Construction temporary bridge
By designing the sliding structure of the bridge plate and the telescopic slide, the traffic inconvenience during the maintenance of the bridge expansion joint is solved, the night opening and normal expansion of the bridge is achieved, the risk of steel plate laying is reduced, and the efficiency and safety of the construction bridge is improved. .
Patent Information
- Application Number
- CN202420766576.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-15
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-04-15
AI Technical Summary
During the maintenance of bridge expansion joints, the existing technology leads to lane blockade, causing inconvenience of traffic, and the risk of deformation and tire cutting of steel plate laying, hindering the normal expansion and contraction of the bridge.
A construction bridge was designed, including a bridge plate, connecting block and telescopic slider. The sliding structure of the telescopic slider ensures the normal expansion and contraction of the bridge, and the lap method is opened to traffic at night, and the traffic jam caused by construction is reduced through rapid disassembly and installation. .
It has achieved normal traffic opening during construction and during non-construction periods, ensuring the elasticity of bridges and roads, reducing night traffic inconvenience, and improving maintenance convenience and safety.
Smart Images

Figure CN222183084U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction temporary bridges, in particular to a construction temporary bridge. Background Art
[0002] During the use of bridges and highways, bridge expansion joints may be damaged or broken and need to be repaired and replaced. The time for bridge expansion joint repair varies depending on the on-site conditions. Usually, the lanes are blocked day and night due to the repair and replacement of expansion joints, which causes a lot of traffic inconvenience. Most of the existing related solutions are to lay one or more steel plates on the expansion joints that need to be repaired or other places to be repaired for traffic. This method has many hazards. For example, long-term vehicle rolling will cause the steel plates to deform, and the deformed steel plates may cut the tires and cause accidents. At the same time, the laying of steel plates will also hinder the normal expansion and contraction of bridge roads. Utility Model Content
[0003] The purpose of the present invention is to solve at least one of the above technical deficiencies.
[0004] Therefore, one purpose of the utility model is to provide a construction temporary bridge to solve the problems mentioned in the background technology and overcome the shortcomings of the prior art.
[0005] In order to achieve the above-mentioned purpose, the utility model provides a construction temporary bridge, including a first temporary bridge board, a second temporary bridge board, a third temporary bridge board, a first connecting block, a second connecting block and a telescopic slider, the first temporary bridge board is connected to one end of the second temporary bridge board through the first connecting block, the third temporary bridge board is connected to the other end of the second temporary bridge board through the second connecting block, the first temporary bridge board is provided with a fixing hole, the third temporary bridge board is provided with a telescopic rail hole, the telescopic slider is arranged in the telescopic rail hole, and the third temporary bridge can slide relative to the telescopic slider along the direction of the horizontal line connecting the second temporary bridge board.
[0006] Preferably, a first connecting claw is provided at one end of the first bridge board, a second connecting claw is provided at one end of the second bridge board, a third connecting claw is provided at the other end of the second bridge board, and a fourth connecting claw is provided at one end of the third bridge board. The first connecting claw is connected to the second connecting claw through the first connecting block, and the third connecting claw is connected to the fourth connecting claw through the second connecting block.
[0007] In any of the above schemes, preferably, the telescopic rail hole is a square hole, the telescopic slider is a square body matched with the telescopic rail hole, and the telescopic slider is provided with a telescopic slider fixing hole.
[0008] In any of the above schemes, it is preferred that it further includes a height adjustment plate, which is arranged at both ends of the second temporary bridge board and is used to adjust the height between the second temporary bridge board and the bridge deck.
[0009] In any of the above schemes, preferably, a first slope is provided on the first temporary bridge board, and the vertical height of the first slope gradually decreases from an end close to the second temporary bridge board to an end away from the second temporary bridge board.
[0010] In any of the above schemes, preferably, a second slope is provided on the third temporary bridge board, and the vertical height of the second slope gradually decreases from an end close to the second temporary bridge board to an end away from the second temporary bridge board.
