protruding structures to form a protruding member (2) and a stopper (21).

6. The anchoring device for high-performance rope net engineering assembly according to claim 5, characterized in that: The side surfaces of the fixing member (1) and the tail ends of both sides of the U-shaped hollow structure (11) are provided with arc-shaped recesses (111) for accommodating and fixing the annular shoulder of the rigid shackle (4).

7. The anchoring device for high-performance rope net engineering assembly according to claim 1, characterized in that: The drafting device is composed of a weight block, a hydraulic cylinder or an electric hoist which can provide a component or system of traction.