Tower and wind generating set
By setting an adjustable distance anchoring assembly on the end surface of the tower body of the wind turbine tower, the problem of tensile stress reduction caused by prestressed cable deformation is solved, and the stability of the tower is improved.
Patent Information
- Application Number
- CN202323662077.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During use, the tensile stress decreases due to deformation during the prestressed cable in the wind turbine, which affects the stability of the tower.
A tower is designed, by providing a first anchor assembly and a second anchor assembly on the end surface of the tower body, the end of the prestressed cable protrudes and is connected to the anchor assembly, and the distance at the connection of the second anchor assembly is adjustable, Pull the prestress cable when the tensile stress is reduced and its tensile stress is increased.
It effectively alleviates the tensile stress reduction phenomenon caused by deformation of prestress cables, makes the prestress cables in a good tensile stress state, and improves the structural stability of the tower.
Smart Images

Figure CN222121681U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric power technology, and in particular to a tower and a wind turbine generator set. Background Art
[0002] More and more wind turbines use concrete towers. Multiple concrete tower sections are connected to form a concrete tower through prestressed cables. At the end of the tower, the end of the prestressed cable needs to be fixed to the tower through anchors. At the same time, in order to firmly connect the tower sections together, the prestressed cable needs to be in a tensile stress state. As the wind turbine is used, the prestressed cable will deform and the tensile stress will decrease, which will reduce the firmness of the connection between the tower sections and affect the stability of the concrete tower. Utility Model Content
[0003] The embodiments of the present application provide a tower and a wind turbine generator set, which can alleviate the phenomenon of reduced tensile stress of prestressed cables.
[0004] In the first aspect, an embodiment of the present application provides a tower, comprising: a tower body, the tower body having a first end face in its own axial direction; a prestressed cable, axially inserted into the tower body, the end of the prestressed cable protruding from the first end face of the tower body to form a protrusion; a first anchoring assembly, fixedly connected to the protrusion, the first anchoring assembly abutting against the first end face; a second anchoring assembly, fixedly connected to the protrusion, the first end face abutting against the second anchoring assembly; along the axial direction, at least a portion of the second anchoring assembly is located on the side of the first anchoring assembly away from the first end face; along the axial direction, the distance from the connection between the second anchoring assembly and the protrusion to the first end face can be adjusted.
[0005] According to an embodiment of the first aspect of the present application, the second anchoring assembly includes: a first supporting structure, which is abutted against the first end face and at least partially surrounds the first anchoring assembly; a second anchor, which is supported on the side of the first supporting structure axially away from the first end face, and the second anchor is fixedly connected to the protrusion, and the distance between the second anchor and the first end face is adjustable along the axial direction.
[0006] According to an embodiment of the first aspect of the present application, the first support structure includes a first support member and a second support member; along the axial direction, the first support member abuts against the first end face, the side of the first support member facing away from the first end face is threadedly connected to the second support member, and the second anchor abuts against the second support member.
[0007] According to an embodiment of the first aspect of the present application, the first support member includes a first structural member and a second structural member. Along the axial direction, the first structural member abuts against the first end face, and the side of the first structural member facing away from the first end face abuts against the second structural member; along the circumference of the tower body, the first structural member and the second structural member are provided with a limiting structure.
[0008] According to an embodiment of the first aspect of the present application, the second anchoring assembly also includes: a second pad, which is detachably connected to the side of the first supporting structure away from the tower body; the second pad includes a second through hole, the prestressed cable passes through the second through hole, and the second anchor abuts against the side of the second pad away from the first supporting structure.
[0009] According to an embodiment of the first aspect of the present application, the first supporting structure includes a supporting portion and a load-bearing portion, and the supporting portion and the load-bearing portion are arranged in an integrated structure. The supporting portion is columnar, and the supporting portion includes a side wall extending along the axial direction of the supporting portion, and the side wall has an opening passing through the supporting portion in a radial direction; the opening extends to both ends of the supporting portion along the extension direction of the prestressed cable; the load-bearing portion is arranged on a side of the supporting portion away from the first end face, the load-bearing portion includes a first through hole, the prestressed cable passes through the first through hole, and the second anchor is supported on the load-bearing portion.
[0010] According to an embodiment of the first aspect of the present application, along the axial direction, the diameter of the circumscribed circle of the orthographic projection of the supporting portion is greater than the diameter of the circumscribed circle of the orthographic projection of the load-bearing portion.
[0011] According to an embodiment of the first aspect of the present application, the first anchoring assembly includes a first pad and a first anchor, and the first anchor is fixedly connected to the protrusion; along the axial direction, one end of the first pad abuts against the first end face, and the other end of the first pad abuts against the first anchor.
[0012] According to an embodiment of the first aspect of the present application, the tower frame also includes a clip, a clip limit plate and a pad; the first anchor includes a first connecting hole, the prestressed cable passes through the first connecting hole, the clip is arranged in the first connecting hole, and the prestressed cable and the first anchor are fixedly connected by the clip; the clip limit plate is detachably connected to the side of the first anchor away from the tower body; the pad is detachably connected to the side of the second anchor assembly facing the tower body.
