Bubbling system and glass production device
By introducing spare pipelines and control valves into the bubble system, the problem of withdrawing the bubble gun when the conveying pipeline is faulty is solved, and the safety and efficiency of glass furnace production are improved.
Patent Information
- Application Number
- CN202420118675.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-01-17
AI Technical Summary
During the production process of glass furnaces, the conveyor pipeline circuit is prone to malfunction, resulting in the bubbling gun being withdrawn immediately, affecting production efficiency and posing safety hazards.
A bubble system is designed, including the main liquid supply pipeline, the main liquid return pipeline and the backup pipeline. The pipeline status is adjusted by controlling the valve to ensure the connectivity of the coolant and avoid the need to withdraw the drum when the pipeline is faulty. Bubble the gun.
Improve operational safety and production efficiency, reduce production shutdowns and glass water leakage caused by pipeline failures, and extend the service life of the equipment.
Smart Images

Figure CN222250406U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of glass production equipment, and more specifically, relates to a bubbling system and a glass production equipment. Background Art
[0002] When using a glass melting furnace to produce glass, it is usually necessary to use a bubbling gun with a gas channel to ventilate the glass liquid. In order to reduce the temperature of the gas channel, a cooling channel for the circulation of coolant is provided in the bubbling gun. The gas channel is arranged in the cooling channel. At the same time, a supply pipe for providing coolant is connected to the first end of the cooling channel through a conveying pipeline, and a return pipe for recovering coolant is connected to the second end of the cooling channel through a conveying pipeline.
[0003] Affected by factors such as the high production temperature of the glass melting furnace, the conveying pipeline is prone to leakage and other faults after being used for a period of time. Once the conveying pipeline fails, it is necessary to immediately stop injecting coolant into the cooling channel and immediately withdraw the bubbling gun from the glass melting furnace. The bubbling gun can only be sent back into the glass melting furnace for use after the damaged conveying pipeline is replaced. This replacement operation is not only inefficient and affects the production efficiency of the glass, but also it is easy to cause accidents such as glass water leakage during the withdrawal of the bubbling gun from the glass melting furnace, and the safety is poor. Utility Model Content
[0004] The purpose of the embodiments of the present application is to provide a bubbling system and a glass production device, aiming to solve the technical problem in the prior art that the bubbling gun must be withdrawn from the glass furnace after a failure of the delivery pipeline.
[0005] To achieve the above-mentioned purpose, according to one aspect of the present application, a bubbling system is provided, and the bubbling system is used in a glass melting furnace; the bubbling system comprises: a bubbling gun, a cooling channel for circulating cooling liquid is provided in the bubbling gun; a liquid supply part, the liquid supply part is used to inject cooling liquid into the cooling channel; a liquid return part, the liquid return part is used to recover the cooling liquid flowing out of the cooling channel; a main liquid supply pipeline, the liquid supply part can be connected to the cooling channel through the main liquid supply pipeline; a main liquid return pipeline, the liquid return part can be connected to the cooling channel through the main liquid return pipeline; a first spare pipeline, the first end of the first spare pipeline is connected to the cooling channel, and the second end of the first spare pipeline is connected to the liquid supply part or the liquid return part.
[0006] Optionally, the second end of the first backup pipeline is communicated with the liquid return portion.
[0007] Optionally, the bubbling system further includes a second backup pipeline, a first end of the second backup pipeline is connected to the cooling channel, and a second end of the second backup pipeline is connected to the liquid supply portion.
[0008] Optionally, a first control valve is provided on the main liquid supply pipeline, a second control valve is provided on the main liquid return pipeline, a third control valve is provided on the first backup pipeline, and a fourth control valve is provided on the second backup pipeline.
[0009] Optionally, the bubbling gun includes: a gun body, a cooling channel is arranged in the gun body; a gas channel, the gas channel is arranged in the gun body; a main liquid supply branch, the main liquid supply pipeline is connected to the cooling channel through the main liquid supply branch; a main liquid return branch, the main liquid return pipeline is connected to the cooling channel through the main liquid return branch; a first spare branch, the first spare pipeline is connected to the cooling channel through the first spare branch; and a second spare branch, the second spare pipeline is connected to the cooling channel through the second spare branch.
[0010] Optionally, the main liquid supply branch is located below the main liquid return branch; the second backup branch is located above the first backup branch and above the main liquid return branch.
