Hot-melting anti-sliding type pavement marking coating construction equipment
By introducing barrier units into the hot melt anti-slip pavement marking coating construction equipment, the problem of debris splash affecting marking laying is solved, and efficient and safe construction of markings is achieved.
Patent Information
- Application Number
- CN202323407681.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-14
AI Technical Summary
When the existing hot melt anti-slip pavement marking coating construction equipment is used, some cleaned debris particles may splash into the rear spraying area, affecting the laying operation of marking.
A barrier unit including a gun telescopic system and a cleaning system is designed. The barrier unit consists of an adjustable suspension frame, a barrier plate, an elastic sealing member and a guide wheel. The barrier plate is in a V-shaped shape and the elastic sealing member has The arc-surface sealing platform can effectively block splash particles and easily replace them after a long time of use.
It effectively blocks splashing debris particles, reduces the impact on the laying of marking lines, and adapts to the undulation of the ground through the deformation of the elastic sealing parts, improves the barrier effect, and ensures the efficient and safe construction of marking lines.
Smart Images

Figure CN222100591U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of traffic markings, in particular to a hot-melt anti-skid road marking paint construction device. Background Art
[0002] Traffic markings refer to signs on the road surface that use lines, arrows, text, elevation marks, raised road signs and contour marks to convey traffic information such as guidance, restrictions and warnings to traffic participants. Its function is to control and guide traffic. It can be used in conjunction with signs or alone. Expressways, first- and second-class highways, urban expressways and trunk roads should be equipped with reflective traffic markings in accordance with standard regulations. Other roads can be equipped with traffic markings in accordance with standards as needed. In the actual maintenance process of hot-melt anti-skid road markings, they are usually inspected and maintained regularly. For roads with missing or blurred road markings, coating construction equipment is usually used to re-pave the road with hot-melt anti-skid markings.
[0003] At present, most of the commonly used hot-melt anti-skid road marking paint construction equipment is a paint vehicle, which drives the coating equipment on it through a vehicle body moving at a constant speed for mobile laying. For example, Chinese patent application CN211772722U discloses a hot-melt spray road marking vehicle, which is a special vehicle for road marking composed of a power system, a carriage assembly, a hot-melt boiling system, a heating system, a heat transfer oil circulation system, a glass bead system, an electrical control system and other systems; this product drives the hydraulic system through the special vehicle chassis; the hydraulic components of the hydraulic system operate and control the melting device, the marking device, the guide device, and the cleaning device to achieve the marking construction operation; the electronic controller realizes the precise operation and implementation of each action, so that the user can freely select the required line type for construction through the control screen according to the project requirements. The electronic controller realizes the precise operation and implementation of each action, so that the user can freely select the required line type for construction through the control screen according to the project requirements. Through the organic combination of the above components, the utility model can achieve efficient and safe marking, no road closure during construction, no impact on normal traffic, and highly integrated marking construction.
[0004] Although the above-mentioned hot melt spray road marking vehicle is equipped with a corresponding cleaning device to roll and clean the area to be marked to reduce the adhesion of debris and affect the subsequent coating laying, the roller brush rotates in an axial circle and contacts the ground during rotation, so that some of the cleaned debris particles may splash into the area to be sprayed behind, which is not conducive to the marking laying operation. Utility Model Content
[0005] The utility model aims to provide a hot-melt anti-skid road marking paint construction equipment, which solves the problem that in the existing hot-melt anti-skid road marking paint construction equipment, some of the cleaned debris particles may splash into the rear spraying area during use, which is not conducive to the laying operation of the marking line.
[0006] In order to solve the above technical problems, the utility model is realized by the following technical solutions:
[0007] Hot melt anti-skid road marking paint construction equipment, including a frame assembly and a hot melt boiling system, a heating system, a heat transfer oil circulation system, a glass bead system, a spray gun telescopic system, a marking line forming system, a guide rod system and a cleaning system connected to the frame assembly, wherein the hot melt boiling system, the heating system, the heat transfer oil circulation system, the glass bead system, the spray gun telescopic system, the marking line forming system, the guide rod system and the cleaning system are connected through an electrical control system for unified deployment, and also includes a barrier unit located between the spray gun telescopic system and the cleaning system;
[0008] A blocking unit, the blocking unit comprising an adjustable suspension frame connected to the vehicle frame assembly and a blocking plate mounted on the adjustable suspension frame, and a groove body for accommodating and installing the elastic blocking member is provided at the bottom of the blocking plate;
[0009] The blocking plate is arranged in a V shape, and a locking bolt is threadedly penetrated thereon and is locked against the adjustable suspension frame.
[0010] As a preferred technical solution of the present application, an assembly groove adapted to the adjustable suspension frame is provided on the top of the baffle plate, and the baffle plate is assembled and connected to the adjustable suspension frame via the assembly groove.
[0011] As a preferred technical solution of the present application, a locking piece is threadedly provided on the inner side of the blocking plate, and a fixing block which is slidably arranged in the blocking plate and can abut against the elastic blocking piece is movably provided at the end of the locking piece.
