Paving steel plate connecting assembly for earthwork transportation stage of building construction
Through the combination of hole-paving steel plates and fixing mechanisms, the sliding and anti-slip problems of traditional paving steel plates during the construction earth transportation stage are solved, and a safer, more efficient and more economical temporary road installation is achieved, which is suitable for a variety of ground conditions. .
Patent Information
- Application Number
- CN202420850771.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-04-22
AI Technical Summary
In the construction earth transportation stage, traditional paving steel plates have problems such as mutual sliding, insufficient anti-slip capability, large safety hazards, high maintenance costs and low construction efficiency, and lack simple and firm connection solutions.
The hole-hole paving steel plate is connected to the fixing mechanism, including pins, inserts and locking pins. Through the arc-shaped design of the pins and the arc-shaped cover of the inserts, the latch principle is used to achieve a stable connection of the paving steel plate to avoid slipping. Move and simplify the installation and disassembly process.
Effectively prevent slippage between paving steel plates, improve overall anti-slip performance, reduce construction costs, improve construction efficiency and safety, is suitable for a variety of ground conditions, and extend the service life of the steel plate.
Smart Images

Figure CN222182956U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction engineering, in particular to a paving steel plate connection assembly used in the earthwork transportation stage of construction. Background Art
[0002] With the continuous advancement of my country's social and economic development and urbanization, housing construction and municipal engineering construction will continue. In the construction of earthwork transportation in the field of construction engineering, paving steel plates are often used for temporary road construction to facilitate the transportation of machinery and vehicles. However, there are some problems with temporary roads paved with traditional paving steel plates, mainly manifested in the lack of anti-slip and mutual movement restriction measures between paving steel plates, which brings great difficulties in use and safety hazards to the construction site.
[0003] Current state of the art: Currently, stacking and laying paving slabs are often used in the earthwork transportation stage. However, this connection method has the following defects: (1) Mutual movement problem. Stacked paving slabs are prone to sliding against each other during transportation, which may cause the upper mechanical equipment to become unstable, increasing the danger of the construction site and the risk of accidents. (2) Insufficient anti-slip ability. Under wet or uneven ground conditions, the surface of a single paving slab often lacks sufficient anti-slip ability, which affects construction efficiency and may even cause safety hazards to mechanical equipment or vehicles. (3) The sliding and displacement of paving slabs under the action of external forces may cause them to bend and deform, which not only poses a safety hazard but also increases their own maintenance costs. (4) The current stacking connection method is not strong enough and requires additional fixing measures, which increases the operational complexity and economic cost of construction.
[0004] At present, paving steel plates have not provided a simple, firm and anti-slip connection solution in actual use, and cannot fully meet the actual needs of the earthwork transportation stage. Therefore, it is an urgent need in the current technical field to seek an innovative paving steel plate connection system that can solve the mutual movement and anti-slip problems at the same time. Utility Model Content
[0005] The purpose of the utility model is to overcome the shortcomings of the above-mentioned background technology and provide a paving steel plate connection assembly for the earthwork transportation stage of construction. Based on the existing construction conditions and material usage, the utility model solves the problems of the traditional paving method, such as lack of stability, poor anti-slip ability, many safety hazards of paving steel plates, high maintenance costs, and low construction efficiency, through an innovative paving steel plate connection assembly. The utility model effectively prevents the paving steel plates from moving relative to each other, organically combines the anti-slip resistance of a single paving steel plate, improves the overall anti-slip performance, eliminates the need for additional fixing measures, and provides a safer, more efficient, and more economical solution for construction sites.
[0006] The utility model provides a paving steel plate connection assembly for use in the earthwork transportation stage of construction, comprising paving steel plates, wherein the paving steel plates are perforated paving steel plates with holes opened along the circumference of the steel plates, the perforated paving steel plates are stacked up and down at the edges of adjacent perforated paving steel plates, the openings of the perforated paving steel plates are connected to the corresponding openings of the adjacent perforated paving steel plates through a fixing mechanism, and the connected multiple perforated paving steel plates form a temporary paving assembly.
