Testing device

By designing a test device that contains multiple independent reaction units and raw material supply units, the problem of being unable to quickly set up multiple test scenarios in the existing technology is solved, and rapid testing and catalyst performance evaluation of marine high-temperature and high-pressure reaction devices are achieved.

CN222379688UActive Publication Date: 2025-01-21THE 711TH RES INST OF CHINA STATE SHIPBUILDING CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323573067.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2025-01-21
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The problem of rapid construction of multiple test scenarios in the prior art is not possible, especially in the testing of marine high-temperature and high-pressure reaction devices, it is necessary to continuously update, iterate and optimize the design of the reactor and the catalyst used internally.

Method used

A test device was designed, including a reaction unit, pilot gas supply unit, air supply unit, fuel gas supply unit, reaction gas supply unit, syngas output unit and flue gas output unit. By setting up independent reaction units and multiple raw material supply units, the device can quickly set up different test scenarios and replace different catalysts and reaction units according to test needs.

Benefits of technology

It achieves rapid construction of test devices and flexible switching of different test scenarios, can effectively evaluate the performance of different catalysts and the thermal performance of reaction units, and supports the optimized design and performance testing of marine high-temperature and high-pressure reaction devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222379688U_ABST
    Figure CN222379688U_ABST
Patent Text Reader

Abstract

The utility model discloses a testing device, and belongs to the technical field of ship LNG power fuel decarburization. Comprising a reaction unit, an ignition gas supply unit, an air supply unit, a fuel gas supply unit, a reaction gas supply unit, a synthesis gas output unit and a flue gas output unit, the reaction unit comprises a shell, a reaction pipeline and a combustor; the shell is provided with a containing cavity, at least part of the reaction pipeline is arranged in the containing cavity and connected with the shell, and the combustor is connected with the shell and used for providing heat for the reaction pipeline; the ignition gas supply unit is connected with the combustor; the air supply unit is connected with the combustor; the fuel gas supply unit is connected with the combustor and used for providing fuel gas for the combustor. The reaction gas supply unit is connected with the reaction pipeline and is used for providing reaction gas for the reaction pipeline; the synthesis gas output unit is connected with the reaction pipeline and is used for receiving synthesis gas output by the reaction pipeline; the smoke output unit is connected with the shell and used for receiving smoke exhausted from the containing cavity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of decarbonization of marine liquefied natural gas power fuel, and specifically relates to a testing device. Background Art

[0002] In recent years, LNG (liquefied natural gas) fuel-end decarbonization technology has developed rapidly due to its advantages of low energy consumption and compact structure, becoming a feasible path to meet future stringent regulations and extend the vitality of LNG energy-powered ships. This technology decarbonizes and captures the fuel before combustion through reactions such as methane reforming or cracking. The decarbonized zero-carbon hydrogen fuel enters the cylinder for combustion, thereby achieving carbon emission reduction for the entire ship.

[0003] However, due to the limitations of the ship's operating environment, the ship's LNG fuel efficient decarbonization system needs to be compact, modular, and intelligent, while also meeting the requirements of low energy consumption and high conversion efficiency. It is necessary to continuously update and optimize the design of the reactor and the catalyst used inside. Therefore, it is urgent to develop a test device for catalysts and ship-based high-temperature and high-pressure reaction devices that can simplify the device structure. Utility Model Content

[0004] Purpose of the utility model: The embodiment of the present application provides a testing device, which aims to solve the problem that it is impossible to quickly build a variety of test scenarios in the prior art.

[0005] Technical solution: A testing device described in an embodiment of the present application includes:

[0006] A reaction unit, comprising a shell, a reaction pipeline and a burner;

[0007] The shell has a containing cavity, at least part of the reaction pipeline is arranged in the containing cavity and connected to the shell, and the burner is connected to the shell to provide heat to the reaction pipeline located in the containing cavity;

[0008] a pilot gas supply unit, connected to the burner, for providing pilot gas to the burner;

[0009] an air supply unit, connected to the burner and used to provide air to the burner;

[0010] a fuel gas supply unit, connected to the burner and used to provide fuel gas to the burner;

[0011] a reaction gas supply unit, connected to the reaction pipeline, and used to provide reaction gas to the reaction pipeline;

[0012] a synthesis gas output unit, connected to the reaction pipeline, and used to receive the synthesis gas output by the reaction pipeline;

[0013] The smoke output unit is connected to the shell and is used to receive the smoke exhausted from the accommodating cavity.

[0014] In some embodiments, the reaction gas supply unit includes a water vapor supply unit, and the water vapor supply unit is connected to the reaction pipeline.

[0015] In some embodiments, the water vapor supply unit comprises:

[0016] A deionized water supply structure, used for providing deionized water;

[0017] a steam generator connected to the deionized water supply structure and used to convert the deionized water into water vapor;

[0018] A first transmission pipeline, one end of which is connected to the steam generator, and one end of the first transmission pipeline away from the steam generator is connected to the reaction pipeline;

[0019] a first flow meter connected to the first transmission pipeline and located between the steam generator and the reaction unit;

[0020] a first pressure sensor connected to the first transmission pipeline and located between the steam generator and the reaction unit;

[0021] a first solenoid valve connected to the first transmission pipeline and located between the steam generator and the reaction unit;

[0022] A metering pump is connected between the steam generator and the deionized water supply structure.

[0023] In some embodiments, the reaction gas supply unit further includes a natural gas supply unit, a catalyst is disposed in the reaction pipeline, and the natural gas supply unit is connected to the reaction pipeline.

