Marker post for engineering surveying

By setting a cone head and a supporting device on the project measurement benchmark, the problem of tilting or crooking the benchmark when using the benchmark on the soft land is solved, and higher stability and use performance is achieved.

CN222419082UActive Publication Date: 2025-01-28青海省有色第四地质勘查院(青海省有色地球物理勘查院)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421035544.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-01-28
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

The existing engineering measurement benchmarks are prone to tilt or tilt when used on soft land, which affects the normal progress of measurement work.

Method used

Designed a benchmark for the first benchmark and the second benchmark. By setting a cone head and a supporting device on the first benchmark, you can rotate the screw ring of the outer thread side wall after inserting into the ground. The connection cylinder is on the ground, increasing the support area of ​​the benchmark, and improving stability.

Benefits of technology

By increasing the supporting area of ​​the benchmark, the stability of the soft land is improved, the normal progress of the measurement work is ensured, and the use of benchmarks is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222419082U_ABST
    Figure CN222419082U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of engineering surveying poles, in particular to an engineering surveying pole which comprises a first pole body and a second pole body, the first pole body and the second pole body are in threaded connection, a conical head is fixedly installed on the end side of the first pole body, and a supporting device is arranged on the side wall of the first pole body. The supporting device comprises an external thread formed in the side wall of the first marker post, the side wall of the external thread is in threaded connection with a threaded ring, the side wall of the threaded ring is evenly and fixedly connected with six limiting blocks, every two limiting blocks form a group, every two limiting blocks form a group, and the sides, close to each other, of every two limiting blocks are rotationally connected with a supporting strip. By arranging the supporting device, further stable supporting work of the first marker post on the soft engineering ground is facilitated, the stability of inserting the first marker post into the soft ground for use is improved, and the use performance of the engineering surveying marker post is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering surveying benchmarks, in particular to a benchmark for engineering surveying. Background Art

[0002] Engineering surveying benchmarks are usually reference objects used for measurement and calibration, usually with known dimensions and geometric shapes. In engineering measurement, benchmarks can be used to calibrate measuring instruments or as a benchmark for measurement. The design and manufacture of benchmarks require precise control of size and shape to ensure their accuracy and reliability.

[0003] The existing related technologies often have the following defects: in the actual use of engineering surveying poles, when measuring a construction site after rain, if the soil is relatively loose, the poles inserted into the soil are prone to tilt or even fall, thereby affecting the normal progress of subsequent measurement work.

[0004] Therefore, the utility model provides a benchmark for engineering measurement. Utility Model Content

[0005] The utility model aims to solve the shortcoming in the prior art that it is inconvenient to use the engineering surveying benchmark on some soft soils, and proposes a benchmark for engineering surveying.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a benchmark for engineering measurement, including a first benchmark and a second benchmark, the first benchmark and the second benchmark are threadedly connected, a cone head is fixedly installed on the end side of the first benchmark, and a side wall of the first benchmark is provided with a supporting device, the supporting device includes an external thread opened on the side wall of the first benchmark, the side wall of the external thread is threadedly connected with a screw ring, and the side wall of the screw ring is evenly and fixedly connected with six limit blocks in groups of two, the six limit blocks are in groups of two, and the side of two limit blocks close to each other is rotatably connected with a support bar.

[0007] The effect achieved by the above components is: after the cone head on the first pole is inserted into the ground, the screw ring on the external threaded side wall can be rotated to press the connecting tube on the support bar against the ground, which can increase the supporting area of ​​the first pole when it is erected on the ground, thereby improving the stability of the first pole in use.

[0008] Preferably, a side wall of the support bar is provided with a reserved hole, and elastic rings are passed through the inner sides of the reserved holes on the three support bars.

[0009] The effect achieved by the above components is that the support bar will be expanded due to the contraction force of the elastic ring.

[0010] Preferably, the other end of the support bar is fixedly connected to a connecting tube, and limiting ropes are passed through the inner sides of the three connecting tubes.

[0011] The effect achieved by the above components is that the three support bars are bound to the side wall of the first pole by contracting the limiting rope, so that the support bars can be retracted.

[0012] Preferably, both ends of the limiting rope are fixedly connected to a sphere.

[0013] The effect achieved by the above-mentioned components is that by providing the spherical body, it is possible to prevent the limiting rope from slipping off the inner side of the connecting tube during the process of contracting the limiting rope.

[0014] Preferably, the side wall of the first marker is provided with a limiting device, and the limiting device comprises a limiting bar fixedly connected to the side wall of the first marker, and the limiting bar is a "U"-shaped structure.

[0015] The effect achieved by the above components is: the excess limiting rope is wound around the inner side of the limiting strip, and the limiting strip with a "U"-shaped structure facilitates the limiting work of the limiting rope after contraction.

[0016] Preferably, the end side of the limit bar is rotatably connected to a rotation pin, the interior of the rotation pin is slidably connected to a slide rod, the other end of the slide rod is fixedly connected to a baffle, and the surface of the baffle is fixedly connected to three cone rods.