[0007] In the above technical scheme, the fixing mechanism includes a pin member, an insert member and a locking pin; the pin member has a base with a radial size larger than the opening of the perforated paving steel plate, the base is provided with a pin that matches the gap of the opening of the perforated paving steel plate, the pin is perpendicular to the base, and a through hole is provided on the top of the pin; the insert member has a sealing plate, a cover body with a bottom opening is provided on one side of the sealing plate, the cover body and the sealing plate are coaxially arranged and perpendicular to each other, a latch rod is provided in the middle of the sealing plate, which is arranged on the same side of the cover body and perpendicular to the sealing plate, the distance between the two ends of the inner side of the cover body is larger than the opening of the perforated paving steel plate, the inner wall of the cover body matches the outer wall of the top of the pin, and the latch rod matches the gap of the through hole; the axial length of the latch rod is larger than the axial length of the through hole, the part of the latch rod protruding from the through hole is provided with a locking hole arranged in a radial direction, and one end of the locking pin is provided with a bent expansion head with a width larger than the locking hole, and the locking pin is inserted into the locking hole to lock the pin member, the insert member and the perforated paving steel plates stacked up and down.
[0008] In the above technical solution, the top of the pin is an arc-shaped cylindrical surface, and the cover body is an arc-shaped column panel.
[0009] In the above technical solution, the top of the pin is a semi-cylindrical surface, and the cover body is a semi-arc plate.
[0010] In the above technical solution, the column body of the pin is a square column.
[0011] In the above technical solution, the base is a circular plate coaxially arranged with the pin.
[0012] In the above technical solution, the latch rod is a round rod, and the through hole is a round hole.
[0013] In the above technical solution, the long side of the perforated paving steel plate is connected to the corresponding long side of the adjacent perforated paving steel plate by stacking up and down; the long sides of the two perforated paving steel plates are connected side by side, and the short sides of the two perforated paving steel plates connected side by side are connected to the long side of the third perforated paving steel plate by stacking up and down.
[0014] The utility model is used for the paving steel plate connection assembly in the earthwork transportation stage of construction, and has the following beneficial effects:
[0015] (1) The utility model fully utilizes the existing paving steel plates and is environmentally friendly; (2) The regular openings and connection mechanisms are suitable for different combinations of paving steel plates and are suitable for construction sites, road construction, and other types of projects that require rapid construction of temporary roads, and are flexible and versatile; (3) The connection assembly is reasonably constructed, which is convenient for operators to quickly install and remove paving steel plates. It can be quickly implemented in construction sites that require frequent construction and evacuation, and has high construction efficiency; (4) The connection assembly uses special pins and uses the principle of latches, which is reliable, stable, and durable, greatly reducing the frequency of replacement and is easy to maintain; (5) The connection assembly The pins are in the shape of an arc, which effectively prevents the tires of the mechanical equipment running above from being damaged and causing accidents, and is safe; (6) The assembly and disassembly process of the connection assembly is simple and reusable, which effectively reduces the time and personnel and equipment costs of the connection, while extending the service life of the paving steel plate, saving project resources and being economical; (7) Compared with the traditional paving steel plate laying, this connection assembly firmly combines the paving steel plates, and its overall anti-skid property is significantly improved, effectively preventing the paving steel plates from slipping, ensuring the function of the temporary road, and performing better under slippery or uneven ground conditions, and is innovative and adaptable. (8) The utility model is not only suitable for the earthwork transportation stage, but also can play a role in the construction of temporary roads at various stages of the project, and has wide applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic structural plan view of a paving steel plate with holes in a paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model;
[0017] Figure 2 It is a structural top view of a pin member in a paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model;
[0018] Figure 3 It is a structural side view of a pin member in a paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model;
[0019] Figure 4 This is a structural front view of a pin member in a paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model;
[0020] Figure 5 This is a structural matching diagram of a pin member and a paving steel plate with holes in a paving steel plate connection assembly used in the earthwork transportation stage of construction;
[0021] Figure 6 It is a bottom view of the structure of the insert in the paving steel plate connection assembly used in the earthwork transportation stage of construction of the utility model;
[0022] Figure 7This is a structural front view of an insert in a paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model;
[0023] Figure 8 for Figure 7 Schematic diagram of the structure of the AA section;
[0024] Fig. 9 This is a schematic diagram of the structure of the locking pin in the paving steel plate connection assembly used in the earthwork transportation stage of construction;
[0025] Fig.10 This is the first superposition method of multiple perforated paving steel plates in the paving steel plate connection assembly used in the earthwork transportation stage of construction of the utility model;
[0026] Fig.11 This is the second superposition method of multiple perforated paving steel plates in the paving steel plate connection assembly used in the earthwork transportation stage of construction of the utility model;
[0027] Fig.12 It is a schematic diagram of the first step of the installation process of the paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model;
[0028] Fig.13 It is a schematic diagram of the second step of the installation process of the paving steel plate connection assembly used in the earthwork transportation stage of the construction of the utility model;
[0029] Fig.14 It is an assembly schematic diagram of the third step in the installation process of the paving steel plate connection assembly used in the earthwork transportation stage of construction according to the utility model. DETAILED DESCRIPTION
[0030] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments, but the embodiments should not be construed as limiting the present invention.