[0024] In some embodiments, the natural gas supply unit comprises:

[0025] a natural gas supply structure to provide natural gas;

[0026] A natural gas temporary storage tank connected to the natural gas supply structure;

[0027] A second transmission pipeline, one end of which is connected to the natural gas supply structure, and one end of the second transmission pipeline away from the natural gas supply structure is connected to the reaction pipeline;

[0028] a second flow meter connected to the second transmission pipeline and located between the natural gas temporary storage tank and the reaction unit;

[0029] a second pressure sensor connected to the second transmission pipeline and located between the natural gas temporary storage tank and the reaction unit;

[0030] The second solenoid valve is connected to the second transmission pipeline and is located between the natural gas temporary storage tank and the reaction unit.

[0031] In some embodiments, the synthesis gas output unit comprises:

[0032] a third transmission pipeline, connected to the reaction pipeline, for leading out the synthesis gas output from the reaction pipeline;

[0033] a third pressure sensor, connected to the third transmission pipeline, for detecting the pressure of the synthesis gas in the third transmission pipeline;

[0034] A filter assembly, disposed on a side of the third pressure sensor away from the reaction unit and connected to the third transmission pipeline;

[0035] A first heat exchange component is disposed on a side of the filter component away from the third pressure sensor and connected to the third transmission pipeline;

[0036] a fourth pressure sensor, disposed on a side of the first heat exchange component away from the filter component and connected to the third transmission pipeline;

[0037] a third flow meter, disposed on a side of the fourth pressure sensor away from the first heat exchange component and connected to the third transmission pipeline;

[0038] The first temperature sensor is disposed on a side of the filter component away from the first heat exchange component and connected to the third transmission pipeline.

[0039] In some embodiments, the smoke output unit comprises:

[0040] a fourth transmission pipeline connected to the housing and communicating with the accommodating chamber;

[0041] a fifth pressure sensor connected to the fourth transmission pipeline;

[0042] a second heat exchange component, disposed on a side of the fifth pressure sensor away from the housing and connected to the fourth transmission pipeline;

[0043] a fan, arranged at a side of the second heat exchange component away from the fifth pressure sensor and connected to the fourth transmission pipeline;

[0044] a fourth flow meter, disposed on a side of the fan away from the second heat exchange component and connected to the fourth transmission pipeline;

[0045] A flue gas post-treatment component, which is arranged on a side of the fourth flow meter away from the fan and connected to the fourth transmission pipeline;

[0046] A second temperature sensor is disposed between the second heat exchange component and the shell and connected to the fourth transmission pipeline.

[0047] In some embodiments, at least one of the pilot gas supply unit, the air supply unit, the fuel gas supply unit, the reaction gas supply unit, the synthesis gas output unit and the smoke gas output unit is provided with a manual valve, and the manual valve is used to control the on or off of the pilot gas supply unit, the air supply unit, the fuel gas supply unit, the reaction gas supply unit, the synthesis gas output unit and the smoke gas output unit.

[0048] In some embodiments, the burner includes a first input end and a second input end, the air supply unit and the fuel gas supply unit are connected to the first input end, and the pilot gas supply unit is connected to the second input end.

[0049] In some embodiments, the reaction unit includes a plurality of the burners, and the plurality of the burners are arranged at intervals in the accommodating cavity.

[0050] In some embodiments, the reaction pipeline is detachably connected to the shell.

[0051] In some embodiments, the pilot gas supply unit, the air supply unit, and the fuel gas supply unit are respectively detachably connected to the burner, the reaction gas supply unit and the synthesis gas output unit are respectively detachably connected to the reaction pipeline, and the smoke gas output unit is detachably connected to the shell.

[0052] Beneficial effect: Compared with the prior art, a testing device according to an embodiment of the present application includes a reaction unit, a pilot gas supply unit, an air supply unit, a fuel gas supply unit, a reaction gas supply unit, a synthesis gas output unit and a smoke gas output unit; the reaction unit includes a shell, a reaction pipeline and a burner; the shell has a accommodating cavity, at least part of the reaction pipeline is arranged in the accommodating cavity and is connected to the shell, and the burner is connected to the shell for providing heat to the reaction pipeline located in the accommodating cavity; the pilot gas supply unit is connected to the burner for providing pilot gas to the burner; the air supply unit is connected to the burner for providing air to the burner; the fuel gas supply unit is connected to the burner for providing fuel gas to the burner; the reaction gas supply unit is connected to the reaction pipeline for providing reaction gas to the reaction pipeline; the synthesis gas output unit is connected to the reaction pipeline for receiving the synthesis gas output by the reaction pipeline; the smoke gas output unit is connected to the shell for receiving the smoke discharged from the accommodating cavity. The present application can simplify the device structure by setting up independent reaction units, multiple raw material supply units, synthesis gas output units and flue gas output units. When testing, the various units are directly connected to achieve rapid construction of the test device, and corresponding raw material supply units can be connected according to different test scenarios, thereby achieving the construction of different test scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0054] Figure 1 This is a schematic diagram of a catalyst performance test of a test device according to an embodiment of the present application;

[0055] Figure 2 This is a schematic diagram of a thermal performance test principle of a test device according to an embodiment of the present application;

[0056] Figure 3 is a structural schematic diagram of a natural gas supply unit according to an embodiment of the present application;

[0057] Figure 4 is a schematic structural diagram of a water vapor supply unit according to an embodiment of the present application;

[0058] Figure 5 is a schematic structural diagram of a synthesis gas output unit according to an embodiment of the present application;

[0059] Figure 6 It is a structural schematic diagram of the smoke output unit of an embodiment of the present application.

