Fabricated temperature-adjustable green building sound insulation wall

By designing prefabricated temperature-adjusting green building sound insulation walls, using hot and cold water systems to adjust the wall temperature, the problem of insufficient sound insulation effect and temperature control capabilities of existing walls is solved, and more efficient sound insulation and comfortable temperature control is achieved .

CN222435619UActive Publication Date: 2025-02-07HUZHOU VOCATIONAL TECH COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421206776.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-02-07
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

The existing walls are usually integrated, resulting in poor sound insulation and limited temperature control capabilities, which cannot meet the comfort requirements in the concept of green buildings and sustainable development.

Method used

A prefabricated temperature-controlled green building sound insulation wall was designed. Through the combination of hot water tank, cold water tank, mixing box and water pipe, the water temperature was adjusted using heaters, hot water pumps, cold water pumps and mixing pumps and other equipment. and convey, thereby regulating the wall temperature.

Benefits of technology

The wall temperature is adjusted, the sound insulation effect and living comfort are improved. At the same time, due to the prefabricated design, the stability and assemblyability of the equipment are guaranteed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222435619U_ABST
    Figure CN222435619U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building heat preservation, in particular to an assembly type temperature-adjustable green building sound insulation wall which comprises the ground, a hot water tank is fixed to the right side of a power supply, a cold water tank is fixed to the rear side of the hot water tank, a mixing tank is fixed to the right side of the cold water tank, and a plurality of outer walls are fixed to the rear side of the mixing tank. An inner wall is arranged on the rear side of each outer wall, each outer wall and the corresponding inner wall are fixedly connected through a fixing rod, a water conveying pipe is arranged between each outer wall and the corresponding inner wall, each water conveying pipe is fixedly connected with the corresponding fixing rod through a plurality of positioning rings, and water conveying valves are fixed to the left end and the right end of each water conveying pipe. Hot water and cold water are conveyed into the mixing box in proportion, so that the temperature of water conveyed into the water conveying pipe can be changed, the purpose of changing the temperature of an inner wall is achieved, the purpose of regulating and controlling the temperature is achieved, and it is guaranteed that the temperature in a room can be regulated and controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building thermal insulation, in particular to an assembled temperature-adjustable green building sound insulation wall. Background Art

[0002] Green buildings and sustainable development concepts have received more and more attention in the construction industry. As an environmentally friendly, efficient and energy-saving construction method, prefabricated buildings are increasingly being studied and applied. In prefabricated buildings, as an important part of the building, the sound insulation performance and temperature control capabilities of the wall are of great significance to improving the quality of the building and the comfort of living.

[0003] However, the existing walls are usually integrated, resulting in poor sound insulation and limited temperature control capabilities. Therefore, the utility model designs an assembled temperature-controllable green building sound insulation wall to solve the above problems. Utility Model Content

[0004] In view of the above situation, in order to overcome the defects of the prior art, the utility model provides an assembled temperature-adjustable green building sound insulation wall, which effectively solves the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an assembled temperature-adjustable green building soundproof wall, comprising a ground, a controller fixed on the top of the ground, a power supply fixed to the right side of the controller, a hot water tank fixed to the right side of the power supply, a cold water tank fixed to the rear side of the hot water tank, a mixing box fixed to the right side of the cold water tank, a plurality of outer walls fixed to the rear side of the mixing box, an inner wall arranged at the rear side of each outer wall, each group of the outer walls and the inner walls fixedly connected by a fixing rod, a water pipe arranged between each group of the outer walls and the inner walls, each of the water pipes fixedly connected to the fixing rod by a plurality of positioning rings, and a water valve fixed to the left and right ends of each water pipe.

[0006] Preferably, a plurality of connecting main rings are fixed at the left end of each group of the exterior walls and the interior walls, a plurality of connecting sub-rings are fixed at the right end of each group of the exterior walls and the interior walls, a plurality of connecting rods are arranged between the connecting main rings at the right end and the connecting sub-rings at the left end, the connecting rods are fixed to the connecting main rings and the connecting sub-rings by iron wire, and mortar is poured between the two groups of the exterior walls and the interior walls.

[0007] Preferably, every two of the water pipes are fixedly connected via the first water valve, the right end of the right water pipe is connected to a mixing tube via the second water valve, a mixing valve is fixed to the front end of the mixing tube, a mixing pump is connected to the left side of the mixing valve via a pipeline, the left side of the mixing pump is fixedly connected to the mixing box via a pipeline, and a thermometer is provided inside the mixing box.

