Pipeline excavation groove layered backfilling quality control device

By designing a pipe excavation groove groove -in -layer backfill quality control device including adjusting the adjustment rod, folding rod, anchor rod, vertical rod and positioning board, solve the problem of re -planning size in different grooves, to achieve the realization of the size and realize it to achieve the realization of the size and achieve the realization. The effect of fast installation, applicable width, and accurate control of the backfilling depth, reducing costs and improving construction efficiency.

CN222413061UActive Publication Date: 2025-01-28中国建设基础设施有限公司 +4
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420390518.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2025-01-28
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

Existing trench layered backfill control tools require resize in different pipe trenches, increasing usage costs and reducing efficiency.

Method used

Through the combination of adjustment rods, folding rods, anchor rods, vertical rods and positioning boards, design a pipeline excavation grooves layered backfill quality control device. Check the flatness of the backfilling earth, and push the soil for scraping during the pull of the rope.

Benefits of technology

The rapid installation or splitting, the application of a large range of filling is large, which can accurately control the accuracy of the depth of the soil layer, reduce costs and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222413061U_ABST
    Figure CN222413061U_ABST
Patent Text Reader

Abstract

The utility model discloses a layered backfilling quality control device for a pipeline excavation groove, and relates to the technical field of groove backfilling. The device structurally comprises an adjusting rod, a folding rod, an anchor rod, a vertical rod and a positioning plate; the unfolding length of the folding rod is greater than that of the adjusting rod; first scale marks are engraved on the outer wall of the anchor rod; the whole adjusting rod is flush with the folding rod and is detachably and fixedly connected with the folding rod; the adjusting rod is flush with one end of the folding rod, and the flush ends of the adjusting rod and the folding rod are each provided with a conical block. The anchor rod vertically penetrates through the adjusting rod and is fixed through the two first nuts, and the fixing position of the anchor rod in the length direction of the adjusting rod is adjustable. The adjusting rod, the folding rod, the anchor rod, the vertical rod, the positioning plate and the like are combined, the flatness of a backfill soil body can be seen when the pull rope moves, meanwhile, the protruding soil body can be pushed to a certain degree in the moving process of the pull rope, the soil body is subjected to slicking treatment, rapid installation or detachment can be achieved, a large space is not occupied, and cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of trench backfilling, in particular to a pipeline excavation trench layered backfilling quality control device. Background Art

[0002] Backfilling during pipeline laying refers to the process of filling the soil around the pipeline back to its original position to make the ground flat again after the pipeline is laid. The quality of backfilling directly affects the service life and drainage effect of the pipeline, so the backfilling requirements are very important.

[0003] Among them, the layered backfilling of pipeline trenches is a key quality control factor in trench backfilling construction, which mainly guarantees the quality of road backfilling and ensures that the compaction of the roadbed meets the design requirements. The current common backfilling control method is to use a layer control scale at two points in a certain section or post a layered backfill sticker on the structure to control the section in layers.

[0004] When performing backfill work for laying drainage pipes, ensure the quality and stability of the backfill layer. The quality of the backfill work determines whether the drainage pipe can operate and be used normally. Among them, the utility model patent with authorization announcement number CN217204137U discloses a trench layered backfill control tool, which ensures a highly consistent and flat backfill surface through wire rope cross-surface control. However, the above-mentioned device only accurately controls the vicinity of a specific cross position of the wire rope. In different pipeline trenches, the dimensions corresponding to the trench need to be re-planned, which not only increases the cost of use, but also reduces the efficiency to a certain extent. In order to facilitate the control of the consistency of the backfill surface height during the backfill process, this application document provides a pipeline excavation trench layered backfill quality control device. Utility Model Content

[0005] The utility model aims to provide a pipeline trench excavation layered backfill quality control device, which combines an adjustment rod, a folding rod, an anchor rod, a vertical rod and a positioning plate, and the flatness of the backfill soil can be seen when the pull rope moves, and can be quickly installed or disassembled.

