Slurry stopping sealing device for high pier steel formwork

By installing a slurry sealing device of inflatable rubber strips on the high pier steel formwork, the problem of the steel formwork not being tightly fitted with the pier body is solved, preventing concrete slurry, improving the appearance quality of the pier body and reducing the handling cost.

CN222139803UActive Publication Date: 2024-12-10CHINA RAILWAY BRIDGE BUREAU GRP EIGHTH ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420691452.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-12-10
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

During the construction of high piers, the steel formwork and the pier body are not tightly fitted, resulting in leaking and root rot during concrete pouring, contaminating the poured pier body, affecting the appearance quality and increasing post-processing costs.

Method used

Design a slurry sealing device, which includes installing a fixing device and a plurality of rubber strips on a steel formwork. The two sides of each rubber strip are connected to the fixing device to form a mid-air cavity, and inflate it through an inflatable hole to make the rubber strips outward. Expand to fit the high piers closely to prevent slurry.

Benefits of technology

Effectively prevent slurry flow during concrete pouring, reduce slurry leakage and root rot, improve the appearance quality of the pier body, reduce post-processing costs, and ensure structural safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222139803U_ABST
    Figure CN222139803U_ABST
Patent Text Reader

Abstract

The utility model relates to a grout stopping sealing device for a high pier steel formwork, and relates to the technical field of building construction.The sealing device comprises a fixing device installed on the steel formwork and a plurality of rubber strips installed on the fixing device, and the two side edges of each rubber strip are connected with the fixing device to form a hollow air cavity; an inflation hole is formed in the joint of the rubber strip and the fixing device; the fixing device is provided with a plurality of hollow air cavities side by side, and every two adjacent hollow air cavities are communicated through an inflation hole. When the hollow air cavity is filled with air, the rubber strip expands outwards and is tightly attached to the high pier, and the situations that slurry flows in the concrete pouring process, consequently, the joints of the pier body of the high pier leak slurry and rot roots, the poured pier body is polluted by the slurry, the appearance quality of the pier body is affected, and the later treatment cost is increased are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a slurry-stopping sealing device for high pier steel formwork. Background Art

[0002] With the continuous development of my country's transportation infrastructure, the speed of road and bridge construction has accelerated. The application of high pier construction technology in highway bridge construction is becoming more and more extensive, and the application effect of this technology has an important impact on the overall construction level and the quality of highways. In the process of high pier body construction, due to the large height of the pier body and the large number of construction sections, climbing formwork, sliding formwork and flip formwork are usually used. During the structural construction stage, the formwork is attached to the already poured high pier body and rises layer by layer with the structural construction. Due to the gap between the formwork and the pier body, the concrete pouring process will affect the appearance quality of the poured pier body. Therefore, it is necessary to fit the formwork closely to the high pier body.

[0003] In the prior art, foam glue or double-sided tape is usually used at the bottom of the template to fit the template to the pier body. However, during the concrete pouring process, the concrete slurry flows down along the steel template, causing leakage and root rot at the joints, and the slurry contaminates the poured pier body. There is a problem of loose fit between the steel template and the pier body, and slurry flows during the concrete pouring process. Utility Model Content

[0004] In view of the defects existing in the prior art, the present application provides a slurry-stopping sealing device for high pier steel formwork, which can solve the problems of loose fit between the steel formwork and the pier body and slurry flow during concrete pouring in the prior art.

[0005] In a first aspect, an embodiment of the present application provides a slurry-stopping sealing device for a high pier steel formwork, the sealing device comprising a fixing device installed on the steel formwork, and a plurality of rubber strips installed on the fixing device, both sides of each of the rubber strips are respectively connected to the fixing device to form a hollow cavity, and an inflation hole is provided at the connection between the rubber strip and the fixing device;

[0006] The fixing device is provided with a plurality of hollow cavities side by side, and two adjacent hollow cavities are connected by an inflation hole; when the hollow cavities are filled with gas, the rubber strip expands outwards and fits tightly with the high pier.

