Vertical greening decoration structure of overpass column body
By designing a combined structure of feeding frame, filter frame, water collection tank, diversion pipe and spray head on the overpass column, the problem of insufficient rainwater utilization in the existing technology is solved, and uniform watering of green plants and water resources are achieved. Efficient utilization enhances the practicality and safety of the device.
Patent Information
- Application Number
- CN202420423641.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-03-04
AI Technical Summary
The vertical greening decoration of the existing overpass columns has a waste of water resources after wind, sun and rain, and it is impossible to use rainwater to water, resulting in difficulty in evenly watering green plants and safety hazards.
A vertical green decorative structure of the overpass column is designed. Rainwater is collected through the filter frame inside the feeding frame and stored in the water collection tank. The water source is extracted from the pump body to the flow pipe, and the nozzle is introduced into the folding pipe for uniform watering to ensure that Green plants are fully supplied with water in windy and rainy weather conditions.
The full utilization of rainwater is achieved, water resources is avoided, and watered green plants in drought or windy weather is ensured, which is improved by improving the practicality and safety of the device.
Smart Images

Figure CN222235748U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of overpasses, in particular to a vertical greening decorative structure of an overpass column. Background Art
[0002] In order to promote the cultural awareness of green environmental protection, cities across the country are also further expanding urban greening space, beautifying the urban environment, and vigorously developing three-dimensional greening construction with a focus on vertical greening of viaducts, and have also achieved gratifying results. However, during use, due to years of wind, rain and exposure, these vertical greenings have gradually shown certain drawbacks and safety hazards while beautifying the road environment.
[0003] The existing patent document announcement number CN204560383U is specifically a vertical greening decoration for an overpass column. The key points of its technical solution are: it includes an elevated column and a municipal curb stone, the elevated column is arranged above the municipal curb stone, and a circle of greening decoration is arranged on the outside of the elevated column. The greening decoration is composed of four finishes, each of which includes: a column, a cross bar and a hanging net, the column and the cross bar are detachably connected, the hanging net is hung between the columns, the adjacent finishes are connected by hinges, and the finish is fixed to the elevated column at the cross bar by bolts.
[0004] The above scheme reduces the shading and adsorption of climbing plants on the columns, but the elevated columns are blocked by the viaduct, and the vertical greening decorations cannot be exposed to rain and can only be watered manually. The rainwater is not fully utilized, resulting in a waste of water resources. It is now necessary to improve the existing equipment to meet actual needs. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides a vertical greening decoration structure for the column of an overpass, which has the function of collecting rain and snow in a water collecting tank by filtering rainwater through a filter frame inside a receiving frame, and pumping water from the inside of the water collecting tank into a diversion pipe by a pump body. The water from the inside of the diversion pipe is introduced into a sprinkler through a folding pipe, so that the sprinkler is directly aimed at the green plants for watering, thereby achieving uniform watering of the green plants. When multiple sprinklers are used to water the green plants at the same time, the green plants around the protective frame can all be watered, thereby making full use of rainwater and avoiding waste of water resources, and solving the above-mentioned technical problems.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a vertical greening decoration structure of an overpass column, comprising a bridge body, steel guardrails are arranged at both ends of the bridge body, a load-bearing steel frame is arranged on the bottom surface of the steel guardrail, a bearing seat is arranged on the bottom surface of the load-bearing steel frame, a water collecting box is arranged on the side of the steel guardrail, a material receiving frame is arranged on the top surface of the water collecting box, a guide pipe is arranged on the front of the water collecting box, a folding pipe is arranged on the bottom surface of the guide pipe, a nozzle is arranged on the bottom surface of the folding pipe, a protection frame is arranged on the outside of the load-bearing steel frame, a fixing plate is arranged on the side of the protection frame, a fixing block is arranged on the inner side of the bearing seat, a reinforcement rod is arranged between the fixing blocks, a positioning rod is arranged on the inner side of the bearing seat, and a reinforcement rod 2 is arranged on the inner side of the bearing seat.
[0009] Preferably, the two ends of the bridge body are respectively fixedly connected to steel guardrails, the two ends of the steel guardrails are fixedly connected to a water collecting box, the top surface of the water collecting box is fixedly connected to a material receiving frame, and the water collecting box and the material receiving frame are connected, and a filter frame is embedded in the inner side of the material receiving frame.