[0011] Optionally, the main liquid supply branch is connected to the main liquid return branch through a cooling channel, and is connected to the first backup branch, and is connected to the second backup branch; or, the cooling channel is divided into a first cooling space and a second cooling space, and the first cooling space and the second cooling space are arranged independently; the main liquid supply branch is connected to the first cooling space, the main liquid return branch is connected to the first cooling space, the first backup branch is connected to the second cooling space, and the second backup branch is connected to the second cooling space.
[0012] Optionally, control valves are provided on the main liquid supply branch pipe, the main liquid return branch pipe, the first backup branch pipe and the second backup branch pipe.
[0013] Optionally, the bubbling system further comprises a moving component, which is drivingly connected to the bubbling gun and can drive the bubbling gun to move in a direction approaching or away from the glass melting furnace.
[0014] According to another aspect of the present application, a glass production device is provided. The glass production device includes a glass melting furnace and the above-mentioned bubbling system, and the bubbling system is used in the glass melting furnace.
[0015] The beneficial effect of the bubbling system provided in the present application is that, compared with the prior art, when the bubbling system in the present application is used normally, the main liquid supply pipeline is in a connected state, the main liquid return pipeline is in a connected state, the first spare pipeline is in a blocked state, and the coolant in the liquid supply part flows into the liquid return part through the main liquid supply pipeline, the cooling channel and the main liquid return pipeline in sequence; when the main liquid supply pipeline in the present application fails, if the second end of the first spare pipeline is connected to the liquid supply part, the main liquid supply pipeline can be adjusted to be in a blocked state, and the first spare pipeline can be adjusted to be in a connected state, so that the coolant in the liquid supply part is transported into the cooling channel through the first spare pipeline, and there is no need to withdraw the bubbling gun from the glass melting furnace; if the second end of the first spare pipeline is connected to the liquid return part, the bubbling gun needs to be withdrawn from the glass melting furnace. When the main liquid return pipeline in the present application fails, if the second end of the first backup pipeline is connected to the liquid return part, the main liquid return pipeline can be adjusted to be in a blocked state, and the first backup pipeline can be adjusted to be in a connected state, so that the coolant in the cooling channel is transported to the liquid return part through the first backup pipeline, and there is no need to withdraw the bubbling gun from the glass furnace; if the second end of the first backup pipeline is connected to the liquid supply part, the bubbling gun needs to be withdrawn from the glass furnace. By adopting the bubbling system in the present application, it can be decided whether to withdraw the bubbling gun from the glass furnace according to the situation when the main liquid supply pipeline or the main liquid return pipeline fails, and there is no need to withdraw the bubbling gun from the glass furnace, which improves the safety of operation and production efficiency to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0017] Figure 1 A schematic diagram of the structure of the bubbling system provided in an embodiment of the present application;
[0018] Figure 2 A schematic cross-sectional front view of a bubbling gun in a first embodiment provided in an embodiment of the present application;
[0019] Figure 3 This is a schematic cross-sectional front view of a bubbling gun in a second embodiment provided in an example of the present application.
[0020] The reference numerals in the above drawings are as follows:
[0021] 100, bubble gun; 110, gun body; 111, cooling channel; 1111, first cooling space; 1112, second cooling space; 120, gas channel; 130, main liquid supply branch; 140, main liquid return branch; 150, first spare branch; 160, second spare branch; 200, liquid supply unit; 300, liquid return unit; 400, main liquid supply pipeline; 500, main liquid return pipeline; 600, first spare pipeline; 700, second spare pipeline; 800, first control valve; 900, second control valve; 1000, third control valve; 1100, fourth control valve; 1200, control valve; 1300, moving assembly; 1310, connector; 1320, threaded rod; 1330, nut; 1340, handle. DETAILED DESCRIPTION
[0022] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0023] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or indirectly connected to the other element. In the absence of conflict, the embodiments in this application and the features in the embodiments may be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0024] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0025] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0026] As described in the background technology, at present, when using a glass melting furnace to produce glass, it is usually necessary to use a bubbling gun with a gas channel to ventilate the glass liquid. In order to reduce the temperature of the gas channel, a cooling channel for the circulation of coolant is provided in the bubbling gun, and the gas channel is provided in the cooling channel. At the same time, a liquid supply pipe that can provide coolant is connected to the first end of the cooling channel through a delivery pipeline, and a return pipe that can recover coolant is connected to the second end of the cooling channel through a delivery pipeline. Affected by factors such as the high production temperature of the glass melting furnace, the delivery pipeline is prone to leakage and other faults after being used for a period of time. Once the delivery pipeline fails, it is necessary to immediately stop injecting coolant into the cooling channel, and the bubbling gun must be immediately withdrawn from the glass melting furnace. After the damaged delivery pipeline is replaced, the bubbling gun can be sent back to the glass melting furnace for use; this replacement operation is not only inefficient, affecting the production efficiency of the glass, but also very likely to cause accidents such as glass water leakage during the withdrawal of the bubbling gun from the glass melting furnace, and the safety is poor.