[0013] According to an embodiment of the first aspect of the present application, along the axial direction, the orthographic projection of the first anchor is circular, the orthographic projection of the first pad is semicircular, and the number of the first pads is one or two; the first pad includes a radial extension portion and an axial extension portion, and the radial extension portion is at least a portion of a ring; the two ends of the radial extension portion along the axial direction are respectively abutted against the first anchor and the first end face; the axial extension portion is arranged on the side of the radial extension portion away from the first end face; the axial extension portion includes an inner wall surface, and the inner wall surface is abutted against the outer peripheral side surface of the first anchor.
[0014] According to an embodiment of the first aspect of the present application, the tower body includes a third through hole, which extends axially to the first end face; the prestressed cable passes through the third through hole, and the third through hole is filled with grouting material at the opening of the first end face.
[0015] In a second aspect, an embodiment of the present application provides a wind turbine generator set, comprising the tower of the embodiment of the first aspect of the present application.
[0016] In the tower and wind turbine generator set provided in the embodiment of the present application, the prestressed cable passes through the tower body, and the end of the prestressed cable protrudes from the first end face of the tower body to form a protrusion. The first anchor assembly is connected to the prestressed cable and abuts against the first end face, so that the first anchor assembly can provide a certain force to the prestressed cable, and the prestressed cable is in a tensile stress state; the second anchor assembly is connected to the prestressed cable and abuts against the first end face, so that the second anchor assembly can also provide a certain force to the prestressed cable. When the tensile stress of the prestressed cable is reduced, the distance from the connection between the second anchor assembly and the protrusion to the first end face can be increased, so that the second anchor assembly can pull the prestressed cable, thereby increasing the tensile stress of the prestressed cable, so that the prestressed cable is in a good tensile stress state, thereby alleviating the phenomenon of tensile stress reduction caused by deformation of the prestressed cable. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The features, advantages and technical effects of exemplary embodiments of the present application will be described below with reference to the accompanying drawings.
[0018] Figure 1 A schematic diagram of the structure of a tower according to an embodiment of the present application.
[0019] Figure 2 for Figure 1 In the figure, a partial enlarged view of the tower in area A of an embodiment of the present application is shown.
[0020] Figure 3 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0021] Figure 4 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0022] Figure 5 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0023] Figure 6 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0024] Figure 7 A structural schematic diagram of a first supporting structure of a tower according to an embodiment of the present application.
[0025] Figure 8 A schematic structural diagram of a second pad of a tower according to an embodiment of the present application.
[0026] Fig. 9 for Figure 8In the figure, a cross-sectional view of the second pad of the tower according to an embodiment of the present application at the DD section is shown.
[0027] Fig.10 for Figure 7 In the figure, a cross-sectional view of the first supporting structure of the tower according to an embodiment of the present application is shown at section BB.
[0028] Fig.11 for Figure 7 In the figure, a cross-sectional view of the first supporting structure of the tower according to an embodiment of the present application is shown at the CC section.
[0029] Fig.12 A schematic structural diagram of a first pad of a tower according to an embodiment of the present application.
[0030] Fig.13 for Fig.12 In the figure, a cross-sectional view of the first pad of the tower of an embodiment of the present application is taken at section AA.
[0031] Fig.14 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0032] Fig.15 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0033] Fig.16 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0034] Fig.17 A schematic structural diagram of a tower frame when the first anchor is not separated from the first end surface during installation of the tower frame according to an embodiment of the present application.
[0035] Fig.18 A structural schematic diagram of installing a first pad during the installation of the tower according to an embodiment of the present application.
[0036] Fig.19 A schematic diagram of the structure of a wind turbine generator set according to an embodiment of the present application.
[0037] Reference numerals:
[0038] 1. tower body; 11. tower section; 12. first end surface; 13. third through hole;
[0039] 2. prestressed cable; 21. protrusion;
[0040] 3. First anchor assembly; 31. First pad; 311. Radial extension; 312. Axial extension; 32. First anchor; 321. First connection hole;
[0041] 4. Second anchoring assembly; 41. First supporting structure; 411. Load bearing part; 412. Support part; 413. Reinforcement rib; 414. First through hole; 415. First supporting member; 415a. First structural member; 415b. Second structural member; 416. Second supporting member; 42. Second pad; 421. Second through hole; 43. Second anchor;
[0042] 5. Clip;
[0043] 6. Clip limit plate;
[0044] 7. Pads;
[0045] 8. Jack;
[0046] 100. Wind turbine generator set; 200. Tower.
[0047] In the drawings, the same reference numerals are used for the same components. The drawings are not drawn to scale. DETAILED DESCRIPTION
[0048] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In the detailed description below, many specific details are proposed to provide a comprehensive understanding of the present application. However, it is obvious to those skilled in the art that the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating examples of the present application. In the accompanying drawings and the following description, at least some of the known structures and technologies are not shown to avoid unnecessary ambiguity in the present application; and, for clarity, the size of some structures may be exaggerated. In addition, the features, structures or characteristics described below may be combined in one or more embodiments in any suitable manner.
[0049] The directional words appearing in the following description are all directions shown in the figures, and do not limit the specific structure of the embodiments of the present application. In the description of the present application, it should also be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0050] When a wind turbine uses a concrete tower, prestressed cables will pass through multiple sections of concrete tower. Anchors will be set at the ends of the tower to connect the anchors to the prestressed cables. At the same time, the anchors will abut against the ends of the tower to connect multiple sections of the tower into a concrete tower. In order to firmly connect multiple sections of the tower, the prestressed cables need to be in a tensile stress state, and the tensile stress should be within a preset range. With the use of the wind turbine, the prestressed cables will undergo certain deformations under the tensile stress state, which will reduce the tensile stress and affect the structural stability of the concrete tower.