[0007] In the embodiment of the present application, by inflating air into the inflation hole, the rubber strip is expanded outward and fits tightly with the high pier, thereby preventing slurry from flowing during concrete pouring, which would cause slurry leakage and root rot at the sections of the pier body, and the slurry from contaminating the poured pier body, affecting the appearance quality of the pier body and increasing the cost of subsequent processing.

[0008] In combination with the first aspect, in one embodiment, the steel template is provided with a groove, the fixing device of the sealing device is embedded in the groove, and the portion of the rubber strip connected to the fixing device is also located in the groove.

[0009] In the embodiment of the present application, a portion of the rubber strip is located in the groove, and another portion of the rubber strip is located outside the groove, thereby reducing the gap between the steel formwork and the high pier body.

[0010] In combination with the first aspect, in one implementation, the width of the groove at least satisfies the overlap length of concrete pouring.

[0011] In the embodiment of the present application, the width of the groove is 10 cm, so that the length of the concrete edging is controlled within 10 cm, meeting the performance of the concrete and ensuring the structural safety of the high pier body.

[0012] In combination with the first aspect, in one implementation, a gap is provided between the groove and the adjacent rubber strip.

[0013] In the embodiment of the present application, when the inflation hole is inflated, the rubber strip adjacent to the top groove can expand upward, and the rubber strip adjacent to the bottom groove can expand downward, avoiding gaps and excessive squeezing between the grooves.

[0014] In combination with the first aspect, in one embodiment, the groove includes a first groove located toward the high pier, and the first groove is close to the ground; when the hollow cavity is filled with gas, the rubber strip and the high pier fit tightly.

[0015] In the embodiment of the present application, when the air cavity is filled with gas, the rubber strip and the high pier fit tightly, so that the steel formwork and the high pier are blocked, preventing slurry from flowing during concrete pouring, resulting in slurry leakage and root rot at the sections of the high pier body, and slurry contaminating the poured pier body, affecting the appearance quality of the pier body and increasing the cost of subsequent processing.

[0016] In combination with the first aspect, in one embodiment, the groove further includes a second groove located on the bottom surface of the steel formwork, the second groove is adjacent to the side surface of the steel formwork, and when the hollow cavity is filled with gas, the rubber strip fits tightly against the ground.

[0017] In the embodiment of the present application, when the hollow cavity of the second groove is filled with gas, the rubber strip fits tightly against the ground, preventing part of the concrete slurry from sliding onto the ground and increasing the cost of subsequent processing.

[0018] In combination with the first aspect, in one embodiment, the outer wall of the second groove and the side surface of the steel template are in the same plane.

[0019] In the embodiment of the present application, when the hollow cavity is filled with gas and the rubber strip expands outward, a portion of the rubber strip is ensured to be in contact with the pier body, thereby further reducing the gap between the template and the pier body.

[0020] In combination with the first aspect, in one implementation, the length of the rubber strip is: a length that can at least surround one of the steel templates in a radial direction.

[0021] In the embodiment of the present application, the length of the rubber strip can at least wrap around a steel formwork in the radial direction. During installation, only the steel formwork needs to be assembled. This can also ensure that the rubber strip fits tightly against the pier to prevent slurry from flowing during concrete pouring, which can cause slurry leakage and root rot at the sections of the pier body, and slurry contamination of the poured pier body.

[0022] In combination with the first aspect, in one embodiment, the fixing device is connected to the steel formwork by screws or bolts.

[0023] In the embodiment of the present application, the fixing device can be tightly connected to the steel formwork by screws or bolts to prevent it from falling off during the long-term construction process, causing slurry to flow during concrete pouring, resulting in leakage and root rot at the sections of the high pier body, and slurry contamination of the poured pier body.

[0024] In combination with the first aspect, in one implementation, the rubber strip is fixed to the fixing device by adhesive.

[0025] In the embodiment of the present application, since the rubber strip is made of flexible material and is fixed by adhesive, the integrity of the rubber strip is ensured to prevent gas from overflowing to the outside when the rubber strip is inflated, thereby affecting the inflation effect in the rubber strip.