[0011] In any of the above schemes, it is preferred that anti-slip grooves are provided on the side of the first temporary bridge board, the second temporary bridge board and the third temporary bridge board away from the bridge deck.
[0012] Compared with the prior art, the advantages and beneficial effects of the utility model are:
[0013] 1. A construction temporary bridge of the utility model can ensure the traffic flow at night and when the bridge deck is not under construction. The first temporary bridge, the second temporary bridge and the third temporary bridge are connected so that vehicles can pass the construction site normally and safely. The telescopic slider is arranged in the telescopic track hole to slide, so that the third temporary bridge and the second temporary bridge have a certain degree of telescopicity. The special telescopic structure can ensure the normal telescopicity of the bridge road during the whole process of use.
[0014] 2. During construction, the utility model can quickly disassemble the connecting pins installed on the connecting block to retract the second temporary bridge plate in the middle to expose the construction point. The temporary bridge for ensuring the smooth construction of the bridge deck can greatly reduce the inconvenience of nighttime traffic caused by construction, and the maintenance is more convenient. The telescopic sliding mechanism composed of the telescopic track hole and the telescopic slider of the third temporary bridge plate can ensure the use at the expansion joint and meet the expansion and contraction requirements of the bridge deck.
[0015] Additional aspects and advantages of the present invention will be given in part in the following description and in part will become apparent from the following description or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0017] Figure 1 The present invention is a schematic structural diagram of a temporary bridge for construction according to an embodiment of the present invention.
[0018] Figure 2 It is another structural schematic diagram of a construction temporary bridge according to an embodiment of the utility model.
[0019] Figure 3 The utility model is a top view of a construction temporary bridge according to an embodiment of the utility model.
[0020] Figure 4The present invention is a front view of a construction temporary bridge according to an embodiment of the present utility model.
[0021] Among them: 1-the first bridge board; 2-the second bridge board; 3-the third bridge board; 4-the first connecting block; 5-the second connecting block; 6-the telescopic slider; 7-the fixing hole; 8-the telescopic track hole; 9-the first connecting claw; 10-the second connecting claw; 11-the third connecting claw; 12-the fourth connecting claw; 13-the height adjustment plate; 14-the first slope; 15-the second slope; 16-the anti-slip groove; 17-the bolt. DETAILED DESCRIPTION
[0022] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0023] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] like Figures 1 to 4 As shown, a construction bridge of an embodiment of the utility model comprises a first bridge board 1, a second bridge board 2, a third bridge board 3, a first connecting block 4, a second connecting block 5 and a telescopic slider 6. The first bridge board 1 is connected to one end of the second bridge board 2 through the first connecting block 4, and the third bridge board 3 is connected to the other end of the second bridge board 2 through the second connecting block 5. The first bridge board 1 is provided with a fixing hole 7, and the third bridge board 3 is provided with a telescopic rail hole 8. The third bridge board slides relative to the telescopic slider 6 along the direction of the horizontal line connecting the third bridge board 2.
[0025] The two ends of the second temporary bridge board 2 are respectively connected to the first temporary bridge board 1 and the third temporary bridge board 3. The connection between the three temporary bridge boards is preferably hinged. The fixing hole 7 on the first temporary bridge board 1 is used to connect to one side of the bridge. There are multiple fixing holes 7. The fixing holes 7 are connected to the bridge by screwing the bolts 17 into the fixing holes 7. The fixing holes 7 are preferably slotted holes. The telescopic slider 6 on the third temporary bridge is fixed to the other side of the bridge by the bolts 17. The second temporary bridge is set between the expansion joints of the bridge. When the vehicle passes through the second temporary bridge, the structure of the telescopic slider 6 on the third temporary bridge and the telescopic track hole 8 ensures the normal expansion and contraction of the bridge. It can ensure the construction requirements during the day and the normal traffic on the road after the construction is stopped at night.