[0051] In view of the above problems, the applicant proposes a tower and a wind turbine generator set. The tower includes a tower body, a prestressed cable, a first anchor assembly and a second anchor assembly. The prestressed cable passes through the tower body, and the end of the prestressed cable protrudes from the first end face of the tower body to form a protrusion. The first anchor assembly is connected to the protrusion of the prestressed cable and abuts against the first end face, so that the first anchor assembly can provide a certain force to the prestressed cable, and the prestressed cable is in a tensile stress state; the second anchor assembly is connected to the protrusion and abuts against the first end face, so that the second anchor assembly can also provide a certain force to the prestressed cable. When the tensile stress of the prestressed cable is reduced, the distance from the connection between the second anchor assembly and the protrusion to the first end face can be increased, so that the second anchor assembly can pull the prestressed cable, thereby increasing the tensile stress of the prestressed cable. Therefore, the tower of the embodiment of the present application can put the prestressed cable in a good tensile stress state, thereby alleviating the phenomenon of reduced tensile stress caused by deformation of the prestressed cable.
[0052] Figure 1 A schematic diagram of the structure of a tower according to an embodiment of the present application. Figure 2 for Figure 1 In the figure, a partial enlarged view of the tower in area A of an embodiment of the present application is shown.
[0053] See also Figure 1 and Figure 2 The embodiment of the present application provides a tower, comprising: a tower body 1, the tower body 1 having a first end face 12 in its own axial direction; a prestressed cable 2, axially inserted in the tower section 11, the end of the prestressed cable 2 protrudes from the first end face 12 of the tower body 1, and forms a protrusion 21; a first anchoring assembly 3, fixedly connected to the protrusion 21, the first anchoring assembly 3 and the first end face 12 abutting; a second anchoring assembly 4, fixedly connected to the protrusion 21, the first end face 12 and the second anchoring assembly 4 abutting; along the axial direction, at least a part of the second anchoring assembly 4 is located on the side of the first anchoring assembly 3 away from the first end face 12; along the axial direction, the distance from the connection between the second anchoring assembly 4 and the protrusion 21 to the first end face 12 can be adjusted.
[0054] It should be noted that, in the embodiments of the present application, the axial direction refers to the axial direction of the tower body 1 , and the radial direction also refers to the radial direction of the tower body 1 .
[0055] The tower body 1 is used to provide support. It should be noted that the tower body 1 may include at least one tower section 11, and the tower section 11 may be columnar or terraced, such as a cylinder or a truncated cone. Multiple tower sections 11 are stacked along the axial direction of the tower body 1 to form a columnar or terraced tower body 1 with a larger axial length. The tower section 11 may be made of concrete material. The prestressed cable 2 passes through each tower section 11 in sequence along the axial direction of the tower body 1. The number of prestressed cables 2 may be multiple, and they are arranged along the circumference of the tower section 11 to connect the multiple tower sections 11 into a whole. The tower body 1 has a first end face 12 in the axial direction, and the prestressed cable 2 extends from the first end face 12, and the extended part forms a protrusion 21.
[0056] The first anchor assembly 3 is fixedly connected to the protrusion 21 and abuts against the first end face 12. The prestressed cable 2 is in a tensile stress state, that is, in a taut state. The first anchor assembly 3 can fix the relative position of the protrusion 21 and the first end face 12, so that the prestressed cable 2 is kept in a tensile stress state. The prestressed cable 2 in a tensile stress state can exert an axial force on the tower section 11 along the tower body 1, pressing the multiple tower sections 11 together, so that the tower of the embodiment of the present application can have good structural strength.
[0057] The second anchor assembly 4 is fixedly connected to the protrusion 21 and abuts against the first end face 12. Similarly, the second anchor assembly 4 can also fix the relative position of the protrusion 21 and the first end face 12, so that the prestressed cable 2 is kept in a tensile stress state. In the axial direction, at least a portion of the second anchor assembly is located on the side of the first anchor assembly 3 away from the first end face 12, so that although the first anchor assembly 3 and the second anchor assembly 4 are both connected to the protrusion 21, there is no interference between the first anchor assembly 3 and the second anchor assembly 4.
[0058] Along the axial direction of the tower body 1, the distance from the connection point between the second anchor assembly 4 and the protrusion 21 to the first end face 12 can be adjusted, so the force applied by the second anchor assembly 4 to the prestressed cable 2 can be adjusted, thereby adjusting the stress borne by the prestressed cable 2. When the prestressed cable 2 shows a trend of decreasing tensile stress, the prestressed cable 2 can be tightened by increasing the distance from the connection point between the second anchor assembly 4 and the protrusion 21 to the first end face 12, so that the tensile stress of the prestressed cable 2 can still be within the normal tensile stress range, so that the tower of the embodiment of the present application can alleviate the phenomenon of reduced tensile stress of the prestressed cable 2.
[0059] It should be noted that when constructing the tower of the embodiment of the present application, the first anchor assembly 3 and the second anchor assembly 4 can be fixedly connected when the tower section 11 is fixedly connected by the prestressed cable 2; considering that a part of the second anchor assembly 4 is located on the side of the first anchor assembly 3 away from the first end face 12, the second anchor assembly 4 can be additionally fixedly connected to the tower finished product having only the first anchor assembly 3. It can be understood that in the embodiment of the present application, the first anchor assembly 3 and the second anchor assembly 4 can be used separately under the premise that the prestressed cable 2 is within the preset tensile stress range.