[0026] The beneficial effects brought by the technical solution provided by the embodiments of the present application include:

[0027] The present application is achieved by installing a fixing device on a steel formwork, and installing multiple rubber strips on the fixing device. Both sides of each rubber strip are respectively connected to the fixing device to form a hollow cavity. An inflation hole is provided at the connection between the rubber strip and the fixing device. The fixing device is provided with multiple hollow cavities side by side, and two adjacent hollow cavities are connected through the inflation hole. By inflating air into the inflation hole, the rubber strip is expanded outward and fits tightly with the high pier, thereby preventing slurry from flowing during concrete pouring, which leads to slurry leakage and root rot at the sections of the high pier body, and the slurry contamination of the poured pier body, affecting the appearance quality of the pier body and increasing the subsequent processing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0029] Figure 1 This is a schematic structural diagram of a slurry-stopping sealing device for a high pier steel formwork according to an embodiment of the present application;

[0030] Figure 2 This is a schematic diagram of the installation of a slurry-stopping sealing device for a high pier steel formwork according to an embodiment of the present application;

[0031] Figure 3 for Figure 2 The enlarged schematic diagram of point A in the middle;

[0032] Figure 4 for Figure 2 Side view of the Sinosteel formwork.

[0033] In the figure:

[0034] 1. Steel template; 101. First groove; 102. Second groove;

[0035] 2. Sealing device; 201. Rubber strip; 202. Inflation hole; 203. Fixing device; 204. Hollow cavity. DETAILED DESCRIPTION

[0036] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0037] The embodiment of the present application provides a slurry-stopping sealing device for a high pier steel formwork, which can solve the problems in the prior art of loose fit between the steel formwork and the pier body and slurry flow during concrete pouring.

[0038] like Figure 1 , Figure 2 and Figure 3As shown, the present application provides an embodiment of a slurry-stop sealing device for high pier steel formwork, the sealing device 2 includes a fixing device 203 installed on the steel formwork 1, and also includes a plurality of rubber strips 201 installed on the fixing device 203, and both side edges of each rubber strip 201 are respectively connected to the fixing device 203, so that a hollow cavity 204 is formed between the inner wall of the rubber strip 201 and the fixing device 203, and an inflation hole 202 is provided at the connection between the rubber strip 201 and the fixing device 203 (only the position of the inflation hole is marked in the figure).

[0039] like Figure 3 As shown, the fixing device 203 is provided with a plurality of hollow cavities 204 in parallel, and two adjacent hollow cavities 204 are connected through the inflation hole 202, which can balance the air pressure on both sides and ensure the same expansion degree on both sides. When the air cavity 204 is filled with gas, the rubber strip 201 expands outwards and fits tightly with the pier body, preventing slurry from flowing during concrete pouring, causing slurry leakage and root rot at the sections of the pier body, and slurry contaminating the poured pier body, affecting the appearance quality of the pier body, and increasing the cost of later processing.

[0040] In this embodiment, the fixing device 203 is provided with two hollow cavities 204 side by side, and the two adjacent hollow cavities 204 are connected through the inflation hole 202. When the air cavity 204 is filled with gas, the two rubber strips 201 expand outwards to form an "M" shape, which fits tightly with the pier body, preventing slurry from flowing during concrete pouring, resulting in slurry leakage and root rot at the sections of the pier body, and slurry contaminating the poured pier body, affecting the appearance quality of the pier body, and increasing the cost of later processing.

[0041] In other embodiments, the fixing device 203 is provided with three hollow cavities 204 in parallel, and two adjacent hollow cavities 204 are connected through the inflation hole 202. When the air cavity 204 is filled with gas, the three rubber strips 201 expand outwards and fit tightly with the pier body, thereby preventing slurry from flowing during concrete pouring, causing slurry leakage and root rot at the sections of the pier body, and slurry contaminating the poured pier body, affecting the appearance quality of the pier body, and increasing the cost of later processing.

