Power construction pay-off rack

By introducing speed reduction components and control components into the power construction wiring rack, the pulling and inertial rotation problems when the cable is closed is solved, and a more labor-saving cable retraction and installation process is achieved, and the construction efficiency is improved.

CN222249479UInactive Publication Date: 2024-12-27XIANGYANG PENGTIAN POWER ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421013162.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2024-12-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing power construction wiring rack requires staff to pull the cable when the cable is closed, which leads to laboriousness, and the cable tray is prone to excessive rotation due to inertia, which affects the operating efficiency.

Method used

A power construction line laying frame including a support frame body, a rotating shaft and a reduction assembly is designed. The reduction assembly consists of a connecting gear, a reduction gear, a reduction disc, a reduction block and a drive spring. Through the coordination of the reduction gear and a drive spring, the reduction gear is reduced. The rotation resistance of the cable tray when retracting, and the control components and locking parts enable the convenient installation and pulling of the cable tray.

Benefits of technology

It effectively reduces the pulling power of the staff when retracting the cable, avoids excessive rotation of the cable tray due to inertia, and improves the convenience and efficiency of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222249479U_ABST
    Figure CN222249479U_ABST
Patent Text Reader

Abstract

The utility model relates to a pay-off rack for power construction. The pay-off rack comprises a supporting frame body; the rotating shaft is used for being connected with a cable drum and rotationally connected with the supporting frame body; the speed reducing assembly comprises a connecting gear coaxially connected with the rotating shaft; the reduction gear is rotationally connected with the supporting frame body and meshed with the connecting gear; the speed reduction disc is coaxially and fixedly connected with the speed reduction gear; the speed reduction block is in sliding connection with the speed reduction gear in the radial direction of the speed reduction disc, a clamping groove matched with the speed reduction block in a clamping mode is formed in the speed reduction disc, the side face, located on the front side, of the speed reduction block is arranged to be an inclined face in the rotation direction of the cable drum during paying off, and a driving piece used for driving the speed reduction block to slide is arranged on the speed reduction gear; one end of the speed spring is connected with the support frame body, and the other end is connected with the reduction gear; and due to the arrangement of the speed reduction assembly, excessive rotation of the cable drum due to inertia is not prone to occurring, and the purpose that workers take up the cable in a labor-saving mode so that the workers can take up the cable conveniently is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of electric power construction devices, and in particular to an electric power construction pay-out rack. Background Art

[0002] The pay-off stand is a device used to support the cable reel.

[0003] In the related technology, for example, a Chinese patent with patent announcement number CN218619535U proposes an electric power construction wire-laying frame, comprising a base plate, support plates are fixedly connected to the tops of both ends of the base plate, rotating shafts are passed through the tops of the two support plates, the rotating shafts are rotatably connected to the support plates, one end of the two rotating shafts located on the inner side of the support plates is fixedly connected to a connecting device, a wire reel is detachably connected between the two connecting devices, a slip ring is slidably connected to the end of the rotating shaft located on the outer side of the support plate, the slip ring is fitted with the outer surface of the support plate, a screw ring is screwed on the rotating shaft on the side of the slip ring away from the support plate, a spring is sleeved on the rotating shaft between the slip ring and the screw ring, one end of the spring is fixedly connected to the slip ring, and the other end of the spring is fixedly connected to the screw ring, a limiting hole is provided on the rotating shaft, and a pin for locking the screw ring is inserted inside the limiting hole.

[0004] The above-mentioned related technologies have the following defects: after the cable construction is completed, the workers need to put away the excess cables, but the setting of the spring makes it difficult for the workers to pull the cables away. Utility Model Content

[0005] In order to save effort for workers when retracting cables and facilitate them to retract cables, the present application provides a power construction pay-out rack.

[0006] The present application provides a power construction pay-out frame, which adopts the following technical solution:

[0007] A power construction pay-out frame, comprising:

[0008] Support frame;

[0009] A rotating shaft, used to be connected to the cable drum and rotatably connected to the support frame;

[0010] The deceleration assembly is used to connect the rotating shaft and the supporting frame, and the deceleration assembly includes:

[0011] A connecting gear is coaxially and fixedly connected with the rotating shaft;

[0012] A reduction gear is rotatably connected to the support frame and meshes with the connecting gear;

[0013] A reduction plate, which is coaxially arranged with the reduction gear and is rotatably connected to the support frame;

[0014] The deceleration block is slidably connected with the deceleration gear along the radial direction of the deceleration disc. The deceleration disc is provided with a slot for engaging with the deceleration block. Along the rotation direction of the cable drum when the cable is released, the side surface of the deceleration block located at the front side is set as an inclined surface. The deceleration gear is provided with a driving member for driving the deceleration block to slide.