[0060] Figure 3 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0061] For further information, see Figure 3 The second anchoring assembly 4 includes: a first supporting structure 41, which is in contact with the first end face 12 and at least partially surrounds the first anchoring assembly 3; a second anchor 43, which is supported on the side of the first supporting structure 41 axially away from the first end face 12, and the second anchor 43 is fixedly connected to the protrusion 21, and the distance between the second anchor 43 and the first end face 12 is adjustable along the axial direction.
[0062] The first support structure 41 is in contact with the first end face 12, and is used to support the second anchor 43. The first support structure 41 is at least partially arranged around the first anchor assembly 3, which can reduce the risk of motion interference between the second anchor assembly 4 and the first anchor assembly 3. The second anchor 43 is fixedly connected to the protrusion 21, so the connection between the second anchor 43 and the protrusion 21 is the connection between the second anchor assembly 4 and the protrusion 21. The length of the first support structure 41 along the axial direction can be adjusted, so as to adjust the distance from the connection between the second anchor 43 and the protrusion 21 to the first end face 12, that is, to adjust the distance from the connection between the second anchor assembly 4 and the protrusion 21 to the first end face 12, and then adjust the force applied by the second anchor assembly 4 to the prestressed cable 2, so as to adjust the tensile stress of the prestressed cable 2.
[0063] Figure 4 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0064] For further information, see Figure 4 The first support structure 41 includes a first support member 415 and a second support member 416; along the axial direction, the first support member 415 abuts against the first end face 12, the side of the first support member 415 away from the first end face 12 is threadedly connected to the second support member 416, and the second anchor 43 abuts against the second support member 416.
[0065] The first support member 415 and the second support member 416 are threadedly connected, and the total length of the first support member 415 and the second support member 416 along the axial direction can be adjusted by relative rotation of the two. The first support member 415 abuts against the first end face 12, and the second anchor 43 abuts against the second support member 416, so the distance from the connection between the second anchor 43 and the protrusion 21 to the first end face 12 can be adjusted by relative rotation of the first support member 415 and the second support member 416, thereby adjusting the force applied by the second anchor assembly 4 to the prestressed cable 2 to adjust the tensile stress of the prestressed cable 2. It should be noted that the first support member 415 can have an internal thread, and the second support member 416 can have an external thread; or, the first support member 415 can have an external thread, and the second support member 416 can have an internal thread.
[0066] Figure 5 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0067] For further information, see Figure 5 The first support member 415 includes a first structural member 415a and a second structural member 415b. Along the axial direction, the first structural member 415a abuts against the first end face 12, and the side of the first structural member 415a away from the first end face 12 abuts against the second structural member 415b; along the circumferential direction of the tower body 1, the first structural member 415a and the second structural member 415b are provided with a limiting structure.
[0068] The first support member 415 can be split into a first structural member 415a and a second structural member 415b. The first structural member 415a abuts against the first end face 12 and can partially surround the first anchoring assembly 3. The first structural member 415a can be designed to have different sizes according to different first anchoring assemblies 3. When installing the tower of the embodiment of the present application, the second anchoring assembly 4 can be directly installed on the tower with the first anchoring assembly 3. At this time, first structural members 415a of different sizes can be adapted to first anchoring assemblies 3 of different models. The second structural member 415b is provided with threads for threaded connection with the second support member 416. First structural members 415a of different sizes can be connected with second structural members 415b of the same size. When installing the tower of the embodiment of the present application, first anchoring assemblies 3 of different models can be installed with the same model of second anchor 43. Along the circumference of the tower body 1, the first structural member 415a and the second structural member 415b are provided with a limiting structure. When the second support member 416 is rotated relative to the second structural member 415b, the second structural member 415b is restricted by the limiting structure and will not rotate obviously with the second support member 416, thereby adjusting the total axial length of the first support member 415 and the second support member 416.
[0069] Figure 6 for Figure 1Another partial enlarged view of the tower in area A of an embodiment of the present application. Figure 7 A structural schematic diagram of a first supporting structure of a tower according to an embodiment of the present application. Figure 8 A schematic structural diagram of a second pad 42 of a tower according to an embodiment of the present application. Fig. 9 for Figure 8 In the figure, a cross-sectional view of the second pad of the tower according to an embodiment of the present application at the DD section is shown.
[0070] For further information, see Figures 6 to 9 The second anchoring assembly 4 also includes: a second pad 42, which is detachably connected to the side of the first supporting structure 41 away from the tower body 1; the second pad 42 includes a second through hole 421, the prestressed cable 2 passes through the second through hole 421, and the second anchor 43 abuts against the side of the second pad 42 away from the first supporting structure 41.