[0031] See also Figure 1 The utility model is a paving steel plate connection assembly used in the earthwork transportation stage of construction, comprising a paving steel plate, wherein the paving steel plate is a perforated paving steel plate 1 with holes opened along the circumference of the steel plate, the perforated paving steel plate 1 is overlapped with the edge of the adjacent perforated paving steel plate 1, the opening of the perforated paving steel plate 1 is connected with the corresponding opening of the adjacent perforated paving steel plate 1 through a fixing mechanism, and the connected multiple perforated paving steel plates 1 form a temporary paving assembly. In one or more embodiments, the fixing mechanism comprises a pin member 2, an insert member 3 and a locking pin 4.
[0032] See also Figures 2 to 5The pin member 2 has a base 21 whose radial dimension is larger than the opening of the perforated paving steel plate 1. The base 21 is provided with a pin 22 which matches the opening of the perforated paving steel plate 1. The pin 22 is perpendicular to the base 21, and a through hole 23 is provided on the top of the pin 22.
[0033] See also Figures 6 to 8 The insert 3 has a sealing plate 31, and a cover body 32 with a bottom opening is provided on one side of the sealing plate 31. The cover body 32 and the sealing plate 31 are coaxially arranged and perpendicular to each other. A latch rod 33 is provided in the middle of the sealing plate 31 and is arranged on the same side as the cover body 32 and perpendicular to the sealing plate 31. The distance between the two ends of the inner side of the cover body 32 is greater than the opening of the perforated paving steel plate 1. The inner wall of the cover body 32 cooperates with the outer wall of the top of the pin 22, and the latch rod 33 is clearance-matched with the through hole 23. In one or more embodiments, the latch rod 33 is a round rod, and the through hole 23 is a round hole.
[0034] The axial length of the latch rod 33 is greater than the axial length of the through hole 23, and the portion of the latch rod 33 protruding from the through hole 23 is provided with a radially arranged locking hole 34, see Fig. 9 One end of the locking pin 4 is provided with a bent expanded head 41 with a width greater than the locking hole 34. The locking pin 4 is inserted into the locking hole 34 to lock the pin member 2, the insert member 3 and the perforated paving steel plates 1 stacked up and down.
[0035] The top of the pin 22 is an arc-shaped cylinder, and the cover 32 is an arc-shaped cylinder panel. In one or more embodiments, the top of the pin 22 is a semi-cylindrical surface, and the cover 32 is a semi-circular arc plate. The column body of the pin 22 is a square column. The base 21 is a circular plate coaxially arranged with the pin 22.
[0036] See also Fig.10 , the first superposition mode of the perforated paving steel plates 1: the long sides of the perforated paving steel plates 1 are superimposed and connected with the corresponding long sides of the adjacent perforated paving steel plates 1;
[0037] See also Fig.11 The second stacking method of the perforated paving steel plates 1 is as follows: the long sides of the two perforated paving steel plates 1 are connected side by side, and the short sides of the two perforated paving steel plates 1 connected side by side are stacked and connected with the long side of the third perforated paving steel plate 1 up and down.
[0038] The utility model discloses a paving steel plate connection assembly for the earthwork transportation stage of construction, which is realized by the following structure: a paving steel plate 1 with holes having standardized regular openings, a steel pin part 2, a steel insert part 3, and a prefabricated locking pin 4. The paving steel plate 1 with holes having standardized regular openings is a paving steel plate with simple holes drilled according to the design positioning requirements, so as to realize different arrangements and combinations of the paving steel plate 1 with holes. The steel pin part 2 has a base 21 of a circular thick plate at the bottom, a square columnar pin 22 at the top, a semicircular arc at the end of the pin 22, and a circular through hole 23 at the head of the pin 22. The steel insert part 3 has a semicircular thick cover body 32 at the top, a steel sealing plate 31 is arranged on one side, a cylindrical latch rod 33 is arranged at the center of the sealing plate 31, and a circular locking hole 34 is opened at the rod end. The body of the prefabricated locking pin 4 is cylindrical, and one end of the prefabricated locking pin 4 is bent and expanded.