[0015] The deceleration spring has one end connected to the support frame body and the other end connected to the deceleration gear.

[0016] Furthermore, the driving member is a driving spring, one end of the driving spring is connected to the deceleration plate, and the other end is connected to the deceleration block. Under the elastic force of the driving spring, the deceleration block is engaged with the slot.

[0017] Furthermore, a plurality of the speed reduction blocks are provided, and the plurality of speed reduction blocks are evenly arranged along the circumference of the speed reduction plate.

[0018] Furthermore, the pay-off frame further comprises a regulating component, and the regulating component comprises:

[0019] A regulating ring connected to the reduction gear;

[0020] There are multiple regulating ropes, each corresponding to a deceleration block. One end of the regulating rope is fixedly connected to the corresponding deceleration block, and the other end is fixedly connected to the regulating ring. A locking piece for locking the position of the regulating ring is provided on the support frame.

[0021] Furthermore, the locking member is a locking nut, which is threadedly connected to the reduction gear and fixedly connected to the regulating ring.

[0022] Furthermore, the rotating shaft includes two connecting sections and a bearing section, the two connecting sections are rotatably connected to the support frame, and the two connecting sections are respectively arranged at two ends of the bearing section and are detachably connected to the bearing section.

[0023] Furthermore, sleeves are threadedly connected to the two connecting sections, and both ends of the load-bearing section are plug-fitted with the sleeves on the corresponding sides.

[0024] Furthermore, both of the connecting sections are fixedly connected with fixing cones, which are sleeved on the outside of the corresponding connecting section and can be plugged into and matched with the hole wall of the cable reel.

[0025] In summary, the beneficial technical effect of the present application is that the provision of the deceleration component makes it less likely for the cable reel to rotate excessively due to inertia, and also achieves the purpose of saving effort for workers when retracting the cables, making it easier for workers to retract the cables. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.

[0027] Figure 2 It is a schematic diagram of the overall structure of the rotating shaft in the embodiment of the present application.

[0028] Figure 3 It is a partial cross-sectional view of an embodiment of the present application.

[0029] Figure 4 yes Figure 3 Enlarged schematic diagram of part A.

[0030] Figure numerals: 1. Support frame; 11. Bracket; 111. Support shaft; 112. Reduction nut; 2. Rotating shaft; 21. Load-bearing section; 22. Connecting section; 221. Fixing cone; 222. Fixing bolt; 23. Sleeve; 3. Reduction assembly; 31. Connecting gear; 32. Reduction gear; 321. Reduction ring; 322. Slide groove; 33. Reduction disc; 331. Slot; 34. Reduction spring; 35. Reduction block; 4. Driving spring; 5. Adjustment assembly; 51. Adjustment rope; 52. Adjustment ring; 53. Locking nut. DETAILED DESCRIPTION

[0031] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0032] The present application embodiment discloses a power construction pay-out frame. Figure 1 The construction pay-off frame includes a support frame body 1, a rotating shaft 2 and a deceleration assembly 3.

[0033] The support frame 1 includes two groups of brackets 11, which are arranged at intervals. The rotating shaft 2 is arranged between the two groups of brackets 11, and both ends of the rotating shaft 2 are connected to the brackets 11 on the corresponding side to carry the cable reel.

[0034] Reference Figure 1 and Figure 2 The rotating shaft 2 includes a bearing section 21 and two connecting sections 22. The two connecting sections 22 are respectively arranged at both ends of the bearing section 21, and the ends of the two connecting sections 22 away from the bearing section 21 are rotatably connected to the bracket 11 on the corresponding side. Both ends of the bearing section 21 are detachably connected to the connecting sections 22 on the corresponding side.

[0035] In this embodiment, the detachable connection between the load-bearing section 21 and the connecting section 22 is as follows: the connecting section 22 is threadedly connected with a sleeve 23 , and both ends of the load-bearing section 21 are plugged into and matched with the sleeve 23 on the corresponding side.

[0036] A hole for inserting the rotating shaft 2 is opened on the cable reel. In order to facilitate the staff to install the cable reel, the size of the rotating shaft 2 is generally smaller than the hole size of the cable reel. Therefore, after the cable reel is installed, the cable reel is prone to shaking. Based on this, the two connecting sections 22 are both slidingly sleeved with a fixing cone 221, and the tip of the fixing cone 221 is set toward the cable reel and can be plugged into the hole wall of the cable reel. The fixing cone 221 is threadedly connected with a fixing bolt 222.

