Production equipment for welding orthotropic bridge deck slab

By designing production equipment with multiple specialized devices, the problem of manual welding in bridge deck production is solved, and the comprehensive welding production of bridge deck is achieved, which improves welding efficiency and quality and reduces labor waste.

CN222059213UActive Publication Date: 2024-11-26ZHEJIANG XINGTU BRIDGE SPECIAL EQUIP MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420613743.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-26
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

The lack of a complete welding production line in the prior art leads to manual manipulation of positioning welding in bridge deck production, which wastes manpower and poor welding quality.

Method used

A production equipment including multiple specialized devices is designed for welding orthogonal opposite-sex bridge panels, including devices for spot welding and full welding, and through components such as cylinders, gantry, tire frame, welding gun and robot, the Fully welded of U-ribs, L-beams, T-beams and bridge decks.

Benefits of technology

The comprehensive welding production of bridge deck panels is achieved, the welding efficiency and quality is improved, manpower waste is reduced, and the integrity and consistency of welding is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222059213U_ABST
    Figure CN222059213U_ABST
Patent Text Reader

Abstract

The production equipment used for welding the orthotropic bridge deck slab comprises a first spot welding device used for assembling a U-shaped rib and conducting spot welding on the U-shaped rib to the bridge deck slab, and a first full welding device used for assembling the U-shaped rib and conducting full welding on the U-shaped rib to the bridge deck slab is arranged on one side of the first spot welding device. A second spot welding device used for spot welding of the L-shaped beam and the T-shaped beam to the bridge deck is arranged on one side of the first full welding device, and a second full welding device used for full welding of the L-shaped beam and the T-shaped beam to the bridge deck is arranged on one side of the second spot welding device. And a third full-length welding device used for turning over the bridge deck and performing full-length welding on the bottom plate and the L beams on the two sides is arranged on one side of the second full-length welding device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to production equipment for welding orthotropic bridge panels. Background Art

[0002] Bridge decks are very common in bridge construction. However, during the production process of bridge decks, U-ribs and L-beams need to be welded on the bridge decks. The bridge decks in the prior art have the following problems in the production process: currently there is no complete and mature welding production line during the production of bridge decks. The welding method in the prior art is manual welding, that is, welding is performed by manually manipulating positioning electrodes, which wastes manpower and has poor quality after welding. Utility Model Content

[0003] The technical problem to be solved by the utility model is to solve the deficiencies in the prior art and provide a production device for welding orthotropic bridge panels instead of manual positioning.

[0004] The technical solution adopted by the utility model is the production equipment for welding orthotropic bridge decks, including a first spot welding device for assembling and spot welding U ribs to the bridge deck, a first full welding device for assembling and fully welding the U ribs to the bridge deck is provided on one side of the first spot welding device, a second spot welding device for spot welding L beams and T beams to the bridge deck is provided on one side of the first full welding device, a second full welding device for fully welding L beams and T beams to the bridge deck is provided on one side of the second spot welding device, and a third full welding device for turning over the bridge deck and fully welding the bottom plate and the L beams on both sides is provided on one side of the second full welding device.

[0005] The first spot welding device of the utility model includes a first workbench for supporting the bridge deck, a fixed beam for positioning one end of the U-rib, a movable beam for positioning the other end of the U-rib, and a pressure beam for positioning the top end of the U-rib are arranged above the first workbench, and also includes a first cylinder for driving the movable beam and a second cylinder for driving the pressure beam. A first welding gun is arranged on one side of the first workbench.

[0006] The first full welding device of the utility model includes a first tire frame, at least two arc-shaped plates are arranged above the first tire frame, a number of transverse rib plates perpendicularly arranged to the arc-shaped plates are arranged between adjacent arc-shaped plates, the two ends of the transverse rib plates respectively abut against adjacent arc-shaped plates, the height of the transverse rib plates is flush with the height of the arc-shaped plates, a steel plate is arranged above the arc-shaped plates, a U-rib to be welded is arranged above the steel plate, the two ends of the first tire frame are respectively provided with a first clamping mechanism for pressing the steel plate downward, and a second welding gun is provided on one side of the first tire frame.

[0007] The second spot welding device of the utility model comprises two parallelly arranged gantries, the two gantries are provided with crossbeams running along the gantries, the crossbeams are provided with a number of second clamping mechanisms, a second workbench is provided between the two gantries, the upper ends of the second workbench are respectively provided with a backrest for limiting the length direction of the bridge deck and a pushing mechanism for limiting the width direction of the bridge deck, and a lifting mechanism for lifting the bridge deck is provided below the second workbench.