[0027] Reference Figure 1 and Figure 2 In order to solve the above problems, according to one aspect of the present application, an embodiment of the present application provides a bubbling system, which is used in a glass melting furnace; the bubbling system includes a bubbling gun 100, a liquid supply part 200, a liquid return part 300, a main liquid supply pipeline 400, a main liquid return pipeline 500 and a first spare pipeline 600, wherein a cooling channel 111 for cooling liquid to circulate is provided in the bubbling gun 100; the liquid supply part 200 is used to inject cooling liquid into the cooling channel 111; the liquid return part 300 is used to recover the cooling liquid flowing out of the cooling channel 111; the liquid supply part 200 can be connected to the cooling channel 111 through the main liquid supply pipeline 400; the liquid return part 300 can be connected to the cooling channel 111 through the main liquid return pipeline 500; the first end of the first spare pipeline 600 is connected to the cooling channel 111, and the second end of the first spare pipeline 600 is connected to the liquid supply part 200 or the liquid return part 300.
[0028] In the embodiment of the present application, the coolant may be cooling water. Of course, in other embodiments, the coolant may also be other cooling media; the liquid supply part 200 may be a liquid supply pipeline capable of providing coolant, or a liquid supply tank capable of providing coolant, and the liquid return part 300 may be a liquid return pipeline capable of recovering coolant, or a liquid return tank capable of recovering coolant; the first end of the main liquid supply pipeline 400 is connected to the liquid supply part 200, and the second end of the main liquid supply pipeline 400 is connected to the cooling channel 111, and the main liquid supply pipeline 400 has a connected state and a blocked state; the first end of the main liquid return pipeline 500 is connected to the liquid return part 300, and the second end of the main liquid return pipeline 500 is connected to the cooling channel 111, and the main liquid return pipeline 500 also has a connected state and a blocked state; the first backup pipeline 600 also has a connected state and a blocked state.
[0029] When the bubbling system in the present application is in normal use, the main liquid supply pipeline 400 is in a connected state, the main liquid return pipeline 500 is in a connected state, and the first spare pipeline 600 is in a blocked state. The coolant in the liquid supply part 200 flows into the liquid return part 300 through the main liquid supply pipeline 400, the cooling channel 111 and the main liquid return pipeline 500 in sequence; when the main liquid supply pipeline 400 in the present application fails, if the second end of the first spare pipeline 600 is connected to the liquid supply part 200, the main liquid supply pipeline 400 can be adjusted to be in a blocked state, and the first spare pipeline 600 can be adjusted to be in a connected state, so that the coolant in the liquid supply part 200 is transported into the cooling channel 111 through the first spare pipeline 600, and there is no need to withdraw the bubbling gun 100 from the glass melting furnace; if the second end of the first spare pipeline 600 is connected to the liquid return part 300, the bubbling gun 100 needs to be withdrawn from the glass melting furnace. When the main liquid return pipeline 500 in the present application fails, if the second end of the first backup pipeline 600 is connected to the liquid return part 300, the main liquid return pipeline 500 can be adjusted to be in a blocked state, and the first backup pipeline 600 can be adjusted to be in a connected state, so that the coolant in the cooling channel 111 is transported to the liquid return part 300 through the first backup pipeline 600, and there is no need to withdraw the bubbling gun 100 from the glass melting furnace; if the second end of the first backup pipeline 600 is connected to the liquid supply part 200, then the bubbling gun 100 needs to be withdrawn from the glass melting furnace. By adopting the bubbling system in the present application, it can be determined whether the bubbling gun 100 needs to be withdrawn from the glass melting furnace according to the situation when the main liquid supply pipeline 400 or the main liquid return pipeline 500 fails, and it is not necessary to withdraw the bubbling gun 100 from the glass melting furnace, which improves the safety and production efficiency of the operation to a certain extent.
