Steel sheet pile facilitating installation of waterproof curtain
By designing steel sheet pile components with ladder structure and arc plate hooks, combining guide cone and retaining plate, the problem of difficulty in sealing gaps of steel sheet piles in the existing technology is solved, efficient water sealing and stability are achieved, and installation is reduced and maintenance costs.
Patent Information
- Application Number
- CN202420667368.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The existing steel sheet piles that are convenient for installing water stop curtains may cause too large gaps in the steel sheet piles during the subsequent gap sealing process, and need to be pulled out and re-piled, which increases the complexity and cost of the project.
A steel sheet pile including the first and second steel sheet pile components is designed, adopting a ladder-shaped structure and an arc-plate hook structure, forming a maze seal through hook engagement, limiting gap and verticality errors, improving sealing effect, and on arc-plate Guide cones and retaining plates are provided at the bottom to reduce installation resistance and prevent soil from filling.
It effectively improves the water sealing effect, enhances the stability and durability of steel sheet piles, reduces installation resistance and maintenance costs, and ensures stability and efficiency under different environmental pressures.
Smart Images

Figure CN222227261U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction, in particular to a steel sheet pile which is convenient for installing a water-stop curtain. Background Art
[0002] When the excavation depth of the foundation pit is large, groundwater control is often involved. In order to avoid undesirable phenomena such as sand flow and leakage on the side walls and bottom of the foundation pit, and to meet the protection requirements of the surrounding environment of the foundation pit, reliable water isolation or anti-seepage measures need to be set up around the foundation pit and in the local area of the bottom of the pit. At the same time, due to the limitations of geological conditions or for the purpose of protecting groundwater resources, some foundation pit support projects also need to use water-stop curtains instead of precipitation groundwater control methods.
[0003] Existing steel sheet piles that are convenient for installing water-stop curtains are generally poured with cement. In addition, there is also a method of connecting waterstops with steel sheet piles, but this method requires controlling the angles between the steel sheet piles to avoid excessive gaps between the steel sheet piles. Otherwise, it may become difficult to seal the gaps in the steel sheet piles, and the steel sheet piles need to be pulled out and re-driven, which increases the complexity and cost of the project. Utility Model Content
[0004] Based on this, the purpose of the utility model is to provide a steel sheet pile that is easy to install a water-stop curtain, so as to solve the technical problem that the gaps in the steel sheet piles may be difficult to seal and the steel sheet piles need to be pulled out and re-piled.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a steel sheet pile that is convenient for installing a water-stop curtain, comprising a first steel sheet pile assembly and a second steel sheet pile assembly, the first steel sheet pile assembly comprising a first steel sheet pile body, one side of the first steel sheet pile body is fixedly connected to a first left arc plate, one side of the first left arc plate is fixedly connected to a first left hook, one side of the first steel sheet pile body is fixedly connected to a first right arc plate, one side of the first right arc plate is fixedly connected to a first right hook, and the structure of the first steel sheet pile body is a ladder structure.
[0006] By adopting the above technical scheme, the first steel sheet pile body can be used to achieve sealing, the first left arc plate can cooperate with the first right arc plate to form a complete space for installing the water-stop curtain, and the first left hook and the first right hook can engage with each other, which on the one hand provide fixation of adjacent first steel sheet piles, and on the other hand can form a labyrinth seal, so that the cement used to act as a water-stop curtain can fully fill the gap between adjacent first steel sheet piles, thereby improving the water blocking effect, and the steel sheet pile can maintain its shape and function in the face of various environmental pressures, such as soil movement, heavy loads, etc.
[0007] Furthermore, the first steel sheet pile components are provided in plurality, and two adjacent first steel sheet pile components are engaged by a first left hook and a first right hook.
[0008] By adopting the above technical solution, the first left hook and the first right hook can limit the gap and verticality error between adjacent first steel sheet piles to prevent the error from being too large, and at the same time can form a labyrinth seal to improve the sealing effect.
[0009] Furthermore, the second steel sheet pile assembly includes a second steel sheet pile body, and the structure of the second steel sheet pile body is a ladder structure.
