Combined building wallboard

Through the design of combined building wall panels, the fixed structure of the hanging boom and angle steel connectors is used to realize the simultaneous lifting of multiple wall panels, which solves the problem of low lifting efficiency in the existing technology, improves assembly efficiency and reduces costs.

CN222227717UActive Publication Date: 2024-12-24CHANGZHOU BUYUE BUILDING MATERIAL TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420868682.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-12-24
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

In existing prefabricated precast concrete buildings, each building wall panel needs to be lifted separately and assisted in positioning, resulting in low efficiency and high cost for workers at high altitudes.

Method used

The combined building wall panel design is adopted, including two parallel booms, multiple wall panels and multiple angle steel connectors. They are fixedly connected by threaded sleeves and bolt rings, and lifting booms are used to achieve multiple lifting booms. The wall panel is hoisted at the same time.

Benefits of technology

The assembly efficiency of building wall panels is greatly improved, and the bolts and wall panels are quickly separated by disassemblying the bolts and rings, achieving rapid assembly and disassembly, reducing labor costs and time consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227717U_ABST
    Figure CN222227717U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building wall bodies, and particularly relates to a combined type building wallboard which comprises at least two suspenders arranged in parallel, a plurality of wallboards tidily laid on the suspenders and a plurality of angle steel connecting pieces arranged in parallel. Each hanging rod is provided with at least two threaded sleeves, and a bolt hanging ring sequentially penetrates through the angle steel connecting pieces, the wallboards and the threaded sleeves to connect the angle steel connecting pieces, the wallboards and the threaded sleeves; and each wall plate is fixedly connected with the angle steel connecting piece through a hook-headed bolt. The plurality of wallboards are arranged on the suspender, the angle steel connecting pieces are fixed on the other sides of the wallboards, and the angle steel connecting pieces, the wallboards and the suspender are fixed together through the bolt hanging rings, so that the plurality of wallboards can be stacked on an assembled wall body at the same time only by hoisting the suspender through hoisting equipment; the assembling efficiency is greatly improved, and the hanging rod and the wall plate can be rapidly separated by disassembling the bolt hanging ring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building walls, and in particular relates to a combined building wall panel. Background Art

[0002] Compared with existing cast-in-place concrete structures, the construction time of prefabricated concrete structures is greatly shortened. The factory production of concrete wall panels has accelerated the production process, greatly reduced production costs, and greatly reduced the labor costs of building factories, etc. However, each building wall panel still needs to be hoisted, and workers need to assist in positioning it at high altitude and fix it to the steel structure beams and columns. The efficiency still needs to be improved. Utility Model Content

[0003] The purpose of the utility model is to overcome the defects in the prior art that each building wall panel needs to be hoisted separately and workers need to assist in positioning, and to provide a modular building wall panel that can hoist multiple building wall panels at one time and has high installation efficiency.

[0004] The technical solution adopted by the utility model to solve its technical problems is:

[0005] A modular building wall panel, characterized in that it includes at least two suspension rods arranged parallel to each other, a plurality of wall panels neatly laid on the suspension rods, and a plurality of angle steel connectors arranged parallel to each other; each of the suspension rods has at least two threaded sleeves, and a bolt eye passes through the angle steel connector, the wall panel and the threaded sleeve in sequence to connect the three; each wall panel is fixedly connected to the angle steel connector by a hook bolt, and the suspension rod is lifted by a lifting device to lift the modular building wall panel into place.

[0006] Furthermore, there are two suspension rods, and a threaded sleeve is provided at the upper end and the lower end of each suspension rod.

[0007] Furthermore, there are two angle steel connectors, and connection holes are provided at positions corresponding to the threaded sleeves of the angle steel connectors and the hanger rod; the bolt eye is fixedly connected to the wall panel and the hanger rod through the connection holes.

[0008] Furthermore, a fixing nut is pre-embedded in each wall panel, the threaded portion of the hook head bolt is connected to the fixing nut, and the hook head of the hook head bolt is welded to the angle steel connector.

[0009] Furthermore, a lifting hole is provided at the upper end of the suspension rod, which is respectively connected to the two lifting holes through lifting wire ropes, and the lifting points on the lifting wire ropes are at the same distance from the two lifting holes.