[0037] After the staff puts the cable reel on the rotating shaft 2, they move the two fixing cones 221 to a position where they contact the peripheral wall of the hole of the cable reel to prevent the cable reel from moving. At this time, they rotate the fixing bolt 222 to make it contact with the rotating shaft 2, thereby achieving the installation of the cable reel.

[0038] In order to facilitate the staff to install the fixing cone 221, the size of the bearing section 21 in this embodiment is smaller than the size of the cable reel, so that after the staff installs the cable reel on the rotating shaft 2, the cable reel is padded by the sleeve 23, that is, the hole wall of the cable reel and the outer peripheral wall of the connecting section 22 are spaced apart, so that the staff can insert the fixing cone 221 into the hole of the cable reel.

[0039] Reference Figure 1 , Figure 3 and Figure 4 The deceleration assembly 3 is used to connect the rotating shaft 2 and the supporting frame 1, so that the cable drum is not prone to excessive rotation due to inertia. Two groups of deceleration assemblies 3 are provided, and one group of deceleration assemblies 3 is correspondingly connected to one connecting section 22.

[0040] The deceleration assembly 3 includes a connecting gear 31, a reduction gear 32, a reduction disc 33, a reduction spring 34 and a reduction block 35. The connecting gear 31 is coaxially fixedly connected to the corresponding connecting section 22. A support shaft 111 is fixedly connected to the bracket 11, and the support shaft 111 is located on the side of the bracket 11 away from the other bracket 11. The reduction gear 32 is rotatably connected to the support shaft 111 on the corresponding side of the bracket 11, and meshes with the connecting gear 31. The reduction disc 33 is rotatably connected to the support shaft 111 on the corresponding side of the bracket 11, and a reduction ring 321 is coaxially fixedly connected to the reduction gear 32, and the reduction ring 321 is sleeved on the outer side of the reduction disc 33. A plurality of reduction blocks 35 are provided. In this embodiment, three reduction blocks 35 are provided. The three reduction blocks 35 are evenly arranged along the circumference of the reduction disc 33, and the reduction blocks 35 are all slidably connected to the reduction ring 321 along the radial direction of the reduction disc 33. In this embodiment, the speed reduction plate 33 is provided with a slide groove 322 corresponding to the speed reduction block 35, and the speed reduction block 35 is located in the slide groove 322 and is slidably connected to the side wall of the slide groove 322. The speed reduction plate 33 is provided with a slot 331 for plugging and matching with the speed reduction block 35. The speed reduction ring 321 is provided with a driving member for driving the speed reduction block 35 to slide.

[0041] The driving member is a driving spring 4, which is located in the slide groove 322, and one end of the driving spring 4 is fixedly connected to the bottom of the slide groove 322, and the other end is fixedly connected to the speed reduction block 35. Under the elastic force of the driving spring 4, the speed reduction block 35 is partially inserted into the slot 331, and along the rotation direction of the cable reel when the cable reel is unwinding, the side surface of the part of the speed reduction block 35 that is engaged with the slot 331 is arranged as an inclined surface on the front side, so that when the cable reel is unwinding, the speed reduction disk 33 needs to be driven to rotate, and when the cable reel is winding up, there is no need to drive the speed reduction disk 33 to rotate.

[0042] The deceleration spring 34 is sleeved on the support shaft 111, and one end of the deceleration spring 34 is in contact with the deceleration disk 33, and the other end is connected to the support shaft 111. In this embodiment, in order to facilitate the regulation of the elastic force of the deceleration spring 34, a deceleration nut 112 is threadedly connected to the support shaft 111, and the end of the deceleration spring 34 away from the deceleration disk 33 is in contact with the deceleration nut 112.

[0043] During construction, the workers need to lay very long cables. Therefore, in order to reduce the work intensity of the workers, a regulating component 5 for regulating the engagement state of the speed reduction block 35 and the card slot 331 is provided on the pay-off frame. The regulating component 5 includes a regulating rope 51 and a regulating ring 52. There are multiple regulating ropes 51, and the regulating ropes 51 correspond to the speed reduction block 35 one by one. One end of the regulating rope 51 is fixedly connected to the speed reduction block 35, and the other end passes through the speed reduction ring 321 and is fixedly connected to the regulating ring 52. The regulating ring 52 is sleeved outside the speed reduction ring 321, and the inner circumferential wall of the regulating ring 52 is spaced from the outer circumferential wall of the speed reduction ring 321. The speed reduction ring 321 is provided with a locking member for locking the relative position of the regulating ring 52 and the speed reduction ring 321. The locking member is a locking nut 53, and the locking nut 53 is fixedly connected to the regulating ring 52 and is threadedly connected to the speed reduction ring 321.