[0060] Figure numerals: 1, reaction unit; 11, shell; 111, accommodating chamber; 12, reaction pipeline; 13, burner; 131, first input end; 132, second input end; 2, pilot gas supply unit; 3, air supply unit; 4, fuel gas supply unit; 5, reaction gas supply unit; 51, natural gas supply unit; 511, natural gas supply structure; 512, natural gas temporary storage tank; 513, second transmission pipeline; 514, second flow meter; 515, second pressure sensor; 516, second solenoid valve; 52, water vapor supply unit; 521, steam generator; 522, first transmission pipeline; 523, first flow meter; 524, the first pressure sensor; 525, the deionized water supply structure; 526, the first solenoid valve; 527, the metering pump; 6, the synthesis gas output unit; 61, the third transmission pipeline; 62, the third pressure sensor; 63, the filter component; 64, the first heat exchange component; 65, the fourth pressure sensor; 66, the third flow meter; 67, the first temperature sensor; 7, the flue gas output unit; 71, the fourth transmission pipeline; 72, the fifth pressure sensor; 73, the second heat exchange component; 74, the fan; 75, the fourth flow meter; 76, the flue gas post-treatment component; 77, the second temperature sensor; 8, the catalyst, 91, the manual valve. DETAILED DESCRIPTION

[0061] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0062] In the description of the present application, it should be understood that the terms "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more features. In the description of the present application, "multiple" means two or more, and at least one means one, two or more, unless otherwise clearly and specifically defined. In the description of this application, "vertical" means completely vertical at 90° or almost completely vertical, for example, an angle within the range of 80° to 100° is considered vertical. Similarly, "parallel" means completely parallel or almost completely parallel, for example, an angle within 10° of completely parallel is considered parallel.

[0063] The applicant noted that with the advancement of greenhouse gas emission reduction strategies, the demand for ship carbon emission reduction has become increasingly prominent. In recent years, the use of LNG (liquefied natural gas) fuel has become a trend, resulting in an annual increase in the number of LNG-powered ships. However, with the implementation of phased carbon reduction indicators, the limited carbon reduction of LNG-powered ships is difficult to meet future carbon emission reduction needs.

[0064] In the face of the carbon dioxide emissions from the combustion of LNG fuel on ships, carbon capture technology is an effective means to achieve ship decarbonization, but the more mature back-end carbon capture technology currently has problems such as high energy consumption and large equipment footprint. In recent years, LNG fuel-end decarbonization technology has developed rapidly with its advantages of low energy consumption and compact structure, becoming a feasible path to extend the vitality of LNG-powered ships. This technology decarbonizes and captures the fuel before it is burned through reactions such as methane reforming or cracking. The decarbonized zero-carbon hydrogen fuel enters the cylinder for combustion, thereby achieving carbon emission reduction for the entire ship.

[0065] The high-temperature and high-pressure reactor is the core equipment of the entire ship's LNG fuel efficient decarbonization system. The raw gas collection chamber is responsible for distributing the mixed raw gas entering the furnace to the conversion tube. The conversion tube completes the conversion reaction of natural gas through the action of the loaded catalyst bed. The combustion chamber is the area where the fuel and air are mixed and burned. The high-temperature flue gas generated by the combustion in the combustion chamber heats the conversion tube, which increases the temperature of the catalyst bed in the conversion tube and provides heat for the catalytic conversion reaction in the tube.

[0066] However, due to the limitations of the ship's operating environment, the ship's LNG fuel efficient decarbonization system needs to be compact, modular, and intelligent, while also meeting the requirements of low energy consumption and high conversion efficiency. It requires continuous updating, iteration, and optimization of the reactor and the catalysts used inside.

[0067] In view of this, an embodiment of the present application provides a testing device for testing and evaluating catalysts of different process routes, high-temperature and high-pressure reactors of different structures, and reaction tube sections of a marine high-temperature and high-pressure reaction device.

[0068] For details, please refer to Figure 1-Figure 6 A test device according to an embodiment of the present application comprises a reaction unit 1, a pilot gas supply unit 2, an air supply unit 3, a fuel gas supply unit 4, a reaction gas supply unit 5, a synthesis gas output unit 6 and a smoke gas output unit 7; the reaction unit 1 comprises a shell 11, a reaction pipeline 12 and a burner 13; the shell 11 has a receiving cavity 111, at least part of the reaction pipeline 12 is arranged in the receiving cavity 111 and connected to the shell 11, and the burner 13 is connected to the shell 11 for providing heat to the reaction pipeline 12 located in the receiving cavity 111; the pilot gas supply unit 2 It is connected to the burner 13 and is used to provide pilot gas to the burner 13; the air supply unit 3 is connected to the burner 13 and is used to provide air to the burner 13; the fuel gas supply unit 4 is connected to the burner 13 and is used to provide fuel gas to the burner 13; the reaction gas supply unit 5 is connected to the reaction pipeline 12 and is used to provide reaction gas to the reaction pipeline 12; the synthesis gas output unit 6 is connected to the reaction pipeline 12 and is used to receive and detect the synthesis gas output by the reaction pipeline 12; the smoke output unit 7 is connected to the shell 11 and is used to receive and detect the smoke exhausted from the accommodating cavity 111.

[0069] The present application can simplify the device structure by setting up independent reaction units 1, pilot gas supply units 2, air supply units 3, fuel gas supply units 4, reaction gas supply units 5, synthesis gas output units 6 and flue gas output units 7. When testing, the various units are directly connected to achieve rapid construction of the test device, and corresponding raw material supply units can be connected according to different test scenarios to achieve the construction of different test scenarios.

[0070] It should be noted that the present application sets up multiple raw material supply raw materials to be connected to the reaction unit 1, and sets up a synthesis gas output unit 6 and a flue gas output unit 7 at the output end of the reaction unit 1. At the same time, different catalysts 8 can be set in the reaction pipeline 12. On the one hand, different raw materials can be input according to test requirements to realize the catalytic reaction in the reaction unit 1. On the other hand, the synthesis gas output unit 6 and the flue gas output unit 7 are used to detect the synthesis gas after the reaction and the flue gas generated in the containing chamber 111, so as to test and evaluate the performance of the entire constructed reaction system and evaluate the catalytic performance corresponding to different catalysts 8.