[0012] As a preferred technical solution of the present application, the elastic sealing member includes a connecting plate and a rubber sealing piece fixed to each other, and a shear groove is formed at the bottom of the rubber sealing piece.
[0013] As a preferred technical solution of the present application, the rubber sealing piece is located between the shear groove and the connecting plate to form a curved sealing platform.
[0014] As a preferred technical solution of the present application, a support frame fixed to the inner side of the blocking plate is provided above the elastic blocking member, and a guide wheel is movably installed on the surface of the support frame;
[0015] Wherein, a spring connected to the blocking plate is sleeved on the surface of the support frame.
[0016] In the scheme of this application:
[0017] 1. Through the barrier unit, when the front cleaning system is rolling and cleaning the road surface to be paved, the barrier plate can effectively block some of the flying particles and debris, reducing the situation where they are directly splashed to the rear and affect the paving of the paint;
[0018] 2. Through the barrier unit, when the coating construction equipment is moving, the elastic blocking piece will directly contact the ground, which is convenient for the separate replacement of the elastic blocking piece after long-term use. At the same time, because the blocking rubber sheet has a certain elasticity, the blocking effect under the blocking plate is further improved, which is conducive to better protection of the barrier unit;
[0019] Furthermore, since the road may have slight undulations in some parts, the deformation of the blocking rubber sheet itself can also well adapt to the ground environment, thereby improving the barrier effect of the barrier unit. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the structure of this application;
[0021] Figure 2 This is a schematic diagram of the barrier unit structure of the construction equipment of this application;
[0022] Figure 3 This is a schematic diagram of the barrier unit structure of the construction equipment of this application;
[0023] Figure 4 This is a schematic diagram of the disassembled structure of the barrier unit of the construction equipment of this application;
[0024] Figure 5 This is a schematic diagram of the structure of the barrier unit part of the construction equipment of this application;
[0025] Figure 6 This is a schematic diagram of the cross-sectional structure of the barrier unit of the construction equipment of this application.
[0026] Indicated in the figure: 10, frame assembly; 11, hot melt boiling system; 12, heating system; 13, heat transfer oil circulation system; 14, glass bead system; 15, spray gun telescopic system; 16, marking line forming system; 17, guide rod system; 18, cleaning system; 19, electrical control system;
[0027] 20. Blocking unit; 21. Adjustable suspension frame; 22. Blocking plate; 23. Elastic blocking member; 24. Locking bolt; 25. Assembly groove; 26. Groove body; 27. Locking member; 28. Fixing block;
[0028] 220, support frame; 221, guide wheel; 222, spring; 230, connecting plate; 231, rubber sealing piece; 232, shear groove; 233, arc surface sealing platform. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the embodiments of the present utility model clearer, the technical solution in the embodiments of the present utility model will be clearly and completely described below in conjunction with the accompanying drawings.
[0030] like Figure 1-Figure 6 As shown, a hot melt anti-skid road marking paint construction equipment includes a frame assembly 10 and a hot melt boiling system 11, a heating system 12, a heat transfer oil circulation system 13, a glass bead system 14, a spray gun telescopic system 15, a marking line forming system 16, a guide rod system 17 and a cleaning system 18 connected to the frame assembly 10. The hot melt boiling system 11, the heating system 12, the heat transfer oil circulation system 13, the glass bead system 14, the spray gun telescopic system 15, the marking line forming system 16, the guide rod system 17 and the cleaning system 18 are connected through an electrical control system 19 for unified deployment. The above systems and their mutual coordination are all known, and the hardware can be purchased on the market. The specific structure and model are not repeated here. The above known hardware is respectively equipped with known software to realize their respective functions, and also includes a barrier unit 20 located between the spray gun telescopic system 15 and the cleaning system 18;
[0031] While the marking forming system 16 is spraying the ground, the cleaning system 18 in front of it rotates synchronously to clean the ground to be marked. At this time, with the setting of the blocking unit 20, the debris particles splashed during the cleaning process can be blocked to prevent them from splashing into the laying area of the marking forming system 16 and hindering the drawing of the markings.
[0032] The barrier unit 20 includes an adjustable suspension frame 21 connected to the vehicle frame assembly 10 and a barrier plate 22 installed on the adjustable suspension frame 21, and a groove 26 for accommodating and installing the elastic blocking member 23 is provided at the bottom of the barrier plate 22. The suspension frame 21 can be fixed to the bottom of the vehicle frame assembly 10 by welding or other fixing methods so that it moves synchronously with the construction equipment;
[0033] The blocking plate 22 is V-shaped, and a locking bolt 24 is threaded through the blocking plate 22 to be locked against the adjustable suspension frame 21. The height of the blocking plate 22 can be adjusted on the surface of the adjustable suspension frame 21 by rotating the locking bolt 24, so that the blocking plate 22 can be lifted and stored after use.