[0010] Through the above technical scheme, the user plants the green plants in turn in the fixed grooves at both ends of the fixed plate, and reinforces the green plants and the protective frame with the empty grooves at the corresponding side ends of the draw rope to prevent the green plants from falling from the side ends of the fixed plate in windy and rainy weather. The material receiving frame can collect rain and snow, and concentrate them in the water collecting tank through the filtration of the filter frame. When it is necessary to water the green plants around the protective frame, the pump body is started to draw the water source inside the water collecting tank into the diversion pipe. The water source inside the diversion pipe is introduced into the nozzle through the folding pipe, so that the nozzle is directly aimed at the green plants for watering, thereby achieving uniform watering of the green plants.
[0011] Preferably, the guide pipe passes through the water collecting tank and is fixedly connected to the pump body, and the guide pipe and the folding pipe are fixed by threads, the bottom surface of the folding pipe and the nozzle are fixed by threads, and the water outlet of the nozzle faces the protective frame.
[0012] Through the above technical scheme, the folding tube can drive the sprinkler to adjust the angle, so that the green plants at both ends of the fixed plate can be evenly watered, and the water collecting tank collects and utilizes the rainwater. The water collecting tanks are fixed on the outside of the steel guardrails, which will not affect the normal driving of the bridge. At the same time, the rainwater can directly fall into the material frame and be collected in the water collecting tank, thereby improving the practicability of the device.
[0013] Preferably, both ends of the fixing plate are connected to the load-bearing steel frame and the protection frame respectively, and storage grooves are provided at both ends of the fixing plate, and empty grooves are provided at the side ends of the protection frame and the side ends of the fixing plate respectively.
[0014] Through the above technical scheme, rainwater is filtered by the filter frame inside the material receiving frame to collect rain and snow in the water collecting tank, and the filter frame is embedded in the water collecting tank. When the weather is dry and the greenery around the protection frame needs to be watered, the pump body is used to draw the water source inside the water collecting tank into the diversion pipe, and the water source inside the diversion pipe is introduced into the sprinkler through the folding pipe, so that the sprinkler can be directly aimed at the green plants for watering, so that the green plants can be evenly watered. When multiple sprinklers are used to water the green plants at the same time, the green plants around the protection frame can be watered, so that the rainwater is fully utilized and water resources are avoided. Waste.
[0015] Preferably, the two ends of the load-bearing steel frame are respectively fixedly connected to the bridge body and the bearing seat, the two ends of the bearing seat are respectively fixedly connected to the fixing blocks, and the fixing blocks are fixedly connected to the fixing rods, and the reinforcement rod and the positioning rod are fixedly connected to the fixing rod.
[0016] Through the above technical solution, the fixing rods are fixedly connected between the fixing blocks, and the fixing rods are respectively fixedly connected to the reinforcement rods and the positioning rods. The fixed connection between the fixing rods and the fixed blocks can protect the stability of the fixed blocks, and the fixed connection between the reinforcement rods and the positioning rods and the fixing rods can improve the stability between the fixed blocks and the bearing seat, thereby improving the bearing capacity of the bearing seat.
[0017] Compared with the prior art, the utility model provides a vertical greening decoration structure of an overpass column, which has the following beneficial effects:
[0018] 1. The utility model collects rain and snow in a water collection box by filtering rainwater through a filter frame inside a receiving frame, and the filter frame is embedded in the water collection box. When the weather is dry and the greenery around the protection frame needs to be watered, the pump body is used to draw the water source inside the water collection box into the diversion pipe, and the water source inside the diversion pipe is introduced into the sprinkler through a folding pipe, so that the sprinkler is directly aimed at the green plants for watering, thereby achieving uniform watering of the green plants. When multiple sprinklers are used to water the green plants at the same time, the green plants around the protection frame can be watered, so that rainwater is fully utilized to avoid wasting water resources.
[0019] 2. The utility model fixes the fixing rods by connecting the fixing blocks, and the fixing rods are respectively fixedly connected to the reinforcing rods and the positioning rods. The fixed connection between the fixing rods and the fixing blocks can protect the fixing blocks stably, and the fixed connection between the reinforcing rods and the positioning rods and the fixing rods can improve the stability between the fixing blocks and the bearing seat, thereby improving the bearing capacity of the bearing seat. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the front structure of the protection frame of the utility model;
[0021] Figure 2 This is a schematic diagram of the cross-sectional structure of the protection frame of the utility model;
[0022] Figure 3 It is a schematic diagram of the cross-sectional structure of the bearing seat of the utility model.