[0071] Specifically, in the embodiment of the present application, the reaction unit 1 can be a high-temperature and high-pressure reactor; the shell 11 is heat-insulated and heat-preserved, and the accommodating chamber 111 in the shell 11 is used to accommodate the reaction pipeline 12 and to provide a high-temperature environment to maintain the high-temperature state of the reaction pipeline 12; the reaction pipeline 12 can be used to supply the raw gas for catalytic reaction, and at this time, a catalyst 8 bed is placed in the reaction pipeline 12 to achieve the catalytic reaction of the raw gas; the burner 13 is used to burn the fuel to provide heat energy to enter the accommodating chamber 111. The pilot gas supply unit 2 is connected to the input end of the burner 13, and is used to provide pilot gas for the ignition of the burner 13 to ensure that the fuel gas burns smoothly in the burner 13. The air supply unit 3 is connected to the input end of the burner 13, and is used to continuously provide air to the burner 13, mainly to provide oxygen to assist combustion. The fuel gas supply unit 4 is connected to the input end of the burner 13, and is used to continuously provide fuel to the burner 13 after the burner 13 is ignited; specifically, when the burner 13 is successfully ignited, the fuel gas supply unit 4 is opened to input the fuel gas, and then the pilot gas supply system is closed, so that the fuel gas passes through the burner 13 and burns in the accommodating chamber 111. The reaction gas supply unit 5 is connected to the input end of the reaction pipeline 12, and is used to continuously input the reaction gas into the reaction pipeline 12. The reaction gas contacts the catalyst 8 in the reaction pipeline 12 to achieve a catalytic reaction to produce the target synthesis gas. The synthesis gas output unit 6 is connected to the output end of the reaction pipeline 12, and is used to lead out the target synthesis gas produced after the catalytic reaction of the reaction pipeline 12 and detect related parameters. The smoke output unit 7 is used to lead out the smoke generated by the combustion of the fuel gas in the accommodating chamber 111 and perform detection and subsequent carbon removal treatment.

[0072] It should be noted that the burner 13 of the embodiment of the present application can be directly arranged in the accommodating chamber 111, or at least its output end is located in the accommodating chamber 111, so as to ensure that the burner 13 can be ignited in the accommodating chamber 111 and finally burn the fuel gas. At the same time, the reaction unit 1 can be provided with multiple burners 13, and the multiple burners 13 are distributed in different positions of the accommodating chamber 111, so that the fuel gas can be ignited and burned at multiple points, ensuring that the temperature inside the accommodating chamber 111 of the reaction unit 1 is evenly distributed. At the same time, it can achieve the desired temperature quickly.

[0073] Furthermore, in some embodiments, the reaction gas supply unit 5 includes a water vapor supply unit 52 , which is connected to the reaction pipeline 12 and is used to test and evaluate the thermal performance of the reaction unit 1 .

[0074] In an embodiment of the present application, the reaction unit 1 of the test device is combined with each raw material supply unit in different ways, and the input and output of each supply unit are controlled at the same time, or different reaction units 1 are replaced, so that different test evaluation scenarios can be achieved.

[0075] Please refer to Figure 1 and Figure 4 Specifically, when the pilot gas supply unit 2, the air supply unit 3, the fuel gas supply unit 4, the water vapor supply unit 52, the synthesis gas output unit 6 and the flue gas output unit 7 are connected to the reaction unit 1, the testing device is used to evaluate the thermal performance of the reaction unit 1. At this time, the thermal performance of the reaction unit 1 is detected by continuously introducing water vapor into the reaction pipeline 12.

[0076] When the test device is in the thermal performance evaluation mode, there is no catalyst 8 in the reaction pipeline 12, and the input end of the reaction pipeline 12 is connected to the water vapor supply unit 52, which continuously generates water vapor through the steam generator 521 and supplies it to the reaction pipeline 12, and uses water vapor as a heat exchange medium to test the thermal performance of the reaction unit 1. Specifically, according to the heating capacity of the reaction unit 1, the steam generator 521 in the water vapor supply unit 52 is used to control the temperature, pressure, flow rate and other parameters of the saturated water vapor entering the input end of the reaction pipeline 12; when the synthesis gas output unit 6 detects a stable water vapor flow rate, the burner 13 is started to ignite the gas supply unit 2 and the air supply unit 3, and the burner 13 of the reaction unit 1 is ignited. After ignition, the combustion gas supply unit is switched to keep the heat supply to the burner 13. After the test device is running stably, the smoke output unit 7 is used to test the smoke composition, temperature and pressure of the smoke discharged from the containing chamber 111, and the synthesis gas output unit 6 is used to test the temperature and pressure of the water vapor discharged from the output end of the reaction pipeline 12, and the enthalpy difference of the water vapor at the input and output ends of the reaction pipeline 12, as well as the enthalpy difference between the smoke in the containing chamber 111 and the smoke at the inlet of the smoke output unit 7 are calculated, and then the heat transfer efficiency and other parameters of the reaction unit 1 are obtained. The data test is repeated by changing multiple common working conditions, and then the thermal performance of the reaction unit 1 is evaluated through comparative analysis, so as to select the reaction unit 1 with high heat transfer efficiency, uniform temperature distribution and high temperature area that meets the reaction requirements.

