Fixing structure of gas water heater operation part and water heater front plate

By adopting a snap structure and positioning step design on the gas water heater, the fixing process between the operating parts and the water heater front plate is simplified, and the complex processing and installation problems in the prior art are solved, thereby achieving a simpler and more reliable connection method.

CN222257059UActive Publication Date: 2024-12-27SHANGHAI RINNAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421622761.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-12-27
Estimated Expiration
2034-07-10

AI Technical Summary

Technical Problem

The fixed structure of the existing gas water heater operating parts and the water heater front plate requires multiple bends and hole excavation, which is complicated in processing and is not conducive to automated production.

Method used

The snap structure and positioning steps are used to fix the operating parts in the flange hole of the front plate of the water heater, cancel the screws and additional sheet metal parts, and connect them with the elasticity of plastic material.

Benefits of technology

The processing and installation process of operating components and water heater front plates is simplified, and convenience and reliability are improved, reducing the risk of fastening failure and screw loosening.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222257059U_ABST
    Figure CN222257059U_ABST
Patent Text Reader

Abstract

The utility model discloses a fixing structure of a gas water heater operation part and a water heater front plate, which comprises an operation part and a water heater front plate, the water heater front plate is provided with a flanging hole, the periphery of the operation part is provided with at least one pair of buckle structures, and the operation part is fixedly connected in the flanging hole through the buckle structures; a positioning step is arranged on the side, close to the water heater front plate, of the operation part, and when the operation part is fixedly connected into the flanging hole through the buckle structure, the positioning step abuts against the outer side face of the water heater front plate. According to the utility model, the front plate of the water heater does not need to be repeatedly bent and punched with a flanging hole, a fastening screw is omitted, an additional sheet metal part is not needed, and the operating part is directly fixed in the flanging hole of the front plate of the water heater through the buckle structure and the positioning step, so that the processing and the installation of the operating part and the front plate of the water heater are simpler; and therefore, the convenience in processing and mounting the operation part and the water heater front plate is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water heater operating parts, in particular to a fixing structure of a gas water heater operating part and a water heater front plate. Background Art

[0002] like Figure 1 and Figure 2 As shown, in the prior art, the operating component 1 of the gas water heater is generally fixed by screws 4, that is, one or more screw holes are set on the plastic operating component 1, and at the same time, a mounting hole is opened at the position where the operating component 1 needs to be installed on the metal sheet metal water heater front plate 2 of the product, and a bending structure is made to form a front plate flange 3, and a flange hole is opened on the bent edge. After the operating component 1 is installed in the mounting hole of the water heater front plate 2, the operating component 1 and the water heater front plate 2 are connected as a whole by screwing.

[0003] The structural assembly scheme of the operating component 1 of the water heater and the front panel 2 of the water heater requires multiple bending of the installation position of the front panel 2 of the water heater to form a front panel flange 3 and to open a flange hole. Sometimes, when there is not enough space on the front panel flange 3, it is even necessary to add additional sheet metal parts to facilitate fitting and fastening. The processing is difficult, the installation process is complicated and it is not conducive to realizing automated production.

[0004] Therefore, how to optimize the fixing structure of the gas water heater operating components and the water heater front panel to facilitate the processing and installation of the operating components and the water heater front panel has become a technical problem that technical personnel in this field urgently need to solve. Utility Model Content

[0005] In view of the above-mentioned defects of the prior art, the utility model provides a fixing structure of the operating part of the gas water heater and the front plate of the water heater, the purpose of which is to improve the convenience of processing and installing the operating part and the front plate of the water heater.

[0006] In order to achieve the above technical purpose, the utility model provides a fixing structure of the operating part of a gas water heater and a front plate of the water heater, comprising an operating component and a front plate of the water heater, wherein a flange hole is provided on the front plate of the water heater, and at least one pair of buckle structures are provided on the periphery of the operating component, and the operating component is fixedly connected in the flange hole through the buckle structure;

[0007] A positioning step is provided on one side of the operating component close to the front plate of the water heater. When the operating component is fixedly connected in the flange hole through the buckle structure, the positioning step abuts against the outer side surface of the front plate of the water heater.

[0008] Preferably, each pair of the buckle structures are symmetrically arranged on both sides of the operating component.

[0009] Preferably, the buckle structure is provided with a guide structure.

[0010] Preferably, the operating component is made of plastic.