[0039] The utility model discloses an installation process of a paving steel plate connection assembly used in the earthwork transportation stage of construction, which requires the use of a paving steel plate 1 with holes having standardized regular openings, a steel pin part 2, a steel insert part 3, and a prefabricated locking pin 4.
[0040] First, we select the paving steel plates (2 meters wide and 4 meters long) with the specifications commonly used in the current engineering field, and make holes according to the design positioning shown in the diagram. The hole diameter is 100mm, and the holes are equidistant from the edge of the steel plate. The holes are made uniformly according to the design rules, which can form a standardized processing process and be completed in batches. At the same time, the paving steel plates can be flexibly combined in different ways during the later use process, which provides convenience for practical applications.
[0041] like Fig.12 As shown, in the first step, the front block (lower layer) perforated paving steel plate 1 is transported to the intended paving position by a machine (not shown in the figure) and placed in place before landing. The side position of the intended connection of the rear block (upper layer) perforated paving steel plate 1 is first determined on the front block (lower layer) perforated paving steel plate 1, and the pin member 2 (including the base 21 and the pin 22) is pre-through the opening of the side position of the intended connection of the rear block (upper layer) perforated paving steel plate 1 on the front block (lower layer) perforated paving steel plate 1. Then, the insert member 3 (including the semicircular cover body 32, the sealing plate 31, and the latch rod 33) is temporarily assembled to the perforated pin member 2, and the front block (lower layer) perforated paving steel plate 1 is placed on the front block (lower layer) perforated paving steel plate 1. When the perforated paving steel plate 1 is put on the ground, the pin member 2 is accurately positioned at one time, and the pin member 2 and the insert member 3 are temporarily assembled in advance, so as to avoid repeated adjustments for accurately placing the pin member 2 and aligning it with the opening position of the front block (lower layer) perforated paving steel plate 1 during the landing process, and avoid the potential safety hazards caused by manual repeated adjustments in the process of synchronously placing the pin member 2 in the hole alignment process when the front block (lower layer) perforated paving steel plate 1 is in place, and can greatly improve the efficiency of steel plate laying. At the same time, this method fully utilizes the existing supporting parts, and there is no need to increase the cost of temporary fixing measures for the pin member 2.
[0042] The opening diameter of the perforated paving steel plate 1 is 100 mm, and the perforated part of the pin member 2 is a square with a side length of 60 mm. The space reserved in the size design of the two can provide convenience for the perforated installation of the pin member 2, and at the same time provide a fault tolerance space for the local deformation of the opening on the perforated paving steel plate 1, thereby expanding the adaptability of the installation of the connection assembly.
[0043] When the front (lower layer) perforated paving steel plate 1 is in place and landed, the latch member 3 of the connecting mechanism is removed.
[0044] In the second step, the rear block (upper layer) perforated paving steel plate 1 is transported to the intended paving position by machinery, and the hole center of the intended connecting section is aligned with the pin part 2 that has been placed in place on the front block (lower layer) perforated paving steel plate 1, and then it is put into place and stacked on the front block (lower layer) perforated paving steel plate 1.
[0045] The opening diameter of the perforated paving steel plate 1 is 100 mm, and the diameter of the perforated part of the pin member 2 is 60 mm. The space reserved in the size design of the two can effectively reduce the accuracy requirement for placing the rear block (upper layer) perforated paving steel plate 1 and improve the paving efficiency.
[0046] After the front and rear perforated paving steel plates 1 are stacked and laid, the insert 3 is aligned with the through hole 23 where the pin 2 is placed and pushed in horizontally.
[0047] The top cover 32 of the insert 3 is designed in an arc shape, which can effectively prevent the tires of the mechanical equipment running above from being damaged and accidents, and provide comprehensive safety protection; at the same time, the reasonable arc height design can provide anti-slip points for the steel plate of the cover 32; and the end of the square columnar pin 22 in the pin member 2 is designed as an arc cylinder, which matches the arc-shaped cover 32 design of the top of the insert 3, so that the pin member 2 provides a sufficiently flexible contact surface for the insert 3, which can provide stable protection for the operation of the mechanical equipment running above;
[0048] In the third step, the locking pin 4 is finally passed through the locking hole 34 reserved on the insert 3. This ensures that the connection assembly is firmly connected during use.