[0017] The effect achieved by the above components is that the conical rod is inserted into the interior of the wound rear limiting rope, so as to realize the fixing work of the wound rear limiting rope.

[0018] Preferably, a spring is sleeved on the surface of the slide rod, and two ends of the spring are fixedly connected to the rotating pin and the baffle respectively.

[0019] The effect achieved by the above components is that the baffle plate is driven by the spring tension to tightly insert the cone rod into the interior of the limiting rope, thereby improving the stability of fixing the limiting rope.

[0020] In summary:

[0021] 1. In the utility model, after the cone head on the first benchmark is inserted into the ground, the screw ring on the external thread side wall can be rotated to press the connecting tube on the support bar against the ground, which can increase the supporting area of ​​the first benchmark when it is erected on the ground, thereby improving the stability of the first benchmark in use. By providing a supporting device, it is convenient to further stably support the first benchmark on soft engineering ground, improve the stability of the first benchmark when inserted into soft ground, and further improve the performance of the engineering measurement benchmark.

[0022] 2. In the present invention, by providing a limiting device, the fixing work of the limiting rope after folding is facilitated, the unravelling of the supporting strip after folding is avoided, and the stability of the binding of the supporting strip after folding is further improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0024] Figure 2 It is a structural schematic diagram of the first benchmark in the utility model;

[0025] Figure 3 For the utility model Figure 2 Schematic diagram of the local structure;

[0026] Figure 4 For the utility model Figure 3 A magnified image of point A;

[0027] Figure 5 For the utility model Figure 3 Enlarged view of point B.

[0028] Legend: 1. First marking pole; 2. Second marking pole; 3. Cone head; 4. Support device; 41. Support bar; 42. Limit rope; 43. Sphere; 44. Screw ring; 45. External thread; 46. Connecting tube; 47. Elastic ring; 48. Limit block; 49. Reserved hole; 5. Limit device; 51. Limit bar; 52. Turn pin; 53. Sliding rod; 54. Baffle; 55. Cone rod; 56. Spring. DETAILED DESCRIPTION

[0029] Reference Figure 1 As shown, the utility model provides a technical solution: a benchmark for engineering measurement, including a first benchmark 1 and a second benchmark 2, the first benchmark 1 and the second benchmark 2 are threadedly connected, a cone head 3 is fixedly installed on the end side of the first benchmark 1, a supporting device 4 is provided on the side wall of the first benchmark 1, and a limiting device 5 is provided on the side wall of the first benchmark 1.

[0030] The specific arrangement and function of the supporting device 4 and the limiting device 5 will be described in detail below.

[0031] Reference Figure 1-Figure 4As shown, in this embodiment: the support device 4 includes an external thread 45 provided on the side wall of the first mark rod 1, the side wall of the external thread 45 is threadedly connected with a screw ring 44, and the side wall of the screw ring 44 is evenly fixedly connected with six limit blocks 48 in groups of two, and the six limit blocks 48 are in groups of two, and the side of two limit blocks 48 close to each other is rotatably connected with a support bar 41. After the cone head 3 on the first mark rod 1 is inserted into the ground, the screw ring 44 on the side wall of the external thread 45 can be rotated to make the connecting tube 46 on the support bar 41 against the ground, which can increase the support area of ​​the first mark rod 1 when it is erected on the ground, thereby improving the stability of the use of the first mark rod 1. The side wall of the support bar 41 is provided with a reserved hole 49, and the inner side of the reserved holes 49 on the three support bars 41 is penetrated with an elastic ring 47. The support bar 41 will be expanded by the contraction force of the elastic ring 47.

[0032] The other end of the support bar 41 is fixedly connected to a connecting tube 46, and a limiting rope 42 is passed through the inner side of the three connecting tubes 46. By contracting the limiting rope 42 to bind the three support bars 41 to the side wall of the first pole 1, the support bar 41 can be retracted. Both ends of the limiting rope 42 are fixedly connected to a ball 43. By providing the ball 43, the limiting rope 42 can be prevented from slipping off the inner side of the connecting tube 46 during the contraction of the limiting rope 42.

[0033] Reference Figure 1-Figure 3 and Figure 5 As shown, specifically, the limiting device 5 includes a limiting strip 51 fixedly connected to the side wall of the first marking pole 1, and the limiting strip 51 is a "U"-shaped structure. The excess limiting rope 42 is wound around the inner side of the limiting strip 51, and the limiting strip 51 with a "U"-shaped structure facilitates the limiting work of the limiting rope 42 after contraction.

[0034] The end side of the limit bar 51 is rotatably connected with a rotating pin 52, and the inside of the rotating pin 52 is slidably connected with a sliding rod 53, and the other end of the sliding rod 53 is fixedly connected with a baffle 54, and the surface of the baffle 54 is fixedly connected with three cone rods 55. The cone rod 55 is inserted into the inside of the winding rear limit rope 42 to achieve the fixing work of the winding rear limit rope 42. The surface of the sliding rod 53 is covered with a spring 56, and the two ends of the spring 56 are fixedly connected to the rotating pin 52 and the baffle 54 respectively. The baffle 54 will be driven by the tension of the spring 56 to drive the cone rod 55 to be tightly inserted into the inside of the limit rope 42, thereby improving the stability of fixing the limit rope 42.

