Heavy hoisting device for underground pressure regulator
By designing a heavy lifting device for underground voltage regulators that connect pipes, connecting seats and lifting frames, the problems of space occupied and operation of traditional gas pressure regulators are solved, and convenient lifting and disassembly of the voltage regulators are achieved, reducing equipment The investment and operation difficulty ensure the safety, reliability and practicality of the device.
Patent Information
- Application Number
- CN202420654587.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-03-29
AI Technical Summary
Traditional gas pressure regulating stations occupy a large amount of ground space and are cumbersome to operate. The existing crane lifting and pressure regulating equipment is invested in large quantities and complex to operate.
Design a heavy lifting device for underground voltage regulator including connecting pipes, connecting seats and lifting frames. The connecting pipes are buried vertically underground. The lifting frame is equipped with a balance rod and a support roller, and the pressure regulator is realized by using three-limb sling rigging. Conveniently lift and put down.
It reduces operation difficulty and equipment investment costs, improves the convenience of disassembly and assembly and transportation, and ensures simple structure, safety, reliability and strong practicality.
Smart Images

Figure CN222204497U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a lifting device, in particular to a heavy lifting device used for an underground voltage regulator. Background Art
[0002] Traditional gas pressure regulating stations are usually set up on the ground, and station buildings need to be built to manage and maintain equipment such as pressure regulators, which not only occupies a large amount of land resources and ground space, but is also not conducive to urban planning. In order to solve the problems existing in traditional gas pressure regulating stations, the current art adopts the method of burying the pressure regulator and the matching pressure regulating box and protective box underground, wherein the pressure regulator is installed in the pressure regulating box, and the protective box is set on the pressure regulating box and exposed to the ground, so that the pressure regulator can be disassembled and assembled by opening the protective box. Because the pressure regulator is heavy, the current art generally uses a crane to lift the pressure regulator (lift the pressure regulator out of the pressure regulating box from bottom to top or put the pressure regulator into the pressure regulator from bottom to bottom). This method not only requires large equipment investment, but also has cumbersome operation. Utility Model Content
[0003] The utility model aims to provide a heavy-duty lifting device for an underground voltage regulator, which has the advantages of simple structure, low cost, convenient operation, safety, reliability and strong practicability.
[0004] In order to solve the above-mentioned problems existing in the prior art, the utility model provides a heavy-duty lifting device for an underground voltage regulator, including a connecting pipe, a connecting seat and a lifting frame, wherein the connecting pipe is vertically buried in the ground and its upper end is in the protective box of the voltage regulator, the connecting seat includes a sleeve matched with the connecting pipe, and the lower end of the sleeve is fixed with a column that can be inserted into the connecting pipe, and the lifting frame includes a main body, a handle is fixed on the left side of the main body, a rotating shaft that can be inserted into the sleeve is fixed on the lower side of the main body, a limiting ring is provided on the peripheral wall of the rotating shaft, a balancing rod located on the right side of the rotating shaft is also fixed on the lower side of the main body, a supporting roller is installed on the left side of the balancing rod through a supporting plate, a vertical rod is fixed on the upper side of the main body, a cross rod extending to the right is fixed on the upper end of the vertical rod, an oblique support rod is fixed between the right half of the cross rod and the lower half of the vertical rod, and the right end of the cross rod is connected to a three-limb sling rigging through a hand winch.
[0005] Furthermore, the utility model provides a heavy-duty lifting device for an underground voltage regulator, wherein the support plate is an arc-shaped plate and two are provided at intervals up and down, and four support rollers distributed along the circumferential direction are respectively installed on the upper and lower sides of each support plate through support shafts.
[0006] Furthermore, the utility model provides a heavy-duty lifting device for an underground voltage regulator, wherein a limiting ring is provided on the inner wall of the upper half of the connecting pipe, and an extending support pipe matching the limiting ring is fixed to the lower end of the column by welding.
[0007] Furthermore, the utility model provides a heavy-duty lifting device for an underground voltage regulator, wherein the casing comprises a main pipe, a supporting ring and a bearing seat, the upper half of the column is inserted into the main pipe and the two are welded and fixed, the supporting ring is sleeved on the column and welded and fixed to the main pipe, the bearing seat is welded and fixed to the upper end of the main pipe, and a lower sleeve, a retaining ring, an upper sleeve and a bearing are sequentially installed on the inner wall of the bearing seat from bottom to top, and a cover plate pressed on the outer ring of the bearing is fixed to the upper end of the bearing seat by screws.
