Shield two-way starting working well suitable for deep tunnel

By designing shield bidirectional starting work wells suitable for deep buried tunnels, including large circular shafts, small circular shafts on the left line, small circular shafts on the right line, leading and middle guide holes, combining composite lining and initial support The structure protection solves the engineering risks and environmental impact problems of traditional shield double-start working wells in deep tunnel projects, and realizes efficient construction and low-cost tunnel construction.

CN222066753UActive Publication Date: 2024-11-26CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420415518.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-26
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

Traditional shield double-original work wells lead to increased engineering risks, reduced construction efficiency, high investment costs, and greater damage and interference to the urban environment in deep tunnel projects, which cannot meet the needs of deep underground space development.

Method used

A shield bidirectional starting work well suitable for deep buried tunnels is designed, including large circular shafts, small circular shafts on the left line, small circular shafts on the right line, leading holes and middle guide holes, through the connection of these structures To realize the two-way overall starting of the shield machine, use composite lining and initial support structure, and select different support methods according to the surrounding rock level to reduce the excavation area and footprint of the foundation pit.

Benefits of technology

The two-way overall origin of the shield machine is realized, reducing the scale of open excavation, saving floor area and engineering investment, reducing project risks, improving construction efficiency, and reducing the impact on the urban environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066753U_ABST
    Figure CN222066753U_ABST
Patent Text Reader

Abstract

The utility model discloses a shield two-way starting working well suitable for a deep tunnel. The shield two-way starting working well comprises a large circular vertical shaft, a left-line small circular vertical shaft and a right-line small circular vertical shaft. Comprising a large-well left-line front pilot tunnel, a large-well right-line front pilot tunnel, a left-line small-well front pilot tunnel and a right-line small-well front pilot tunnel; comprising a left-line middle pilot tunnel and a right-line middle pilot tunnel; the large circular vertical shaft is communicated with the left-line small circular vertical shaft through a left-line middle pilot tunnel, and the large circular vertical shaft is communicated with the right-line small circular vertical shaft through a right-line middle pilot tunnel; the large well left line front pilot tunnel and the large well right line front pilot tunnel are located in the small mileage direction of the large circular vertical shaft and communicate with the large circular vertical shaft. The left-line small well front pilot tunnel is located in the large-mileage direction of the left-line small circular vertical well and is communicated with the left-line small circular vertical well; and the right-line small well front pilot tunnel is positioned in the large-mileage direction of the right-line small circular vertical well and is communicated with the right-line small circular vertical well. According to the utility model, the influence on the surrounding environment can be reduced, the excavation area of the foundation pit is reduced, and the influence on the environment and the society is small.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel engineering, in particular to a shield bidirectional starting working shaft suitable for a deep buried tunnel. Background Art

[0002] With the rapid progress of urbanization, the development and utilization of underground space is becoming more and more important. Exploring and studying the construction method of shield starting working shaft that is more suitable for deep tunnel engineering is very important to promote urbanization. The existing shield double starting working shaft is usually rectangular in shape and is constructed by open-cut method, that is, the space required for the shield to start is excavated by open-cut method and then the structure is constructed to meet the starting conditions. With the increasing intensity of underground space development, the shallow underground space will not be able to meet the needs of further urban development. Therefore, tunnel engineering is getting deeper and deeper. If the open-cut rectangular shield double starting working shaft is still used, the project risk will increase, the construction efficiency will decrease, and the project investment will increase greatly.