[0008] Preferably, a hot water pipe is fixed at the front end of the mixing tank, a hot water flow valve is provided on the left side of the hot water pipe, a hot water pump is connected to the left side of the hot water flow valve through a pipeline, the left side of the hot water pump is fixedly connected to the hot water tank through a pipeline, a hot water tank cover is provided on the top of the hot water tank, a heater is fixed on the left side of the hot water tank, a heating pipe is fixed inside the hot water tank, and the heater is electrically connected to the heating pipe.

[0009] Preferably, the left side of the mixing box is connected to a cold water flow valve via a pipeline, the left side of the cold water flow valve is connected to a cold water pump via a pipeline, the left side of the cold water pump is fixedly connected to the cold water tank via a pipeline, a cold water recovery pipe is provided on the left side of the cold water tank, and the left side of the cold water recovery pipe is fixedly connected to the third water supply valve on the left side of the water supply pipe at the left end.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] The utility model can heat the water in the hot water tank by the heating pipe through the heater, and can transport the hot water in the hot water tank to the mixing tank through the hot water pump and the hot water flow valve, and can transport the cold water in the cold water tank to the mixing tank through the cold water pump and the cold water flow valve. At the same time, the temperature of the mixed water in the mixing tank can be monitored from the thermometer by adjusting the ratio, so that the temperature of the water transported to the water pipe can be changed, so as to achieve the purpose of changing the temperature of the inner wall, and then realize the purpose of regulating the temperature, so as to ensure that the temperature in the room can be controlled.

[0012] The utility model can fix two groups of outer walls and inner walls through two groups of connecting main rings, connecting secondary rings and connecting rods, thereby ensuring the stability of the equipment and achieving the purpose of assembly. At the same time, since there is a gap between each group of outer walls and inner walls, the diffusion of noise can be reduced, thereby ensuring the quietness of the room.

[0013] The utility model can fix the water pipe and the fixing rod through multiple positioning rings, thereby preventing the water pipe from falling, thereby ensuring the safety of the water pipe. At the same time, multiple groups of water pipes can be connected through multiple water valves, thereby ensuring that the temperature of the entire wall is controllable, thereby ensuring the thermal insulation effect of the wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention.

[0015] In the attached picture:

[0016] Figure 1 It is an overall schematic diagram of the utility model;

[0017] Figure 2It is a top view schematic diagram of the utility model;

[0018] Figure 3 This is a schematic diagram of the mixed water delivery mechanism of the utility model;

[0019] Figure 4 This is a schematic diagram of the interior of the hot water tank of the utility model;

[0020] Figure 5 This is a schematic diagram of the assembly wall of the utility model;

[0021] Figure 6 This is a schematic diagram of the interior of the assembly wall of the utility model;

[0022] Figure 7 A schematic diagram of the interior side view of the assembly wall of the utility model.

[0023] In the figure: 1-ground; 2-hot water tank; 3-mixing tank; 4-cold water tank; 5-exterior wall; 6-fixing rod; 7-water pipe; 101-controller; 102-power supply; 201-hot water pump; 202-hot water flow valve; 203-hot water pipe; 204-hot water tank cover; 205-heater; 206-heating pipe; 301-mixing pump; 302-mixing valve; 303-mixing pipe; 304-thermometer; 401-cold water pump; 402-cold water flow valve; 403-cold water recovery pipe; 501-connecting main ring; 502-connecting secondary ring; 503-connecting rod; 504-interior wall; 701-water valve; 702-positioning ring. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0025] Embodiment 1, by Figure 1-2 , Figure 6The utility model includes a floor 1, a controller 101 is fixed on the top of the floor 1, the controller 101 is used to control the entire device, a power supply 102 is fixed on the right side of the controller 101, the power supply 102 provides energy for the entire device, a hot water tank 2 is fixed on the right side of the power supply 102, the hot water tank 2 is made of alloy material, the outside of the hot water tank 2 is heat-insulated, the hot water tank 2 provides the required hot water for the mixing tank 3, and a cold water tank 4 is fixed on the rear side of the hot water tank 2. The water tank 4 is made of alloy material. The cold water tank 4 has a strong heat dissipation capacity. The cold water tank 4 provides cold water for the mixing box 3. A mixing box 3 is fixed on the right side of the cold water tank 4. The mixing box 3 provides water of the required temperature for the water pipe 7. The mixing box 3 is heat-insulated. A plurality of outer walls 5 are fixed on the rear side of the mixing box 3. The outer walls 5 are made of concrete. The outer walls 5 can increase the heat preservation effect of the water pipe 7. An inner wall 504 is arranged on the rear side of each outer wall 5. The inner wall 504 is made of concrete. The inner wall 504 and the outer wall 5 cooperate to reduce noise. Each group of the outer wall 5 and the inner wall 504 are fixedly connected by a fixing rod 6. The fixing rod 6 is welded by multiple steel materials. The fixing rod 6 is used to connect the outer wall 5 and the inner wall 504, thereby ensuring the safety of the entire device. A water pipe 7 is arranged between each group of the outer wall 5 and the inner wall 504. The water pipe 7 is made of steel material. The water pipe 7 is used to transport heat to the outer wall 5 and the inner wall 504. The amount is achieved to change the temperature of the outer wall 5 and the inner wall 504. Each of the water pipes 7 is fixedly connected to the fixing rod 6 via a plurality of positioning rings 702. The positioning rings 702 are used to fix the water pipes 7 to prevent the water pipes 7 from falling from the cavity between the outer wall 5 and the inner wall 504. Water valves 701 are fixed at the left and right ends of each of the water pipes 7. The water valves 701 are used to control the water to enter the water pipes 7 or to control the water to flow out of the water pipes 7.