[0010] The beneficial effects of a combined building wall panel of the utility model are:

[0011] 1. By arranging multiple relatively light wall panels on the hanger, fixing the angle steel connector on the other side of the wall panel, and fixing the angle steel connector, wall panel and hanger together through bolt lifting rings, it is only necessary to lift the hanger with lifting equipment to achieve the simultaneous stacking of multiple wall panels on the assembled wall, which greatly improves the assembly efficiency. By removing the bolt lifting ring, the hanger can be quickly separated from the wall panel, and the assembly of the next modular building wall panel can be continued. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0013] Figure 1 This is a three-dimensional structural diagram of a combined building wall panel according to an embodiment of the utility model;

[0014] Figure 2 This is a diagram of the hoisting state of the combined building wall panel of the embodiment of the utility model;

[0015] Figure 3 It is a structural diagram of the suspension rod of the combined building wall panel of the embodiment of the utility model;

[0016] Figure 4 This is a structural diagram of a wall panel according to an embodiment of the utility model;

[0017] Figure 5 This is a structural diagram of a hook bolt of an embodiment of the utility model;

[0018] Figure 6 It is a structural diagram of an angle steel connector according to an embodiment of the utility model.

[0019] In the figure: 1. threaded sleeve, 2. lifting rod, 21. lifting hole, 3. angle steel connector, 31. connecting hole, 4. bolt eye, 5. wall panel, 6. hook head bolt, 61. threaded part, 62. hook head, 7. lifting equipment, 8. winch, 9. fixing nut, 10. lifting wire rope, 11. traction wire rope. DETAILED DESCRIPTION

[0020] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.

[0021] like Figure 1-Figure 6 The utility model is a specific embodiment of a combined building wall panel, the combined building wall panel comprises at least two mutually parallel suspension rods 2, a plurality of wall panels 5 neatly laid on the suspension rods 2, and a plurality of mutually parallel angle steel connectors 3; see Figure 2Each suspension rod 2 has at least two threaded sleeves 1, and a bolt eye 4 passes through the angle steel connector 3, the wall panel 5 and the threaded sleeve 1 in sequence to connect the three; each wall panel 5 is fixedly connected to the angle steel connector 3 by a hook bolt 6, and the suspension rod 2 is lifted by a lifting device 7 to lift the modular building wall panel into place.

[0022] See also Figure 1 In the embodiment of the utility model, there are two suspension rods 2, and each suspension rod 2 is provided with a threaded sleeve 1 at the upper end and the lower end. There are also two angle steel connectors 3, and the angle steel connectors 3 are provided with connection holes 31 at positions corresponding to the threaded sleeves 1 of the suspension rods 2; the bolt eye 4 is fixedly connected to the wall panel 5 and the suspension rod 2 through the connection holes 31. There are at least two angle steel connectors 3, and the left and right sides of the wall panel 5 are fixedly connected with one angle steel connector 3 respectively. If the wall panel 5 is relatively long, an angle steel connector 3 can be added in the middle of the wall panel 5 for reinforcement.

[0023] In order to facilitate the quick connection between the angle steel connector 3 and each wall panel 5, see Figure 4 A fixing nut 9 is pre-buried in each wall panel 5 , a threaded portion 61 of a hook bolt 6 is connected to the fixing nut 9 , and a hook head 62 of the hook bolt 6 is welded to the angle steel connector 3 .

[0024] See also Figure 1 and Figure 2 A lifting hole 21 is provided at the upper end of the suspension rod 2, and the lifting wire ropes are respectively connected to the two lifting holes 21, and the lifting points on the lifting wire ropes 10 are at the same distance from the two lifting holes 21.

[0025] The installation process of the modular building wallboard of the utility model comprises the following steps:

[0026] S1: Place two suspension rods 2 in parallel on the ground; each suspension rod 2 has two threaded sleeves 1.

[0027] S2: Place multiple wall panels 5 neatly and closely on two suspension rods 2.

[0028] S3: Place multiple angle steel connectors 3 on multiple wall panels 5, and two of the angle steel connectors 3 are arranged parallel to and opposite to the two suspension rods 2; the angle steel connectors 3 and the threaded sleeves 1 of the suspension rods 2 are provided with connection holes 31 at corresponding positions. In the implementation of the utility model, only two angle steel connectors 3 are arranged at corresponding positions of the suspension rods 2. Generally, the suspension rods 2 and the angle steel connectors 3 are arranged near the left and right ends of the wall panels 5, and the left and right sides of the wall panels 5 extend partly relative to the suspension rods 2.

