Temporary operation platform for open cut tunnel foundation pit
By using a temporary operating platform combining support piles, reinforced concrete support and Larsen steel sheet piles in open-digging tunnel foundation pits, the problems of poor soil quality and space limitations are solved, and stable construction and safe transportation channels of tunnel foundation pits are achieved. , ensuring the smooth progress of tunnel construction.
Patent Information
- Application Number
- CN202420225001.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The existing technology cannot apply to poor soil quality and limited space on both sides of the tunnel in the construction of open-dig tunnel foundation pits, resulting in the inability to slop and form steps, causing difficulties in lifting transportation channels and materials, and easy to cause safety hazards such as collapse.
A temporary operating platform combining support piles, first reinforced concrete support and Larsen steel sheet piles is used to form an operating platform using the existing structure of the tunnel, and connected with Larsen steel sheet piles through the first reinforced concrete support to form a support structure to solve the soil quality. The problems of poor and space limitations ensure the stability and construction safety of tunnel foundation pits.
It has achieved smooth earth excavation, material stacking, mechanical stance and concrete pouring under the conditions of poor soil quality and limited space, ensuring the stability and safety of tunnel construction, and avoiding collapse and blockage of transportation channels.