[0026] Embodiment 2, based on embodiment 1, Figure 5It is given that a plurality of connecting main rings 501 are fixed at the left end of each group of the outer wall 5 and the inner wall 504, and the connecting main rings 501 are made of hard steel. The two ends of the connecting main rings 501 are cast inside the outer wall 5 and the inner wall 504. A plurality of connecting secondary rings 502 are fixed at the right end of each group of the outer wall 5 and the inner wall 504, and the connecting secondary rings 502 are made of hard steel. The two ends of the connecting secondary rings 502 are cast inside the outer wall 5 and the inner wall 504. The horizontal height of each connecting secondary ring 502 is higher than the connecting secondary ring on its left side. The main ring 501, a plurality of connecting rods 503 are arranged between the right end connecting main ring 501 and the left end connecting secondary ring 502, the connecting rods 503 are made of hard steel, the connecting rods 503 are fixed to the connecting main ring 501 and the connecting secondary ring 502 by iron wires, the connecting main ring 501, the connecting secondary ring 502 and the connecting rods 503 cooperate, and then grouting is performed, so that the two groups of the external walls 5 and the internal walls 504 can be connected, so as to achieve assembly, and mortar is poured between the two groups of the external walls 5 and the internal walls 504;

[0027] Before pouring the entire mechanism, the staff fixedly connected the water pipe 7 and the fixing rod 6 through a plurality of positioning rings 702, and then began pouring work, thereby fixing the fixing rod 6 to the outer wall 5 and the inner wall 504, and then poured a plurality of the connecting sub-rings 502 and the connecting main ring 501 on both sides of the outer wall 5 and the inner wall 504, thereby keeping the entire device stable, and then the staff fixed the poured outer wall 5 to the desired position through concrete, and then fixed the second poured outer wall 5 to the left side of the first outer wall 5 through concrete, and then the two water pipes 7 were connected through the first water valve 701, and then the staff opened the first water pipe 7, thereby connecting the two water pipes 7, and so on, the staff completed the installation of the wall.

[0028] Embodiment 3, based on embodiment 1, Figure 3-4 , Figure 7It is shown that every two of the water pipes 7 are fixedly connected through the first water valve 701, and the first water valve 701 is used to connect the two water pipes 7. The right end of the water pipe 7 is connected to a mixing pipe 303 through the second water valve 701. The mixing pipe 303 is made of a rigid material, and the mixing pipe 303 is heat-insulated. The mixing pipe 303 can transport the required mixed water to the water pipe 7. A mixing valve 302 is fixed at the front end of the mixing pipe 303. The mixing valve 302 is used to control the circulation of water inside the mixing pipe 303. The left side of the mixing valve 302 is connected to a mixing pump 301 through a pipeline. The mixing pump 301 can mix the water inside the mixing box 3. The water is extracted, the left side of the mixing pump 301 is fixedly connected to the mixing box 3 through a pipeline, the mixing box 3 is provided with a thermometer 304 inside, the thermometer 304 can monitor the temperature inside the mixing box 3, the front end of the mixing box 3 is fixed with a hot water pipe 203, the hot water pipe 203 is made of steel material, the outside of the hot water pipe 203 is insulated, the hot water pipe 203 transports hot water to the mixing box 3, the left side of the hot water pipe 203 is provided with a hot water flow valve 202, the hot water flow valve 202 can control the hot water to enter the mixing box 3, the left side of the hot water flow valve 202 is connected to a hot water pump 201 through a pipeline, the hot water pump 201 can pump the hot water inside the hot water tank 2 The hot water pump 201 is fixedly connected to the hot water tank 2 through a pipeline on the left side. A hot water tank cover 204 is provided on the top of the hot water tank 2. The hot water tank cover 204 can facilitate water filling by the staff. A heater 205 is fixed on the left side of the hot water tank 2. The heater 205 is used to control the heating of the heating pipe 206. A heating pipe 206 is fixed inside the hot water tank 2. The heating pipe 206 can boil the water inside the hot water tank 2. The heater 205 is electrically connected to the heating pipe 206. A cold water flow valve 402 is connected to the left side of the mixing tank 3 through a pipeline. The cold water flow valve 402 can control the cold water inside the cold water tank 4 to enter the mixing tank 3. The left side of the water flow valve 402 is connected to a cold water pump 401 through a pipeline, and the cold water pump 401 can pump out the cold water inside the cold water tank 4. The left side of the cold water pump 401 is fixedly connected to the cold water tank 4 through a pipeline. A cold water recovery pipe 403 is provided on the left side of the cold water tank 4. The cold water recovery pipe 403 has a strong heat dissipation ability. The cold water recovery pipe 403 is used to connect the third water delivery valve 701 and the cold water tank 4, so that the water inside the water delivery pipe 7 can be transported to the inside of the cold water tank 4, thereby completing the cycle, thereby achieving repeated utilization, and thus saving water resources. The left side of the cold water recovery pipe 403 is fixedly connected to the third water delivery valve 701 on the left side of the water delivery pipe 7 at the left end;