[0042] like Figure 2 and Figure 4 As shown, in some embodiments, the steel formwork 1 is provided with a groove, the fixing device 203 of the sealing device 2 is embedded in the groove, and the portion of the rubber strip 201 connected to the fixing device 203 is also located in the groove, a portion of the rubber strip 201 is located in the groove, and another portion of the rubber strip 201 is located outside the groove, thereby reducing the gap between the steel formwork 1 and the high pier body. When the rubber strip 201 expands outward, it fits tightly with the high pier body to prevent slurry from flowing during concrete pouring, resulting in slurry leakage and root rot at the sections of the high pier body, and slurry contamination of the poured pier body, affecting the appearance quality of the pier body and increasing the subsequent processing costs.

[0043] Furthermore, the width of the groove can at least meet the length of the concrete edge wrapping, which is the lap length of the concrete at the junction of adjacent templates. When pouring the pier body of the high pier, the length of the concrete edge wrapping shall not exceed 10 cm, otherwise it will affect the performance of the concrete and the structural performance of the pier body. In this embodiment, the width of the groove is 10 cm, so that the length of the concrete edge wrapping is controlled within 10 cm, which meets the performance of the concrete and ensures the structural safety of the pier body.

[0044] like Figure 3 As shown, further, a gap is provided between the above-mentioned groove and the adjacent rubber strip 201, which facilitates the installation and removal of the fixing device 203 on the one hand, and makes way for the rubber strip 201 to expand outward on the other hand. When the inflation hole 202 is inflated, the rubber strip 201 adjacent to the top groove can expand upward, and the rubber strip 201 adjacent to the bottom groove can expand downward, avoiding the formation of gaps and excessive extrusion between the grooves.

[0045] like Figure 4 As shown, in some embodiments, the groove includes a first groove 101 located toward the high pier, and the first groove 101 is close to the ground to facilitate the flow of concrete on the steel formwork 1 and facilitate the pouring of concrete; when the air cavity 204 is filled with gas, the rubber strip 201 and the high pier fit tightly, so that the steel formwork 1 and the high pier are blocked to prevent slurry from flowing during concrete pouring, resulting in leakage and root rot at the sections of the high pier body, and slurry contamination of the poured pier body, affecting the appearance quality of the pier body and increasing the cost of subsequent processing.

[0046] like Figure 4 As shown, in other embodiments, the groove includes not only the first groove 101, but also a second groove 102 located on the bottom surface of the steel template 1. The second groove 102 is adjacent to the side of the steel template 1. When the hollow cavity 204 of the second groove 102 is filled with gas, the rubber strip 201 fits tightly with the ground, preventing part of the concrete slurry from sliding onto the ground and increasing the cost of subsequent processing.

[0047] Preferably, the outer wall of the second groove 102 and the side of the steel template 1 are in the same plane. When the hollow cavity 204 is filled with gas, the rubber strip 201 expands outward, ensuring that a portion of the rubber strip 201 is in contact with the pier body, further reducing the gap between the template and the pier body.

[0048] In some embodiments, the length of the rubber strip 201 is: at least enough to surround a steel formwork 1 in the radial direction. In actual on-site construction, multiple steel formworks 1 are assembled to form a steel formwork assembly, and the length of the rubber strip 201 is at least enough to surround a steel formwork 1 in the radial direction. During installation, only the steel formworks 1 need to be assembled, and the rubber strip 201 can be closely fitted to the high pier to prevent slurry from flowing during concrete pouring, resulting in leakage and root rot at the sections of the high pier body, and slurry contamination of the poured pier body.

[0049] In some embodiments, the fixing device 203 is connected to the steel formwork 1 by screws or bolts. In this way, the fixing device 203 can be tightly connected to the steel formwork 1. Since the pier body is relatively long and the curing period of concrete is also long, in the actual on-site construction process, it is possible to avoid falling off during the long-term construction process, causing slurry flow during concrete pouring, resulting in leakage and root rot at the sections of the pier body, and slurry contamination of the poured pier body.