[0077] like Figure 4 As shown, further, in some embodiments, the water vapor supply unit 52 includes: a deionized water supply structure 525, a steam generator 521, a first transmission pipeline 522, a first flow meter 523, a first pressure sensor 524, a first solenoid valve 526 and a metering pump 527; wherein the deionized water supply structure 525 is used to provide deionized water; the steam generator 521 is connected to the deionized water supply structure 525, and is used to convert deionized water into water vapor; the first transmission pipeline 522 is connected to the steam generator 521, and is used to convert water vapor into water vapor. The gas is transmitted to the reaction pipeline 12; the first flow meter 523 is connected to the first transmission pipeline 522, and is used to detect the flow rate of water vapor in the first transmission pipeline 522; the first pressure sensor 524 is connected to the first transmission pipeline 522, and is used to detect the pressure of water vapor in the first transmission pipeline 522; the first solenoid valve 526 is connected to the first transmission pipeline 522, and is used to control the opening and closing of the first transmission pipeline 522; the metering pump 527 is connected between the steam generator 521 and the deionized water supply structure 525, and is used to measure the supply of deionized water.

[0078] Specifically, when conducting the test evaluation, the deionized water supply structure 525 is first opened and the deionized water is delivered to the steam generator 521. The metering pump 527 is used to measure the amount of deionized water input, and then the deionized water passes through the steam generator 521 to generate water vapor and is delivered to the reaction pipeline 12. During this period, the first flow meter 523 is used to measure the output water vapor flow rate, and the first pressure sensor 524 is used to measure the pressure in the first transmission pipeline 522, which is convenient for the subsequent thermal performance evaluation. In addition, the water vapor supply unit 52 is also provided with a first electromagnetic valve 526, which is used to directly cut off or open the water vapor supply during the test process to ensure safety and avoid waste of water vapor.

[0079] Please refer to Figure 2 and Figure 3 In some embodiments, the reaction gas supply unit 5 further includes a natural gas supply unit 51 , and a catalyst 8 is disposed in the reaction pipeline 12 ; the natural gas supply unit 51 is connected to the reaction pipeline 12 for testing and evaluating the performance of the catalyst 8 .

[0080] It should be noted that when the test device is used to evaluate the performance of the catalyst 8, the catalyst 8 of the decarbonization reaction at the fuel end can be tested and evaluated. At this time, the reaction pipeline 12 is provided with a corresponding catalyst 8 that needs to be tested and evaluated for performance, and the natural gas supply unit 51 is connected to the input end of the reaction pipeline 12 to continuously input the reaction gas into the reaction pipeline 12, thereby achieving natural gas decarbonization.

[0081] In the embodiment of the present application, the fuel gas may also be natural gas. After the system is built, the pilot gas supply unit 2 and the air supply unit 3 are started to ignite the burner 13 of the reaction unit 1. After ignition, the combustion gas supply unit is switched to keep the heat supply to the burner 13. After the temperature in the reaction pipeline 12 is stabilized, the reaction gas supply unit 5 is turned on, and the reaction gas is input into the reaction pipeline 12, wherein the water vapor supply unit 52 continuously inputs water vapor, and the natural gas supply unit 51 continuously inputs natural gas, and the input amount during the process is recorded; after the test device is stably operated, the smoke output unit 7 is used to test the smoke composition, temperature, and pressure of the smoke discharged from the accommodating chamber 111, and the synthesis gas output unit 6 is used to test the temperature and pressure of the synthesis gas discharged from the output end of the reaction pipeline 12, and the synthesis gas output unit 6 also includes a heat exchange component (specifically, it can be circulating water cooling), the synthesis gas is cooled down, and then the components of the cooled synthesis gas are analyzed to obtain the hydrogen concentration in the reaction pipeline 12. By setting different input and output modes for each unit, changing various operating conditions (material input amount and temperature adjustment, etc.), or replacing the catalyst 8 for repeated testing, as well as conducting tests and hydrogen concentration detection in different time periods, the efficiency and service life of the catalyst 8 under different operating conditions are analyzed and calculated, thereby evaluating the performance, operating temperature space, service life and other indicators of different types of catalysts 8, and then screening out catalysts 8 that meet the reaction requirements.

[0082] It should be noted that natural gas and water vapor are simultaneously input into the reaction pipeline 12 , and methane and water vapor undergo a catalytic reaction on the catalyst 8 to produce hydrogen.

[0083] It should also be noted that when the testing device is evaluating the performance of the catalyst 8, different types of catalysts 8 can be replaced in the reaction pipeline 12 according to the test needs. By making the catalyst 8 replaceable, it is possible to test and evaluate different types of catalysts 8.

[0084] In addition, the testing device of the present application can also perform structural performance test and evaluation of the reaction unit 1. At this time, the reaction unit 1 in the catalyst 8 performance test mode is replaced, and the others remain unchanged. The input and output operating conditions of each unit are adjusted, as well as the temperature in the containing chamber 111. The various parameters of the flue gas of the flue gas output unit 7 under various operating conditions, as well as the synthesis gas at the synthesis gas output unit 6, are tested. The structural performance test and evaluation of the reaction unit 1 can be achieved through analysis and calculation.

[0085] Of course, since the difference in the structure of the reaction unit 1 is mainly reflected in the reaction pipeline 12 , the effect of replacing the reaction unit 1 can be achieved by replacing the reaction pipeline 12 in the reaction unit 1 .

[0086] Furthermore, the testing device of the present application can also test and evaluate the performance of various decarbonization processes. The specific testing and evaluation architecture is the same as the architecture of the catalyst 8 performance testing and evaluation, and will not be repeated here.

