Device for pulling out steel underground diaphragm wall

By designing a device including pads, hoisting parts and steel ropes, the problem of difficulty and cost of removing steel underground continuous walls in the prior art is solved, and an efficient and simplified extraction process is achieved to adapt to different construction environments. .

CN222227290UInactive Publication Date: 2024-12-24HUAQIAO UNIVERSITY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420995529.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2024-12-24
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks special machinery for efficient removal of steel underground continuous walls, resulting in long preparation time, high cost and difficult to adapt to different construction environments.

Method used

A device including a first pad, a hoist, a beam and a steel rope is designed. Through a superimposed and disassembled pad structure, the steel rope is driven by the hoist and a beam to remove the underground continuous wall and adjust it. The size of the gasket is suitable for the construction environment.

Benefits of technology

It has achieved simplified operations, reduced labor demand, adapted to different construction environments, and improved removal efficiency and reusability of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227290U_ABST
    Figure CN222227290U_ABST
Patent Text Reader

Abstract

The utility model provides a device for pulling out a steel underground diaphragm wall. The device comprises a first cushion block, a jacking piece, a cross beam and a steel rope. The first cushion blocks are arranged on the two sides of the steel underground diaphragm wall in the length direction of the steel underground diaphragm wall, and the first cushion block on each side is at least connected with two jacking pieces. The cross beam is used for connecting the jacking pieces on different sides; the jacking part jacks and extends in the height direction of the first cushion block to drive the height position of the cross beam to change; the cross beam is connected with a steel rope used for being connected with the steel underground diaphragm wall. Compared with a traditional pile pulling machine, the device is easy to arrange and easy to operate, and assistance of multiple persons is not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering construction equipment, in particular to a device for removing a steel underground continuous wall. Background Art

[0002] At present, the enclosure during the excavation of urban underground space has begun to transition from all cast-in-place reinforced concrete continuous walls to partially recyclable steel continuous walls. The removal of steel continuous walls is a key link in the construction process of recyclable steel continuous walls. Different site environments, construction budgets, and construction period requirements will have a huge impact on the removal of steel continuous walls. In actual construction operations, there is no special machinery clearly used to remove underground continuous walls. In most cases, pile pulling machinery is used to remove underground continuous walls. Compared with piles, underground continuous walls have larger specifications and weights, and the difficulty of removal is greatly increased. There are obvious problems in using pile pulling machinery to remove underground continuous walls: professional pile pulling machinery and equipment require the deployment of multiple operators for assistance, and the equipment preparation time is long and the cost is high; when restricted by the construction site environment, mechanical equipment that occupies too much space cannot be smoothly driven in and start work. Utility Model Content

[0003] The main technical problem to be solved by the utility model is to provide a device for removing a steel underground continuous wall, which can remove the underground continuous wall and save manpower and material resources.

[0004] In order to solve the above-mentioned technical problems, the utility model provides a device for removing a steel underground continuous wall, comprising a first pad, a lifting piece, a crossbeam and a steel rope; the first pad is arranged on both sides of the steel underground continuous wall along the length direction of the steel underground continuous wall, and each side of the first pad is connected to at least two of the lifting pieces; the crossbeam is used to connect the lifting pieces on different sides; the lifting piece is lifted and extended along the height direction of the first pad, driving the height position of the crossbeam to change; the crossbeam is connected to a steel rope for connecting the steel underground continuous wall.

[0005] In a preferred embodiment: it also includes a second cushion block and a vertical beam, the second cushion block is arranged parallel to the outside of the first cushion block, and the second cushion block is connected to the horizontal beam through the vertical beam.

[0006] In a preferred embodiment: the lifting member and the vertical beam are fixedly connected to the cross beam via fasteners respectively.

[0007] In a preferred embodiment: the first pad block and the second pad block each include a top pad, a middle pad and a bottom pad, and the top pad, the middle pad and the bottom pad are sequentially stacked and assembled along the height direction of the steel underground continuous wall; at least one middle pad is connected between the top pad and the bottom pad.

[0008] In a preferred embodiment: the top gasket is provided with a first depression on the side facing the middle gasket, and the bottom gasket is provided with a first protrusion on the side facing the middle gasket; the middle gasket has a second protrusion on the upper end surface, and the middle gasket has a second depression on the lower end surface; the first depression of the top gasket and the second protrusion of the middle gasket are engaged with each other, and the first protrusion of the bottom gasket and the second depression of the middle gasket are engaged with each other; the middle gaskets are connected in series through the second protrusion and the second depression.

