Modular construction platform
By using detachable corbel components and modular design in the hydraulic pile foundation structure construction platform, the complexity and high cost problems in the construction process of the existing construction platform are solved, and efficient construction and resource reuse are achieved.
Patent Information
- Application Number
- CN202421010860.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2034-05-10
AI Technical Summary
During the construction process of the existing hydraulic pile foundation structure construction platform, there are problems such as complex construction of auxiliary steel pipe piles, slow construction progress, high cost and low steel structure utilization rate.
A modular construction platform is designed. By setting the detachable corbel assembly on the pile body, the beam body is set on the detachable corbel assembly, and the working platform is set on the beam body. The overall structure is simple and easy to install. The process is simple.
It improves the construction efficiency, realizes the recycling and reuse of the working platform, and reduces the construction cost and the cost of erecting the working platform.
Smart Images

Figure CN222375413U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hydraulic pile foundation structures, in particular to a modular construction platform. Background Art
[0002] The construction of PHC rock-embedded piles and cast-in-place piles in water transport projects requires the use of an operating platform. Conventional operating platforms inject auxiliary steel pipe piles and erect steel structures to form operating platforms. Conventional operating platforms require the injection of auxiliary steel pipe piles during the construction process. The operating platform needs to be connected and reinforced by welding or other means during erection. In addition, the operating platform is generally large in area. When the construction period is tight, it is generally not reused, and the utilization rate of the steel structure is low. In addition, the conventional operating platform also has problems such as complex construction procedures, slow construction progress, and high cost during erection. Utility Model Content
[0003] In view of the above-mentioned deficiencies in the prior art, the purpose of the present invention is to provide a modular construction platform, which has the advantages of convenient erection of the working platform and recyclability.
[0004] The above technical objectives of the utility model are achieved through the following technical solutions:
[0005] A modular construction platform, comprising:
[0006] A pile body, wherein a detachable corbel assembly is provided on the pile body;
[0007] A beam body, wherein the beam body is arranged on the detachable corbel assembly;
[0008] A working platform is arranged on the beam body.
[0009] Compared with the prior art, the present application arranges a detachable corbel assembly on the pile body, arranges the beam body on the detachable corbel assembly, and arranges the working platform on the beam body. The overall structure is simple and the installation process is simple, thereby effectively improving the construction efficiency. The detachable corbel assembly cooperates with the pile body to provide a supporting foundation for the beam body and the working platform. When the construction period is completed, the detachable corbel assembly, the beam body and the working platform can be disassembled for the purpose of recycling and reuse, thereby effectively reducing the cost of erecting the working platform and reducing the construction cost.
[0010] As a preferred solution of the utility model, the detachable corbel assembly comprises a corbel body and a sleeve, at least one corbel body is arranged on the sleeve, and the sleeve is sleeved on the pile body.
[0011] By adopting the above-mentioned solution, when installing the corbel body, it is only necessary to sleeve the sleeve on the pile body, which is convenient for installation and effectively improves the construction efficiency.
[0012] As a preferred solution of the utility model, a limiting plate is provided on one side of the top wall of the corbel body away from the sleeve, a limiting groove is formed between the limiting plate, the corbel body and the sleeve, and the beam body is arranged in the limiting groove.
[0013] By adopting the above solution, the beam body can be arranged in the limiting groove, and the limiting plate can provide lateral constraints for the beam body, thereby preventing the beam body from falling off the corbel body.
[0014] As a preferred solution of the utility model, a limited support assembly is arranged in the sleeve, and the sleeve is sleeved on the pile body through the limited support assembly.
[0015] By adopting the above scheme, the limiting support assembly can provide an installation basis for the sleeve, and the sleeve can be stably sleeved on the pile body through the limiting support assembly, thereby effectively improving the installation stability of the sleeve.
[0016] As a preferred solution of the utility model, the position limiting support assembly includes an annular support plate and a vertical rib plate, the annular support plate is arranged on the inner side wall of the sleeve, and the vertical rib plate is arranged on the annular support plate and connected to the sleeve.
[0017] By adopting the above solution, the annular support plate and the vertical ribs can provide sufficient supporting bearing capacity for the sleeve and the corbel body.
[0018] As a preferred solution of the utility model, the working platform includes a distribution beam, a connecting beam and a panel, the distribution beam is connected to the connecting beam, and the panel is arranged above the distribution beam and the connecting beam and is connected to the distribution beam and the connecting beam.
[0019] By adopting the above scheme, the distribution beam, the connection beam and the panel are connected to each other to form a working platform, which can effectively provide a construction area to meet the construction load.