[0006] In order to solve the above technical problems, the utility model is achieved through the following technical solutions:

[0007] The utility model discloses a quality control device for layered backfilling of trench excavation for pipelines, comprising an adjusting rod, a folding rod, an anchor rod, a vertical rod and a positioning plate; the unfolded length of the folding rod is greater than the length of the adjusting rod; a first scale line is engraved on the outer wall of the anchor rod; the adjusting rod is arranged flush with the folding rod as a whole and is detachably fixedly connected; the adjusting rod is flush with one end of the folding rod, and a conical block is respectively arranged at the flush end of the adjusting rod and the folding rod; the anchor rod vertically passes through the adjusting rod and is fixed by two first nuts, and the fixed position of the anchor rod in the length direction of the adjusting rod is adjustable; the vertical rod vertically passes through the folding rod and is fixed by two second nuts, and the fixed position of the vertical rod in the length direction of the folding rod is adjustable; the positioning plate is installed and fixed to the lower end of the vertical rod.

[0008] As a preferred technical solution of the utility model, the adjusting rod and the folding rod are respectively fixed with mutually matching guide slots and guide sliders on the opposite sides; the adjusting rod is fixed with one end aligned with the folding rod by a penetrating bolt and nut.

[0009] As a preferred technical solution of the present utility model, the adjusting rod is a rectangular frame structure.

[0010] As a preferred technical solution of the utility model, the folding rod includes a first U-shaped frame and a second U-shaped frame with openings arranged opposite to each other; the upper end surfaces of the first U-shaped frame and the second U-shaped frame at the butt ends are connected as a whole by at least two hinges.

[0011] As a preferred technical solution of the utility model, the upper surface of the adjusting rod is engraved with a second scale line; the upper surfaces of the first U-shaped frame and the second U-shaped frame are jointly engraved with a third scale line.

[0012] As a preferred technical solution of the utility model, a plurality of binding holes are provided on the positioning plate; and a plurality of draw ropes are bound between two adjacent positioning plates.

[0013] The utility model has the following beneficial effects:

[0014] 1. The utility model combines an adjusting rod, a folding rod, an anchor rod, a vertical rod and a positioning plate. After the backfilling of the soil is completed, the vertical rod can be moved to drive the pull rope to move. When the pull rope moves, the flatness of the backfilled soil can be seen. At the same time, during the movement of the pull rope, the protruding soil can be pushed to a certain extent, and the soil can be scraped and leveled. The accuracy of the overall backfill soil layer depth can be accurately controlled in a surface manner.

[0015] 2. The folding rod of the utility model is composed of two foldable parts, which is applicable to a wide range of backfill widths, and the adjustment rod and the folding rod are quick to assemble.

[0016] 3. The adjusting rod, folding rod, anchor rod, vertical rod and positioning plate of the utility model can be disassembled into independent parts, which can be quickly installed or disassembled. At the same time, they do not take up a lot of space during transportation, which saves costs to a certain extent.

[0017] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0019] Figure 1 The utility model is a structural schematic diagram of a pipeline trench excavation layered backfilling quality control device.

[0020] Figure 2 It is a schematic diagram of the structure of the folding rod of the utility model when it is folded.

[0021] Figure 3 for Figure 1 A partial enlarged view of point A in the middle.

[0022] Figure 4 It is a schematic diagram of the structure when the utility model is implemented.

[0023] Figure 5 This is a schematic diagram of the utility model when the backfilling state is implemented.

[0024] Figure 6 for Figure 4 A partial enlarged view of point B in the middle.

