Water conservancy project construction plugging device
By setting up sealing mechanisms and installation mechanisms inside and outside the canal, rapid installation and sealing is achieved by using the cooperation of screws, clamps and cylinders, the problems of labor and poor stability of the canal sealing device are solved, the sealing efficiency and stability are improved, and the sealing efficiency and stability are reduced. Waste of water resources.
Patent Information
- Application Number
- CN202420405433.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-04
AI Technical Summary
The existing canal sealing device has high transportation cost and poor stability, which is prone to collapse and leaks, affecting irrigation efficiency and water resource utilization.
A sealing device for construction of water conservancy projects was designed, including the sealing mechanism on the inside of the canal and the installation mechanism on the outside. The sealing mechanism consists of a mounting plate, a U-shaped plate, a cylinder, a sealing strip, a reinforcement rod and a bottom plate, and is passed through a screw and a clamp. The combination of the cylinder enables rapid installation and sealing, and the cylinder elongation allows the sealing plate to move downward to fill the gap, enhancing stability.
It improves the installation efficiency and sealing reliability of the sealing device, reduces the difficulty of use and waste of water resources, and enhances the stability and compressive resistance of canal sealing.
Smart Images

Figure CN222120147U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water conservancy projects, and in particular relates to a water conservancy project construction plugging device. Background Art
[0002] Irrigation of crops is one of the common application areas of water conservancy projects. In order to facilitate water use, people will build ditches to divert river water to the fields. The canal used for farmland irrigation is usually a public long canal. When irrigating farmland, a blocking device needs to be set at the farmland port to block the water flow, and then divert it to irrigate the farmland.
[0003] In the prior art, soil or sandbags are mostly used to block water channels. This blocking method is not only inefficient but also has poor stability. In the process of blocking the water flow, it is prone to collapse and leakage, which affects the efficiency of farmland irrigation and causes a waste of water resources.
[0004] Therefore, a water conservancy project construction plugging device is needed to solve the problems of the prior art that the water channel plugging device is difficult to carry and the plugging device has poor stability and plugging effect. Utility Model Content
[0005] The purpose of the utility model is to provide a water conservancy project construction plugging device to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water conservancy project construction plugging device, comprising a water channel, a plugging mechanism is arranged inside the water channel, and a mounting mechanism is arranged outside the top of the water channel;
[0007] The blocking mechanism includes a mounting plate, a U-shaped plate is fixed to the outer side of the top wall of the mounting plate, cylinders are fixed to the left and right sides of the top wall of the U-shaped plate, the output ends of the cylinders are respectively fixed to the left and right sides of the top wall of the blocking plate, the blocking plate is arranged on the inner side of the opening, the opening is arranged in the middle of the mounting plate, a sealing strip is fixed to the outer wall of the blocking plate, a plurality of groups of evenly distributed reinforcing rods are fixed to the middle of the rear wall of the blocking plate, and a bottom plate is fixed to the bottom of the reinforcing rods.
[0008] It should be noted in the scheme that the installation mechanism includes a fixing plate, a screw is threadedly connected in the middle of the fixing plate, two groups of screws are rotatably connected to one end close to each other, and the two groups of clamps are far away from the middle of one side wall and the front and rear ends are fixed with limiting rods, and the limiting rods are penetrated and slidably connected to the inner side of the limiting hole.
[0009] It is further worth noting that the fixing plates are fixed to the left and right ends of the bottom wall of the mounting plate respectively, and the limiting holes are respectively arranged at the front and rear sides of the middle part of the fixing plate.
[0010] It should be further explained that the blocking plate is located inside the water channel, the blocking plate is trapezoidal in shape, and the blocking plate fits in the opening gap.
[0011] As a preferred implementation, the U-shaped plate is located on the upper side of the outer periphery of the opening, and the sealing strip is in contact with the inner wall of the water channel.
[0012] As a preferred implementation, the fixing plate and the clamping plate are both located on the left and right sides of the outer side of the water channel.
[0013] Compared with the prior art, the utility model provides a water conservancy project construction plugging device, which has at least the following beneficial effects:
[0014] (1) When the plugging device is needed, the installation plate is moved to the installation position on the upper side of the canal, and then the left and right screws are rotated. During the rotation of the screws, the clamping plates on both sides are driven to approach each other, so that the clamping plates fit the outer wall of the canal and clamp the canal at the same time, thus completing the installation operation of the plugging device. This reduces the difficulty of using the plugging device for water conservancy projects and improves the installation efficiency of the plugging device.