[0030] Reference Figure 1 As an optional method in the embodiment of the present application, the second end of the first backup pipeline 600 is connected to the liquid return part 300. In this optional method, when the main liquid return pipeline 500 fails, the main liquid return pipeline 500 is adjusted to be in a blocked state, and the main liquid supply pipeline 400 is still in a connected state, and the first backup pipeline 600 is adjusted to be in a connected state, so that the coolant in the liquid supply part 200 flows into the liquid return part 300 through the main liquid supply pipeline 400, the cooling channel 111 and the first backup pipeline 600.
[0031] Reference Figure 1 As an optional method in the embodiment of the present application, the bubbling system also includes a second backup pipeline 700, a first end of the second backup pipeline 700 is connected to the cooling channel 111, and a second end of the second backup pipeline 700 is connected to the liquid supply part 200.
[0032] In this optional method, the second backup pipeline 700 has a connected state and a blocked state; when the main liquid supply pipeline 400 fails, the main liquid supply pipeline 400 is adjusted to be in a blocked state, and the main return liquid pipeline 500 is still in a connected state, and the second backup pipeline 700 is adjusted to be in a connected state, so that the coolant in the liquid supply part 200 flows into the return liquid part 300 through the second backup pipeline 700, the cooling channel 111 and the main return liquid pipeline 500.
[0033] Reference Figure 1 As an optional method in the embodiment of the present application, a first control valve 800 is provided on the main liquid supply pipeline 400, a second control valve 900 is provided on the main liquid return pipeline 500, a third control valve 1000 is provided on the first backup pipeline 600, and a fourth control valve 1100 is provided on the second backup pipeline 700.
[0034] In this optional mode, the first control valve 800, the second control valve 900, the third control valve 1000 and the fourth control valve 1100 can all be ball valves. Of course, in other embodiments, the first control valve 800 and the fourth control valve 1100 can also be installed on the liquid supply part 200, and the second control valve 900 and the third control valve 1000 can also be installed on the liquid return part 300. The first control valve 800 can adjust the main liquid supply pipeline 400 to switch back and forth between the connected state and the blocked state; the second control valve 900 can adjust the main liquid return pipeline 500 to switch back and forth between the connected state and the blocked state; the third control valve 1000 can adjust the first backup pipeline 600 to switch back and forth between the connected state and the blocked state; the fourth control valve 1100 can adjust the second backup pipeline 700 to switch back and forth between the connected state and the blocked state.
[0035] Reference Figure 1 and Figure 2 As an optional method in the embodiment of the present application, the bubble gun 100 includes a gun body 110, a gas channel 120, a main liquid supply branch 130, a main liquid return branch 140, a first spare branch 150 and a second spare branch 160, wherein the cooling channel 111 is arranged in the gun body 110; the gas channel 120 is arranged in the gun body 110; the main liquid supply pipeline 400 is connected to the cooling channel 111 through the main liquid supply branch 130; the main liquid return pipeline 500 is connected to the cooling channel 111 through the main liquid return branch 140; the first spare pipeline 600 is connected to the cooling channel 111 through the first spare branch 150; the second spare pipeline 700 is connected to the cooling channel 111 through the second spare branch 160.
[0036] In this optional embodiment, the gun body 110 is vertically arranged, and the gas channel 120 is also vertically arranged. The gas in the glass liquid to be introduced into the glass melting furnace can pass through the upper port of the gas channel 120 to pass into the gas channel 120 and be discharged into the glass liquid in the glass melting furnace through the lower port of the gas channel 120. The gas channel 120 can be arranged in the cooling channel 111 to improve the cooling effect of the gas. Of course, in other embodiments, the gas channel 120 can also be arranged on one side of the cooling channel 111; the first end of the main liquid supply branch pipe 130 is connected to the second end of the main liquid supply pipeline 400, and the second end of the main liquid supply branch pipe 130 is connected to the cooling channel 111. The main liquid supply branch pipe 130 has a connection state and a resistance state. The first end of the main liquid return branch pipe 140 is connected to the second end of the main liquid return pipeline 500, and the second end of the main liquid return branch pipe 140 is connected to the cooling channel 111, and the main liquid return branch pipe 140 has a connected state and a blocked state; the first end of the first backup branch pipe 150 is connected to the first end of the first backup pipeline 600, and the second end of the first backup branch pipe 150 is connected to the cooling channel 111, and the first backup branch pipe 150 has a connected state and a blocked state; the first end of the second backup branch pipe 160 is connected to the first end of the second backup pipeline 700, and the second end of the second backup branch pipe 160 is connected to the cooling channel 111, and the second backup branch pipe 160 has a connected state and a blocked state.