[0020] As a preferred solution of the utility model, a lifting hole is provided on the panel.
[0021] By adopting the above solution, the hoisting holes on the panel can facilitate the hoisting and transportation of the working platform, effectively improving the installation and disassembly efficiency of the working platform.
[0022] As a preferred solution of the present invention, the panel is a steel plate.
[0023] The above-mentioned modular construction platform has the following beneficial effects: the corbel body is sleeved on the pile body through a sleeve, and the annular support plate and the vertical ribs in the sleeve can provide sufficient supporting bearing capacity for the corbel body and the sleeve. The installation of the corbel body can be completed by the sleeve installation method, which effectively improves the efficiency of the erection of the working platform. At the same time, by arranging a limit plate on the corbel body, the limit groove formed between the limit plate, the corbel body and the sleeve can provide an installation basis for the beam body. At the same time, the limit plate provides lateral constraints for the beam body, thereby avoiding the problem of the beam body falling off the corbel body; the working platform is arranged on the beam body, and the beam body can provide supporting bearing capacity for the working platform; when disassembling the corbel, it is only necessary to disassemble the working platform, the beam body and the detachable corbel assembly in turn to complete the disassembly of the construction platform, thereby achieving the purpose of recycling and reusing the construction platform. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the overall structure of a modular construction platform of the utility model;
[0025] Figure 2 It is a structural schematic diagram of a detachable bracket assembly in a modular construction platform of the utility model;
[0026] Figure 3 It is a top view of a detachable bracket assembly in a modular construction platform of the utility model;
[0027] Figure 4 It is a structural schematic diagram of another detachable bracket assembly in a modular construction platform of the utility model;
[0028] Figure 5 This is a structural schematic diagram of a working platform in a modular construction platform of the utility model;
[0029] In the figure: 1. pile body; 2. detachable corbel assembly; 21. corbel body; 22. sleeve; 23. limit plate; 24. limit groove; 25. support assembly; 251. annular support plate; 252. vertical rib; 3. beam body; 4. working platform; 41. distribution beam; 42. connecting beam; 43. panel.
[0030] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indications will also change accordingly.
[0033] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the utility model.
[0034] The utility model provides a modular construction platform.
[0035] Reference Figure 1 In one embodiment of the utility model, a modular construction platform includes: a pile body 1, a beam body 3 and a working platform 4, wherein a detachable corbel assembly 2 is arranged on the pile body 1; the beam body 3 is arranged on the detachable corbel assembly 2; and the working platform 4 is arranged on the beam body 3. By arranging the detachable corbel assembly 2 on the pile body 1, arranging the beam body 3 on the detachable corbel assembly 2, and arranging the working platform 4 on the beam body 3, the overall structure is simple and the installation process is simple, thereby effectively improving the construction efficiency, and the detachable corbel assembly 2 cooperates with the pile body 1 to provide a supporting foundation for the beam body 3 and the working platform 4; when the construction period is over, the detachable corbel assembly 2, the beam body 3 and the working platform 4 can be disassembled to achieve the purpose of recycling and reuse, thereby effectively reducing the cost of erecting the working platform 4 and reducing the construction cost.
[0036] Reference Figures 2 to 4 In one embodiment, the detachable bracket assembly 2 includes a bracket body 21 and a sleeve 22, a limited support assembly 25 is arranged in the sleeve 22, and the sleeve 22 is sleeved on the pile body 1 through the limited support assembly 25. It is worth noting that the inner diameter of the sleeve 22 is 1 cm to 5 cm larger than the outer diameter of the pile body 1, so that the sleeve 22 can be quickly sleeved on the pile body 1 on site. The limited support assembly 25 includes an annular support plate 251 and a vertical rib 252. The annular support plate 251 is welded to the inner side wall of the sleeve 22, and the vertical rib 252 is welded to the annular support plate 251 and welded to the sleeve 22. In this embodiment, the number of vertical ribs 252 is six. In some other embodiments, the vertical ribs 252 can be increased or decreased according to the actual support load requirements. The number of ribs 252 does not limit the number of vertical ribs 252; at least one corbel body 21 is welded on the sleeve 22. In the present embodiment, two corbel bodies 21 are welded on the sleeve 22, and the two corbel bodies 21 are mirror-imaged along the central axis of the sleeve 22. In other embodiments, different numbers of corbel bodies 21 can be set according to actual needs, and the angle between the two corbel bodies 21 can also be designed according to actual needs. The number of corbel bodies 21 and the design angle between the corbel bodies 21 are not limited; a limiting plate 23 is welded on the side of the top wall of the corbel body 21 away from the sleeve 22, and a limiting groove 24 is formed between the limiting plate 23, the corbel body 21 and the sleeve 22, and the beam body 3 is placed in the limiting groove 24. When installing the corbel body 21, it is only necessary to sleeve the sleeve 22 on the pile body 1, which is convenient for installation and effectively improves the construction efficiency; the beam body 3 is placed in the limiting groove 24, and the limiting plate 23 can provide lateral constraints for the beam body 3 to prevent the beam body 3 from falling off the corbel body 21. The limiting support assembly 25 can provide an installation foundation for the sleeve 22, and the sleeve 22 can be stably sleeved on the pile body 1 through the limiting support assembly 25, which effectively improves the installation stability of the sleeve 22. The annular support plate 251 and the vertical ribs 252 can provide sufficient support bearing capacity for the sleeve 22 and the corbel body 21.