[0010] By adopting the above technical solution, the second steel sheet pile body can be used to achieve sealing, and the trapezoidal structure of the second steel sheet pile body can improve the ability to withstand water pressure.
[0011] Furthermore, a second left arc plate is fixedly connected to one side of the second steel sheet pile body, and a second left hook is fixedly connected to one side of the second left arc plate.
[0012] By adopting the above technical solution, the second left arc plate can form a space, and the second left hook can be used to engage with the second right hook to ensure the installation accuracy, stability and sealing effect of the water-stop curtain steel sheet pile mechanism.
[0013] Furthermore, a second right arc plate is fixedly connected to one side of the second steel sheet pile body, and a second right hook is fixedly connected to one side of the second right arc plate.
[0014] By adopting the above technical solution, the second right arc plate can cooperate with the second left arc plate to form a complete space for installing the water-stop curtain. The second right hook can clamp the adjacent second steel sheet pile body through the second left hook, thereby increasing the strength of a single steel sheet pile and enhancing the stability and durability of the entire water-stop curtain structure.
[0015] Furthermore, a left guide cone is fixedly connected to the bottom of the second left arc plate, and a left earth retaining plate is engaged in the second left arc plate.
[0016] By adopting the above technical solution, the left guide cone can reduce the resistance encountered when driving the second steel sheet pile downward, and the left retaining plate can prevent soil from filling into the space in the left arc plate, which helps to maintain the integrity of the entire steel sheet pile structure.
[0017] Furthermore, a right guide cone is fixedly connected to the bottom of the second right arc plate, and a right earth retaining plate is engaged in the second right arc plate.
[0018] By adopting the above technical solution, the right guide cone can reduce the resistance encountered when driving the second steel sheet pile downward, and the right retaining plate can prevent soil from filling into the space inside the right arc plate, thereby improving the efficiency and accuracy of the installation process and maintaining the integrity and effectiveness of the structure.
[0019] Furthermore, a left straight groove is provided on the left earth retaining plate, and a left hanging hole is provided on the top of the left earth retaining plate.
[0020] By adopting the above technical solution, the left straight groove can provide space and a second left hook engagement space, and the left hanging hole can facilitate pulling out the left earth retaining plate, thereby ensuring that the left earth retaining plate can be effectively installed and removed.
[0021] Furthermore, a right straight groove is provided on the right earth retaining plate, and a right hanging hole is provided on the top of the right earth retaining plate.
[0022] By adopting the above technical solution, the right straight groove can provide space and the second right hook engagement space, which is convenient for subsequent adjustment or removal. The right hanging hole can facilitate pulling out the right retaining plate, thereby improving the installation and maintenance flexibility of the water-stop curtain steel sheet pile mechanism.
[0023] Furthermore, the right retaining plate and the left retaining plate are made of stainless steel.
[0024] By adopting the above technical solutions, the stainless steel material has excellent corrosion resistance, is suitable for use in a variety of environments, maintains the integrity of the structure, and can maintain its structural integrity and performance for a long time, reducing the frequency of maintenance and replacement, thereby reducing long-term operating costs.
[0025] In summary, the utility model mainly has the following beneficial effects:
[0026] 1. The utility model sets a first steel sheet pile assembly, and the design of the first steel sheet pile assembly ensures effective sealing, reduces the possibility of water penetrating the structure, and thus improves the overall waterproof effect. Through the mutual engagement of the first left hook and the first right hook, the stability between adjacent first steel sheet pile assemblies is enhanced, the gap and error are reduced, and the stability of the overall structure is ensured. The labyrinth sealing structure formed by the first steel sheet pile assembly improves the sealing effect, ensures that the cement can fully fill the gap, effectively improves the water blocking effect, and avoids leakage caused by deviation of the first steel sheet pile body.
[0027] 2. The utility model increases the sealing of the overall structure by setting the second steel sheet pile assembly, effectively preventing water penetration, thereby improving the waterproof effect. The ladder-shaped structure design enhances the ability to withstand water pressure and ensures stability and efficiency under different water pressure environments. The engagement of the second left hook and the second right hook increases the installation stability and durability of the entire second steel sheet pile body.