[0071] The second pad 42 is arranged between the second anchor 43 and the first support structure 41. Since the second anchor 43 is fixedly connected to the prestressed cable 2 and the prestressed cable 2 is in a tensile stress state, the second anchor 43 will exert a force on the second pad 42 and transmit it to the first support structure 41. The first support structure 41 then transmits the force to the first end face 12, so that the force exerted by the second anchor 43 can also press the multiple tower sections 11, so that the tower of the embodiment of the present application can have good structural stability. In addition, the second anchor 43 can press the second pad 42 against the first support structure 41, and the second anchor 43 and the second pad 42, and the second pad 42 and the first support structure 41 can be fixed without additional fasteners, simplifying the structure of the second anchor assembly 4. When the prestressed cable 2 is stressed and relaxed, or the first pad 31 is not suitable for bearing excessive force, the protrusion 21 of the prestressed cable 2 can be pulled to increase the thickness of the second pad 42, so that the tensile stress of the prestressed cable 2 can be restored to the preset tensile stress range, so that the tower of the embodiment of the present application can alleviate the phenomenon of reducing the tensile stress of the prestressed cable 2. It should be noted that whether to set the second pad 42 can be selected according to actual needs, as long as the tensile stress requirement of the prestressed cable 2 can be met.
[0072] It is understandable that when the second anchor assembly 4 includes the second pad 42, the first support structure 41 can be adjusted in length along the axial direction. That is, when the first support structure 41 adopts the threaded connection form of the aforementioned embodiment of the present application, it can stretch the prestressed cable 2 together with the second pad 42 to make the tensile stress of the prestressed cable 2 within the preset tensile stress range; when the length of the first support structure 41 along the axial direction is fixed, the tensile stress of the prestressed cable 2 can be made within the preset tensile stress range only by adjusting the thickness of the second pad 42.
[0073] Fig.10 for Figure 7 In the figure, a cross-sectional view of the first supporting structure of the tower according to an embodiment of the present application is shown at section BB. Fig.11 for Figure 7 In the figure, a cross-sectional view of the first supporting structure of the tower according to an embodiment of the present application is shown at the CC section.
[0074] For further information, see Fig.10 and Fig.11 , and combined with Figure 6 and Figure 7 The first supporting structure 41 includes a supporting portion 412 and a load-bearing portion 411. The supporting portion 412 and the load-bearing portion 411 are arranged in an integrated structure, and the supporting portion 412 is columnar; the load-bearing portion 411 is arranged on the side of the supporting portion 412 away from the first end face 12, and the load-bearing portion 411 includes a first through hole 414. The prestressed cable 2 passes through the first through hole 414, and the second anchor 43 is supported on the load-bearing portion 411.
[0075] The load-bearing portion 411 is in the shape of a plate, and its plane is perpendicular to the axial direction of the prestressed cable 2. The support portion 412 is in the shape of a column, used to support the load-bearing portion 411, and can be perpendicular to the plane where the load-bearing portion 411 is located, or can be inclined relative to the plane where the load-bearing portion 411 is located. The load-bearing portion 411 and the support portion 412 can be an integral structure. The load-bearing portion 411 bears the force directly or indirectly applied by the second anchor 43, and transmits it to the first end face 12 through the support portion 412. The opening of the load-bearing portion 411 is used to make way for the prestressed cable 2, reducing the interference of the load-bearing portion 411 on the prestressed cable 2. Exemplarily, the support portion 412 can be a square frame with an opening on the side or a ring frame with an opening. When installing the first supporting structure 41, the opening can make way for the prestressed cable 2. After the first supporting structure 41 is installed, the prestressed cable 2 basically passes through the central area of the first supporting structure 41, so that the first supporting structure 41 can transmit the force applied by the second anchor 43 to the second pad 42 to the first end face 12, and apply it evenly to the first end face 12 along the circumference of the prestressed cable 2, thereby reducing the risk of damage to the first end face 12 due to excessive local pressure.
[0076] Further, see Figure 6 , Figure 7 , Figure 10 to Figure 11 The first supporting structure 41 further includes a reinforcing rib 413 , and the supporting portion 412 and the load-bearing portion 411 are both fixedly connected to the reinforcing rib 413 .
[0077] Obvious stress concentration phenomenon will occur at the connection between the support part 412 and the load-bearing part 411. Providing a reinforcing rib 413 and fixing the support part 412 and the load-bearing part 411 to the reinforcing rib 413 can alleviate the stress concentration phenomenon at the connection between the support part 412 and the load-bearing part 411, thereby improving the structural strength of the first support structure 41, and further enabling the tower frame of the embodiment of the present application to have good structural stability.
[0078] Further, see Figure 6 , Figure 7 , Figure 10 to Figure 11 , along the axial direction, the diameter of the circumscribed circle of the orthographic projection of the supporting portion 412 is greater than the diameter of the circumscribed circle of the orthographic projection of the load-bearing portion 411 .
[0079] Along the axial direction, the first support structure 41 is thicker at one end close to the first end face 12 and thinner at one end away from the first end face 12. The action area of the first support structure 41 and the first end face 12 is increased, and the pressure of the first support structure 41 on the first end face 12 can be reduced, thereby reducing the risk of the first end face 12 being damaged by the first support structure 41, and improving the structural stability of the tower in the embodiment of the present application. Figure 6 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0080] Fig.12 A schematic structural diagram of a first pad of a tower according to an embodiment of the present application. Fig.13 for Fig.12 In the figure, a cross-sectional view of the first pad of the tower of an embodiment of the present application is taken at section AA.
[0081] For further information, see Figure 12 to Figure 13 , and combined with Figure 6 The first anchoring assembly 3 includes: a first pad 31 and a first anchor 32. The first anchor 32 is fixedly connected to the protrusion 21. One end of the first pad 31 abuts against the first end face 12 along the axial direction, and the first anchor 32 abuts against the other end of the first pad 31.