[0003] The significance of solving the above technical problems is:

[0004] The traditional shield machine's double starting working shaft causes great damage and interference to the urban environment, while the new shield machine's starting working shaft can reduce the impact on the surrounding environment and reduce the foundation pit excavation area. It has the advantages of high construction efficiency, small impact on the environment and society, and low investment cost. It is conducive to reducing project risks, accelerating project progress, reducing construction costs, and further promoting urban development. Utility Model Content

[0005] According to the above problems, the utility model proposes a shield bidirectional starting working shaft suitable for deep buried tunnels, and the specific scheme is as follows:

[0006] A shield bidirectional starting working shaft suitable for deep buried tunnels, comprising a vertical shaft, a pilot tunnel and a middle pilot tunnel;

[0007] The vertical shafts include a large circular vertical shaft, a left-line small circular vertical shaft, and a right-line small circular vertical shaft;

[0008] The pilot hole includes a large well left line pilot hole, a large well right line pilot hole, a left line small well pilot hole and a right line small well pilot hole;

[0009] The middle guide hole includes a left-line middle guide hole and a right-line middle guide hole;

[0010] The large circular vertical shaft is connected to the small circular vertical shaft of the left line through the middle guide hole of the left line, and the large circular vertical shaft is connected to the small circular vertical shaft of the right line through the middle guide hole of the right line;

[0011] The left-line pilot tunnel of the large well and the right-line pilot tunnel of the large well are located in the small mileage direction of the large circular vertical shaft and are connected to the large circular vertical shaft;

[0012] The pilot tunnel of the left-line small shaft is located in the direction of the large mileage of the left-line small circular shaft, and the two are interconnected;

[0013] The leading tunnel of the right-line small shaft is located in the large mileage direction of the right-line small circular vertical shaft, and the two are interconnected.

[0014] Preferably, the large circular shaft, the left-line small circular shaft and the right-line small circular shaft all include a main structure, a foundation pit support structure and a foundation pit enclosure structure;

[0015] The main structure has a reserved steel bar connector, which includes a top plate, a bottom plate and a side wall connecting the top plate and the bottom plate, the side wall is reserved with a guide hole, and the top plate is reserved with a hoisting hole;

[0016] The foundation pit retaining structure is a ground-connected wall or retaining piles;

[0017] The foundation pit supporting structure is a ring beam or an inner lining wall.

[0018] Further preferably, the large circular vertical shaft includes a large shaft main structure, the left-line small circular vertical shaft includes a left-line small shaft main structure, and the left-line small shaft main structure includes a right-line small shaft main structure.

[0019] Further preferably, when the foundation pit retaining structure is a ground-connected wall, steel bars are reserved in the ground-connected wall.

[0020] Further preferably, when the foundation pit supporting structure is a ring beam, the ground-connected wall and the ring beam are formed into a whole by the steel bars reserved in the ground-connected wall; when the foundation pit supporting structure is an inner lining wall, the ground-connected wall and the inner lining wall are overlapped together by the steel bars reserved in the ground-connected wall.

[0021] Further preferably, the leading tunnel and the middle tunnel are constructed with composite lining to serve as initial support structures.

[0022] Further preferably, the initial support structure includes shotcrete support, advance support or full-section grouting.

[0023] Further preferably, the initial support structure adopts different structures according to the surrounding rock grade of the pilot tunnel, and the surrounding rock grade is divided into grade IV, grade III, and grade V;

[0024] The openings of the leading tunnel and the middle tunnel are supported by pipe sheds;

[0025] The IV-level surrounding rock is supported by anchor rods, grid steel frames, steel mesh and shotcrete;

[0026] The Class III surrounding rock is supported by anchor rods, steel mesh and shotcrete;

[0027] Level V adopts grouting, advanced small ducts, grid steel frame, steel mesh and shotcrete support.

[0028] Further preferably, the left-line central guide tunnel and the right-line central guide tunnel are both provided with a secondary lining structure, and the secondary lining structure adopts cast-in-place concrete and is connected to the vertical shaft as a whole through a steel bar connector reserved in the main structure of the vertical shaft.

[0029] Further preferably, the left-line pilot tunnel of the large well, the right-line pilot tunnel of the large well, the left-line small well pilot tunnel and the right-line small well pilot tunnel are all provided with a secondary lining structure, and the secondary lining structure adopts shield segments and is connected to the vertical shaft as a whole through post-cast beams.