[0028] 3. The utility model sets a left guide cone, a right guide cone, a left retaining plate and a right retaining plate. The left guide cone and the right guide cone help to reduce the resistance encountered during the driving of the steel sheet piles. Their conical structure makes it easier for the steel sheet piles to penetrate the soil, thereby improving the installation efficiency. The left retaining plate and the right retaining plate effectively prevent soil and other debris from filling the space inside the steel sheet piles, maintaining the cleanliness and integrity of the structure, facilitating the subsequent correct filling of cement, and improving the installation convenience of the entire water-stop curtain steel sheet pile mechanism. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a schematic diagram of the three-dimensional structure of the first embodiment of the utility model;
[0030] Figure 2 For this utility model Figure 1 The enlarged structural diagram at A in the middle;
[0031] Figure 3 This is a schematic diagram of the three-dimensional structure of the second embodiment of the present utility model;
[0032] Figure 4 This is a rear structural schematic diagram of the second embodiment of the utility model;
[0033] Figure 5 For this utility model Figure 3 The enlarged structural diagram at B in the middle;
[0034] Figure 6 For this utility model Figure 4 Schematic diagram of the enlarged structure at point C in the middle.
[0035] In the figure: 1. first steel sheet pile assembly; 2. second steel sheet pile assembly; 101. first steel sheet pile body; 102. first left arc plate; 103. first left hook; 104. first right arc plate; 105. first right hook; 201. second steel sheet pile body; 202. second left arc plate; 203. second left hook; 204. second right arc plate; 205. second right hook; 3. left guide cone; 4. left retaining plate; 5. right guide cone; 6. right retaining plate; 7. left straight groove; 8. left hanging hole; 9. right straight groove; 10. right hanging hole. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. The embodiments described below with reference to the drawings are exemplary and are only used to explain the utility model, and cannot be understood as limiting the utility model.
[0037] The following describes an embodiment of the utility model based on its overall structure.
[0038] Embodiment 1:
[0039] A steel sheet pile that is convenient for installing a water-stop curtain, such as Figure 1-Figure 6 As shown, it includes a first steel sheet pile assembly 1 and a second steel sheet pile assembly 2. The first steel sheet pile assembly 1 includes a first steel sheet pile body 101. A first left arc plate 102 is fixedly connected to one side of the first left arc plate 102. A first left hook 103 is fixedly connected to one side of the first left arc plate 102. A first right arc plate 104 is fixedly connected to one side of the first steel sheet pile body 101. A first right arc plate 104 is fixedly connected to one side of the first right arc plate 104. A first right hook 105 is fixedly connected to the first steel sheet pile body 101. The structure of the first steel sheet pile body 101 is a ladder structure. The first steel sheet pile body 101 can be used to achieve sealing. The first left arc plate 102 can cooperate with the first right arc plate 104 to form a complete space for installing a water-stop curtain. The first left hook 103 and the first right hook 105 can be engaged with each other. On the one hand, it provides fixation of adjacent first steel sheet pile bodies 101. On the other hand, it can form a labyrinth seal, so that the cement used to serve as a water-stop curtain can fully fill the gap between adjacent first steel sheet pile bodies 101, effectively block the water flow, and improve the water blocking effect.
[0040] See also Figure 1 A plurality of first steel sheet pile assemblies 1 are provided, and two adjacent first steel sheet pile assemblies 1 are engaged with each other through a first left hook 103 and a first right hook 105. The first left hook 103 and the first right hook 105 can limit the gap and verticality error between adjacent first steel sheet pile bodies 101, prevent excessive installation errors, ensure the correct alignment of each steel sheet pile, and form a labyrinth seal, which increases the difficulty of water flow passing through the steel sheet piles, thereby improving the overall sealing effect, allowing multiple steel sheet pile assemblies to be closely connected to each other, thereby enhancing the stability and durability of the overall structure.