[0029] S4: Drill a hole in the wall panel 5 at the connection hole 31 of the angle steel connector 3, and then insert the bolt eye 4 into the connection hole 31, the hole of the wall panel 5 and the threaded sleeve 1 in sequence to fix the angle steel connector 3, the wall panel 5 and the suspension rod 2 together.

[0030] S5: insert the hook bolt 6 into the wall panel 5, fix the hook bolt 6 with the fixing nut 9, and weld the hook head 62 of the hook bolt 6 to the angle steel connector 3.

[0031] S6: Before the lifting of the lifting equipment 7, one end of the traction wire rope 11 is connected to at least two bolt lifting rings 4, and the other end of the traction wire rope 11 is connected to the winch 8. The traction wire rope 11 is pulled by the winch 8 to stack the modular building wall panels above the installed wall panels 5; the lifting equipment 7 is connected to the lifting point of the lifting wire rope 10 to lift the modular building wall panels to the appropriate position of the wall, and fixedly connected to the steel structure beams and columns through the angle steel connectors 3.

[0032] As a preferred embodiment, the four bolt lifting rings 4 are connected with traction wire ropes 11, and the angle and position of the modular building wall panel can be adjusted by adjusting the length of the four traction wire ropes 11.

[0033] Four traction wire ropes 11 can be connected to the same winch 8 to synchronously pull the modular building wall panels until they are suitable. A better way is: each traction wire rope 11 is connected to a winch 8, and the angle of the modular building wall panels can be adjusted by adjusting the length of each traction wire rope 11.

[0034] S7: The staff unscrews the bolt eye 4 to separate the two suspension rods 2 from the assembled building wall panel.

[0035] The utility model arranges a plurality of relatively light wall panels 5 on the suspension rod 2, fixes the angle steel connector 3 on the other side of the wall panel 5, and fixes the angle steel connector 3, the wall panel 5 and the suspension rod 2 together through the bolt eye 4. Only the lifting equipment 7 is needed to lift the suspension rod 2 to realize stacking of a plurality of wall panels 5 on the assembled wall at the same time, which greatly improves the assembly efficiency. Moreover, by removing the bolt eye 4, the suspension rod 2 can be quickly separated from the wall panel 5, and the assembly of the next modular building wall panel can be continued.

[0036] It should be understood that the specific embodiments described above are only used to explain the present invention, and are not used to limit the present invention. Obvious changes or modifications derived from the spirit of the present invention are still within the scope of protection of the present invention.

Claims

1. A modular building wall panel, characterized in that: The invention comprises at least two suspension rods (2) arranged in parallel with each other, a plurality of wall panels (5) neatly laid on the suspension rods (2), and a plurality of angle steel connectors (3) arranged in parallel with each other; each of the suspension rods (2) is provided with at least two threaded sleeves (1); a bolt eye (4) passes through the angle steel connector (3), the wall panel (5) and the threaded sleeve (1) in sequence to connect the three; each wall panel (5) is fixedly connected to the angle steel connector (3) by a hook bolt (6); the suspension rod (2) is lifted by a lifting device (7) to lift the assembled building wall panel into place.

2. The modular building wall panel according to claim 1, characterized in that: There are two suspension rods (2), and a threaded sleeve (1) is provided at the upper end and the lower end of each suspension rod (2).

3. The combined building wall panel according to claim 1 or 2, characterized in that: There are two angle steel connectors (3), and connection holes (31) are provided at positions corresponding to the threaded sleeves (1) of the angle steel connectors (3) and the suspension rod (2); the bolt eye (4) is fixedly connected to the wall panel (5) and the suspension rod (2) through the connection holes (31).

4. The modular building wall panel according to claim 3, characterized in that: A fixing nut (9) is pre-buried in each wall panel (5), the threaded portion (61) of the hook bolt (6) is connected to the fixing nut (9), and the hook head portion (62) of the hook bolt (6) is welded to the angle steel connector (3).

5. The combined building wall panel according to claim 3, characterized in that: The upper end of the suspension rod (2) is provided with a suspension hole (21), which is connected to the two suspension holes (21) respectively through a suspension wire rope (10), and the lifting point on the suspension wire rope (10) is at the same distance from the two suspension holes (21).