[0008] The second full welding device of the utility model includes a third workbench, a roller for transporting bridge panels is provided above the third workbench, limiting devices for preventing the bridge panels from shifting are provided on both sides of the third workbench, a blocker for positioning the bridge panels is provided on one side of the roller, and a welding robot is provided on the periphery of the third workbench.

[0009] The third full welding device of the utility model includes a second tire frame, a roller structure for transporting bridge panels is provided above the second tire frame, guide seats distributed at equal intervals are provided above the second tire frame, and flipping devices for flipping bridge panels are provided at both ends of the second tire frame.

[0010] The flipping device of the utility model includes a bracket located on the ground, a mounting column sliding up and down along the cross bar of the bracket is provided in the middle of the bracket, the mounting column is driven by a third cylinder, the bottom of the mounting column is rotatably connected to the rotating shaft through a mounting seat, and a fixing plate for fixing the bridge deck is provided on the side of the rotating shaft facing the bridge deck.

[0011] The second pressing mechanism of the utility model is a cylinder or a motor.

[0012] The pushing mechanism of the utility model includes a mounting plate located on the second workbench, the mounting plate is provided with a fourth cylinder, the fourth cylinder drives the cylinder axis to approach or move away from the side of the bridge deck, a fixed seat is provided above the mounting plate, a fifth cylinder is provided above the fixed seat, the cylinder shaft of the fifth cylinder drives the end of a clamping plate, the middle part of the clamping plate is hinged to the cylinder seat, and the other end of the clamping plate approaches or moves away from the top of the bridge deck.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The utility model assembles and spot welds U ribs to the bridge deck through a first spot welding device, fully welds the U ribs to the bridge deck through a first full welding device, spot welds L beams and T beams to the bridge deck through a second spot welding device, fully welds L beams and T beams to the bridge deck through a second full welding device, and fully welds the reverse side of the bridge deck and the L beams on both sides to the bridge deck through a third full welding device, thereby realizing comprehensive welding production of the bridge deck. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model.

[0016] Figure 2 It is a structural schematic diagram of the first spot welding device of the utility model.

[0017] Figure 3 It is a structural schematic diagram of the first full welding device of the utility model.

[0018] Figure 4 It is a structural schematic diagram of the second spot welding device of the utility model.

[0019] Figure 5 It is a structural schematic diagram of the second full welding device of the utility model.

[0020] Figure 6 It is a structural schematic diagram of the third full welding device described in the utility model.

[0021] Figure 7 yes Figure 4 A partial enlarged view of point A in the middle. DETAILED DESCRIPTION

[0022] The present invention will be further described below with reference to the accompanying drawings and by way of embodiments.

[0023] like Figures 1 to 7 As shown, the production equipment for welding orthogonal anisotropic bridge decks described in the utility model comprises a first spot welding device 1 for assembling and spot welding U ribs to the bridge deck, a first full welding device 2 for assembling and fully welding U ribs to the bridge deck is provided on one side of the first spot welding device 1, a second spot welding device 3 for spot welding L beams and T beams to the bridge deck is provided on one side of the first full welding device 2, a second full welding device 4 for fully welding L beams and T beams to the bridge deck is provided on one side of the second spot welding device 3, a third full welding device 5 for turning over the bridge deck and fully welding the bottom plate and the L beams on both sides is provided on one side of the second full welding device 4; the utility model assembles and spot welds U ribs to the bridge deck through the first spot welding device 1, fully welds U ribs to the bridge deck through the first full welding device 2, spot welds L beams and T beams to the bridge deck through the second spot welding device 3, fully welds L beams and T beams to the bridge deck through the second full welding device 4, and fully welds the reverse side of the bridge deck and the L beams on both sides to the bridge deck through the third full welding device 5, thereby realizing comprehensive welding production of the bridge deck.

[0024] Among them, the specific structure of the first spot welding device 1 is as follows: the first spot welding device 1 includes a first workbench 11 for supporting the bridge deck, and the first workbench 11 is provided with a fixed beam 12 for positioning one end of the U-rib and a movable beam 13 for positioning the other end of the U-rib, and a pressure beam 14 for positioning the top end of the U-rib. It also includes a first cylinder 15 for driving the movable beam 13 and a second cylinder 16 for driving the pressure beam 14. A first welding gun is provided on one side of the first workbench 11; in this embodiment, the bridge deck is first placed on the first workbench 11, and one end of the U-rib is positioned by the fixed beam 12, and the other end of the U-rib is positioned by driving the movable beam 13 by the first cylinder 15, and the top of the U-rib is pressed downward by the second cylinder 16, so as to completely position the U-rib. At this time, the U-rib can be spot welded to the bridge deck.