[0082] The first pad 31 is arranged between the first end face 12 and the first anchor 32. Since the prestressed cable 2 is in a tensile stress state, the first anchor 32 can press the first pad 31 against the first end face 12. Therefore, the first pad 31 and the first end face 12 are directly abutted against each other, so that the relative positions of the first anchor 32, the first pad 31 and the first end face 12 can be fixed. When the tensile stress of the prestressed cable 2 is reduced, the protrusion 21 of the prestressed cable 2 can be pulled. On the basis of directly tensioning the prestressed cable 2, the thickness of the first pad 31 can be increased so that the tensile stress of the prestressed cable 2 can be increased again to within the preset tensile stress range. Considering that the tower section 11 can be made of concrete material, there is a risk of damage to the first end face 12. The first pad 31 can disperse the force of the first anchor assembly 3 on the first end face 12, thereby reducing the possibility of damage to the first end face 12 due to long-term force.
[0083] For further information, see Fig.12 and Fig.13 , and combined with Figure 6 Along the axial direction, the orthographic projection of the first anchor 32 is circular, the orthographic projection of the first pad 31 is semicircular, and the number of the first pad 31 is one or two; the first pad 31 includes a radial extension portion 311 and an axial extension portion 312, and the radial extension portion 311 is at least a part of a ring; the two ends of the radial extension portion 311 along the axial direction are respectively abutted against the first anchor 32 and the first end face 12; the axial extension portion 312 is arranged on the side of the radial extension portion 311 away from the first end face 12; the axial extension portion 312 includes an inner wall surface, and the inner wall surface is abutted against the outer peripheral side surface of the first anchor 32.
[0084] Considering that in order to apply the force evenly, the first anchor 32 usually adopts a rotating body structure coaxial with the prestressed cable 2. The first pad 31 is pressed against the first end face 12 by the first anchor 32. The radial extension 311 of the first pad 31 is located between the first anchor 32 and the first end face 12. As a part pressed against the first end face 12 by the first anchor 32, the force applied by the first anchor 32 is transmitted to the tower body 1. On the basis of tensioning the prestressed cable 2, the tensile stress of the anchor 2 can also be changed by changing the thickness of the radial extension 311 along the axial direction of the prestressed cable 2. The first axial extension 312 can abut against the outer peripheral side of the first anchor 32 along the radial direction of the prestressed cable 2, thereby limiting the possibility of the first anchor 32 and the first pad 31 being displaced along the radial direction of the prestressed cable 2, further fixing the relative position of the first anchor 32 and the first pad 31, and improving the structural stability of the tower of the embodiment of the present application.
[0085] Along the axial direction of the prestressed cable 2, the orthographic projection of the first anchor 32 is at least partially circular. Preferably, the orthographic projection of the first anchor 32 is circular. When the first anchor 32 is pulled by the prestressed cable 2, the first anchor 32 can apply a uniform force to the first pad 31, reducing the risk of excessive local pressure and damage to the first pad 31. Along the axial direction of the prestressed cable 2, the orthographic projection of the first pad 31 is semicircular. When installing the first pad 31, the first pad 31 can be directly inserted between the first anchor 32 and the first end face 12. At the same time, the first pad 31 is semicircular, so that the inner side surface of the axial extension portion 312 of the first pad 31 can abut against the outer peripheral side surface of the first anchor 32 to fix the relative position of the first pad 31 and the first anchor 32 along the radial direction of the prestressed cable 2. When there are two first pads 31, the orthographic projections of the two first pads 31 along the axial direction of the prestressed cable 2 can be in the form of a circular ring, which can evenly transmit the force applied by the first anchor 32 on the first pad 31 to the first end face 12, thereby reducing the risk of damage to the first end face 12 due to local excessive pressure.
[0086] Fig.14 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application. Fig.15 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0087] For further information, see Fig.14 and Fig.15 The tower frame of the embodiment of the present application also includes a clip 5, a clip limiting plate 6 and a cushion block 7; the first anchor 32 includes a first connecting hole 321, the prestressed cable 2 passes through the first connecting hole 321, the clip 5 is arranged in the first connecting hole 321, the prestressed cable 2 and the first anchor 32 are fixedly connected by the clip 5; the clip limiting plate 6 is detachably connected to the side of the first anchor 32 away from the tower body 1; the cushion block 7 is detachably connected to the side of the second anchor assembly 4 toward the tower body 1.
[0088] The clip 5 is used to fix the first anchor 32 and the prestressed cable 2 together. After the prestressed cable 2 passes through the first connection hole 321, there is a gap between the prestressed cable 2 and the hole wall of the first connection hole 321, and the clip 5 can be inserted into the hole along the direction from the first anchor 32 to the first end face 12. Considering that the clip 5 will be wedge-shaped, the tip is inserted into the gap. Since the prestressed cable 2 is in a tensile stress state, under the action of friction, the prestressed cable 2 will cause the clip 5 to continue to be inserted into the gap, so that it is stuck in the gap, and the first anchor assembly 3 is fixedly connected to the protrusion 21.