[0029] When the entire wall is installed, the staff connects the second water delivery valve 701 and the mixing pipe 303, and connects the third water delivery valve 701 and the cold water recovery pipe 403, and further opens all the water delivery valves 701. The staff further adds cold water to the hot water tank 2 and the cold water tank 4. At this time, the controller 101 controls the heater 205 to start working, so that the heating pipe 206 heats up, thereby boiling the water in the hot water tank 2. When the staff needs to change the temperature of the inner wall 504, the controller 101 controls the cold water pump 401 and the cold water flow valve 402 to start working, so that the cold water in the cold water tank 4 is transported to the mixing tank 3. At the same time, the hot water pump 201 and the hot water flow valve 202 are controlled to start working, so that the hot water in the hot water tank 2 is transported to the mixing tank 3 through the hot water pipe 203. At this time, the staff can The meter 304 monitors the water temperature inside the mixing box 3. When the temperature does not reach the required temperature, the controller 101 changes the amount of hot water and cold water entering the mixing box 3 by controlling the hot water flow valve 202 and the cold water flow valve 402. When the water temperature inside the mixing box 3 reaches the required requirement, the controller 101 controls the hot water flow valve 202 and the cold water pump 401 to fix the flow of hot water and cold water. Further, the controller 101 controls the mixing pump 301 and the mixing valve 302 to start working, so that the mixed water inside the mixing box 3 enters the water pipe 7, and then the mixed water is transported to the cold water tank 4 through the cold water recovery pipe 403, so that the mixed water is cooled. At the same time, since the water inside the cold water tank 4 is always circulating, the cold water inside the cold water tank 4 can be guaranteed to freeze. At this time, due to the effect of the water inside the water pipe 7, the temperature of the inner wall 504 can be changed, thereby changing the indoor temperature.

[0030] The working process of the utility model is as follows: before pouring the entire mechanism, the staff uses a plurality of positioning rings 702 to fix the water pipe 7 and the fixing rod 6, and then the staff starts pouring work, so that the fixing rod 6 is fixedly connected to the outer wall 5 and the inner wall 504, and then a plurality of the connecting secondary rings 502 and the connecting main ring 501 are poured on both sides of the outer wall 5 and the inner wall 504, so that the entire device remains stable, and then the staff fixes the poured outer wall 5 to the desired position through concrete, and then the staff fixes the second poured outer wall 5 to the left side of the first outer wall 5 through concrete, and at this time, the first water valve 7 is used to fix the outer wall 5 to the left side of the first outer wall 5. 01 connects the two water pipes 7. At this time, the staff opens the first water pipe 7, thereby connecting the two water pipes 7. By analogy, the staff completes the installation of the wall. When the entire wall is installed, the staff connects the second water valve 701 to the mixing pipe 303, and at the same time connects the third water valve 701 to the cold water recovery pipe 403. All the water valves 701 are further opened. The staff further adds cold water to the hot water tank 2 and the cold water tank 4. At this time, the controller 101 controls the heater 205 to start working, thereby causing the heating pipe 206 to heat up, thereby boiling the water in the hot water tank 2. When the staff needs to change When the temperature of the inner wall 504 changes, the controller 101 controls the cold water pump 401 and the cold water flow valve 402 to start working, so that the cold water in the cold water tank 4 is transported to the inside of the mixing tank 3, and at the same time controls the hot water pump 201 and the hot water flow valve 202 to start working, so that the hot water in the hot water tank 2 is transported to the inside of the mixing tank 3 through the hot water pipe 203. At this time, the staff can monitor the water temperature in the mixing tank 3 through the thermometer 304. When the temperature does not reach the required temperature, the controller 101 changes the amount of hot water and cold water entering the mixing tank 3 by controlling the hot water flow valve 202 and the cold water flow valve 402. When the mixing tank 3 When the water temperature inside the mixing box 3 reaches the required requirement, the controller 101 controls the hot water flow valve 202 and the cold water pump 401 to make the flow of hot water and cold water fixed. Further, the controller 101 controls the mixing pump 301 and the mixing valve 302 to start working, so that the mixed water inside the mixing box 3 enters the water pipe 7, and then the mixed water is transported to the cold water tank 4 through the cold water recovery pipe 403, so that the mixed water is cooled. At the same time, since the water inside the cold water tank 4 is always circulating, the cold water inside the cold water tank 4 can be guaranteed to freeze. At this time, the temperature of the inner wall 504 can be changed due to the action of the water inside the water pipe 7, thereby changing the indoor temperature.

