Quick mounting structure of pre-embedded hoisting frame
By designing the fast -loading structure of the embedded hanging rack, using the thread of the thread and the lock film to solve the problem of complex structure and insufficient carrying capacity of the existing hanging frame, realize fast installation and multiple utilization, improve safety, and improve safety. Sexual and carrying capacity.
Patent Information
- Application Number
- CN202421354080.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-06-13
AI Technical Summary
The existing hoisting rack has a complex structure, is troublesome to connect with the pipe bracket, has weak load-bearing capacity and poor safety.
A fast -loading structure of the embedded hanging rack includes the embedded rod, the fast -loaded sleeve and the locking film. The thread coordination with the thread with the thread is used to achieve fast locking and disassembly.
It realizes the rapid installation and multiple use of the hoisting rack, improves the safety and load-bearing capacity of the hoisting rack, and simplifies the connection process with the pipe support.
Smart Images

Figure CN222392137U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building material hoisting equipment, in particular to a quick-installation structure of a pre-buried hoisting frame. Background Art
[0002] In factories such as chemical, metallurgical, electric power, light industry, and textile, pipe supports are the main structures that support the entire plant's process production equipment and provide pipe support. They are distributed throughout the plant and connect all production equipment in the plant. Pipe supports need to be connected to the hanging frame to achieve row fixation. Part of the hanging frame is pre-buried in concrete, and the rest is fixedly connected to the pipe support. Some existing hanging frames have complex structures and are difficult to connect to the pipe supports, which makes the installation of the pipe supports difficult. Some hanging frames have weak bearing capacity and poor safety. Utility Model Content
[0003] In order to overcome the above-mentioned defects existing in the prior art, the utility model provides a quick-installation structure of a pre-embedded hanging frame.
[0004] A quick-installation structure of a pre-embedded lifting frame comprises a pre-embedded rod, the end of the pre-embedded rod is connected to a quick-installation sleeve, a quick-installation assembly is arranged in the quick-installation sleeve, the quick-installation assembly comprises a plurality of locking plates, a plurality of the locking plates are uniformly distributed circumferentially with the central axis of the quick-installation sleeve as the center, the locking plates are threadedly connected to the studs, the bottom of the studs is connected to a supporting frame, an elastic component is arranged on the top of the outer wall of the locking plates, and the bottom of the locking plates is rotatably connected to the inner wall of the quick-installation sleeve.
[0005] Furthermore, the elastic component is a spring, one end of the spring is connected to the locking plate, and the other end of the spring is connected to the inner wall of the quick-release sleeve.
[0006] Furthermore, the bottom of the locking plate is rotatably connected to the locking plate via a mounting seat, and the mounting seat includes a fixing plate fixedly connected to the quick-release sleeve, and a mounting protrusion is provided on the fixing plate, and the mounting protrusion is rotatably connected to the connecting plate at the bottom of the locking plate via a rotating shaft.
[0007] Furthermore, a threaded hole is provided on the top inner wall of the quick-release sleeve, and the quick-release sleeve is connected to the stud through the threaded hole.
[0008] Furthermore, a spiral pattern is provided on the outer wall of the embedded rod.
[0009] Due to the adoption of the above technical scheme, the beneficial technical effect of the utility model is as follows: in the utility model, the embedded rod is first installed in the concrete, the screw rod is inserted into the quick-installation sleeve, and then the support bracket is connected to the pipe bracket, so that the quick installation of the hanging frame can be realized. The specific implementation method is that when the stud is not inserted into the quick-installation sleeve, the locking plate is in an inclined state under the action of the elastic component. After the stud is inserted into the quick-installation sleeve for a certain length, the locking plate changes from the inclined state to a vertical state, and the thread on the locking plate cooperates with the thread on the stud, thereby locking the stud, realizing the quick installation of the hanging frame. When the pipeline changes its route, the connection between the pipe bracket and the support bracket is released, and then the stud is rotated to disassemble the support bracket, so that the support bracket can be used multiple times. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a structural schematic diagram of a quick-installation structure of a pre-buried hanging frame of the utility model;
[0011] Figure 2 It is a schematic cross-sectional structure diagram of a quick-installation structure of a pre-embedded hanging frame in the main viewing direction of the utility model;
[0012] Figure 3 It is a structural schematic diagram of the locking plate in the utility model.
[0013] In the figure, 1, embedded rod, 2, quick-release sleeve, 3, locking plate, 4, stud, 5, support bracket, 6, elastic component, 7, fixing plate, 8, mounting protrusion, 9, rotating shaft, 10, connecting plate, 11, threaded hole. DETAILED DESCRIPTION
[0014] In order to more clearly illustrate the technical solution of the utility model, the utility model is further described below in conjunction with the accompanying drawings. Obviously, the accompanying drawings described below are only one embodiment of the utility model. For ordinary technicians in this field, without paying any creative work, other embodiments can be obtained based on this drawing and embodiment, which all belong to the protection scope of the utility model.