[0037] In addition, the main liquid supply pipeline 400, the main liquid return pipeline 500, the first backup pipeline 600 and the second backup pipeline 700 can all be soft and bendable hoses, so that the bubble gun 100 can adjust its position according to actual needs. In this case, the main liquid supply branch pipe 130, the main liquid return branch pipe 140, the first backup branch pipe 150 and the second backup branch pipe 160 can all be inflexible hard pipes. Such a design not only facilitates the main liquid supply pipeline 400 to be connected with the main liquid supply branch pipe 130, but also facilitates the main liquid return pipeline 500 to be connected with the main liquid return branch pipe 140. The first backup pipeline 600 is connected with the first backup branch 150, and the second backup pipeline 700 and the second backup branch 160 are connected, and the service life of the bubbling system is extended. In addition, based on the setting of the first backup pipeline 600 and the second backup pipeline 700, it is also avoided that the bubbling system needs to be immediately withdrawn from the glass melting furnace in the event of water leakage at the connection between the main liquid supply pipeline 400 and the main liquid supply branch 130 and water leakage at the connection between the main return liquid pipeline 500 and the main return liquid pipeline 500, thereby ensuring the production efficiency of the glass.
[0038] Reference Figure 1 and Figure 2 As an optional method in the embodiment of the present application, the main liquid supply branch pipe 130 is located below the main liquid return branch pipe 140; the second backup branch pipe 160 is located below the first backup branch pipe 150 and above the main liquid return branch pipe 140. Such a design further improves the cooling effect of the gas in the gas channel 120.
[0039] Reference Figure 2 In the first embodiment of the present application, the main liquid supply branch 130 is connected to the main liquid return branch 140 through the cooling channel 111, and is connected to the first backup branch 150 and the second backup branch 160.
[0040] Reference Figure 3 In the second embodiment of the present application, the cooling channel 111 is divided into a first cooling space 1111 and a second cooling space 1112, and the first cooling space 1111 and the second cooling space 1112 are arranged independently; the main liquid supply branch 130 is connected to the first cooling space 1111, the main liquid return branch 140 is connected to the first cooling space 1111, the first spare branch 150 is connected to the second cooling space 1112, and the second spare branch 160 is connected to the second cooling space 1112.
[0041] In this embodiment, the gas channel 120 is arranged in the first cooling space 1111 to improve the cooling effect of the gas in the gas channel 120. Of course, in other embodiments, the gas channel 120 may also be arranged in the second cooling space 1112, or be independently arranged with the first cooling space 1111 and the second cooling space 1112.
[0042] Reference Figure 1 As an optional method in the embodiment of the present application, a control valve 1200 is provided on the main liquid supply branch 130, the main liquid return branch 140, the first backup branch 150 and the second backup branch 160.
[0043] In this optional mode, the control valve 1200 can be a ball valve. Of course, in other embodiments, the control valve 1200 can also be installed on the gun body 110. The corresponding control valve 1200 can adjust the main liquid supply branch 130 to switch back and forth between the connected state and the blocked state, adjust the main liquid return branch 140 to switch back and forth between the connected state and the blocked state, adjust the first backup branch 150 to switch back and forth between the connected state and the blocked state, and adjust the second backup branch 160 to switch back and forth between the connected state and the blocked state.
[0044] Reference Figure 1 As an optional method in the embodiment of the present application, the bubbling system also includes a moving component 1300, which is driven and connected to the bubbling gun 100 and can drive the bubbling gun 100 to move in a direction close to or away from the glass melting furnace.