[0087] like Figure 3 As shown, in some embodiments, the natural gas supply unit 51 includes a natural gas supply structure 511, a natural gas temporary storage tank 512, a second transmission pipeline 513, a second flow meter 514, a second pressure sensor 515 and a second solenoid valve 516; wherein the natural gas supply structure 511 is used to provide natural gas; the natural gas temporary storage tank 512 is connected to the natural gas supply structure 511 for temporarily storing natural gas; the second transmission pipeline 513 is connected to the natural gas supply structure 511 for transmitting natural gas to the reaction pipeline 12; the second flow meter 514 is connected to the second transmission pipeline 513 for detecting the flow of natural gas in the second transmission pipeline 513; the second pressure sensor 515 is connected to the second transmission pipeline 513 for detecting the pressure of natural gas in the second transmission pipeline 513; the second solenoid valve 516 is connected to the second transmission pipeline 513 for controlling the opening and closing of the second transmission pipeline 513.

[0088] In the embodiment of the present application, when the performance test and evaluation of the catalyst 8 is performed, the burner 13 is first ignited to heat the reaction unit 1. After the temperature of the reaction unit 1 is stabilized, the natural gas supply unit 51 is turned on. At this time, the natural gas input by the natural gas supply structure 511 is first circulated in the natural gas temporary storage tank 512, and then the natural gas in the natural gas temporary storage tank 512 is input into the reaction pipeline 12 using the second transmission pipeline 513. In this process, the input amount of natural gas is measured by the second flow meter 514, and the pressure in the second transmission pipeline 513 is measured by the second pressure sensor 515, which is convenient for the subsequent performance evaluation of the catalyst 8. A second solenoid valve 516 is set at one end of the second transmission pipeline 513 entering the reaction pipeline 12, which is used to realize the rapid opening and closing of the second transmission pipeline 513, realize the input and rapid interception of natural gas, improve safety and avoid waste of natural gas.

[0089] Please refer to Figure 1 , Figure 2 and Figure 5In some embodiments, the synthesis gas output unit 6 includes: a third transmission pipeline 61, a third pressure sensor 62, a filter component 63, a first heat exchange component 64, a fourth pressure sensor 65, a third flow meter 66 and a first temperature sensor 67; wherein the third transmission pipeline 61 is connected to the reaction pipeline 12, and is used to draw out the synthesis gas output by the reaction pipeline 12; the third pressure sensor 62 is connected to the third transmission pipeline 61, and is used to detect the pressure of the synthesis gas in the third transmission pipeline 61; the filter component 63 is arranged on the side of the third pressure sensor 62 away from the reaction unit 1 and is connected to the third transmission pipeline 61, and is used to filter particulate matter in the synthesis gas; the first heat exchange component 64 is arranged on the filter component 63 is located on a side away from the third pressure sensor 62 and connected to the third transmission pipeline 61, and is used to cool the synthesis gas; the fourth pressure sensor 65 is arranged on a side of the first heat exchange component 64 away from the filter component 63 and is connected to the third transmission pipeline 61, and is used to detect the pressure of the cooled synthesis gas; the third flow meter 66 is arranged on a side of the fourth pressure sensor 65 away from the first heat exchange component 64 and is connected to the third transmission pipeline 61, and is used to measure the flow rate of the cooled synthesis gas in the third transmission pipeline 61; the first temperature sensor 67 is arranged on a side of the filter component 63 away from the first heat exchange component 64 and is connected to the third transmission pipeline 61, and is used to detect the temperature of the synthesis gas discharged from the reaction pipeline 12.

[0090] In the embodiment of the present application, the synthesis gas detection unit is mainly used to connect to the output end of the reaction pipeline 12 to detect the synthesis gas output by the reaction pipeline 12. Specifically, the synthesis gas is first input into the third transmission pipeline 61, and then the third pressure sensor 62 detects the gas pressure of the gas in the third transmission pipeline 61 at this time, and then the synthesis gas enters the filter component 63 for particulate matter filtration, and then enters the first heat exchange component 64 for cooling after filtration. After cooling, the fourth pressure sensor 65 is used to detect the pressure in the third transmission pipeline 61 at this time, and then the third flowmeter 66 is used to detect the flow in the third transmission pipeline 61 at this time. At the same time, when the synthesis gas is discharged, the first temperature sensor 67 is also needed to detect the synthesis gas discharged from the reaction pipeline 12 for test evaluation.

[0091] Please refer to Figure 1 , Figure 2 and Figure 6In some embodiments, the smoke output unit 7 includes a fourth transmission pipeline 71, a fifth pressure sensor 72, a second heat exchange component 73, a fan 74, a fourth flow meter 75, a smoke post-treatment component 76 and a second temperature sensor 77; wherein the fourth transmission pipeline 71 is connected to the shell 11 and communicates with the accommodating chamber 111, and is used to lead out the smoke in the accommodating chamber 111; the fifth pressure sensor 72 is connected to the fourth transmission pipeline 71, and is used to detect the pressure of the smoke in the fourth transmission pipeline 71; the second heat exchange component 73 is arranged on the side of the fifth pressure sensor 72 away from the shell 11 and is connected to the fourth transmission pipeline 71, and is used to cool the smoke; the fan 74 is arranged on the second heat exchange component 73 A side away from the fifth pressure sensor 72 and connected to the fourth transmission pipe 71 is used to continuously output the flue gas to the side of the fourth transmission pipe 71 away from the shell 11; the fourth flow meter 75 is arranged on the side of the fan 74 away from the second heat exchange component 73 and connected to the fourth transmission pipe 71, and is used to measure the flow of the cooled flue gas in the fourth transmission pipe 71; the flue gas post-treatment component 76 is arranged on the side of the fourth flow meter 75 away from the fan 74 and connected to the fourth transmission pipe 71, and is used to perform subsequent treatment on the flue gas; the second temperature sensor 77 is arranged between the second heat exchange component 73 and the shell 11 and connected to the fourth transmission pipe 71, and is used to detect the temperature of the flue gas discharged from the accommodating chamber 111.