[0008] Compared with the prior art, the utility model discloses a heavy-duty lifting device for an underground voltage regulator, which has the following advantages: the utility model bury the connecting pipe vertically underground and place its upper end in the protective box of the voltage regulator by setting a connecting pipe, a connecting seat and a lifting frame, so that the connecting pipe is provided with a sleeve matched with the connecting pipe, and a column which can be inserted into the connecting pipe is fixed at the lower end of the sleeve, so that the lifting frame is provided with a main body, a handle is fixed on the left side of the main body, a rotating shaft which can be inserted into the sleeve is fixed on the lower side of the main body, a limiting ring is provided on the peripheral wall of the rotating shaft, and a balancing rod on the right side of the rotating shaft is fixed on the lower side of the main body, wherein a supporting roller is installed on the left side of the balancing rod through a supporting plate, a vertical rod is fixed on the upper side of the main body, a horizontal rod extending to the right is fixed at the upper end of the vertical rod, and a diagonal bracing rod is fixed between the right half of the horizontal rod and the lower half of the vertical rod, wherein the right end of the horizontal rod is connected with a three-limb sling rigging through a hand winch. This constitutes a heavy-duty lifting device for underground voltage regulators. Compared with the prior art of using a crane to lift and disassemble the voltage regulator, it reduces the operating difficulty and equipment investment cost, and has the advantages of simple structure, safety, reliability and strong practicality. When installing the voltage regulator, first open the protection box, and insert the column of the connecting seat into the connecting pipe, and then insert the rotating shaft of the lifting frame into the sleeve of the connecting seat. At this time, the sleeve of the connecting seat is supported on the upper end of the connecting pipe, the limiting ring of the lifting frame is supported on the upper end of the sleeve of the connecting seat, and the supporting roller is supported on the side wall of the sleeve of the connecting seat; then rotate the lifting frame by the handle until the three-legged sling rigging is on the upper side of the voltage regulator placed on one side of the protection box, and lower the height of the three-legged sling rigging by the hand winch to connect the voltage regulator; then, after connecting the three-legged sling rigging to the voltage regulator, lift the voltage regulator by the hand winch, and rotate the lifting frame by the handle until the voltage regulator is on the upper side of the voltage regulating box; then, put the voltage regulator into the voltage regulating box from top to bottom by the hand winch, and then release the connection between the three-legged sling rigging and the voltage regulator, and close the protection box after removing the lifting frame and the connecting seat in turn, and the installation process of the voltage regulator is completed. When disassembling the voltage regulator, first open the protection box, insert the column of the connecting seat into the connecting pipe, and then insert the rotating shaft of the lifting frame into the sleeve of the connecting seat; then rotate the lifting frame by the handle until the three-legged sling is on the upper side of the voltage regulator, and lower the height of the three-legged sling by the hand winch to connect the voltage regulator; then connect the three-legged sling to the voltage regulator, lift the voltage regulator by the hand winch, and move the voltage regulator to one side of the protection box by rotating the lifting frame by the handle; then lower the voltage regulator from top to bottom to the ground or support by the hand winch, and release the connection between the three-legged sling and the voltage regulator. At this point, the disassembly process of the voltage regulator is completed, and the voltage regulator can be reinstalled later.The utility model improves the convenience of disassembly, assembly and transportation by arranging a connecting pipe, a connecting seat and a lifting frame with a split design and used in combination; a balancing rod is arranged on the lifting frame, and supporting rollers are installed on the balancing rod through a supporting plate. When in use, the supporting rollers are supported on the side walls of the sleeve of the connecting seat, which can effectively avoid the phenomenon of rotation jamming of the lifting frame caused by the deviation of the center of gravity, thereby ensuring the stability of the structure and the action.
[0009] The heavy-duty lifting device for an underground voltage regulator of the utility model is described in detail below in conjunction with the embodiments shown in the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a structural schematic diagram of a heavy-duty lifting device for an underground voltage regulator of the utility model;
[0011] Figure 2 for Figure 1 A partial enlarged view of position A in the middle;
[0012] Figure 3 It is a structural schematic diagram of the connecting seat in the utility model;
[0013] Figure 4 It is a structural schematic diagram of the lifting frame in the utility model;
[0014] Figure 5 for Figure 4 A partial enlarged view of position B in the middle;
[0015] Figure 6 It is a top view of the support plate in the utility model. DETAILED DESCRIPTION
[0016] First of all, it should be explained that the directional words such as up, down, left, right, front and back described in the present invention are only described according to the drawings for the convenience of understanding, and are not intended to limit the technical solution of the present invention and the scope of protection requested.