[0041] The implementation principle of the utility model is: first, a first steel sheet pile body 101 is driven in, and then another first steel sheet pile body 101 is driven in, so that the adjacent first left hook 103 and the first right hook 105 are engaged with each other, so that the first left arc plate 102 and the first right arc plate 104 form a space with each other, and then the soil inside the space is taken out, and cement is filled in the space, so that a water-stop curtain can be formed after the cement solidifies.
[0042] Embodiment 2:
[0043] See also Figure 3 and Figure 4 The second steel sheet pile assembly 2 includes a second steel sheet pile body 201. The structure of the second steel sheet pile body 201 is a trapezoidal structure. The second steel sheet pile body 201 can be used to achieve sealing. When combined with adjacent steel sheet pile assemblies, it can effectively achieve sealing. The trapezoidal structure of the second steel sheet pile body 201 can improve the ability to withstand water pressure. The trapezoidal structure can more effectively disperse and bear the pressure brought by the water flow, thereby improving the stability and durability of the entire structure and increasing the overall strength of the steel sheet pile body.
[0044] See also Figure 3 and Figure 5 A second left arc plate 202 is fixedly connected to one side of the second steel sheet pile body 201, and a second left hook 203 is fixedly connected to one side of the second left arc plate 202. The second left arc plate 202 can form a space, and the second left hook 203 can be used to engage with the second right hook 205, which not only provides a physical connection, but also ensures the stability and consistency between the steel sheet piles, reducing errors and gaps during the installation process.
[0045] See also Figure 4 and Figure 6 A second right arc plate 204 is fixedly connected to one side of the second steel sheet pile body 201, and a second right hook 205 is fixedly connected to one side of the second right arc plate 204. The second right arc plate 204 can cooperate with the second left arc plate 202 to form a complete space for installing a water-stop curtain, ensuring that cement or other sealing materials can be correctly placed and fixed between the steel sheet piles. The second right hook 205 can clamp the adjacent second steel sheet pile bodies 201 through the second left hook 203, ensuring the stability and consistency between the adjacent second steel sheet pile bodies 201, and reducing the gaps and errors that may occur during the installation process.
[0046] See also Figure 3 and Figure 4 A left guide cone 3 is fixedly connected to the bottom of the second left arc plate 202, and a left retaining plate 4 is engaged in the second left arc plate 202. The left guide cone 3 can reduce the resistance encountered when the second steel sheet pile body 201 is driven downward, because the conical structure helps to pass through the soil more smoothly, reducing the physical resistance encountered during the driving process, thereby improving the installation efficiency. The left retaining plate 4 can prevent soil from filling into the space inside the second left arc plate 202, keeping the space clean and ensuring that the subsequent cement can be correctly placed and fixed.
[0047] See also Figure 3 and Figure 4The bottom of the second right arc plate 204 is fixedly connected with a right guide cone 5, and a right retaining plate 6 is engaged in the second right arc plate 204. The right guide cone 5 can reduce the resistance encountered when the second steel sheet pile body 201 is driven downward, because the conical structure helps to pass through the soil more smoothly, reducing the physical resistance encountered during the driving process, thereby improving the installation efficiency. The right retaining plate 6 can prevent soil from filling into the space inside the second right arc plate 204, keeping the space clean, and ensuring that the subsequent cement can be correctly placed and fixed.
[0048] See also Figure 3 and Figure 5 A left straight groove 7 is provided on the left retaining plate 4, and a left hanging hole 8 is provided on the top of the left retaining plate 4. The left straight groove 7 can provide space and a second left hook 203 engagement space, ensuring that the left retaining plate 4 can be stably fixed in an appropriate position, and is also convenient for adjustment or removal when necessary. The left hanging hole 8 can facilitate pulling out the left retaining plate 4, ensuring that the left retaining plate 4 can be effectively installed and removed.
[0049] See also Figure 4 and Figure 6 A right straight groove 9 is provided on the right retaining plate 6, and a right hanging hole 10 is provided on the top of the right retaining plate 6. The right straight groove 9 can provide space and a second right hook 205 engagement space to ensure that the right retaining plate 6 can be stably fixed in an appropriate position, while also being convenient for adjustment or removal. The right hanging hole 10 can facilitate pulling out the right retaining plate 6, thereby improving the maintenance efficiency and disassembly and assembly convenience of the entire system.