[0026] A construction temporary bridge in the embodiment of the utility model can ensure the traffic during the construction period of the bridge deck at night and when there is no construction. Through the overlap of the first temporary bridge, the second temporary bridge and the third temporary bridge, vehicles can pass through the construction site normally and safely. The telescopic slider 6 is set in the telescopic track hole 8 to slide. Preferably, there are two telescopic sliders 6, so that the third temporary bridge and the second temporary bridge have a certain degree of telescopicity. The special telescopic structure can ensure the normal telescopicity of the bridge road during the whole use process.
[0027] Specifically, a first connecting claw 9 is provided at one end of the first bridge board 1, a second connecting claw 10 is provided at one end of the second bridge board 2, a third connecting claw 11 is provided at the other end of the second bridge board 2, and a fourth connecting claw 12 is provided at one end of the third bridge board 3. The first connecting claw 9 is connected to the second connecting claw 10 through the first connecting block 4, and the third connecting claw 11 is connected to the fourth connecting claw through the second connecting block 5.
[0028] There are four first connecting claws 9, four second connecting claws 10, four third connecting claws 11, four fourth connecting claws, two first connecting blocks 4 and two second connecting blocks 5 respectively, and there is a connecting claw on each side of the first connecting block 4. One end of the first connecting block 4 is connected to the first connecting claw 9. Through holes are provided on the first connecting block 4 and the connecting claws, and the hinge is achieved by connecting pins to the through holes. Similarly, the other end of the first connecting block 4 is connected to the second connecting claw 10. The connection method of the third connecting block to the third connecting claw 11 and the fourth connecting claw is the same as the connection method of the first connecting claw 9 to the first connecting block 4.
[0029] Through the connection method of the above structure, the second temporary bridge board 2 can be disassembled when not in use, which is convenient for maintenance and use of the bridge seam, and is also convenient for installation, recycling, replacement, maintenance and repair.
[0030] Further, the telescopic track hole 8 is a square hole, the telescopic slider 6 is a square body matched with the telescopic track hole 8, and the telescopic slider 6 is provided with a telescopic slider 6 fixing hole 7. Preferably, the slider fixing hole 7 is a slotted hole. The shape of the telescopic slider 6 matches the shape of the telescopic hole, and the telescopic slider 6 can slide in the telescopic track hole 8. The bolt 17 is inserted into the slider fixing hole 7 to fix it to the bridge, and the third slider plate can move horizontally relative to the telescopic slider 6.
[0031] Specifically, it also includes a height adjustment plate 13, which is arranged at both ends of the second temporary bridge board 2 and is used to adjust the height between the second temporary bridge board 2 and the bridge deck. The height adjustment plate 13 is arranged at the bottom of the second bridge board, and the height adjustment plate 13 is connected to the second temporary bridge board 2 by bolts 17. The two ends of the second temporary bridge board 2 are respectively placed on the bridges on both sides of the bridge seam. A height adjustment plate 13 is respectively arranged at both ends of the second temporary bridge board 2, and the height of the second temporary bridge board 2 from the bridge deck is adjusted by the height adjustment plate 13.
[0032] Furthermore, a first slope 14 is provided on the first temporary bridge board 1 , and the vertical height of the first slope 14 gradually decreases from an end close to the second temporary bridge board 2 to an end far away from the second temporary bridge board 2 .
[0033] Optionally, a second slope 15 is provided on the third temporary bridge board 3 , and the vertical height of the second slope 15 gradually decreases from an end close to the second temporary bridge board 2 to an end away from the second temporary bridge board 2 .
[0034] Optionally, an anti-slip groove 16 is provided on the side of the first temporary bridge board 1, the second temporary bridge board 2 and the third temporary bridge board 3 away from the bridge deck.
[0035] The installation process of a construction temporary bridge of the utility model is as follows:
[0036] Locate the front bridge deck position: mainly measure the distance between the bolt holes of the front bridge deck and the repair and construction site, and drill holes in the road surface.
[0037] Install the front temporary bridge board: Use the boom crane mounted on the construction vehicle to lower the first temporary bridge board to the bolt hole positioning point and install it by tightening the bolts.