[0025] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0026] 1-adjusting rod, 2-folding rod, 3-anchor rod, 4-vertical rod, 5-positioning plate, 6-first nut, 7-second nut, 8-conical block, 9-guide slot, 10-guide slider, 11-bolt nut, 12-pull rope, 13-foundation pit, 14-pipeline, 21-first U-shaped frame, 22-second U-shaped frame, 23-hinge, 51-binding hole. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Specific embodiment one:

[0029] See also Figure 1-6 As shown, the utility model is a pipeline excavation trench layered backfill quality control device, comprising an adjusting rod 1, a folding rod 2, an anchor rod 3, a vertical rod 4, and a positioning plate 5. The unfolded length of the folding rod 2 is greater than the length of the adjusting rod 1. The outer wall of the anchor rod 3 is engraved with a first scale line. The adjusting rod 1 is arranged flush with the folding rod 2 as a whole and is detachably fixedly connected. The adjusting rod 1 is flush with one end of the folding rod 2, and a conical block 8 is respectively arranged at the flush ends of the adjusting rod 1 and the folding rod 2. The conical block 8 is inserted into the side wall of the foundation pit 13 when in use for positioning the ends of the adjusting rod 1 and the folding rod 2. The anchor rod 3 vertically passes through the adjusting rod 1 and is fixed by two first nuts 6, and the anchor rod 3 is adjustable in the fixed position in the length direction of the adjusting rod 1. The vertical rod 4 vertically passes through the folding rod 2 and is fixed by two second nuts 7, and the vertical rod 4 is adjustable in the fixed position in the length direction of the folding rod 2. The positioning plate 5 is installed and fixed at the lower end of the vertical rod 4. Both ends of the vertical rod 4 are provided with threaded sections, and the positioning plate 5 is provided with threaded holes adapted to the threaded sections. This arrangement allows the vertical rod 4 and the positioning plate 5 to be quickly assembled into a whole, thereby improving construction efficiency. The positioning plate 5 is a rectangular plate structure, and its lower end can be aligned with the first scale line of the anchor rod 3, so as to facilitate the measurement of the distance from the soil to the lower end of the positioning plate 5 and determine the height of the soil to be filled. The adjusting rod 1, folding rod 2, anchor rod 3, vertical rod 4 and positioning plate 5 of the utility model can be disassembled into independent components, which can be quickly packaged and installed, and do not take up a lot of space during transportation, thereby saving costs to a certain extent.

[0030] The detachable fixed connection between the adjusting rod 1 and the folding rod 2 is specifically that a guide slot 9 and a guide slider 10 that cooperate with each other are fixed on the opposite sides of the adjusting rod 1 and the folding rod 2. The adjusting rod 1 and the folding rod 2 are fixed at one end aligned by a bolt and nut 11 that penetrates.

[0031] The adjusting rod 1 is a rectangular frame structure. The folding rod 2 includes a first U-shaped frame 21 and a second U-shaped frame 22 with openings arranged opposite to each other. The upper end surfaces of the first U-shaped frame 21 and the second U-shaped frame 22 are connected as a whole by at least two hinges 23.

[0032] The second scale line is engraved on the upper surface of the adjusting rod 1. The third scale line is engraved on the upper surface of the first U-shaped frame 21 and the second U-shaped frame 22. The second scale line and the third scale line are provided to facilitate observation of the distance between the anchor rod 3 and the vertical rod 4 and the side wall of the foundation pit 13.

[0033] Among them, a plurality of binding holes 51 are provided on the positioning plate 5. A plurality of pull ropes 12 are tied between two adjacent positioning plates 5. When the pull rope 12 is straightened, its bottom is flush with the bottom surface of the positioning plate 5. After the landfill is completed, the pull rope 12 can be driven to move by moving the vertical rod 4. When the pull rope 12 moves, the flatness of the backfill soil can be seen. At the same time, during the movement of the pull rope 12, the protruding soil can be pushed to a certain extent, and the soil can be scraped flat. During the movement of the pull rope 12, a surface is formed on the backfill soil, which comprehensively determines the height of the backfill soil, improves the backfill accuracy, and is convenient and reliable to operate.