[0044] The implementation principle of an electric power construction pay-off rack in an embodiment of the present application is as follows: when a worker needs to install a cable reel, first connect the load-bearing section 21 with a connecting section 22, then connect the cable reel with the load-bearing section 21, and then connect the load-bearing section 21 with another connecting section 22, and finally insert the fixing cone 221 into the hole of the cable reel, and rotate the fixing bolt 222 to lock the position of the fixing cone 221, thereby completing the installation of the cable reel.

[0045] When the staff needs to release the line, they only need to pull the end of the cable. When the length of the line to be released is longer, the locking nut 53 can be rotated first to allow the locking nut 53 to drive the regulating ring 52 to rotate, thereby pulling the regulating rope 51 to retract the deceleration block 35 into the slide groove 322, making it easier for the staff to pull the cable.

[0046] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A power construction pay-off frame, characterized in that: include: Support frame (1); A rotating shaft (2) is used to be connected to the cable reel and is rotatably connected to the support frame (1); The deceleration assembly (3) is used to connect the rotating shaft (2) and the supporting frame (1), and the deceleration assembly (3) comprises: A connecting gear (31) coaxially and fixedly connected to the rotating shaft (2); A reduction gear (32) is rotatably connected to the support frame (1) and meshes with the connecting gear (31); A reduction plate (33) is coaxially arranged with the reduction gear (32) and is rotatably connected to the support frame (1); A deceleration block (35) is slidably connected to the deceleration gear (32) along the radial direction of the deceleration disc (33); a slot (331) for engaging with the deceleration block (35) is provided on the deceleration disc (33); a side surface of the deceleration block (35) located at the front side is arranged as an inclined surface along the rotation direction of the cable drum when unwinding the cable; and a driving member for driving the deceleration block (35) to slide is arranged on the deceleration gear (32); A deceleration spring (34) has one end connected to the support frame (1) and the other end connected to the deceleration gear (32).

2. The electric power construction pay-off frame according to claim 1, characterized in that: The driving member is a driving spring (4), one end of the driving spring (4) is connected to the reduction gear (32), and the other end is connected to the reduction block (35), and under the elastic force of the driving spring (4), the reduction block (35) is engaged with the engagement groove (331).

3. The electric power construction pay-off frame according to claim 1, characterized in that: A plurality of the deceleration blocks (35) are provided, and the plurality of deceleration blocks (35) are evenly arranged along the circumference of the deceleration plate (33).

4. The electric power construction pay-off frame according to claim 3, characterized in that: The reduction gear (32) is provided with a control component (5) for controlling the engagement state of the reduction block (35) and the engagement groove (331), and the control component (5) comprises: A regulating ring (52) connected to the reduction gear (32); A plurality of regulating ropes (51) are provided, the regulating ropes (51) corresponding to the deceleration blocks (35) one by one, one end of the regulating rope (51) being fixedly connected to the corresponding deceleration block (35), and the other end of the regulating rope (51) being fixedly connected to the regulating ring (52), and a locking member for locking the position of the regulating ring (52) being provided on the support frame (1).

5. The electric power construction pay-off frame according to claim 4, characterized in that: The locking member is a locking nut (53), which is threadedly connected to the reduction gear (32) and fixedly connected to the regulating ring (52).

6. The electric power construction pay-off frame according to claim 1, characterized in that: The rotating shaft (2) comprises two connecting sections (22) and a bearing section (21); the two connecting sections (22) are both rotatably connected to the support frame (1); the two connecting sections (22) are respectively arranged at two ends of the bearing section (21) and are detachably connected to the bearing section (21).

7. The electric power construction pay-off frame according to claim 6, characterized in that: The two connecting sections (22) are both threadedly connected with sleeves (23), and both ends of the bearing section (21) are plug-fitted with the sleeves (23) on the corresponding side.

8. The electric power construction pay-off frame according to claim 7, characterized in that: A fixing cone (221) is fixedly connected to each of the two connecting sections (22); the fixing cone (221) is sleeved on the outside of the corresponding connecting section (22) and can be plugged into and matched with the hole wall of the cable reel.