[0015] (2) By starting the cylinder, the cylinder output end extends to move the sealing plate downward on the inside of the opening, so that the sealing strip on the outer periphery of the sealing plate is squeezed and fitted with the inner wall of the water channel. After being squeezed, the sealing strip is deformed to fill the gap between the water channel and the sealing plate, and at the same time, the bottom plate is fitted with the bottom wall of the water channel to complete the sealing operation, thereby improving the sealing efficiency and reliability of the sealing device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a top view of the three-dimensional structure of the utility model;
[0017] Figure 2 It is a rear-view stereoscopic structural schematic diagram of the utility model;
[0018] Figure 3 It is a partial side view stereoscopic structural schematic diagram of the utility model.
[0019] In the figure: 1. water channel; 2. sealing mechanism; 3. mounting mechanism; 4. mounting plate; 5. opening; 6. sealing plate; 7. U-shaped plate; 8. cylinder; 9. sealing strip; 10. fixing plate; 11. limiting hole; 12. limiting rod; 13. screw; 14. splint; 15. reinforcing rod; 16. bottom plate. DETAILED DESCRIPTION
[0020] The present invention will be further described below in conjunction with the embodiments.
[0021] See also Figure 1-3The utility model provides a plugging device for water conservancy project construction, comprising a water channel 1, a plugging mechanism 2 is arranged inside the water channel 1, and a mounting mechanism 3 is arranged outside the top of the water channel 1;
[0022] The sealing mechanism 2 includes a mounting plate 4, a sealing mechanism 2 is mounted on the inner side of the mounting plate 4, a mounting mechanism 3 is arranged on the outer side of the mounting plate 4, a U-shaped plate 7 is fixed on the outer side of the top wall of the mounting plate 4, and a cylinder 8 is fixed on both the left and right sides of the top wall of the U-shaped plate 7. The U-shaped plate 7 provides space for the installation of the cylinder 8. During the operation of the cylinder 8, the sealing plate 6 will move up and down inside the opening 5, thereby switching the sealing state of the sealing device. The output ends of the cylinder 8 are respectively fixed on the left and right sides of the top wall of the sealing plate 6, the sealing plate 6 is arranged on the inner side of the opening 5, and the opening 5 is arranged in the middle of the mounting plate 4. A sealing strip 9 is fixed on the outer side wall of the sealing plate 6. The sealing strip 9 can be deformed by being squeezed after the inner wall of the canal 1 is fitted with the sealing plate 6, so that the gap between the two can be filled. A plurality of groups of evenly distributed reinforcing rods 15 are fixed in the middle of the rear wall of the sealing plate 6, and a bottom plate 16 is fixed at the bottom of the reinforcing rod 15. The cooperation between the reinforcing rod 15 and the bottom plate 16 can improve the stability and pressure resistance of the sealing plate 6 and reduce the possibility of it being washed away by water.
[0023] Further Figure 1 , Figure 2 and Figure 3 As shown, it is worth explaining in detail that the mounting mechanism 3 includes a fixing plate 10, and a screw 13 is threadedly connected in the middle of the fixing plate 10. The screw 13 can move left and right during the rotation of the inner side of the fixing plate 10, thereby driving the clamping plate 14 to move left and right. The two groups of screws 13 are rotatably connected to the clamping plate 14 at one end close to each other, and the two groups of clamping plates 14 are far away from each other. The limiting rods 12 are fixed at the front and rear ends of the middle of the side wall, and the limiting rods 12 are all inserted through and slidably connected to the inner side of the limiting hole 11. The limiting rods 12 cooperate with the limiting hole 11 to limit the clamping plate 14 so that it will not rotate during the movement.
[0024] Further Figure 3 As shown, it is worth explaining in detail that the fixing plate 10 is fixed to the left and right ends of the bottom wall of the mounting plate 4 respectively, and the limiting holes 11 are respectively arranged on the front and back sides of the middle of the fixing plate 10 , and the fixing plate 10 serves to connect the mounting plate 4 and the screw 13 .
[0025] This solution has the following working process: when it is necessary to block the water flow in the canal 1, first move the installation plate 4 to the required installation position on the upper side of the canal 1, and then rotate the left and right screws 13. During the rotation of the screws 13, the clamping plates 14 on both sides are driven to approach each other, so that the clamping plates 14 are in contact with the outer wall of the canal 1 and clamp the canal 1 at the same time, completing the installation operation of the blocking device, and then start the cylinder 8. The output end of the cylinder 8 is extended to move the blocking plate 6 downward on the inside of the opening 5, so that the sealing strip 9 on the outer periphery of the blocking plate 6 is squeezed and fitted with the inner wall of the canal 1. After being squeezed, the sealing strip 9 is deformed to fill the gap between the canal 1 and the blocking plate 6, and at the same time, the bottom plate 16 is in contact with the inner bottom wall of the canal 1 to complete the blocking operation.