[0034] A specific application of this embodiment is: when the operator uses this device, the operator measures the size of the groove, splices the adjustment rod 1, first inserts the guide slider 10 on the side of the anchor rod 3 into the guide slot 9 on the side of the adjustment rod 1, and then uses the bolt nut 11 to lock and fix. Then insert the vertical rod 4 into the rectangular frame opened by the adjustment rod 1, use two first nuts 6 to lock, then screw the positioning plate 5 into the vertical rod 4, and insert the vertical rod 4 into the folding rod 2. Then the operator inserts the adjustment rod 1 and the folding rod 2 into the soil on the side of the foundation pit 11, and operates the anchor rod 3 to insert into the soil at the bottom of the foundation pit 11. According to the depth of the anchor rod 3 inserted into the soil plus the depth of the soil layer to be backfilled, find the marking line position corresponding to the first scale line of the anchor rod 3, adjust the bottom of the positioning plate 5 to be flush with this marking line, and use two second nuts 7 to pre-tighten and fix, and determine the height of the soil to be filled. The adjusting rod 1 can be adjusted according to different pipeline grooves, and the folding rod 2 can be stored or unfolded according to the width of the foundation pit 11. At the same time, the device is inserted at a certain distance, and the pull rope 12 is tied on the positioning plate 5 of the adjacent devices. After the soil is landfilled, the second nut 7 below is loosened and the vertical rod 4 is in a state where the height position of the movable positioning plate 5 remains unchanged. By moving the vertical rod 4, the pull rope 12 can be driven to move. When the pull rope 12 moves, the flatness of the backfill soil can be seen. At the same time, during the movement of the pull rope 12, the protruding soil can be pushed to a certain extent to level the soil.

[0035] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0036] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.

Claims

1. A pipeline trench excavation layered backfill quality control device, characterized by: It comprises an adjusting rod (1), a folding rod (2), an anchor rod (3), a vertical rod (4), and a positioning plate (5); the unfolded length of the folding rod (2) is greater than the length of the adjusting rod (1); and the outer wall of the anchor rod (3) is engraved with a first scale line; The adjusting rod (1) is arranged flush with the folding rod (2) as a whole and is detachably fixedly connected; the adjusting rod (1) is flush with one end of the folding rod (2), and a conical block (8) is respectively arranged at the flush ends of the adjusting rod (1) and the folding rod (2); The anchor rod (3) vertically passes through the adjusting rod (1) and is fixed by two first nuts (6), and the anchor rod (3) is adjustable in the fixed position in the length direction of the adjusting rod (1); The vertical rod (4) vertically passes through the folding rod (2) and is fixed by two second nuts (7), and the fixed position of the vertical rod (4) in the length direction of the folding rod (2) is adjustable; The positioning plate (5) is mounted and fixed on the lower end of the vertical rod (4).

2. The pipeline excavation trench layered backfilling quality control device according to claim 1 is characterized in that: The adjusting rod (1) and the folding rod (2) are respectively fixed with mutually matching guide slots (9) and guide slide blocks (10) on opposite sides thereof; the adjusting rod (1) and the folding rod (2) are fixed at one end thereof aligned with each other by means of a through-penetrating bolt and nut (11).

3. The pipeline excavation trench layered backfilling quality control device according to claim 2 is characterized in that: The adjusting rod (1) is a rectangular frame structure.

4. The pipeline excavation trench layered backfilling quality control device according to claim 3 is characterized in that: The folding rod (2) comprises a first U-shaped frame (21) and a second U-shaped frame (22) which are arranged with their openings facing each other; the upper end surfaces of the butt ends of the first U-shaped frame (21) and the second U-shaped frame (22) are connected as one body via at least two hinges (23).

5. The pipeline excavation trench layered backfilling quality control device according to claim 4 is characterized in that: The upper surface of the adjusting rod (1) is engraved with a second scale line; the upper surfaces of the first U-shaped frame (21) and the second U-shaped frame (22) are jointly engraved with a third scale line.

6. The pipeline excavation trench layered backfilling quality control device according to claim 5 is characterized in that: A plurality of tying holes (51) are provided on the positioning plate (5); and a plurality of drawstrings (12) are tied between two adjacent positioning plates (5).