[0030] The beneficial effects of the utility model are:

[0031] The large circular vertical shaft, the left-line small circular vertical shaft, the right-line small circular vertical shaft, the large shaft left-line pilot tunnel, the large shaft right-line pilot tunnel, the left-line small shaft pilot tunnel, the right-line small shaft pilot tunnel, the left-line middle pilot tunnel, and the right-line middle pilot tunnel are connected to form a whole, which meets the length requirements of the entire array of shield machines, realizes the bidirectional overall starting of the shield, reduces the plane scale of the open excavation, saves floor space, has a safe and reasonable structure, reduces the size of components, and saves project investment. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The technical solution of the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments, but it should be understood that these drawings are designed only for the purpose of explanation and are not intended to limit the scope of the utility model. In addition, unless otherwise specified, these drawings are only intended to conceptually illustrate the structural configurations described herein and are not necessarily drawn to scale.

[0033] Figure 1 It is a plan view of the utility model;

[0034] Figure 2 It is a cross-sectional schematic diagram along the line direction of the utility model.

[0035] In the figure:

[0036] 1-large circular vertical shaft; 2-small circular vertical shaft on the right line; 3-small circular vertical shaft on the left line; 4-pilot tunnel on the left line of the large shaft; 5-pilot tunnel on the right line of the large shaft; 6-middle pilot tunnel on the left line; 7-middle pilot tunnel on the right line; 8-pilot tunnel on the small shaft on the left line; 9-pilot tunnel on the small shaft on the right line; 10-small-mileage shield tunnel on the left line; 11-small-mileage shield tunnel on the right line; 12-large-mileage shield tunnel on the left line; 13-large-mileage shield tunnel on the right line; 14-main structure of the large shaft; 15-main structure of the small shaft on the right line; 16-main structure of the small shaft on the left line; 17-dividing line of the ground-connected wall; 18-ring beam. DETAILED DESCRIPTION

[0037] First of all, it should be noted that the specific structure, features and advantages of the present invention will be specifically described below by way of example, but all descriptions are only for illustration and should not be understood as limiting the present invention in any way. In addition, any single technical feature described or implied in the embodiments mentioned herein, or any single technical feature displayed or implied in the drawings, can still be combined or deleted between these technical features (or their equivalents) to obtain more other embodiments of the present invention that may not be directly mentioned in this document. In addition, in order to simplify the drawings, the same or similar technical features may be marked in only one place in the same drawing.

[0038] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0039] The following is combined with Figure 1 -Attached Figure 2 The utility model is described in detail.

[0040] Embodiment 1:

[0041] A shield bidirectional starting working shaft suitable for deep buried tunnels, comprising a vertical shaft, a pilot tunnel and a middle pilot tunnel;

[0042] The vertical shaft comprises a large circular vertical shaft 1, a left-line small circular vertical shaft 3 and a right-line small circular vertical shaft 2;

[0043] The pilot hole includes a large well left line pilot hole 4, a large well right line pilot hole 5, a left line small well pilot hole 8 and a right line small well pilot hole 9;

[0044] The middle guide hole includes a left-line middle guide hole 6 and a right-line middle guide hole 7;

[0045] The large circular shaft 1 is connected to the small circular shaft 3 of the left line through the left line middle guide hole 6, and the large circular shaft 1 is connected to the small circular shaft 2 of the right line through the right line middle guide hole 7;

[0046] The large well left line pilot tunnel 4 and the large well right line pilot tunnel 5 are located in the small mileage direction of the large circular vertical shaft 1 and are connected to the large circular vertical shaft 1;

[0047] The left line small shaft leading hole 8 is located in the large mileage direction of the left line small circular vertical shaft 3, and the two are interconnected;

[0048] The right-line small shaft leading hole 9 is located in the large mileage direction of the right-line small circular vertical shaft 2, and the two are interconnected.