[0011] Beneficial effects of the utility model:

[0012] Due to the above-mentioned structural design, the utility model does not need to bend the front plate of the water heater multiple times and punch flange holes, and the fastening screws are eliminated. No additional sheet metal parts are required, and the operating components are directly fixed in the flange holes of the front plate of the water heater through the snap structure and the positioning steps, making the processing and installation of the operating components and the front plate of the water heater simpler, thereby improving the convenience of processing and installation of the operating components and the front plate of the water heater. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the prior art;

[0014] Figure 2 It is a schematic diagram of the structure of the prior art from a top view;

[0015] Figure 3 It is a structural schematic diagram of the utility model in a front view;

[0016] Figure 4 It is a schematic diagram of the structure of the utility model from a top view.

[0017] In the figure: 1 operating component, 2 water heater front plate, 3 front plate flange, 4 screws, 5 flange hole, 6 snap structure, 7 positioning step. DETAILED DESCRIPTION

[0018] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention.

[0019] Example:

[0020] like Figure 3-Figure 4 As shown, the fixing structure of the gas water heater operating part and the water heater front plate includes an operating component 1 and a water heater front plate 2. The water heater front plate 2 is provided with a flange hole 5. At least one pair of snap structures 6 are provided on the periphery of the operating component 1. The operating component 1 is fixedly connected in the flange hole 5 through the snap structures 6.

[0021] The flange height of the flange hole 5 ensures that it is consistent with the height of the installation position corresponding to the snap structure 6. A positioning step 7 is provided on the side of the operating component 1 close to the water heater front plate 2. When the operating component 1 is fixedly connected to the flange hole 5 through the snap structure 6, the positioning step 7 abuts against the outer side surface of the water heater front plate 2 to ensure that the operating component 1 is installed in a suitable position.

[0022] The main innovation of the utility model is that there is no need to bend the opening of the water heater front plate 2 multiple times, and the design of screw holes and screws is eliminated. The elasticity of the operating component 1 made of plastic material, the snap structure 6 and the positioning step 7 are utilized to make the processing and installation of the operating component 1 and the water heater front plate 2 simpler, more reasonable and reliable.

[0023] In this embodiment, two pairs of buckle structures 6 are provided, and each pair is symmetrically arranged on two sides of the operating component 1 .

[0024] Furthermore, the buckle structure 6 is provided with a guide structure to facilitate the assembly of the buckle structure 6 .

[0025] The operating component 1 is made of plastic.

[0026] In summary, compared with the screw fastening form in the prior art, the operating component 1 of the utility model utilizes the elasticity of the plastic part itself and the snap-on structure 6 and the positioning step 7, so that the installation between the operating component 1 and the water heater front panel 2 is simpler and more reasonable and reliable; the processing process of the water heater front panel 2 is greatly optimized (no need for multiple bending and punching of flanging holes); fastening screws, additional sheet metal parts and other parts are eliminated, and the number of parts in the fixing structure of the operating component 1 and the water heater front panel 2 is optimized; and there is no need to adopt the fastening method of screwing, which reduces the reliability risks such as fastening failure and screw loosening.

[0027] The preferred specific embodiments of the utility model are described in detail above. It should be understood that ordinary technicians in this field can make many modifications and changes based on the concept of the utility model without creative work. Therefore, all technical solutions that can be obtained by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the scope of protection determined by the claims.

Claims

1. A fixing structure of a gas water heater operating part and a water heater front plate, comprising an operating part and a water heater front plate, characterized in that: A flange hole is provided on the front plate of the water heater, and at least one pair of buckle structures are provided on the periphery of the operating component, and the operating component is fixedly connected in the flange hole through the buckle structures; A positioning step is provided on one side of the operating component close to the front plate of the water heater. When the operating component is fixedly connected in the flange hole through the buckle structure, the positioning step abuts against the outer side surface of the front plate of the water heater.

2. The fixing structure of the gas water heater operating part and the water heater front plate according to claim 1, characterized in that: Each pair of the buckle structures is symmetrically arranged on two sides of the operating component.

3. The fixing structure of the gas water heater operating part and the water heater front plate according to claim 1 or 2, characterized in that: The buckle structure is provided with a guide structure.

4. The fixing structure of the gas water heater operating part and the water heater front plate according to claim 3, characterized in that: The operating component is made of plastic.