[0089] After the tensile stress of the prestressed cable 2 is reduced, the tensile stress of the prestressed cable 2 can be increased again by pulling the prestressed cable 2. At this time, the relative position of the first anchor 32 and the prestressed cable 2 can be adjusted. During the adjustment process, the connection between the first anchor 32 and the prestressed cable 2 can be released, and the first anchor 32 can be re-fixed at an appropriate position of the prestressed cable 2. When releasing the connection between the first anchor 32 and the prestressed cable 2, the position of the first anchor 32 can be kept unchanged, and the prestressed cable 2 can be pulled to loosen the clip 5, thereby releasing the connection between the prestressed cable 2 and the first anchor 32. Considering that the position change of the first anchor 32 is usually not large, the process of completely removing the clip 5 and then reinstalling the clip 5 is relatively cumbersome. The clip limit plate 6 can achieve that the clip 5 is not completely separated from the gap of the first connection hole 321, and the first anchor 32 and the prestressed cable 2 are in a state of releasing the fixed connection. When the prestressed cable 2 is pulled, the first anchor 32 can also move toward the side away from the first end face 12, and the pad 7 can limit the movement of the clip limit plate 6, hindering the clip limit plate 6 and the first anchor 32 from moving significantly along the axial direction of the prestressed cable 2, so as to reduce the risk of interference between the first anchor 32 and the second anchor 43. After the position adjustment of the first anchor 32 relative to the prestressed cable 2 is completed, the clip limit plate 6 and the pad 7 can be disassembled to simplify the structure of the tower in the embodiment of the present application.
[0090] In the embodiment of the present application, when the first support structure 41 of the second anchor assembly 4 is threadedly connected to adjust the length of the first support structure 41 in the axial direction to adjust the distance from the second anchor 43 to the first end face 12, the cushion block 7 can be arranged on the side of the second support member 416 of the first support structure 41 facing the first anchor assembly 3. When the first support structure 41 of the second anchor assembly 4 cannot adjust the length of the first support structure 41 in the axial direction, and the distance from the second anchor 43 to the first end face 12 is adjusted by the second pad 42, the cushion block 7 can be arranged on the side of the load-bearing portion 411 of the first support structure 41 facing the first anchor assembly 3. In the embodiment of the present application, the first support structure 41 cannot adjust the length in the axial direction, and the distance from the second anchor 43 to the first end face 12 is adjusted by the second pad 42 as an example for explanation.
[0091] Fig.16 for Figure 1 Another partial enlarged view of the tower in area A of an embodiment of the present application.
[0092] For further information, see Fig.16 The tower body 1 includes a third through hole 13 , which extends axially to the first end face 12 ; the prestressed cable 2 passes through the third through hole 13 , and the opening of the third through hole 13 at the first end face 12 is filled with grouting material.
[0093] A through hole can be reserved during the manufacture of the tower section 11. After multiple tower sections 11 are connected to form the tower body 1, the reserved through holes are connected to form a third through hole 13. The prestressed cable 2 passes through the third through hole 13 to connect multiple tower sections 11 together. Considering that the tower section 11 can be made of concrete material, the prestressed cable 2 will cause a small amount of wear on the inner wall of the third through hole 13, especially the third through hole 13 is located at the opening of the first end face 12. Grouting material can be filled in the opening to fill the damaged part to improve the structural strength of the opening and keep the first end face 12 flat at the opening. When the tensile stress of the prestressed cable 2 is reduced, the grouting material can be filled in the opening while adjusting the thickness of the first pad 31, and the depth requirement of the filling part can be met, so that the first end face 12 can provide stable support for the first pad 31 and improve the anti-corrosion and sealing ability of the opening.
[0094] Fig.17 A schematic structural diagram of a tower frame when the first anchor is not separated from the first end surface during installation of the tower frame according to an embodiment of the present application. Fig.18 A structural schematic diagram of installing a first pad during the installation of the tower according to an embodiment of the present application.
[0095] Please note that Fig.17 and Fig.18 , the embodiment of the present application can also be used for a tower in which the tensile stress of the prestressed cable 2 has been reduced. Such a tower is usually only provided with a first anchor assembly 3. The first support structure 41 can be installed first, and the prestressed cable 2 is pulled by the jack 8 so that the tensile stress of the prestressed cable 2 is within the preset tensile stress range. At this time, the first anchor 32 is separated from the first end face 12. After adjusting the connection position between the first anchor 32 and the prestressed cable 2, the first pad 31 can be installed between the first anchor 32 and the first end face 12 to complete the installation of the first anchor assembly 3; keep the jack 8 pulling the prestressed cable 2, fix the second anchor 43 to the prestressed cable 2, and then install the second pad 42 between the second anchor 43 and the first support structure 41 to complete the installation of the second anchor assembly 4; release the pulling of the prestressed cable 2 by the jack 8.
[0096] Fig.19 A schematic diagram of the structure of a wind turbine generator set according to an embodiment of the present application.
[0097] See also Fig.19 The embodiment of the present application further provides a wind turbine generator set 100, comprising the tower 200 of the aforementioned embodiment of the present application.
[0098] In summary, the embodiment of the present application provides a tower and a wind turbine generator set, wherein the prestressed cable passes through the tower body, and the end of the prestressed cable protrudes from the first end face of the tower body to form a protrusion. The first anchor assembly is connected to the prestressed cable and abuts against the first end face, so that the first anchor assembly can provide a certain force to the prestressed cable, and the prestressed cable is in a tensile stress state; the second anchor assembly is connected to the prestressed cable and abuts against the first end face, so that the second anchor assembly can also provide a certain force to the prestressed cable. When the tensile stress of the prestressed cable is reduced, the distance from the connection point between the second anchor assembly and the protrusion to the first end face can be increased, so that the second anchor assembly can pull the prestressed cable, thereby increasing the tensile stress of the prestressed cable, so that the prestressed cable is in a good tensile stress state, thereby alleviating the phenomenon of tensile stress reduction caused by deformation of the prestressed cable.