[0049] Furthermore, it can also be considered in the embodiment that the large circular shaft 1, the left-line small circular shaft 3 and the right-line small circular shaft 2 all include a main structure, a foundation pit support structure and a foundation pit enclosure structure;

[0050] The main structure has a reserved steel bar connector, which includes a top plate, a bottom plate and a side wall connecting the top plate and the bottom plate, the side wall is reserved with a guide hole, and the top plate is reserved with a hoisting hole;

[0051] The foundation pit retaining structure is a ground-connected wall or retaining piles;

[0052] The foundation pit supporting structure is a ring beam 18 or an inner lining wall.

[0053] In this embodiment, the foundation pit support scheme of the shaft is determined according to the geological conditions and the surrounding environmental risks, the enclosure structure adopts ground-connected walls or bored piles, and the supporting structure adopts ring beams 18 or lining walls;

[0054] When the lower part of the foundation pit is hard rock, sprayed anchor support is used.

[0055] The main structural scheme of the shaft is a frame structure, and the side walls are composite walls or superimposed walls; the number of structural layers is determined comprehensively according to the use function; when the structure is covered with thick soil, the top plate is arched.

[0056] Furthermore, in an embodiment, it can also be considered that the large circular vertical shaft 1 includes a large shaft main structure 14, the left-line small circular vertical shaft 3 includes a left-line small shaft main structure 16, and the left-line small shaft main structure 16 includes a right-line small shaft main structure 15.

[0057] Furthermore, in the embodiment, it can also be considered that when the foundation pit retaining structure is a ground-connected wall, steel bars are reserved in the ground-connected wall. The width of the ground-connected wall is determined according to the diameter of the shaft, the stress condition of the structure after fitting, and the construction process.

[0058] Furthermore, in the embodiments, it can also be considered that when the foundation pit supporting structure is a ring beam 18, the ground-connected wall and the ring beam 18 are formed into a whole by the steel bars reserved in the ground-connected wall; when the foundation pit supporting structure is an inner lining wall, the ground-connected wall and the inner lining wall are overlapped together by the steel bars reserved in the ground-connected wall.

[0059] Furthermore, in the embodiment, it can be considered that the leading tunnel and the middle tunnel are lined with composite lining to construct an initial support structure. If necessary, advance measures can be taken.

[0060] Furthermore, it can also be considered in the embodiments that the initial support structure includes spray anchor support, advance support or full-section grouting. The excavation of the pilot tunnel and the middle pilot tunnel needs to take corresponding support measures according to different geological conditions, which can be used separately or in combination. Generally, when necessary, advance support and full-section grouting should be adopted to ensure safety. After the deformation is stable, the second lining formwork concrete construction of the middle pilot tunnel is carried out.

[0061] Furthermore, in the embodiment, it can also be considered that the initial support structure adopts different structures according to the surrounding rock grade of the pilot tunnel, and the surrounding rock grade is divided into grade IV, grade III, and grade V;

[0062] The openings of the leading tunnel and the middle tunnel are supported by pipe sheds;

[0063] The IV-level surrounding rock is supported by anchor rods, grid steel frames, steel mesh and shotcrete;

[0064] The Class III surrounding rock is supported by anchor rods, steel mesh and shotcrete;

[0065] Level V adopts grouting, advanced small ducts, grid steel frame, steel mesh and shotcrete support.

[0066] Furthermore, in the embodiment, it can be considered that the left-line middle guide tunnel 6 and the right-line middle guide tunnel 7 are both provided with a secondary lining structure, the secondary lining structure adopts cast-in-place concrete, and is connected to the shaft as a whole through a steel bar connector reserved in the main structure of the shaft. The left-line middle guide tunnel 6 and the right-line middle guide tunnel 7 do not have a shield machine passing through, and the secondary lining structure adopts cast-in-place concrete.