[0092] In the embodiment of the present application, the smoke output unit 7 is used to detect the composition, temperature, pressure, etc. of the smoke discharged from the accommodating chamber 111 after the fuel gas is burned in the burner 13 for testing. Specifically, the smoke generated by the combustion of the fuel gas is discharged from the accommodating chamber 111 into the fourth transmission pipeline 71. First, the pressure in the pipeline is detected by the fifth pressure sensor 72, and then the temperature of the exhaust smoke is detected by the second temperature sensor 77. The second heat exchange component 73 is used to cool the smoke, and then the fan 74 is used to output the cooled smoke to the outside, and the fourth flowmeter 75 is used to measure the flow rate of the smoke exhaust, and finally it is transported to the smoke post-treatment component 76 for subsequent carbon removal treatment. The composition, temperature, pressure and other information of the smoke are obtained to facilitate subsequent testing and evaluation.

[0093] like Figure 1-Figure 6 As shown, in some embodiments, at least one of the pilot gas supply unit 2, the air supply unit 3, the fuel gas supply unit 4, the reaction gas supply unit 5, the synthesis gas output unit 6 and the smoke gas output unit 7 is provided with a manual valve 91, and the manual valve 91 is used to control the on or off of the pilot gas supply unit 2, the air supply unit 3, the fuel gas supply unit 4, the reaction gas supply unit 5, the synthesis gas output unit 6 and the smoke gas output unit 7.

[0094] Specifically, in the embodiment of the present application, manual valves 91 may be respectively provided on the transmission pipelines of the pilot gas supply unit 2, the air supply unit 3, the fuel gas supply unit 4, the reaction gas supply unit 5, the synthesis gas output unit 6 and the flue gas output unit 7. Figure 1-Figure 6 As shown; the setting of the manual valve 91 can manually control the conduction and shutdown of each unit, and then control the working state of each unit. It is preferred to set the manual valve 91 at the end of the transmission pipeline of the pilot gas supply unit 2, the air supply unit 3, the fuel gas supply unit 4, the reaction gas supply unit 5, the synthesis gas output unit 6 and the flue gas output unit 7 away from the reaction unit 1, so as to ensure that the manual valve 91 is away from the heat source. At this time, when manually opening or closing each unit, it can be away from the high temperature environment, thereby improving the safety of operation.

[0095] In some embodiments, the burner 13 includes a first input end 131 and a second input end 132 , the air supply unit 3 and the fuel gas supply unit 4 are connected to the first input end 131 , and the pilot gas supply unit 2 is connected to the second input end 132 .

[0096] In the embodiment of the present application, when performing various performance evaluations, the burner 13 undergoes two stages, one is the ignition stage, and the other is the combustion stage. Specifically, in the ignition stage, the air supply unit 3 inputs air through the first input end 131, and the pilot gas supply unit 2 inputs pilot gas through the second input end 132; in the combustion stage, the air supply unit 3 inputs air through the first input end 131, and the fuel gas supply unit 4 inputs fuel gas through the first input end 131, and the two are mixed and burned.

[0097] In some embodiments, the reaction tube 12 is detachably connected to the shell 11 .

[0098] In the embodiment of the present application, the reaction line 12 is detachably connected to the shell 11, so that the reaction line 12 can be quickly replaced, thereby realizing the change of the structure of the reaction unit 1. In this way, the performance test of different positive reaction unit 1 structures can be realized, avoiding direct replacement of the reaction unit 1, and effectively improving the test efficiency.

[0099] In some embodiments, the pilot gas supply unit 2, the air supply unit 3, and the fuel gas supply unit 4 are respectively detachably connected to the burner 13, the reaction gas supply unit 5 and the synthesis gas output unit 6 are respectively detachably connected to the reaction pipeline 12, and the smoke gas output unit 7 is detachably connected to the shell 11.

[0100] In the embodiment of the present application, the corresponding connection parts of each system and the reaction unit 1 are all detachably connected. At this time, a corresponding test and evaluation platform that meets the needs can be built according to different scenarios required for test and evaluation, thereby realizing the test and evaluation of the performance of different high-temperature and high-pressure reaction devices and catalysts 8.

[0101] In some embodiments, the pilot gas supply unit 2 , the air supply unit 3 , the fuel gas supply unit 4 , the reaction gas supply unit 5 , the synthesis gas output unit 6 , and the flue gas output unit 7 are all modularly designed.

[0102] In the embodiments of the present application, each system adopts a modular design, and each system is independent of each other, and has reserved interfaces for connecting with other devices, which is more convenient for movement and disassembly, thereby making it easier to combine different test scenarios of the test device.

[0103] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0104] The above is a detailed introduction to a test device provided in an embodiment of the present application, and the principles and implementation methods of the present application are explained by using specific examples. The description of the above embodiments is only used to help understand the technical solution and core idea of ​​the present application; ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some of the technical features therein with equivalents; and these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the present application.

Claims

1. A testing device, characterized in that: include: A reaction unit (1) comprises a shell (11), a reaction pipeline (12) and a burner (13); the shell (11) has a containing cavity (111), at least part of the reaction pipeline (12) is arranged in the containing cavity (111) and connected to the shell (11); the burner (13) is connected to the shell (11) and is used to provide heat to the reaction pipeline (12) located in the containing cavity (111); A pilot gas supply unit (2), connected to the burner (13), and used for providing pilot gas to the burner (13); an air supply unit (3), connected to the burner (13) and used to supply air to the burner (13); A fuel gas supply unit (4), connected to the burner (13), and used to provide fuel gas to the burner (13); A reaction gas supply unit (5), connected to the reaction pipeline (12), and used for providing reaction gas to the reaction pipeline (12); A synthesis gas output unit (6), connected to the reaction pipeline (12), and used for receiving the synthesis gas output from the reaction pipeline (12); A smoke output unit (7) is connected to the housing (11) and is used to receive the smoke exhausted from the accommodating chamber (111).