[0050] In some embodiments, the rubber strip 201 is fixed to the fixing device 203 by adhesive. Since the rubber strip is a flexible material, this connection method ensures the integrity of the rubber strip 201 and prevents gas from overflowing to the outside when the rubber strip 201 is inflated, thereby affecting the inflation effect of the rubber strip 201.

[0051] On the other hand, an embodiment of the use of a slurry-stopping sealing device for high pier steel formwork is provided, in which the rubber strip 201 is first fixed on the fixing device 203, and then the fixing device 203 is installed on the steel formwork 1, with the rubber strip 201 facing the outside, and air is inflated into the rubber strip 201 through the inflation holes 202 at the rubber strip 201 and the fixing device 203. At this time, the rubber strip 201 expands outward and fits tightly against the pier body.

[0052] In summary, the present application is achieved by installing a fixing device 203 on a steel formwork 1, and installing multiple rubber strips 201 on the fixing device 203, both sides of each rubber strip 201 are respectively connected to the fixing device 203 to form a hollow cavity 204, and an inflation hole 202 is provided at the connection between the rubber strip 201 and the fixing device 203. The fixing device 203 is provided with multiple hollow cavities 204 side by side, and two adjacent hollow cavities 204 are connected through the inflation hole 202. By inflating air into the inflation hole 202, the rubber strip 201 is expanded outward and fits tightly with the high pier, so as to prevent slurry from flowing during concrete pouring, which will cause slurry leakage and root rot at the sections of the high pier body, and the slurry contaminates the poured pier body, affecting the appearance quality of the pier body and increasing the subsequent processing costs.

[0053] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0054] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0055] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A grout-stopping sealing device for high pier steel formwork, characterized in that: The sealing device (2) comprises a fixing device (203) installed on the steel template (1), and a plurality of rubber strips (201) installed on the fixing device (203), the two sides of each rubber strip (201) are respectively connected to the fixing device (203) to form a hollow cavity (204), and an inflation hole (202) is provided at the connection between the rubber strip (201) and the fixing device (203); The fixing device (203) is provided with a plurality of hollow cavities (204) arranged side by side, and two adjacent hollow cavities (204) are connected through an inflation hole (202); when the hollow cavities (204) are filled with gas, the rubber strip (201) expands outwards and fits tightly with the high pier.

2. The grout-stopping sealing device for high pier steel formwork according to claim 1, characterized in that: The steel template (1) is provided with a groove, the fixing device (203) of the sealing device (2) is embedded in the groove, and the portion of the rubber strip (201) connected to the fixing device (203) is also located in the groove.

3. The grout-stopping sealing device for high pier steel formwork according to claim 2, characterized in that: The width of the groove at least meets the overlap length of concrete pouring.

4. The grout-stopping sealing device for high pier steel formwork according to claim 2, characterized in that: A gap is provided between the groove and the adjacent rubber strip (201).

5. The grout-stopping sealing device for high pier steel formwork according to claim 2, characterized in that: The groove comprises a first groove (101) located toward the high pier, and the first groove (101) is close to the ground; when the hollow cavity (204) is filled with gas, the rubber strip (201) and the high pier are tightly fitted.

6. The grout-stopping sealing device for high pier steel formwork according to claim 5, characterized in that: The groove also includes a second groove (102) located on the bottom surface of the steel template (1), and the second groove (102) is adjacent to the side surface of the steel template (1). When the hollow cavity (204) is filled with gas, the rubber strip (201) is tightly fitted to the ground.

7. The grout-stopping sealing device for high pier steel formwork according to claim 6, characterized in that: The outer wall of the second groove (102) and the side surface of the steel template (1) are in the same plane.

8. The grout-stopping sealing device for high pier steel formwork according to claim 1, characterized in that: The length of the rubber strip (201) is at least enough to surround one of the steel templates (1) in a radial direction.

9. The grout-stopping sealing device for high pier steel formwork according to claim 1, characterized in that: The fixing device (203) is connected to the steel template (1) via screws or bolts.

10. The grout-stopping sealing device for high pier steel formwork according to claim 1, characterized in that: The rubber strip (201) is fixed to the fixing device (203) by means of glue.