[0009] In a preferred embodiment: it also includes an anchor rod for inserting into the ground soil layer, the anchor rod is fixed to the bottom gasket, and the anchor rod is arranged at one end of the bottom gasket close to the ground.

[0010] In a preferred embodiment: a groove for engaging the lifting member and the vertical beam is provided on a side of the top gasket facing away from the middle gasket.

[0011] In a preferred embodiment: the lifting member and the vertical beam are fixedly connected to the groove via fasteners respectively.

[0012] In a preferred embodiment: the crossbeam is provided with a lifting ring for cooperating with the steel rope, and the lifting ring is located on the side of the crossbeam facing the steel underground continuous wall.

[0013] Compared with the prior art, the technical solution of the utility model has the following beneficial effects:

[0014] 1. The utility model provides a device for removing a steel underground continuous wall, by arranging a first pad and a second pad that can be stacked and disassembled on both sides of the underground continuous wall, and installing a plurality of lifting pieces on the first pad, and the lifting pieces on different sides are connected by a crossbeam. The lifting pieces are lifted upward to drive the crossbeam to remove the underground continuous wall through the steel rope. When the lifting pieces are lifted to a certain height, they cooperate with the second pad and the vertical beam as support, and add middle gaskets in the first pad and the second pad until the underground continuous wall is removed from the groove. Compared with traditional pile pulling machinery, the device is easy to arrange and simple to operate, and does not require the assistance of multiple people.

[0015] 2. The utility model provides a device for removing a steel underground continuous wall. The sizes of the top gasket, the middle gasket and the bottom gasket are set according to factors such as the construction site environment, and then they are stacked and assembled to form a first gasket and a second gasket. The device can be disassembled and assembled to adapt to the construction environment, and can achieve rapid construction and reuse. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the front structure of the device described in the preferred embodiment 1 of the utility model;

[0017] Figure 2 for Figure 1 A partial enlarged view of the middle A;

[0018] Figure 3 for Figure 1 A partial enlarged view of point B in the middle;

[0019] Figure 4 This is a schematic diagram of the side structure of the device described in the preferred embodiment 1 of the utility model;

[0020] Figure 5 This is a schematic diagram of the top structure of the device described in the preferred embodiment 1 of the utility model;

[0021] Figure 6 This is a schematic structural diagram of the top gasket described in the preferred embodiment 1 of the utility model;

[0022] Figure 7 This is a schematic structural diagram of the bottom gasket described in the preferred embodiment 1 of the utility model;

[0023] Figure 8 This is a schematic structural diagram of the middle gasket described in the preferred embodiment 1 of the utility model. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.

[0025] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0026] In the description of the present utility model, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "installed / connected", "connected", etc. should be understood in a broad sense. For example, "connection" can be a wall-mounted connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to the specific circumstances.

[0027] Example 1

[0028] refer to Figure 1-Figure 8 The present embodiment provides a device for removing a steel underground continuous wall, comprising a first pad 1, a lifting piece 2, a crossbeam 3 and a steel rope 4; the first pad 1 is arranged on both sides of the steel underground continuous wall along the length direction of the steel underground continuous wall, and each side of the first pad 1 is connected with at least two of the lifting pieces 2; the crossbeam 3 is used to connect the lifting pieces 2 on different sides; the lifting piece 2 is lifted and extended along the height direction of the first pad 1, driving the height position of the crossbeam 3 to change; the crossbeam 3 is connected with a steel rope 4 for connecting the steel underground continuous wall.

[0029] In more detail, the device for removing the steel underground continuous wall comprises a first pad 1, a lifting member 2, a crossbeam 3 and a steel rope 4. The first pad 1 is arranged on both sides of the steel underground continuous wall along the length direction of the steel underground continuous wall, and at least two of the lifting members 2 are connected to the first pad 1 on each side. The crossbeam 3 is used to connect the lifting members 2 on different sides, and one crossbeam 3 is correspondingly connected to two lifting members 2. In this embodiment, the device mainly applies an upward jacking force through four lifting members 2. The crossbeam 3 is provided with a lifting ring 31, and the lifting ring 31 is used to cooperate with the steel rope 4 to connect the steel underground continuous wall, and the lifting ring 31 is arranged on the side of the crossbeam 3 facing the steel underground continuous wall. The lifting member 2 is lifted and extended along the height direction of the first pad 1, driving the height position of the crossbeam 3 to change; the crossbeam 3 is connected to the steel rope 4 for connecting the steel underground continuous wall.