[0026] According to the above working process, it can be known that: with the cooperation of the mounting plate 4, the fixing plate 10, the limiting rod 12, the limiting hole 11, the screw 13 and the clamping plate 14, the sealing device can be quickly installed, which reduces the installation difficulty and improves the installation efficiency of the sealing device compared with the traditional sealing method. At the same time, with the cooperation of the U-shaped plate 7, the cylinder 8, the sealing plate 6, the sealing strip 9, the reinforcing rod 15 and the bottom plate 16, the sealing efficiency and the sealing strength can be improved.
[0027] Further as Figure 1 , Figure 2 and Figure 3 As shown, it is worth explaining in detail that the blocking plate 6 is located on the inner side of the canal 1, the blocking plate 6 is trapezoidal in shape, the blocking plate 6 is gap-matched with the opening 5, the blocking plate 6 can move up and down during the operation of the cylinder 8, the blocking plate 6 has the same shape as the canal 1, and can fit with the inner wall of the canal 1 during the downward movement.
[0028] Further as Figure 1 As shown, it is worth explaining in detail that the U-shaped plate 7 is located on the upper side of the outer periphery of the opening 5, the sealing strip 9 is in contact with the inner wall of the canal 1, and the sealing strip 9 is squeezed and deformed by the sealing plate 6 and the inner wall of the canal 1 during the downward movement of the sealing plate 6.
[0029] Further as Figure 1 As shown, it is worth explaining in detail that the fixing plate 10 and the clamping plate 14 are both located at the left and right parts of the outer side of the water channel 1. After the clamping plates 14 are close to each other to clamp the water channel 1, the plugging device can be installed.
[0030] In summary: the blocking plate 6 can move up and down during the operation of the cylinder 8. The blocking plate 6 has the same shape as the water channel 1 and can fit with the inner wall of the water channel 1 during the downward movement. The sealing strip 9 is squeezed and deformed by the blocking plate 6 and the inner wall of the water channel 1 during the downward movement of the blocking plate 6, so that the gap between the two can be filled. The left and right side screws 13 are rotated, and the screws 13 drive the two side clamps 14 to approach each other during the rotation of the screws 13, so that the clamps 14 fit with the outer wall of the water channel 1 and clamp the water channel 1 at the same time. After the clamps 14 approach each other and clamp the water channel 1, the sealing device installation operation can be realized. Start the cylinder 8, and the output end of the cylinder 8 extends to move the blocking plate 6 downward on the inside of the opening 5, so that the outer peripheral sealing strip 9 of the blocking plate 6 is squeezed and fits with the inner wall of the water channel 1.
[0031] The cylinder 8 can be purchased on the market, which is a mature technology in this field and has been fully disclosed, so it will not be repeated in the specification.
Claims
1. A water conservancy project construction plugging device, comprising a water channel (1), characterized in that: A blocking mechanism (2) is provided on the inner side of the water channel (1), and a mounting mechanism (3) is provided on the outer side of the top of the water channel (1); The blocking mechanism (2) comprises a mounting plate (4), a U-shaped plate (7) is fixed on the outer side of the top wall of the mounting plate (4), a cylinder (8) is fixed on the left and right sides of the top wall of the U-shaped plate (7), the output ends of the cylinder (8) are respectively fixed on the left and right sides of the top wall of the blocking plate (6), the blocking plate (6) is arranged on the inner side of the opening (5), the opening (5) is arranged in the middle of the mounting plate (4), a sealing strip (9) is fixed on the outer side wall of the blocking plate (6), a plurality of groups of evenly distributed reinforcing rods (15) are fixed in the middle of the rear wall of the blocking plate (6), and a bottom plate (16) is fixed to the bottom of each reinforcing rod (15).
2. A water conservancy project construction plugging device according to claim 1, characterized in that: The mounting mechanism (3) comprises a fixing plate (10), the middle part of which is threadedly connected with a screw rod (13), two groups of the screw rods (13) are rotatably connected with a clamping plate (14) at one end close to each other, and the front and rear ends of the middle part of a side wall of the two groups of the clamping plates (14) are fixed with a limiting rod (12), and the limiting rod (12) passes through and is slidably connected to the inner side of the limiting hole (11).
3. A water conservancy project construction plugging device according to claim 2, characterized in that: The fixing plate (10) is respectively fixed to the left and right ends of the bottom wall of the mounting plate (4), and the limiting holes (11) are respectively arranged at the front and rear sides of the middle of the fixing plate (10).
4. A water conservancy project construction plugging device according to claim 1, characterized in that: The blocking plate (6) is located inside the water channel (1); the blocking plate (6) is trapezoidal in shape; and the blocking plate (6) is clearance-matched with the opening (5).
5. A water conservancy project construction plugging device according to claim 1, characterized in that: The U-shaped plate (7) is located on the upper side of the outer periphery of the opening (5), and the sealing strip (9) is in contact with the inner wall of the water channel (1).
6. A water conservancy project construction plugging device according to claim 2, characterized in that: The fixing plate (10) and the clamping plate (14) are both located on the left and right sides of the outer side of the water channel (1).