[0035] Working principle: when the engineering surveying benchmark is used on a loose engineering ground, the three support bars 41 are unfolded, and the support bars 41 are unfolded by the contraction force of the elastic ring 47. At this time, after the cone head 3 on the first benchmark 1 is inserted into the ground, the screw ring 44 on the side wall of the external thread 45 can be rotated to make the connecting tube 46 on the support bar 41 press against the ground, which can increase the supporting area of ​​the first benchmark 1 when it is erected on the ground, thereby improving the stability of the use of the first benchmark 1. By setting the screw ring 44 and the first benchmark 1 as a threaded connection structure, the support height of the support bar 41 can be adjusted, which is convenient for inserting the cone head 3 into different depths according to the softness of the ground, and the support bar 41 presses against the ground for support. After using the structure, The three support bars 41 can be retracted by contracting the limit rope 42 to bind the side wall of the first benchmark 1, so that the support bar 41 can be folded up, and after the support bar 41 is folded up, the support bar 41 can cover the cone head 3, so as to avoid the cone head 3 directly stabbing the staff in the later process of carrying the first benchmark 1, thereby improving the safety performance of the use of the first benchmark 1. By setting the sphere 43, it can be avoided that the limit rope 42 slips off the inner side of the connecting tube 46 during the contraction of the limit rope 42. By setting the supporting device 4, it is convenient to further stabilize the support work of the first benchmark 1 on soft engineering ground, improve the stability of the first benchmark 1 inserted into the soft ground, and further improve the performance of the engineering measurement benchmark.

[0036] When it is necessary to retract the limit rope 42, first rotate the rotating pin 52 to rotate the cone rod 55 to a position staggered with the inner side of the limit strip 51. At this time, the excess limit rope 42 can be wrapped around the inner side of the limit strip 51. The limit strip 51 with a "U"-shaped structure facilitates the limiting work of the limit rope 42 after retraction. After the support strip 41 is tightened on the first benchmark 1, the slide bar 53 can be slid to lift the baffle 54. After the baffle 54 is lifted to a certain height, the rotating pin 52 is rotated to rotate the cone rod 55 to face the inner side of the limit strip 51. The baffle plate 54 is in the position, and the conical rod 55 is inserted into the interior of the wound rear limiting rope 42 at this time, so that the wound rear limiting rope 42 can be fixed. The baffle plate 54 will be driven by the pulling force of the spring 56 to drive the conical rod 55 to be tightly inserted into the interior of the limiting rope 42, thereby improving the stability of fixing the limiting rope 42. By setting the limiting device 5, the fixing of the rear limiting rope 42 is facilitated, and the rear support bar 41 is avoided from spreading out after being folded, thereby further improving the stability of the restraint of the rear support bar 41.

[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

Claims

1. A benchmark for engineering surveying, comprising a first benchmark (1) and a second benchmark (2), characterized in that: The first mark rod (1) and the second mark rod (2) are threadedly connected, a cone head (3) is fixedly installed on the end side of the first mark rod (1), and a supporting device (4) is provided on the side wall of the first mark rod (1), wherein the supporting device (4) comprises an external thread (45) provided on the side wall of the first mark rod (1), a screw ring (44) is threadedly connected to the side wall of the external thread (45), and six limit blocks (48) are evenly fixedly connected to the side wall of the screw ring (44) in groups of two, the six limit blocks (48) are in groups of two, and a support bar (41) is rotatably connected to the side where two limit blocks (48) are close to each other.

2. The engineering surveying pole according to claim 1, characterized in that: A reserved hole (49) is provided on the side wall of the support bar (41), and elastic rings (47) are passed through the inner sides of the reserved holes (49) on the three support bars (41).

3. The engineering surveying pole according to claim 1, characterized in that: The other end of the support bar (41) is fixedly connected to a connecting tube (46), and limiting ropes (42) are passed through the inner sides of the three connecting tubes (46).

4. The engineering surveying pole according to claim 3, characterized in that: Both ends of the limiting rope (42) are fixedly connected to a sphere (43).

5. The engineering surveying pole according to claim 1, characterized in that: The side wall of the first marking pole (1) is provided with a limiting device (5), and the limiting device (5) comprises a limiting strip (51) fixedly connected to the side wall of the first marking pole (1), and the limiting strip (51) is a "U"-shaped structure.

6. The engineering surveying pole according to claim 5, characterized in that: The end side of the limit bar (51) is rotatably connected to a rotating pin (52), the interior of the rotating pin (52) is slidably connected to a sliding rod (53), the other end of the sliding rod (53) is fixedly connected to a baffle (54), and the surface of the baffle (54) is fixedly connected to three cone rods (55).

7. The engineering surveying pole according to claim 6, characterized in that: A spring (56) is sleeved on the surface of the slide rod (53), and two ends of the spring (56) are fixedly connected to the rotating pin (52) and the baffle (54) respectively.