[0099] Although the present application has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present application. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there are no structural conflicts. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A tower, characterized in that: include: A tower body (1), wherein the tower body (1) has a first end surface (12) in its own axial direction; A prestressed cable (2) is inserted into the tower body (1) along the axial direction, and an end of the prestressed cable (2) protrudes from the first end surface (12) of the tower body (1) to form a protruding portion (21); A first anchoring assembly (3) fixedly connected to the protruding portion (21), the first anchoring assembly (3) abutting against the first end surface (12); The second anchoring component (4) is fixedly connected to the protruding portion (21), and the first end face (12) and the second anchoring component (4) are in abutment with each other; along the axial direction, at least a portion of the second anchoring component (4) is located on a side of the first anchoring component (3) away from the first end face (12); along the axial direction, the distance from the connection between the second anchoring component (4) and the protruding portion (21) and the first end face (12) can be adjusted.
2. The tower according to claim 1, characterized in that The second anchoring assembly (4) comprises: A first supporting structure (41) is disposed in contact with the first end surface (12) and at least partially surrounds the first anchoring assembly (3); A second anchor (43) is supported on the first supporting structure (41) on the side facing away from the first end face (12) in the axial direction. The second anchor (43) is fixedly connected to the protrusion (21). Along the axial direction, the distance between the second anchor (43) and the first end face (12) is adjustable.
3. The tower according to claim 2, characterized in that The first supporting structure (41) includes a first supporting member (415) and a second supporting member (416); along the axial direction, the first supporting member (415) abuts against the first end face, the side of the first supporting member (415) facing away from the first end face (12) is threadedly connected to the second supporting member (416), and the second anchor (43) abuts against the second supporting member (416).
4. The tower according to claim 3, characterized in that The first support member (415) comprises a first structural member (415a) and a second structural member (415b); along the axial direction, the first structural member (415a) abuts against the first end face (12), and the side of the first structural member (415a) facing away from the first end face (12) abuts against the second structural member (415b); along the circumferential direction of the tower body (1), the first structural member (415a) and the second structural member (415b) are provided with a limiting structure.
5. The tower according to claim 2, characterized in that: The second anchoring assembly (4) further comprises: a second pad (42) which is detachably connected to a side of the first supporting structure (41) which faces away from the tower body (1); the second pad (42) comprises a second through hole (421), the prestressed cable (2) passes through the second through hole (421), and the second anchor (43) abuts against a side of the second pad (42) which faces away from the first supporting structure (41).
6. The tower according to claim 5, characterized in that The first supporting structure (41) comprises a supporting portion (412) and a load-bearing portion (411); the supporting portion (412) and the load-bearing portion (411) are arranged in an integral structure, and the supporting portion (412) is columnar; the load-bearing portion (411) is arranged on a side of the supporting portion (412) away from the first end surface (12), and the load-bearing portion (411) comprises a first through hole (414), the prestressed cable (2) passes through the first through hole (414), and the second anchor (43) is supported on the load-bearing portion (411).
7. The tower according to claim 6, characterized in that Along the axial direction, the diameter of the circumscribed circle of the orthographic projection of the support portion (412) is greater than the diameter of the circumscribed circle of the orthographic projection of the load-bearing portion (411).
8. The tower according to claim 1, characterized in that The first anchoring assembly (3) comprises a first pad (31) and a first anchor (32), wherein the first anchor (32) is fixedly connected to the protruding portion (21); along the axial direction, one end of the first pad (31) abuts against the first end face (12), and the other end of the first pad (31) abuts against the first anchor (32).
9. The tower according to claim 8, characterized in that The tower frame further comprises a clip (5), a clip stop plate (6) and a cushion block (7); the first anchor (32) comprises a first connection hole (321), the prestressed cable (2) passes through the first connection hole (321), the clip (5) is arranged in the first connection hole (321), and the prestressed cable (2) and the first anchor (32) are fixedly connected via the clip (5); The clip limiting plate (6) is detachably connected to a side of the first anchor (32) facing away from the tower body (1); The cushion block (7) is detachably connected to a side of the second anchoring assembly (4) facing the tower body (1).
10. The tower according to claim 8, characterized in that Along the axial direction, the orthographic projection of the first anchor (32) is circular, and the orthographic projection of the first pad (31) is semicircular, and the number of the first pad (31) is one or two; the first pad (31) includes a radial extension portion (311) and an axial extension portion (312), and the radial extension portion (311) is at least a part of a ring; the two ends of the radial extension portion (311) along the axial direction are respectively in contact with the first anchor (32) and the first end face (12); the axial extension portion (312) is arranged on the side of the radial extension portion (311) away from the first end face (12); the axial extension portion (312) includes an inner wall surface, and the inner wall surface is in contact with the outer peripheral side surface of the first anchor (32).
11. The tower according to claim 1, characterized in that The tower body (1) comprises a third through hole (13), and along the axial direction, the third through hole (13) extends to the first end face; the prestressed cable (2) passes through the third through hole (13), and the third through hole (13) is filled with grouting material at the opening of the first end face (12).
12. A wind turbine generator set, characterized in that: Comprising the tower (200) according to any one of claims 1 to 11.