[0023] Among them: 1. Bridge body; 2. Steel guardrail; 3. Load-bearing steel frame; 4. Bearing seat; 5. Water collecting tank; 6. Material receiving frame; 7. Diversion pipe; 8. Folding pipe; 9. Nozzle; 10. Protection frame; 11. Fixed plate; 12. Fixed block; 13. Reinforcement rod; 14. Positioning rod; 15. Reinforcement rod 2. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figure 1-3 A vertical greening decoration structure of an overpass column comprises a bridge body 1, steel guardrails 2 are arranged at both ends of the bridge body 1, a load-bearing steel frame 3 is arranged on the bottom surface of the steel guardrail 2, a bearing seat 4 is arranged on the bottom surface of the load-bearing steel frame 3, a water collecting box 5 is arranged on the side of the steel guardrail 2, a material receiving frame 6 is arranged on the top surface of the water collecting box 5, a guide pipe 7 is arranged on the front of the water collecting box 5, a folding pipe 8 is arranged on the bottom surface of the guide pipe 7, and a nozzle 9 is arranged on the bottom surface of the folding pipe 8, a protection frame 10 is arranged on the outside of the load-bearing steel frame 3, a fixing plate 11 is arranged on the side of the protection frame 10, a fixing block 12 is arranged on the inside of the bearing seat 4, a reinforcement rod 13 is arranged between the fixing blocks 12, a positioning rod 14 is arranged on the inside of the bearing seat 4, and a reinforcement rod 2 15 is arranged on the inside of the bearing seat 4.
[0026] Specifically, the two ends of the bridge body 1 are respectively fixedly connected to the steel guardrail 2, and the two ends of the steel guardrail 2 are fixedly connected to the water collecting box 5. The top surface of the water collecting box 5 is fixedly connected to the material receiving frame 6, and the water collecting box 5 and the material receiving frame 6 are connected, and the filter frame is embedded in the inner side of the material receiving frame 6. The advantage is that the user can plant green plants in the fixed grooves at the two ends of the corresponding fixed plate 11 in turn, and reinforce the space between the green plants and the protective frame 10 with the empty grooves at the corresponding side ends of the draw rope to prevent the green plants from falling from the side ends of the fixed plate 11 in windy and rainy weather. The material receiving frame 6 can collect rain and snow, and concentrate them in the water collecting box 5 through the filtration of the filter frame. When it is necessary to water the green plants around the protective frame 10, the pump body is started to extract the water source inside the water collecting box 5 into the diversion pipe 7, and the water source inside the diversion pipe 7 is introduced into the nozzle 9 through the folding pipe 8, so that the nozzle 9 is directly aimed at the green plants for watering, so that the green plants can be evenly watered.
[0027] Specifically, the guide pipe 7 passes through the water collecting tank 5 and is fixedly connected to the pump body, and the guide pipe 7 is fixed to the folding pipe 8 by threads, and the bottom surface of the folding pipe 8 is fixed to the nozzle 9 by threads, and the outlet of the nozzle 9 faces the protection frame 10. The advantage is that the folding pipe 8 can drive the nozzle 9 to adjust the angle, so that the green plants at both ends of the fixed plate 11 can be evenly watered, and the water collecting tank 5 collects and utilizes rainwater, and the water collecting tank 5 is respectively fixed on the outside of the steel guardrail 2, which does not affect the normal driving of the bridge body 1. At the same time, the rainwater can directly fall into the material frame 6 and be collected in the water collecting tank 5, thereby improving the practicality of the device.
[0028] Specifically, the two ends of the fixed plate 11 are respectively connected to the load-bearing steel frame 3 and the protective frame 10, and storage grooves are provided at both ends of the fixed plate 11, and empty grooves are provided at the side ends of the protective frame 10 and the fixed plate 11. The advantage is that rainwater is filtered by the filter frame inside the material receiving frame 6 to collect rain and snow in the water collecting box 5, and the filter frame is embedded in the water collecting box 5. When the weather is dry and the greenery around the protective frame 10 needs to be irrigated, the water source inside the water collecting box 5 is pumped into the diversion pipe 7 by the pump body, and the water source inside the diversion pipe 7 is introduced into the nozzle 9 through the folding pipe 8, so that the nozzle 9 is directly aimed at the green plants for watering, so that the green plants can be evenly irrigated. When multiple nozzles 9 are used to irrigate the green plants at the same time, the green plants around the protective frame 10 can be irrigated, making full use of rainwater and avoiding waste of water resources.