[0049] According to the needs of temporary road paving, in the case of several perforated paving steel plates 1 being connected later, it is only necessary to completely repeat the above process before the previous (lower layer) perforated paving steel plate 1 is put into place and landed to achieve any length requirement. The above standardized operation process can accurately calculate the amount of materials required for temporary road paving and improve the paving efficiency.
[0050] When the temporary road is finished and needs to be dismantled, it can be disassembled in the reverse order of the above installation process, first remove the locking pin 4, then remove the insert 3, remove the front and rear perforated paving steel plates 1, and finally recycle the pin 2. All parts of the connection assembly can be recycled, and at the same time, they are easy to classify and reuse, which can realize the concept of environmental protection.
[0051] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
[0052] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
Claims
1. A paving steel plate connection assembly for use in the earthwork transportation stage of construction, comprising a paving steel plate, characterized in that: The paving steel plate is a perforated paving steel plate (1) with holes opened along the circumference of the steel plate. The perforated paving steel plate (1) is stacked up and down at the edge of the adjacent perforated paving steel plate (1). The openings of the perforated paving steel plate (1) are connected to the corresponding openings of the adjacent perforated paving steel plates (1) through a fixing mechanism. The connected multiple perforated paving steel plates (1) form a temporary paving assembly.
2. The paving steel plate connection assembly used in the earthwork transportation stage of construction according to claim 1 is characterized in that: The fixing mechanism comprises a pin member (2), an insert member (3) and a locking pin (4); The pin member (2) has a base (21) whose radial dimension is larger than the opening of the perforated paving steel plate (1); the base (21) is provided with a pin (22) which matches the opening of the perforated paving steel plate (1); the pin (22) is perpendicular to the base (21); and a through hole (23) is provided on the top of the pin (22); The insert (3) has a sealing plate (31), one side of the sealing plate (31) is provided with a cover body (32) with a bottom opening, the cover body (32) and the sealing plate (31) are coaxially arranged and perpendicular to each other, a latch rod (33) is arranged in the middle of the sealing plate (31) on the same side as the cover body (32) and perpendicular to the sealing plate (31), the distance between the two ends of the inner side of the cover body (32) is greater than the opening of the perforated paving steel plate (1), the inner wall of the cover body (32) matches the outer wall of the top of the pin (22), and the latch rod (33) is clearance-matched with the through hole (23); The axial length of the latch rod (33) is greater than the axial length of the through hole (23); a portion of the latch rod (33) protruding from the through hole (23) is provided with a radially arranged locking hole (34); one end of the locking pin (4) is provided with a bent expanded head (41) having a width greater than the locking hole (34); the locking pin (4) is inserted into the locking hole (34) to lock the pin member (2), the insert member (3) and the perforated paving steel plates (1) stacked up and down.
3. The paving steel plate connection assembly for the earthwork transportation stage of construction according to claim 2 is characterized in that: The top of the pin (22) is an arc-shaped cylindrical surface, and the cover (32) is an arc-shaped cylindrical panel.
4. The paving steel plate connection assembly for the earthwork transportation stage of construction according to claim 3 is characterized in that: The top of the pin (22) is a semi-cylindrical surface, and the cover (32) is a semi-circular arc plate.
5. The paving steel plate connection assembly for the earthwork transportation stage of construction according to claim 4 is characterized in that: The column body of the pin (22) is a square column.
6. The paving steel plate connection assembly for use in the earthwork transportation stage of construction according to claim 5 is characterized in that: The base (21) is a circular plate coaxially arranged with the pin (22).
7. The paving steel plate connection assembly for use in the earthwork transportation stage of construction according to claim 6 is characterized in that: The latch rod (33) is a round rod, and the through hole (23) is a round hole.
8. The paving steel plate connection assembly for use in the earthwork transportation stage of construction according to claim 7 is characterized in that: The long sides of the perforated paving steel plate (1) are connected to the corresponding long sides of the adjacent perforated paving steel plate (1) by overlapping each other up and down; The long sides of the two perforated paving steel plates (1) are connected side by side, and the short sides of the two perforated paving steel plates (1) connected side by side are connected to the long side of the third perforated paving steel plate (1) by overlapping each other up and down.
Citation Information
Cited By
Large-area soft soil foundation partition reinforcing and bearing capacity improving construction method
CN121915722A