[0017] like Figures 1 to 6The utility model is a specific embodiment of a heavy-duty lifting device for an underground voltage regulator, comprising a connecting pipe 1, a connecting seat 2 and a lifting frame 3. The connecting pipe 1 is vertically buried underground and its upper end is in a protective box 200 of the voltage regulator 100. The connecting seat 2 is provided with a sleeve 21 matched with the connecting pipe 1, and a column 22 into which the connecting pipe 1 can be inserted is fixed at the lower end of the sleeve 21. The lifting frame 3 is provided with a main body 31, a handle 32 is fixed on the left side of the main body 31, a rotating shaft 33 that can be inserted into the sleeve 21 is fixed on the lower side of the main body 31, a limiting ring 331 is set on the peripheral wall of the rotating shaft 33, and a balance rod 34 on the right side of the rotating shaft 33 is fixed on the lower side of the main body 31, wherein a supporting roller 342 is installed on the left side of the balance rod 34 through a supporting plate 341; a vertical rod 35 is fixed on the upper side of the main body 31, a horizontal rod 36 extending to the right is fixed on the upper end of the vertical rod 35, and a diagonal support rod 37 is fixed between the right half of the horizontal rod 36 and the lower half of the vertical rod 35, wherein the right end of the horizontal rod 36 is connected to a three-legged sling rigging 5 through a hand winch 4, so as to connect the voltage regulator 100 through the three-legged sling rigging 5.
[0018] The above arrangement constitutes a heavy-duty lifting device for underground voltage regulators. Compared with the prior art that uses a crane to lift and disassemble the voltage regulator, it reduces the difficulty of operation and the cost of equipment investment, and has the advantages of simple structure, safety, reliability, and strong practicality. When installing the voltage regulator 100, first open the protective box 200, and insert the column 22 of the connecting seat 2 into the connecting pipe 1, and then insert the rotating shaft 33 of the lifting frame 3 into the sleeve 21 of the connecting seat 2. At this time, the sleeve 21 of the connecting seat 2 is supported on the upper end of the connecting pipe 1, the limiting ring 331 of the lifting frame 3 is supported on the upper end of the sleeve 21 of the connecting seat 2, and the supporting roller 342 is supported on the side wall of the sleeve 21 of the connecting seat 2; then rotate the lifting frame 3 by the handle 32 until the three-legged sling rigging 5 is on the upper side of the voltage regulator 100 placed on one side of the protective box 200, and through the hand winch 4 Lower the height of the three-legged sling 5 to connect the voltage regulator 100; then, after connecting the three-legged sling 5 to the voltage regulator 100, lift the voltage regulator 100 through the hand winch 4, and rotate the lifting frame 3 through the handle 32 until the voltage regulator 100 is on the upper side of the voltage regulating box (not shown in the figure); then, put the voltage regulator 100 from top to bottom into the voltage regulating box through the hand winch 4, release the connection between the three-legged sling 5 and the voltage regulator 100, and close the protective box 200 after removing the lifting frame 3 and the connecting seat 2 in turn, and the installation process of the voltage regulator 100 is completed. When disassembling the voltage regulator, first open the protection box 200, and after inserting the column 22 of the connecting seat 2 into the connecting pipe 1, insert the rotating shaft 33 of the lifting frame 3 into the sleeve 21 of the connecting seat 2; then rotate the lifting frame 3 by the handle 32 until the three-legged sling rigging 5 is on the upper side of the voltage regulator 100, and lower the height of the three-legged sling rigging 5 by the hand winch 4 to connect the voltage regulator 100; then, after connecting the three-legged sling rigging 5 to the voltage regulator 100, lift the voltage regulator 100 from the voltage regulating box from bottom to top by the hand winch 4, and move the voltage regulator 100 to one side of the protection box 200 by rotating the lifting frame 3 by the handle 32; then, put the voltage regulator 100 from top to bottom on the ground or a support by the hand winch 4, and then release the connection between the three-legged sling rigging 5 and the voltage regulator 100, so far, the disassembly process of the voltage regulator 100 is completed, and the voltage regulator can be reinstalled later. The utility model improves the convenience of disassembly and transportation by setting a split design and combined use of a connecting pipe 1, a connecting seat 2 and a lifting frame 3. By setting a balance bar 34 on the lifting frame 3 and installing a support roller 342 on the balance bar 34 through a support plate 341, the support roller 342 is supported on the side wall of the sleeve 21 of the connecting seat 2 during use, which can effectively avoid the rotation jam of the lifting frame 3 caused by the center of gravity offset, and ensure the stability of the structure and action. It should be noted that the voltage regulator 100, the protective box 200 and the voltage regulating box in this document are all existing equipment in the field, and their structures and installation and connection methods are well known to technicians.