[0038] Install the middle temporary bridge board: Use the boom crane mounted on the construction vehicle to place the second middle temporary bridge board to the construction point that needs to be covered.
[0039] Install the rear bridge board: Use the boom crane mounted on the construction vehicle to place the third bridge board on the other side of the second bridge board.
[0040] Install the telescopic slider: drill a hole in the telescopic track hole of the third temporary bridge plate to reserve a positioning and fixing hole on the bridge deck on that side, place the slider in the telescopic track hole of the rear temporary bridge plate, and use bolts to pass through the hole on the telescopic slider and connect it to the positioning and fixing hole of the bridge deck.
[0041] Connect the front, middle and rear sidewalk boards: place the connecting blocks at the connection between the first, second and third sidewalk boards and insert the connecting pins to connect the whole, and finally level the middle sidewalk board.
[0042] The working process is to remove the connecting pins on both sides of the second temporary bridge board during daytime construction, and use the arm crane carried by the construction vehicle to lift and retract the second temporary bridge board. Workers can carry out the construction of the bridge deck road after the second temporary bridge board is retracted. After stopping the construction at night, the second temporary bridge board is put back and the connecting pins are installed. After leveling, it can be opened to traffic. When the road is open to traffic, vehicles drive over the first, second, and third temporary bridge boards in turn. When the vehicle drives fast and presses on the first or second temporary bridge board, it will drive the third temporary bridge board to slide backwards. At this time, the relative movement of the telescopic track hole and the telescopic slider of the rear temporary bridge board ensures the telescopic effect at the expansion joint.
[0043] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0044] It is not difficult for those skilled in the art to understand that the utility model includes any combination of the utility model content and the specific implementation method part of the above specification and the various parts shown in the drawings. Due to the limited space and to make the specification concise, the various schemes composed of these combinations are not described one by one. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
[0045] Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. Those skilled in the art can change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and purpose of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction bridge, characterized in that: The invention comprises a first bridge board, a second bridge board, a third bridge board, a first connecting block, a second connecting block and a telescopic slider, wherein the first bridge board is connected to one end of the second bridge board via the first connecting block, and the third bridge board is connected to the other end of the second bridge board via the second connecting block, the first bridge board is provided with a fixing hole, the third bridge board is provided with a telescopic rail hole, the telescopic slider is arranged in the telescopic rail hole, and the third bridge can slide relative to the telescopic slider along the direction of the horizontal line connecting the second bridge board.
2. A temporary bridge for construction as claimed in claim 1, characterized in that: A first connecting claw is provided at one end of the first bridge board, a second connecting claw is provided at one end of the second bridge board, a third connecting claw is provided at the other end of the second bridge board, and a fourth connecting claw is provided at one end of the third bridge board. The first connecting claw is connected to the second connecting claw through a first connecting block, and the third connecting claw is connected to the fourth connecting claw through the second connecting block.
3. A temporary bridge for construction as claimed in claim 1, characterized in that: The telescopic rail hole is a square hole, the telescopic slider is a square body matched with the telescopic rail hole, and the telescopic slider is provided with a telescopic slider fixing hole.
4. A temporary bridge for construction as claimed in claim 1, characterized in that: It also includes a height adjustment plate, which is arranged at both ends of the second temporary bridge board and is used to adjust the height between the second temporary bridge board and the bridge deck.
5. A temporary bridge for construction as claimed in claim 1, characterized in that: A first slope is provided on the first temporary bridge board, and the vertical height of the first slope gradually decreases from an end close to the second temporary bridge board to an end far away from the second temporary bridge board.
6. A temporary bridge for construction as claimed in claim 1, characterized in that: A second slope is provided on the third temporary bridge board, and the vertical height of the second slope gradually decreases from an end close to the second temporary bridge board to an end far away from the second temporary bridge board.
7. A temporary bridge for construction as claimed in claim 1, characterized in that: Anti-slip grooves are provided on the sides of the first temporary bridge board, the second temporary bridge board and the third temporary bridge board away from the bridge deck.