[0030] The device for removing the steel underground continuous wall also includes a second pad 5, a vertical beam 6 and an anchor rod 7. The second pad 5 is arranged parallel to the outside of the first pad 1, that is, the positional relationship between the first pad 1, the second pad 5 and the steel underground continuous wall is that the second pad 5 is farther from the steel underground continuous wall, the first pad 1 is closer to the steel underground continuous wall, and the first pad 1 and the second pad 5 are symmetrically distributed on both sides of the steel underground continuous wall. The second pad 5 is connected to the cross beam 3 through the vertical beam 6. The jacking member 2 and the vertical beam 6 are fixedly connected to the cross beam 3 through fasteners 8, respectively.

[0031] Furthermore, the first pad 1 and the second pad 5 both include a top pad 11, a middle pad 12 and a bottom pad 13. It should be emphasized that the top pad 11, the middle pad 12 and the bottom pad 13 included in the first pad 1 and the second pad 5 are the same, so in this embodiment, the first pad 1 is mainly used as an example for detailed description. The top pad 11, the middle pad 12 and the bottom pad 13 are sequentially stacked and assembled along the height direction of the steel underground continuous wall; at least one middle pad 12 is connected between the top pad 11 and the bottom pad 13.

[0032] A groove 111 is provided on the side of the top gasket 11 facing away from the middle gasket 12. The groove 111 is used to engage the jacking member 2 and the vertical beam 6. In detail, the end of the jacking member 2 facing away from the cross beam 3 is connected and fixed to the top gasket 11 at the position of the groove 111 by a fastener 8, and the end of the vertical beam 6 facing away from the cross beam 3 is connected and fixed to the top gasket 11 at the position of the groove 111 by a fastener 8. A first recess 112 is provided on the side of the top gasket 11 facing the middle gasket 12, and a first protrusion 131 is provided on the side of the bottom gasket 13 facing the middle gasket 12; the top gasket 11 and the bottom gasket 13 can be fixed by the engagement of the first recess 112 and the first protrusion 131. It is worth noting that the upper end surface of the middle gasket 12 is provided with a second protrusion 121, and the lower end surface of the middle gasket 12 is provided with a second depression 122. The first depression 112 of the top gasket 11 and the second protrusion 121 of the middle gasket 12 are engaged with each other, and the first protrusion 131 of the bottom gasket 13 and the second depression 122 of the middle gasket 12 are engaged with each other, so as to realize the plug-in connection between the middle gasket 12 and the upper and lower gaskets. It can be understood that when multiple middle gaskets 12 need to be stacked between the top gasket 11 and the bottom gasket 13, each middle gasket 12 is connected in series through the second protrusion 121 and the second depression 122. In layman's terms, each gasket is assembled and fixed by concave-convex engagement. The anchor rod 7 is arranged at one end of the bottom gasket 13 close to the ground, one end of the anchor rod 7 is fixed to the bottom gasket 13, and the other end is used to insert into the ground soil layer. In this embodiment, the lifting member 2 is preferably a jack, and the fastener 8 is preferably a bolt.

[0033] In this embodiment, a method for using the device for removing a steel underground continuous wall is also provided, comprising the following steps:

[0034] Step 1: Arrange the bottom gaskets 13 on both sides of the steel underground continuous wall, with two bottom gaskets 13 arranged in parallel on each side, and stack the top gasket 11 on the bottom gasket 13.

[0035] Step 2: Install the jacking pieces 2 at intervals on the two top gaskets 11 near the steel underground continuous wall. According to the construction requirements, at least two jacking pieces 2 are installed on each top gasket 11. The crossbeams 3 are erected on the jacking pieces 2 located on both sides of the steel underground continuous wall and connected to the jacking pieces 2. One crossbeam 3 is connected to two jacking pieces 2.

[0036] Step 3: Connect one end of the steel rope 4 to the steel underground continuous wall, and the other end to the lifting ring 31 of the beam 3.

[0037] Step 4: Pressurize the jacking member 2, lift the cross beam 3 upward, and when the height position of the cross beam 3 stops changing, install the vertical beam 6 on the two top gaskets 11 away from the steel underground continuous wall. The vertical beam 6 is fixed in the groove 111 of the top gasket 11 by bolts.