[0045] In this optional embodiment, the main liquid supply pipeline 400, the main liquid return pipeline 500, the first backup pipeline 600 and the second backup pipeline 700 are all soft and flexible hoses; the bubble gun 100 can move in the vertical direction, and a limit block or a limit groove arranged in the vertical direction may be provided on the surface of the gun body 110, and the glass melting furnace may be provided with a limit block in which the limit block on the gun body 110 is embedded and a limit groove arranged in the vertical direction or a limit block that can be embedded in the limit groove on the gun body 110.
[0046] The moving assembly 1300 includes a connecting member 1310, a threaded rod 1320, and a plurality of nuts 1330, wherein the connecting member 1310 is horizontally arranged and fixedly connected to the gun body 110, the threaded rod 1320 is vertically arranged and can move in the glass melting furnace along the vertical direction, and a limit block or a limit groove arranged along the vertical direction may be provided on the surface of the threaded rod 1320, and the glass melting furnace may be provided with a limit block for the limit block on the threaded rod 1320 to be embedded and a limit groove arranged along the vertical direction or a limit block that can be embedded in the limit groove on the threaded rod 1320, and the connecting member 1310 is provided with a limit block for the threaded rod 1320 to be embedded. 0 is passed through the through hole, the threaded rod 1320 is fixedly passed through the through hole, one threaded rod 1320 is used in conjunction with two nuts 1330, both nuts 1330 are sleeved on the outer circumference of the threaded rod 1320, one of the two nuts 1330 is located above the connecting piece 1310 and is tightly pressed against the connecting piece 1310, and the other nut 1330 is located below the connecting piece 1310 and is tightly pressed against the connecting piece 1310; when the bubble gun 100 needs to be driven close to or away from the glass melting furnace, the two nuts 1330 used in conjunction with the threaded rod 1320 can be rotated. In order to enhance the stability of the movement of the bubble gun 100, two threaded rods 1320 are provided, and the two threaded rods 1320 are respectively arranged on the opposite sides of the bubble gun 100 and are fixedly connected to the connecting piece 1310. In addition, in order to facilitate the movement of the threaded rod 1320, a handle 1340 is fixedly connected to the upper end of the threaded rod 1320.
[0047] Reference Figures 1 to 3 According to another aspect of the present application, an embodiment of the present application further provides a glass production device, the glass production device includes a glass melting furnace and the above-mentioned bubbling system, the bubbling system is used in the glass melting furnace. The bubbling system can introduce gas into the glass liquid in the glass melting furnace.
[0048] In summary, the bubbling system and glass production device provided in this embodiment have at least the following beneficial technical effects: when the bubbling system in the present application is in normal use, the main liquid supply pipeline 400 is in a connected state, the main liquid return pipeline 500 is in a connected state, and the first backup pipeline 600 is in a blocked state. The coolant in the liquid supply part 200 flows into the liquid return part 300 through the main liquid supply pipeline 400, the cooling channel 111 and the main liquid return pipeline 500 in sequence; when the main liquid supply pipeline 400 in the present application fails, the main liquid return pipeline 500 is in a connected state, and the first backup pipeline 600 is in a blocked state. After the blockage occurs, if the second end of the first backup pipeline 600 is connected to the liquid supply part 200, the main liquid supply pipeline 400 can be adjusted to be in a blocked state, and the first backup pipeline 600 can be adjusted to be in a connected state, so that the coolant in the liquid supply part 200 is transported into the cooling channel 111 through the first backup pipeline 600, and there is no need to withdraw the bubbling gun 100 from the glass melting furnace; if the second end of the first backup pipeline 600 is connected to the liquid return part 300, the bubbling gun 100 needs to be withdrawn from the glass melting furnace. When the main liquid return pipeline 500 in the present application fails, if the second end of the first backup pipeline 600 is connected to the liquid return part 300, the main liquid return pipeline 500 can be adjusted to be in a blocked state, and the first backup pipeline 600 can be adjusted to be in a connected state, so that the coolant in the cooling channel 111 is transported to the liquid return part 300 through the first backup pipeline 600, and there is no need to withdraw the bubbling gun 100 from the glass melting furnace; if the second end of the first backup pipeline 600 is connected to the liquid supply part 200, then the bubbling gun 100 needs to be withdrawn from the glass melting furnace. By adopting the bubbling system in the present application, it can be determined whether the bubbling gun 100 needs to be withdrawn from the glass melting furnace according to the situation when the main liquid supply pipeline 400 or the main liquid return pipeline 500 fails, and it is not necessary to withdraw the bubbling gun 100 from the glass melting furnace, which improves the safety and production efficiency of the operation to a certain extent.