[0019] As a specific implementation, the utility model makes the support plate 341 adopt an arc-shaped plate structure and sets two of them at intervals in the upper and lower parts, and four support rollers 342 distributed along the circumferential direction are respectively installed on the upper and lower sides of each support plate 341 through support shafts. This setting plays a certain surrounding role on the sleeve 21 by allowing the support rollers 342 distributed along the circumferential direction to be supported on the side wall of the sleeve 21 of the connecting seat 2, which can effectively prevent the lifting frame 3 from shifting to the front and rear sides, and enhance the stability of the structure and movement. At the same time, in this specific implementation, a limiting ring platform 11 is set on the inner wall of the upper half of the connecting pipe 1, and an extended support pipe 221 matched with the limiting ring platform 11 is fixed to the lower end of the column 22 by welding to enhance the support stability.
[0020] As a specific implementation, in order to simplify the structure and preparation process, the utility model makes the sleeve 21 adopt the following structure: including the main pipe 211, the support ring 212 and the bearing seat 213, wherein the upper half of the column 22 is inserted into the main pipe 211 and the two are welded and fixed, the support ring 212 is sleeved on the column 22 and welded and fixed with the main pipe 211, the bearing seat 213 is welded and fixed to the upper end of the main pipe 211, and the lower sleeve 214, the retaining ring 215, the upper sleeve 216 and the bearing 217 are installed on the inner wall of the bearing seat 213 from bottom to top in sequence, and the upper end of the bearing seat 213 is fixed with a cover plate 218 pressed on the outer ring of the bearing 217 by screws. This setting improves the stability of the rotation action by inserting the rotating shaft 33 of the lifting frame 3 into the bearing 217, the upper sleeve 216 and the lower sleeve 214.
[0021] The above embodiments are only descriptions of the preferred implementation modes of the present invention, and are not intended to limit the protection scope of the present invention. Without departing from the design concept of the present invention, various modifications made by those skilled in the art based on the technical solution of the present invention should fall within the protection scope determined by the claims of the present invention.
Claims
1. A heavy lifting device for underground voltage regulator, characterized in that: The invention comprises a connecting pipe (1), a connecting seat (2) and a lifting frame (3), wherein the connecting pipe (1) is vertically buried underground and its upper end is located in a protective box of a voltage regulator, the connecting seat (2) comprises a sleeve (21) matched with the connecting pipe (1), a column (22) which can be inserted into the connecting pipe (1) is fixed at the lower end of the sleeve (21), and the lifting frame (3) comprises a main body (31), a handle (32) is fixed on the left side of the main body (31), a rotating shaft (33) which can be inserted into the sleeve (21) is fixed on the lower side of the main body (31), and a peripheral wall of the rotating shaft (33) is fixed on the lower side of the main body (31). A limiting ring (331) is provided on the upper side, a balancing rod (34) located on the right side of the rotating shaft (33) is also fixed on the lower side of the main body (31), a supporting roller (342) is installed on the left side of the balancing rod (34) through a supporting plate (341), a vertical rod (35) is fixed on the upper side of the main body (31), a horizontal rod (36) extending to the right is fixed on the upper end of the vertical rod (35), an oblique support rod (37) is fixed between the right half of the horizontal rod (36) and the lower half of the vertical rod (35), and the right end of the horizontal rod (36) is connected to a three-limb sling rigging (5) through a hand chain hoist (4).
2. A heavy-duty lifting device for underground voltage regulator according to claim 1, characterized in that: The support plate (341) is an arc-shaped plate and two are spaced apart from each other. Four support rollers (342) distributed along the circumferential direction are respectively installed on the upper and lower sides of each support plate (341) through support shafts.
3. The heavy-duty lifting device for underground voltage regulator according to claim 1, characterized in that: A limiting ring platform (11) is provided on the inner wall of the upper half of the connecting pipe (1), and an extending support pipe (221) matched with the limiting ring platform (11) is fixed to the lower end of the upright column (22) by welding.
4. The heavy-duty lifting device for underground voltage regulator according to claim 1, characterized in that: The sleeve (21) comprises a main pipe (211), a supporting ring (212) and a bearing seat (213); the upper half of the column (22) is inserted into the main pipe (211) and the two are welded and fixed; the supporting ring (212) is sleeved on the column (22) and welded and fixed to the main pipe (211); the bearing seat (213) is welded and fixed to the upper end of the main pipe (211); a lower sleeve (214), a retaining ring (215), an upper sleeve (216) and a bearing (217) are sequentially installed on the inner wall of the bearing seat (213) from bottom to top; and a cover plate (218) pressed on the outer ring of the bearing (217) is fixed to the upper end of the bearing seat (213) by screws.