[0038] Step 5: depressurize the lifting member 2 and shorten the extension distance of the lifting member 2 so that the top gasket 11 connected to the lifting member 2 is separated from the bottom gasket 13, and the middle gasket 12 is stacked and assembled in the gap between the top gasket 11 and the bottom gasket 13 until the gap is filled.

[0039] Step six, pressurize the lifting member 2, the cross beam 3 is lifted upward, driving the top gasket 11 connected to the vertical beam 6 to separate from the bottom gasket 13, and superimpose and assemble the middle gasket 12 in the gap between the top gasket 11 and the bottom gasket 13 until the gap is filled.

[0040] Step 7: loop the steps 5 and 6, and stack and assemble the middle gasket 12 in the gap between the top gasket 11 and the bottom gasket 13 until the steel underground continuous wall is pulled out of the groove.

[0041] It should be noted that before executing step one, several construction preparations need to be carried out. The top gasket 11, the middle gasket 12 and the bottom gasket 13 of the device, as well as some steel components involved in the device are designed and processed in advance, and then transported to the construction site. Then, according to the environmental conditions of the construction site, the areas on both sides of the steel underground continuous wall to be removed are leveled, and the weak strata on both sides are reinforced. Then, the areas on both sides of the steel underground continuous wall are measured and laid out to further accurately locate the layout position of the device. In this embodiment, when the middle gasket 12 is superimposed and assembled into the gap between the top gasket 11 and the bottom gasket 13, the protrusions and grooves 111 on the upper and lower surfaces are aligned, and then inserted from the side.

[0042] The above is only a preferred specific implementation method of the utility model, but the design concept of the utility model is not limited to this. Any technician familiar with the technical field who uses this concept to make non-substantial changes to the utility model within the technical scope disclosed by the utility model shall be deemed to infringe the protection scope of the utility model.

Claims

1. A device for removing a steel underground continuous wall, characterized in that: It includes a first pad, a lifting piece, a crossbeam and a steel rope; the first pad is arranged on both sides of the steel underground continuous wall along the length direction of the steel underground continuous wall, and the first pad on each side is connected to at least two of the lifting pieces; the crossbeam is used to connect the lifting pieces on different sides; the lifting piece is lifted and extended along the height direction of the first pad, driving the height position of the crossbeam to change; the crossbeam is connected to a steel rope for connecting the steel underground continuous wall.

2. The device for removing a steel underground continuous wall according to claim 1, characterized in that: It also includes a second cushion block and a vertical beam. The second cushion block is arranged parallel to the outside of the first cushion block, and the second cushion block is connected to the cross beam through the vertical beam.

3. The device for removing a steel underground continuous wall according to claim 2, characterized in that: The lifting member and the vertical beam are fixedly connected to the cross beam via fasteners respectively.

4. The device for removing a steel underground continuous wall according to claim 2, characterized in that: The first pad block and the second pad block both include a top pad, a middle pad and a bottom pad, and the top pad, the middle pad and the bottom pad are sequentially stacked and assembled along the height direction of the steel underground continuous wall; at least one middle pad is connected between the top pad and the bottom pad.

5. The device for removing a steel underground continuous wall according to claim 4, characterized in that: The top gasket is provided with a first depression on a side facing the middle gasket, and the bottom gasket is provided with a first protrusion on a side facing the middle gasket; the middle gasket has a second protrusion on the upper end surface, and the middle gasket has a second depression on the lower end surface; the first depression of the top gasket and the second protrusion of the middle gasket are engaged with each other, and the first protrusion of the bottom gasket and the second depression of the middle gasket are engaged with each other; the middle gaskets are connected in series through the second protrusion and the second depression.

6. The device for removing a steel underground continuous wall according to claim 4, characterized in that: It also includes an anchor rod for inserting into the ground soil layer, the anchor rod is fixed to the bottom gasket, and the anchor rod is arranged at one end of the bottom gasket close to the ground.

7. The device for removing a steel underground continuous wall according to claim 5, characterized in that: A groove for engaging the lifting member and the vertical beam is provided on a side of the top gasket facing away from the middle gasket.

8. The device for removing a steel underground continuous wall according to claim 7, characterized in that: The lifting member and the vertical beam are respectively fixedly connected to the groove via fasteners.

9. A device for removing a steel underground continuous wall according to any one of claims 1 to 8, characterized in that: The cross beam is provided with a lifting ring for cooperating with the steel rope, and the lifting ring is located on the side of the cross beam facing the steel underground continuous wall.