[0049] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A bubbling system, characterized in that: The bubbling system is used in a glass melting furnace; the bubbling system comprises: a bubbling gun (100), wherein a cooling channel (111) for cooling liquid to flow is provided in the bubbling gun (100); a liquid supply portion (200), the liquid supply portion (200) being used to inject the cooling liquid into the cooling channel; a liquid return portion (300), the liquid return portion (300) being used to recover the cooling liquid flowing out of the cooling channel; A main liquid supply pipeline (400), through which the liquid supply portion (200) can be communicated with the cooling channel (111); A main liquid return pipeline (500), through which the liquid return portion (300) can be communicated with the cooling channel (111); A first backup pipeline (600), wherein a first end of the first backup pipeline (600) is in communication with the cooling channel (111), and a second end of the first backup pipeline (600) is in communication with the liquid supply portion (200) or the liquid return portion (300).
2. The bubbling system according to claim 1, characterized in that: The second end of the first standby pipeline (600) is in communication with the liquid return portion (300).
3. The bubbling system according to claim 2, characterized in that: The bubbling system further comprises a second backup pipeline (700), a first end of the second backup pipeline (700) being in communication with the cooling channel (111), and a second end of the second backup pipeline (700) being in communication with the liquid supply portion (200).
4. The bubbling system according to claim 3, characterized in that: The main liquid supply pipeline (400) is provided with a first control valve (800), the main liquid return pipeline (500) is provided with a second control valve (900), the first backup pipeline (600) is provided with a third control valve (1000), and the second backup pipeline (700) is provided with a fourth control valve (1100).
5. The bubbling system according to claim 3, characterized in that: The bubbling gun (100) comprises: a gun body (110), wherein the cooling channel (111) is arranged in the gun body (110); A gas channel (120), wherein the gas channel (120) is disposed in the gun body (110); A main liquid supply branch pipe (130), wherein the main liquid supply pipeline (400) is connected to the cooling channel (111) through the main liquid supply branch pipe (130); A main liquid return branch pipe (140), wherein the main liquid return pipeline (500) is connected to the cooling channel (111) through the main liquid return branch pipe (140); a first spare branch pipe (150), wherein the first spare pipeline (600) is in communication with the cooling channel (111) through the first spare branch pipe (150); A second backup branch pipe (160), wherein the second backup pipeline (700) is in communication with the cooling channel (111) through the second backup branch pipe (160).
6. The bubbling system according to claim 5, characterized in that: The main liquid supply branch pipe (130) is located below the main liquid return branch pipe (140); the second backup branch pipe (160) is located below the first backup branch pipe (150) and above the main liquid return branch pipe (140).
7. The bubbling system according to claim 5, characterized in that: The main liquid supply branch pipe (130) is connected to the main liquid return branch pipe (140) through the cooling channel (111), and is connected to the first backup branch pipe (150), and is connected to the second backup branch pipe (160); or, The cooling channel (111) is divided into a first cooling space (1111) and a second cooling space (1112), and the first cooling space (1111) and the second cooling space (1112) are arranged independently; The main liquid supply branch pipe (130) is connected to the first cooling space (1111), the main liquid return branch pipe (140) is connected to the first cooling space (1111), the first backup branch pipe (150) is connected to the second cooling space (1112), and the second backup branch pipe (160) is connected to the second cooling space (1112).
8. The bubbling system according to claim 5, characterized in that: The main liquid supply branch pipe (130), the main liquid return branch pipe (140), the first backup branch pipe (150) and the second backup branch pipe (160) are all provided with control valves (1200).
9. The bubbling system according to any one of claims 1 to 8, characterized in that: The bubbling system further comprises a moving component (1300), wherein the moving component (1300) is drivingly connected to the bubbling gun (100) and can drive the bubbling gun (100) to move in a direction close to or away from the glass melting furnace.
10. A glass production device, characterized in that: The glass production device comprises a glass melting furnace and the bubbling system according to any one of claims 1 to 9, wherein the bubbling system is used in the glass melting furnace.