[0025] The specific structure of the first full welding device 2 is as follows: the first full welding device 2 includes a first tire frame 21, at least two arc plates 22 are arranged above the first tire frame 21, a number of transverse rib plates 23 are arranged vertically with the arc plates 22 between adjacent arc plates 22, the two ends of the transverse rib plates 23 respectively contact the adjacent arc plates 22, the height of the transverse rib plates 23 is flush with the height of the arc plates 22, a steel plate 24 is arranged above the arc plates 22, a U rib to be welded is arranged above the steel plate 24, and the two ends of the first tire frame 21 A first clamping mechanism 25 for pressing the steel plate 24 downward is respectively provided, and a second welding gun is provided on one side of the first tire frame 21; in this embodiment, the arc plate 22 is located on the first tire frame 21, and the steel plate 24 is located on the arc plate 22, and the first clamping mechanism 25 is used to press the steel plate 24 on the first tire frame 21, and the reverse deformation of the arc plate 22 is utilized, and then the U rib on the steel plate 24 is welded. After welding, the original reverse deformation of the steel plate 24 is basically eliminated due to the deformation of the steel plate, thereby preventing deformation caused during the welding of the bridge deck.

[0026] Among them, the specific structure of the second spot welding device 3 is as follows: the second spot welding device 3 includes two parallel gantries 31, the two gantries 31 are provided with a beam 32 running along the gantries 31, the beam 32 is provided with a number of second clamping mechanisms 33, and a second workbench 34 is provided between the two gantries 31, and the two ends above the second workbench 34 are respectively provided with a backrest 35 for limiting the length direction of the bridge deck and a pushing mechanism 36 for limiting the width direction of the bridge deck, and a lifting mechanism for lifting the bridge deck is provided below the second workbench 34; in this embodiment, the bridge deck is placed on the second workbench 34, the bridge deck is positioned in the length direction by the backrest 35, and the bridge deck is positioned in the width direction by the pushing mechanism 36, thereby positioning the bridge deck in all directions to facilitate the spot welding of the bridge deck, and the function of the lifting mechanism is to lift the welded bridge deck and then transport it.

[0027] Among them, the specific structure of the pushing mechanism 36 in the second spot welding device 3 is as follows: the pushing mechanism 36 includes a mounting plate 361 located on the second workbench 34, and the mounting plate 361 is provided with a fourth cylinder 362, and the fourth cylinder 362 drives the cylinder axis to approach or move away from the side of the bridge deck, and a fixed seat 363 is provided above the mounting plate 361, and a fifth cylinder 364 is provided above the fixed seat 363, and the cylinder shaft of the fifth cylinder 364 drives the end of a clamping plate 365, and the middle part of the clamping plate 365 is hinged to the cylinder seat, and the other end of the clamping plate 365 approaches or moves away from the top of the bridge deck; in this embodiment, the side of the bridge deck is positioned by the fourth cylinder 362, and the top of the bridge deck is positioned by the fifth cylinder 364.

[0028] Among them, the specific structure of the second full welding device 4 is as follows: the second full welding device 4 includes a third workbench 41, a roller 42 for transporting the bridge deck is provided above the third workbench 41, and limiting devices 43 for preventing the bridge deck from shifting are provided on both sides of the third workbench 41, and a blocker 44 for positioning the bridge deck is provided on one side of the roller 42. A welding robot 45 is provided on the periphery of the third workbench 41. In this embodiment, the bridge deck is placed on the third workbench 41. The function of the roller 42 is to transport the bridge deck, the function of the limiting device 43 is to position the bridge deck and prevent the bridge deck from shifting, and the function of the blocker 44 is to position the bridge deck.

[0029] Among them, the specific structure of the third full welding device 5 is as follows: the third full welding device 5 includes a second tire frame 51, and the upper part of the second tire frame is provided with guide seats 53 distributed at equal intervals, and the two ends of the second tire frame are provided with flipping devices 54 for flipping the bridge deck; the flipping device 54 includes a bracket 541 located on the ground, and the middle part of the bracket 541 is provided with a mounting column 543 that slides up and down along the cross bar 542 of the bracket 541, and the third cylinder 544 drives the mounting column 543, and the lower part of the mounting column 543 is rotatably connected to the rotating shaft 546 through the mounting seat 545, and the rotating shaft 546 is provided with a fixing plate 547 for fixing the bridge deck on the side facing the bridge deck; in this embodiment, the bridge deck is flipped by the flipping device 54 to facilitate welding on the back of the bridge deck.