[0034] The top of the baffle plate 22 is provided with an assembly groove 25 adapted to the adjustable suspension frame 21, and the baffle plate 22 is assembled and connected to the adjustable suspension frame 21 through the assembly groove 25;
[0035] like Figure 3As shown, by the V-shaped setting of the blocking plate 22, when the cleaning system 18 rolls to clean the ground, if the particles splashed during the cleaning process are splashed toward the marking forming system 16, they can be well blocked by the cooperation of the blocking plate 22. At the same time, the V-shaped structure setting can guide the splashed particles and debris to disperse them on both sides of the blocking plate 22 to avoid affecting the subsequent marking operation of the marking forming system 16.
[0036] As a further optimization of this embodiment: a locking member 27 is threadedly provided on the inner side of the blocking plate 22, and a fixing block 28 is movably provided at the end of the locking member 27, which is slidably arranged in the blocking plate 22 and can contact the elastic blocking member 23. The elastic blocking member 23 includes a connecting plate 230 and a rubber blocking piece 231 fixed to each other, and a shear groove 232 is provided at the bottom of the rubber blocking piece 231;
[0037] The rubber sealing piece 231 is located between the shear groove 232 and the connecting plate 230 to form a curved sealing platform 233;
[0038] By setting the elastic blocking member 23, when the blocking plate 22 is moving and blocking, the rubber blocking piece 231 connected thereto will be close to the ground, thereby increasing the blocking effect of the blocking plate 22. Since the rubber blocking piece 231 has a certain elasticity and can be bent to a certain extent, when the blocking plate 22 is affected by the ups and downs of the road during its movement, the rubber blocking piece 231 can also be adaptively adjusted to achieve a better protective blocking effect.
[0039] In the actual marking process, the bottom of the rubber sealing piece 231 constantly forms contact friction with the ground. At this time, the locking piece 27 can be rotated to release the fixing block 28 at its end from fixing the connecting plate 230, thereby facilitating the disassembly and replacement of the rubber sealing piece 231, so as to avoid the overall scrapping of the barrier unit 20, thereby improving the practicality of the barrier unit 20.
[0040] As a further optimization of this embodiment: a support frame 220 fixed to the inner side of the blocking plate 22 is provided above the elastic blocking member 23, and a guide wheel 221 is movably installed on the surface of the support frame 220;
[0041] Among them, the surface of the support frame 220 is provided with a spring 222 connected to the blocking plate 22. Through the setting of the guide wheel 221, the blocking plate 22 can cooperate with the guide wheel 221 to form a more stable blocking state during its movement, and through the setting of the spring 222 thereon, the guide wheel 221 can form an elastic resistance state with the ground to ensure that when the construction equipment is constructing on the undulating ground, the guide wheel 221 can still contact the ground to form an effective support and stability for the blocking plate 22.
Claims
1. A hot melt anti-skid road marking paint construction equipment, comprising a frame assembly (10) and a hot melt material preparation system (11), a heating system (12), a heat transfer oil circulation system (13), a glass bead system (14), a spray gun telescopic system (15), a marking line forming system (16), a guide rod system (17) and a cleaning system (18) connected to the frame assembly (10), wherein the hot melt material preparation system (11), the heating system (12), the heat transfer oil circulation system (13), the glass bead system (14), the spray gun telescopic system (15), the marking line forming system (16), the guide rod system (17) and the cleaning system (18) are connected through an electrical control system (19) for unified deployment, and characterized in that: Also included is a barrier unit (20) located between the spray gun telescopic system (15) and the cleaning system (18); A barrier unit (20), the barrier unit (20) comprising an adjustable suspension frame (21) connected to the vehicle frame assembly (10) and a barrier plate (22) mounted on the adjustable suspension frame (21), and a groove (26) for accommodating and installing an elastic blocking member (23) is provided at the bottom of the barrier plate (22); The blocking plate (22) is arranged in a V-shape, and a locking bolt (24) is threadedly penetrated thereon and is locked against the adjustable suspension frame (21).
2. The hot melt anti-skid road marking paint construction equipment according to claim 1, characterized in that: The top of the baffle plate (22) is provided with an assembly groove (25) adapted to the adjustable suspension frame (21), and the baffle plate (22) is assembled and connected to the adjustable suspension frame (21) via the assembly groove (25).
3. The hot melt anti-skid road marking paint construction equipment according to claim 1, characterized in that: A locking piece (27) is threadedly penetrated on the inner side of the blocking plate (22), and a fixing block (28) is movably provided at the end of the locking piece (27) and is slidably arranged in the blocking plate (22) and can contact the elastic blocking piece (23).
4. The hot melt anti-skid road marking paint construction equipment according to claim 3, characterized in that: The elastic blocking member (23) comprises a connecting plate (230) and a rubber blocking piece (231) fixed to each other, and a shear groove (232) is provided at the bottom of the rubber blocking piece (231).
5. The hot melt anti-skid road marking paint construction equipment according to claim 4, characterized in that: The rubber sealing piece (231) is located between the shear groove (232) and the connecting plate (230) to form a curved sealing platform (233).
6. The hot melt anti-skid road marking paint construction equipment according to claim 1, characterized in that: A support frame (220) fixed to the inner side of the blocking plate (22) is provided above the elastic blocking member (23), and a guide wheel (221) is movably mounted on the surface of the support frame (220); The surface of the support frame (220) is sleeved with a spring (222) connected to the blocking plate (22).