[0067] Furthermore, in the embodiments, it can also be considered that the large well left line pilot tunnel 4, the large well right line pilot tunnel 5, the left line small well pilot tunnel 8 and the right line small well pilot tunnel 9 are all provided with a secondary lining structure, and the secondary lining structure adopts shield segments and is connected to the vertical shaft into a whole through post-cast beams.

[0068] The large well left line pilot tunnel 4, the large well right line pilot tunnel 5, the left line small well pilot tunnel 8, and the right line small well pilot tunnel 9 are all passed by shield machines, and the secondary lining structure adopts shield segments.

[0069] The size of the shaft shall be determined according to the requirements of shield construction. The length of the leading tunnel and the middle tunnel shall be determined comprehensively according to the actual site size, the safety distance between the shafts, the safety distance between the shafts and the surrounding risk points, the safety distance between the tunnels and the surrounding risk points, and the length of the shield machine array.

[0070] The vertical shafts are all supported by a combination of 0.8m thick suspended ground-connected walls and ring beams 18, and the lower rock layer is supported by sprayed anchors.

[0071] In this embodiment, according to the shield hoisting space requirements, the inner diameter of the large circular shaft 1 is 33m, and the inner diameters of the left-line small circular shaft 3 and the right-line small circular shaft 2 are 12.6m. According to the site size, the safety distance between the shafts, the safety distance between the shafts and the surrounding risk points, and the safety distance between the pilot tunnel and the surrounding risk points, the net distances between the large circular shaft 1 and the left-line small circular shaft 3 and the right-line small circular shaft 2 are 68m and 48m respectively; the net distance between the left-line small circular shaft 3 and the right-line small circular shaft 2 is 8.5m.

[0072] The entire array length of the shield machine is 120m, so the length of the left line pilot tunnel 4 of the big well is determined to be 23m, the length of the right line pilot tunnel 5 of the big well is 15m, the length of the left line middle pilot tunnel 6 is 80m, the length of the right line middle pilot tunnel 7 is 58m, the length of the left line small well pilot tunnel 8 is 6m, and the length of the right line small well pilot tunnel 9 is 26m.

[0073] In terms of the shaft structure, the strata for excavating the shaft are plain fill, silty clay, clay, gravel sand, gravelly clay, fully weathered granite, strongly weathered granite, moderately weathered granite, and slightly weathered granite. The foundation pit depth of the large circular shaft 1 is about 47m, and the foundation pit depths of the small circular shaft 3 on the left and the small circular shaft 2 on the right are about 48m.

[0074] The main structure of the shaft is a one-story frame structure, and the side wall is a composite wall. The top and bottom plates of the large circular shaft 1 are 1.7m thick, the side wall is 1.5m thick, and the middle partition wall is 0.8m thick; the top and bottom plates of the left-line small circular shaft 3 and the right-line small circular shaft 2 are 1.7m thick, and the side wall is 1.3m thick.

[0075] Each ground-connected wall of the large circular shaft 1 is 5.2m wide (5.41m wide on the outside), with a fold angle of 165°, for a total of 24 walls. Each ground-connected wall of the left-line small circular shaft 3 and the right-line small circular shaft 2 is 4.609m wide (5.037m wide on the outside), with a fold angle of 150°, for a total of 12 walls.

[0076] In this embodiment, the foundation pit supporting structure is set as a ring beam 18. The ring beam 18 of the large circular shaft 1 has a size of 1.5mx1.0m, with a total of 9; the ring beam 18 of the left-line small circular shaft 3 and the right-line small circular shaft 2 has a size of 1.0mx0.8m, with a total of 6.

[0077] The above embodiments describe the present invention in detail, but the above contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of application of the present invention shall still fall within the scope of the patent coverage of the present invention.