[0050] See also Figure 3 , Figure 4 , Figure 5 and Figure 6 The right retaining plate 6 and the left retaining plate 4 are made of stainless steel, which has excellent corrosion resistance. At the same time, the strength and durability of stainless steel mean that the right retaining plate 6 and the left retaining plate 4 can maintain their structural integrity and performance during long-term disassembly and assembly, reducing the frequency of maintenance and replacement, thereby reducing long-term operating costs. The use of high-strength stainless steel can enhance the stability of the entire water-stop curtain steel sheet pile mechanism. These retaining plates not only prevent soil intrusion, but also provide additional support and strength for the overall structure.
[0051] The implementation principle of the utility model is: first, the second steel sheet pile body 201 is driven in, and the left guide cone 3 and the right guide cone 5 at the bottom of the second steel sheet pile body 201 discharge the soil, and at the same time the left retaining plate 4 and the right retaining plate 6 prevent the soil from entering, and then the right retaining plate 6 is taken out by hanging the right hanging hole 10 with a hook, and another second steel sheet pile body 201 is driven in, so that the adjacent second left hook 203 and the second right hook 205 are engaged with each other, so that the second left arc plate 202 and the second right arc plate 204 form a space with each other, and cement is filled in the space so that a water-stop curtain can be formed after the cement solidifies.
[0052] Parts not involved in the present invention are the same as the prior art or can be implemented by using the prior art, and will not be described in detail here.
[0053] Although an embodiment of the utility model has been shown and described, this specific embodiment is only an explanation of the utility model and is not a limitation of the utility model. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contribution as needed without departing from the principles and purpose of the utility model. However, as long as they are within the scope of the claims of the utility model, they are protected by patent law.
Claims
1. A steel sheet pile for facilitating installation of a water-stop curtain, characterized in that: The invention comprises a first steel sheet pile assembly (1) and a second steel sheet pile assembly (2), wherein the first steel sheet pile assembly (1) comprises a first steel sheet pile body (101), one side of the first steel sheet pile body (101) is fixedly connected to a first left arc plate (102), one side of the first left arc plate (102) is fixedly connected to a first left hook (103), one side of the first steel sheet pile body (101) is fixedly connected to a first right arc plate (104), one side of the first right arc plate (104) is fixedly connected to a first right hook (105), and the structure of the first steel sheet pile body (101) is a ladder structure.
2. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 1, characterized in that: A plurality of the first steel sheet pile assemblies (1) are provided, and two adjacent first steel sheet pile assemblies (1) are engaged with each other via a first left hook (103) and a first right hook (105).
3. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 1, characterized in that: The second steel sheet pile assembly (2) comprises a second steel sheet pile body (201), and the structure of the second steel sheet pile body (201) is a ladder structure.
4. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 3, characterized in that: A second left arc plate (202) is fixedly connected to one side of the second steel sheet pile body (201), and a second left hook (203) is fixedly connected to one side of the second left arc plate (202).
5. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 3, characterized in that: A second right arc plate (204) is fixedly connected to one side of the second steel sheet pile body (201), and a second right hook (205) is fixedly connected to one side of the second right arc plate (204).
6. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 4, characterized in that: A left guide cone (3) is fixedly connected to the bottom of the second left arc plate (202), and a left earth retaining plate (4) is clamped inside the second left arc plate (202).
7. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 5, characterized in that: A right guide cone (5) is fixedly connected to the bottom of the second right arc plate (204), and a right earth retaining plate (6) is clamped inside the second right arc plate (204).
8. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 6, characterized in that: A left straight groove (7) is provided on the left earth retaining plate (4), and a left hanging hole (8) is provided on the top of the left earth retaining plate (4).
9. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 7, characterized in that: The right retaining plate (6) is provided with a right straight groove (9), and the top of the right retaining plate (6) is provided with a right hanging hole (10).
10. The steel sheet pile for facilitating installation of a water-stop curtain according to claim 9, characterized in that: The right retaining plate (6) and the left retaining plate (4) are made of stainless steel.