Claims

1. A production device for welding orthotropic bridge decks, characterized in that: The invention comprises a first spot welding device (1) for assembling and spot welding a U-rib to a bridge deck, a first full welding device (2) for assembling and fully welding a U-rib to a bridge deck is provided on one side of the first spot welding device (1), a second spot welding device (3) for spot welding an L-beam or a T-beam to the bridge deck is provided on one side of the first full welding device (2), a second full welding device (4) for fully welding an L-beam or a T-beam to the bridge deck is provided on one side of the second spot welding device (3), and a third full welding device (5) for turning over the bridge deck and fully welding the bottom plate and the L-beams on both sides is provided on one side of the second full welding device (4).

2. The production equipment for welding orthotropic bridge decks according to claim 1, characterized in that: The first spot welding device (1) comprises a first workbench (11) for supporting a bridge deck, a fixed beam (12) for positioning one end of a U-rib, a movable beam (13) for positioning the other end of the U-rib, and a pressure beam (14) for positioning the top end of the U-rib are arranged above the first workbench (11), and a first cylinder (15) for driving the movable beam (13) and a second cylinder (16) for driving the pressure beam (14) are also included. A first welding gun is arranged on one side of the first workbench (11).

3. The production equipment for welding orthotropic bridge decks according to claim 1, characterized in that: The first full welding device (2) comprises a first tire frame (21), at least two arc-shaped plates (22) are arranged above the first tire frame (21), a plurality of transverse rib plates (23) arranged perpendicular to the arc-shaped plates (22) are arranged between adjacent arc-shaped plates (22), two ends of the transverse rib plates (23) respectively abut against adjacent arc-shaped plates (22), the height of the transverse rib plates (23) is flush with the height of the arc-shaped plates (22), a steel plate (24) is arranged above the arc-shaped plates (22), a U-rib to be welded is arranged above the steel plate (24), first clamping mechanisms (25) for pressing the steel plate (24) downward are respectively arranged at two ends of the first tire frame (21), and a second welding gun is arranged on one side of the first tire frame (21).

4. The production equipment for welding orthotropic bridge decks according to claim 1, characterized in that: The second spot welding device (3) comprises two parallel gantries (31), the two gantries (31) are provided with a crossbeam (32) running along the gantries (31), the crossbeam (32) is provided with a plurality of second clamping mechanisms (33), a second workbench (34) is provided between the two gantries (31), a backrest (35) for limiting the length direction of the bridge deck and a pushing mechanism (36) for limiting the width direction of the bridge deck are provided at both ends above the second workbench (34), and a lifting mechanism for lifting the bridge deck is provided below the second workbench (34).

5. The production equipment for welding orthotropic bridge decks according to claim 1, characterized in that: The second full welding device (4) comprises a third workbench (41), a roller (42) for transporting a bridge deck is provided above the third workbench (41), limiting devices (43) for preventing the bridge deck from shifting are provided on both sides of the third workbench (41), a blocker (44) for positioning the bridge deck is provided on one side of the roller (42), and a welding robot (45) is provided on the periphery of the third workbench (41).

6. The production equipment for welding orthotropic bridge decks according to claim 1, characterized in that: The third full welding device (5) comprises a second tire frame (51), a roller structure (52) for transporting a bridge deck is provided above the second tire frame (51), guide seats (53) distributed at equal intervals are provided above the second tire frame (51), and turning devices (54) for turning over the bridge deck are provided at both ends of the second tire frame.

7. The production equipment for welding orthotropic bridge decks according to claim 6, characterized in that: The tilting device (54) comprises a bracket (541) located on the ground, a mounting column (543) is provided in the middle of the bracket (541) and slides up and down along a crossbar (542) of the bracket (541), a third cylinder (544) drives the mounting column (543), the lower part of the mounting column (543) is rotatably connected to a rotating shaft (546) via a mounting seat (545), and a fixing plate (547) for fixing the bridge deck is provided on a side of the rotating shaft (546) facing the bridge deck.

8. The production equipment for welding orthotropic bridge decks according to claim 4, characterized in that: The second pressing mechanism (33) is a cylinder or a motor.

9. The production equipment for welding orthotropic bridge decks according to claim 4, characterized in that: The pushing mechanism (36) includes a mounting plate (361) located on the second workbench (34), the mounting plate (361) is provided with a fourth cylinder (362), the fourth cylinder (362) drives the cylinder axis to move closer to or farther from the side of the bridge deck, a fixing seat (363) is provided above the mounting plate (361), a fifth cylinder (364) is provided above the fixing seat (363), the cylinder axis of the fifth cylinder (364) drives the end of a clamping plate (365), the middle part of the clamping plate (365) is hinged to the cylinder seat, and the other end of the clamping plate (365) moves closer to or farther from the top of the bridge deck.