Claims

1. A shield bidirectional starting working shaft suitable for deep buried tunnels, characterized by: It includes vertical shaft, pilot tunnel and intermediate pilot tunnel; The vertical shaft comprises a large circular vertical shaft (1), a left-line small circular vertical shaft (3) and a right-line small circular vertical shaft (2); The pilot hole comprises a large well left line pilot hole (4), a large well right line pilot hole (5), a left line small well pilot hole (8) and a right line small well pilot hole (9); The middle guide hole comprises a left-line middle guide hole (6) and a right-line middle guide hole (7); The large circular vertical shaft (1) is connected to the small circular vertical shaft (3) of the left line through the left line middle guide hole (6), and the large circular vertical shaft (1) is connected to the small circular vertical shaft (2) of the right line through the right line middle guide hole (7); The large well left line pilot tunnel (4) and the large well right line pilot tunnel (5) are located in the small mileage direction of the large circular vertical shaft (1) and are connected to the large circular vertical shaft (1); The left-line small well pilot hole (8) is located in the large mileage direction of the left-line small circular vertical well (3), and the two are interconnected; The right-line small well leading hole (9) is located in the large mileage direction of the right-line small circular vertical well (2), and the two are interconnected.

2. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 1, characterized in that: The large circular vertical shaft (1), the left-line small circular vertical shaft (3) and the right-line small circular vertical shaft (2) all include a main structure, a foundation pit support structure and a foundation pit enclosure structure; The main structure has a reserved steel bar connector, which includes a top plate, a bottom plate and a side wall connecting the top plate and the bottom plate, the side wall is reserved with a guide hole, and the top plate is reserved with a hoisting hole; The foundation pit retaining structure is a ground-connected wall or retaining piles; The foundation pit supporting structure is a ring beam (18) or an inner lining wall.

3. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 2, characterized in that: The large circular vertical shaft (1) comprises a large shaft main structure (14), the left-line small circular vertical shaft (3) comprises a left-line small shaft main structure (16), and the left-line small shaft main structure (16) comprises a right-line small shaft main structure (15).

4. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 2, characterized in that: When the foundation pit retaining structure is a ground-connected wall, steel bars are reserved in the ground-connected wall.

5. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 4, characterized in that: When the foundation pit supporting structure is a ring beam (18), the ground-connected wall and the ring beam (18) are integrated by the steel bars reserved in the ground-connected wall; when the foundation pit supporting structure is an inner lining wall, the ground-connected wall and the inner lining wall are overlapped together by the steel bars reserved in the ground-connected wall.

6. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 2, characterized in that: The leading tunnel and the middle tunnel are constructed with composite lining to serve as initial support structures.

7. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 6, characterized in that: The initial support structure includes shotcrete support, advance support or full-section grouting.

8. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 7, characterized in that: The initial support structure adopts different structures according to the surrounding rock grade of the pilot tunnel, and the surrounding rock grade is divided into grade IV, grade III, and grade V; The openings of the leading tunnel and the middle tunnel are supported by pipe sheds; The IV-level surrounding rock is supported by anchor rods, grid steel frames, steel mesh and shotcrete; The Class III surrounding rock is supported by anchor rods, steel mesh and shotcrete; Level V adopts grouting, advanced small ducts, grid steel frame, steel mesh and shotcrete support.

9. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 6, characterized in that: The left-line central guide tunnel (6) and the right-line central guide tunnel (7) are both provided with a secondary lining structure, wherein the secondary lining structure is made of molded concrete and is connected to the vertical shaft as a whole through a steel bar connector reserved in the main structure of the vertical shaft.

10. The shield bidirectional starting working shaft suitable for deep buried tunnels according to claim 6, characterized in that: The large well left line pilot tunnel (4), the large well right line pilot tunnel (5), the left line small well pilot tunnel (8) and the right line small well pilot tunnel (9) are all provided with a secondary lining structure, wherein the secondary lining structure adopts shield segments and is connected to the vertical shaft as a whole through post-cast beams.