[0015] according to Figure 1-3 As shown, a quick-installation structure of a pre-embedded lifting frame includes an embedded rod 1, the end of the embedded rod 1 is connected to a quick-installation sleeve, a quick-installation assembly is provided in the quick-installation sleeve, and the quick-installation assembly includes a plurality of locking plates 3, a plurality of the locking plates 3 are uniformly distributed circumferentially with the central axis of the quick-installation sleeve as the center, the locking plates 3 are threadedly connected to the studs 4, the bottom of the studs 4 is connected to a supporting bracket 5, an elastic component 6 is provided on the top of the outer wall of the locking plates 3, and the bottom of the locking plates 3 is rotatably connected to the inner wall of the quick-installation sleeve.
[0016] In the above specific technical scheme, the embedded rod 1 is first installed in the concrete, the screw is inserted into the quick-install sleeve, and then the support bracket 5 is connected to the pipe bracket, so that the quick installation of the hanging frame can be realized. The specific implementation method is that when the stud 4 is not inserted into the quick-install sleeve, the locking plate 3 is in an inclined state under the action of the elastic component 6. After the stud 4 is inserted into the quick-install sleeve for a certain length, the locking plate 3 changes from the inclined state to a vertical state, and the thread on the locking plate 3 cooperates with the thread on the stud 4, thereby locking the stud 4, thereby realizing the quick installation of the hanging frame. When the pipeline changes its route, the connection between the pipe bracket and the support bracket 5 is released, and then the stud 4 is rotated to remove the support bracket 5, so that the support bracket 5 can be used multiple times.
[0017] The elastic component 6 is a spring, one end of which is connected to the locking plate 3, and the other end is connected to the inner wall of the quick-release sleeve. When the stud 4 is not inserted into the quick-release sleeve, the locking plate 3 is inclined under the action of the spring. When the stud 4 is inserted into the quick-release sleeve to a certain length, the locking plate 3 becomes vertical due to the force of the spring.
[0018] The bottom of the locking plate 3 is rotatably connected to the locking plate 3 via a mounting seat, and the mounting seat includes a fixing plate 7 fixedly connected to the quick-release sleeve, and a mounting protrusion 8 is provided on the fixing plate 7. The mounting protrusion 8 is rotatably connected to the connecting plate 10 at the bottom of the locking plate 3 via a rotating shaft 9. The locking plate 3 is rotatably mounted on the inner wall of the quick-release sleeve through the mounting seat.
[0019] A threaded hole 11 is provided on the top inner wall of the quick-release sleeve, and the quick-release sleeve is connected with the stud 4 through the threaded hole 11. When the locking plate 3 becomes a vertical state, the stud 4 is rotated to make the stud 4 and the quick-release sleeve threadedly connected. When the hanging frame needs to be disassembled, the stud 4 is rotated in the opposite direction to release the connection between the stud 4 and the quick-release sleeve and the locking plate 3.
[0020] The outer wall of the embedded rod 1 is provided with a spiral pattern. By providing the pattern on the embedded rod 1, the friction between the embedded rod 1 and the concrete can be increased, thereby enhancing the stability of the structure.
[0021] The above embodiments are only exemplary embodiments of the present invention and are not intended to limit the present invention. The protection scope of the present invention is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.
Claims
1. A quick-installation structure of a pre-buried hanging frame, comprising a pre-buried rod (1), characterized in that: The end of the embedded rod (1) is connected to a quick-release sleeve, a quick-release assembly is arranged in the quick-release sleeve, and the quick-release assembly comprises a plurality of locking plates (3), the plurality of locking plates (3) are evenly distributed in the circumferential direction with the central axis of the quick-release sleeve as the center, the locking plates (3) are threadedly connected to the studs (4), the bottom of the studs (4) is connected to the support bracket (5), the top of the outer wall of the locking plates (3) is provided with an elastic component (6), and the bottom of the locking plates (3) is rotatably connected to the inner wall of the quick-release sleeve.
2. The quick-install structure of the embedded hanging frame according to claim 1 is characterized in that: The elastic component (6) is a spring, one end of which is connected to the locking plate (3), and the other end of which is connected to the inner wall of the quick-install sleeve.
3. The quick-install structure of the pre-embedded hanging frame according to claim 1 is characterized in that: The bottom of the locking plate (3) is rotatably connected to the locking plate (3) via a mounting seat, the mounting seat comprises a fixing plate (7) fixedly connected to the quick-release sleeve, the fixing plate (7) is provided with a mounting protrusion (8), and the mounting protrusion (8) is rotatably connected to a connecting plate (10) at the bottom of the locking plate (3) via a rotating shaft (9).
4. The quick-install structure of the pre-embedded hanging frame according to claim 3 is characterized in that: A threaded hole (11) is provided on the inner wall of the top of the quick-release sleeve, and the quick-release sleeve is connected to the stud (4) through the threaded hole (11).
5. The quick-install structure of the embedded hanging frame according to claim 3 is characterized in that: The outer wall of the embedded rod (1) is provided with a spiral pattern.