[0029] Specifically, the two ends of the load-bearing steel frame 3 are respectively fixedly connected to the bridge body 1 and the bearing seat 4, the two ends of the bearing seat 4 are respectively fixedly connected to the fixing blocks 12, and the fixing blocks 12 are fixedly connected to the fixing rods, and the reinforcement rods 13 and the positioning rods 14 are fixedly connected to the fixing rods. The advantage is that the fixing rods are fixedly connected between the fixing blocks 12, and the fixing rods are respectively fixedly connected to the reinforcement rods 13 and the positioning rods 14, the fixed connection between the fixing rods and the fixing blocks 12 can protect the stability of the fixing blocks 12, and the fixed connection between the reinforcement rods 13 and the positioning rods 14 and the fixing rods can improve the stability between the fixing blocks 12 and the bearing seat 4, thereby improving the bearing capacity of the bearing seat 4.
[0030] When in use, the user plants the green plants in the fixed grooves at both ends of the fixing plate 11 in turn, and reinforces the green plants between the green plants and the protective frame 10 with the empty grooves at the corresponding side ends of the draw rope to prevent the green plants from falling from the side ends of the fixing plate 11 in windy and rainy weather. The material receiving frame 6 can collect rain and snow, and concentrate them in the water collecting box 5 through filtering by the filter frame. When it is necessary to water the green plants around the protective frame 10, the pump body is started to extract the water source inside the water collecting box 5 into the guide pipe 7. The water source inside the guide pipe 7 is introduced into the nozzle 9 through the folding tube 8, so that the nozzle 9 is directly aimed at the green plants for watering, so that the green plants can be evenly watered. The folding tube 8 can drive the nozzle 9 to adjust the angle, so that the green plants at both ends of the fixing plate 11 can be evenly watered, and the water collecting box 5 collects and utilizes rainwater, and the water collecting box 5 is respectively fixed on the outside of the steel guardrail 2, which does not affect the normal driving of the bridge body 1. At the same time, the rainwater can directly fall into the material receiving frame 6 and be collected in the water collecting box 5, thereby improving the practicality of the device.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A vertical greening decorative structure for an overpass column, comprising a bridge body (1), steel guardrails (2) are arranged at both ends of the bridge body (1), a load-bearing steel frame (3) is arranged on the bottom surface of the steel guardrail (2), a bearing seat (4) is arranged on the bottom surface of the load-bearing steel frame (3), and a water collecting tank (5) is arranged on the side of the steel guardrail (2), characterized in that: The top surface of the water collecting box (5) is provided with a material receiving frame (6), the front surface of the water collecting box (5) is provided with a guide tube (7), the bottom surface of the guide tube (7) is provided with a folding tube (8), the bottom surface of the folding tube (8) is provided with a nozzle (9), the outer side of the load-bearing steel frame (3) is provided with a protection frame (10), the side of the protection frame (10) is provided with a fixing plate (11), the inner side of the bearing seat (4) is provided with a fixing block (12), a reinforcing rod (13) is provided between the fixing blocks (12), the inner side of the bearing seat (4) is provided with a positioning rod (14), and the inner side of the bearing seat (4) is provided with a reinforcing rod 2 (15).
2. The vertical greening decoration structure of an overpass column according to claim 1 is characterized by: The two ends of the bridge body (1) are respectively fixedly connected to the steel guardrail (2), the two ends of the steel guardrail (2) are fixedly connected to the water collecting box (5), the top surface of the water collecting box (5) is fixedly connected to the material receiving frame (6), and the water collecting box (5) and the material receiving frame (6) are connected, and the inner side of the material receiving frame (6) is embedded with a filter frame.
3. The vertical greening decoration structure of an overpass column according to claim 1 is characterized by: The flow guide pipe (7) passes through the water collecting box (5) and is fixedly connected to the pump body, and the flow guide pipe (7) and the folding pipe (8) are fixed by threads, and the bottom surface of the folding pipe (8) and the nozzle (9) are fixed by threads, and the water outlet of the nozzle (9) faces the protection frame (10).
4. The vertical greening decoration structure of an overpass column according to claim 1 is characterized by: The two ends of the fixing plate (11) are respectively connected to the load-bearing steel frame (3) and the protection frame (10), and storage grooves are provided at both ends of the fixing plate (11), and empty grooves are provided at the side ends of the protection frame (10) and the fixing plate (11).
5. The vertical greening decoration structure of an overpass column according to claim 1 is characterized by: The two ends of the load-bearing steel frame (3) are respectively fixedly connected to the bridge body (1) and the bearing seat (4), the two ends of the bearing seat (4) are respectively fixedly connected to the fixing blocks (12), and the fixing blocks (12) are fixedly connected to the fixing rods, and the reinforcing rods (13) and the positioning rods (14) are fixedly connected to the fixing rods.