[0037] Reference Figure 5In one embodiment, the working platform 4 includes a distribution beam 41, a connecting beam 42 and a panel 43. The distribution beam 41 is welded to the connecting beam 42. The panel 43 is arranged above the distribution beam 41 and the connecting beam 42 and is welded to the distribution beam 41 and the connecting beam 42. A hoisting hole is provided on the panel 43. In this embodiment, the number of the distribution beams 41 is six, the number of the connecting beams 42 is four, and the distribution beams 41 and the connecting beams are arranged perpendicular to each other. The panel 43 is a steel plate. In some other embodiments, the number of the distribution beams 41 and the connecting beams 42 can be increased or decreased according to actual needs. The number of the distribution beams 41 and the connecting beams 42 is not limited here. The distribution beams 41, the connecting beams 42 and the panel 43 are connected to each other to form the working platform 4, which can effectively provide a construction area to meet the construction load. The hoisting holes on the panel 43 can facilitate the hoisting and transportation of the working platform 4, and effectively improve the installation and disassembly efficiency of the working platform 4.
[0038] The corbel body 21 is sleeved on the pile body 1 through the sleeve 22, and the annular support plate 251 and the vertical ribs 252 in the sleeve 22 can provide sufficient supporting bearing capacity for the corbel body 21 and the sleeve 22. The installation of the corbel body 21 can be completed by the sleeve installation method, which effectively improves the efficiency of erecting the working platform 4. At the same time, by arranging a limiting plate 23 on the corbel body 21, the limiting groove 24 formed between the limiting plate 23, the corbel body 21 and the sleeve 22 can provide an installation foundation for the beam body 3. At the same time, the limiting plate 23 provides lateral constraints for the beam body 3, thereby avoiding the problem of the beam body 3 falling off the corbel body 21; the working platform 4 is arranged on the beam body 3, and the beam body 3 can provide supporting bearing capacity for the working platform 4; when disassembling the corbel, it is only necessary to disassemble the working platform 4, the beam body 3 and the detachable corbel assembly 2 in turn to complete the disassembly of the construction platform, thereby achieving the purpose of recycling and reusing the construction platform.
[0039] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A modular construction platform, characterized in that: include: A pile body, wherein a detachable corbel assembly is provided on the pile body; A beam body, wherein the beam body is arranged on the detachable bracket assembly; A working platform is arranged on the beam body.
2. The modular construction platform according to claim 1, characterized in that: The detachable corbel assembly comprises a corbel body and a sleeve, at least one corbel body is arranged on the sleeve, and the sleeve is sleeved on the pile body.
3. The modular construction platform according to claim 2, characterized in that: A limiting plate is arranged on one side of the top wall of the corbel body away from the sleeve, a limiting groove is formed between the limiting plate, the corbel body and the sleeve, and the beam body is arranged in the limiting groove.
4. The modular construction platform according to claim 2, characterized in that: A limited position support component is arranged in the sleeve, and the sleeve is sleeved on the pile body through the limited position support component.
5. The modular construction platform according to claim 4, characterized in that: The position limiting support assembly includes an annular support plate and a vertical rib plate. The annular support plate is arranged on the inner side wall of the sleeve, and the vertical rib plate is arranged on the annular support plate and connected to the sleeve.
6. The modular construction platform according to claim 1, characterized in that: The working platform comprises a distribution beam, a connection beam and a panel, wherein the distribution beam is connected to the connection beam, and the panel is arranged above the distribution beam and the connection beam and is connected to the distribution beam and the connection beam.
7. The modular construction platform according to claim 6, characterized in that: The panel is provided with a hoisting hole.
8. The modular construction platform according to claim 6, characterized in that: The panel is a steel plate.
Citation Information
Cited By
Overwater drilling platform construction process for water area engineering
CN120520205A