2. The testing device according to claim 1, characterized in that: The reaction gas supply unit (5) comprises a water vapor supply unit (52), and the water vapor supply unit (52) is connected to the reaction pipeline (12).

3. The testing device according to claim 2, characterized in that: The water vapor supply unit (52) comprises: A deionized water supply structure (525) for providing deionized water; a steam generator (521), connected to the deionized water supply structure (525), for converting the deionized water into water vapor; A first transmission pipeline (522), one end of which is connected to the steam generator (521), and an end of the first transmission pipeline (522) away from the steam generator (521) is connected to the reaction pipeline (12); A first flow meter (523), connected to the first transmission pipeline (522) and located between the steam generator (521) and the reaction unit (1); A first pressure sensor (524), connected to the first transmission pipeline (522) and located between the steam generator (521) and the reaction unit (1); A first solenoid valve (526), ​​connected to the first transmission pipeline (522) and located between the steam generator (521) and the reaction unit (1); A metering pump (527) is connected between the steam generator (521) and the deionized water supply structure (525).

4. The testing device according to claim 2 or 3, characterized in that: The reaction gas supply unit (5) further comprises a natural gas supply unit (51); a catalyst (8) is arranged in the reaction pipeline (12); and the natural gas supply unit (51) is connected to the reaction pipeline (12).

5. The testing device according to claim 4, characterized in that: The natural gas supply unit (51) comprises: a natural gas supply structure (511) for providing natural gas; A natural gas temporary storage tank (512) connected to the natural gas supply structure (511); A second transmission pipeline (513), one end of which is connected to the natural gas supply structure (511), and one end of the second transmission pipeline (513) away from the natural gas supply structure (511) is connected to the reaction pipeline (12); A second flow meter (514), connected to the second transmission pipeline (513), and located between the natural gas temporary storage tank (512) and the reaction unit (1); A second pressure sensor (515), connected to the second transmission pipeline (513), and located between the natural gas temporary storage tank (512) and the reaction unit (1); The second solenoid valve (516) is connected to the second transmission pipeline (513) and is located between the natural gas temporary storage tank (512) and the reaction unit (1).

6. The testing device according to claim 1, characterized in that: The synthesis gas output unit (6) comprises: a third transmission pipeline (61), connected to the reaction pipeline (12), and used for leading out the synthesis gas in the reaction pipeline (12); a third pressure sensor (62), connected to the third transmission pipeline (61); a filter assembly (63), arranged on a side of the third pressure sensor (62) away from the reaction unit (1) and connected to the third transmission pipeline (61); a first heat exchange component (64), arranged on a side of the filter component (63) away from the third pressure sensor (62) and connected to the third transmission pipeline (61); a fourth pressure sensor (65), arranged on a side of the first heat exchange component (64) away from the filter component (63) and connected to the third transmission pipeline (61); a third flow meter (66), arranged on a side of the fourth pressure sensor (65) away from the first heat exchange component (64) and connected to the third transmission pipeline (61); A first temperature sensor (67) is disposed on a side of the filter component (63) away from the first heat exchange component (64) and is connected to the third transmission pipeline (61).

7. The testing device according to claim 1, characterized in that: The smoke output unit (7) comprises: a fourth transmission pipeline (71), connected to the housing (11) and in communication with the accommodating chamber (111); a fifth pressure sensor (72), connected to the fourth transmission pipeline (71); a second heat exchange component (73), arranged on a side of the fifth pressure sensor (72) away from the housing (11) and connected to the fourth transmission pipeline (71); a fan (74), arranged on a side of the second heat exchange component (73) away from the fifth pressure sensor (72) and connected to the fourth transmission pipeline (71), and used for continuously outputting the smoke to a side of the fourth transmission pipeline (71) away from the housing (11); a fourth flow meter (75), arranged on a side of the fan (74) away from the second heat exchange component (73) and connected to the fourth transmission pipeline (71); a flue gas post-treatment component (76), arranged on a side of the fourth flow meter (75) away from the fan (74) and connected to the fourth transmission pipeline (71); A second temperature sensor (77) is disposed between the second heat exchange component (73) and the shell (11) and is connected to the fourth transmission pipeline (71).

8. The testing device according to claim 1, characterized in that: At least one of the pilot gas supply unit (2), the air supply unit (3), the fuel gas supply unit (4), the reaction gas supply unit (5), the synthesis gas output unit (6) and the smoke gas output unit (7) is provided with a manual valve (91), and the manual valve (91) is used to control the on or off of the pilot gas supply unit (2), the air supply unit (3), the fuel gas supply unit (4), the reaction gas supply unit (5), the synthesis gas output unit (6) and the smoke gas output unit (7).

9. The testing device according to claim 1, characterized in that: The burner (13) comprises a first input end (131) and a second input end (132); the air supply unit (3) and the fuel gas supply unit (4) are connected to the first input end (131); and the pilot gas supply unit is connected to the second input end (132).

10. The testing device according to claim 9, characterized in that: The reaction unit (1) comprises a plurality of burners (13), and the plurality of burners (13) are arranged at intervals in the accommodating chamber (111).

11. The testing device according to claim 1, characterized in that: The reaction pipeline (12) is detachably connected to the shell (11).

12. The testing device according to claim 1, characterized in that: The pilot gas supply unit (2), the air supply unit (3), and the fuel gas supply unit (4) are respectively detachably connected to the burner (13); the reaction gas supply unit (5) and the synthesis gas output unit (6) are respectively detachably connected to the reaction pipeline (12); and the smoke gas output unit (7) is detachably connected to the shell (11).