[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An assembled temperature-adjustable green building soundproof wall, characterized by: The invention comprises a floor (1), a controller (101) being fixed on the top of the floor (1), a power supply (102) being fixed on the right side of the controller (101), a hot water tank (2) being fixed on the right side of the power supply (102), a cold water tank (4) being fixed on the rear side of the hot water tank (2), a mixing tank (3) being fixed on the right side of the cold water tank (4), a plurality of outer walls (5) being fixed on the rear side of the mixing tank (3), an inner wall (504) being provided on the rear side of each outer wall (5), each group of the outer walls (5) and the inner wall (504) being fixedly connected via a fixing rod (6), a water pipe (7) being provided between each group of the outer walls (5) and the inner wall (504), each water pipe (7) being fixedly connected to the fixing rod (6) via a plurality of positioning rings (702), and a water valve (701) being fixed on the left and right ends of each water pipe (7).

2. The assembled temperature-adjustable green building soundproof wall according to claim 1 is characterized by: A plurality of connecting main rings (501) are fixed at the left end of each group of the outer wall (5) and the inner wall (504), and a plurality of connecting sub-rings (502) are fixed at the right end of each group of the outer wall (5) and the inner wall (504). A plurality of connecting rods (503) are arranged between the connecting main rings (501) at the right end and the connecting sub-rings (502) at the left end. The connecting rods (503) are fixed to the connecting main rings (501) and the connecting sub-rings (502) by iron wires. Mortar is poured between the two groups of the outer wall (5) and the inner wall (504).

3. The assembled temperature-adjustable green building soundproof wall according to claim 1 is characterized by: Every two of the water delivery pipes (7) are fixedly connected via the first water delivery valve (701); the right end of the right water delivery pipe (7) is connected to a mixing pipe (303) via the second water delivery valve (701); a mixing valve (302) is fixedly provided at the front end of the mixing pipe (303); the left side of the mixing valve (302) is connected to a mixing pump (301) via a pipeline; the left side of the mixing pump (301) is fixedly connected to the mixing box (3) via a pipeline; and a thermometer (304) is provided inside the mixing box (3).

4. The assembled temperature-adjustable green building soundproof wall according to claim 3 is characterized by: A hot water pipe (203) is fixed at the front end of the mixing tank (3); a hot water flow valve (202) is provided on the left side of the hot water pipe (203); a hot water pump (201) is connected to the left side of the hot water flow valve (202) via a pipeline; the left side of the hot water pump (201) is fixedly connected to the hot water tank (2) via a pipeline; a hot water tank cover (204) is provided on the top of the hot water tank (2); a heater (205) is fixed on the left side of the hot water tank (2); a heating pipe (206) is fixed inside the hot water tank (2); and the heater (205) and the heating pipe (206) are electrically connected.

5. The assembled temperature-adjustable green building soundproof wall according to claim 4 is characterized by: The left side of the mixing box (3) is connected to a cold water flow valve (402) via a pipeline, the left side of the cold water flow valve (402) is connected to a cold water pump (401) via a pipeline, the left side of the cold water pump (401) is fixedly connected to the cold water box (4) via a pipeline, the left side of the cold water box (4) is provided with a cold water recovery pipe (403), and the left side of the cold water recovery pipe (403) is fixedly connected to the third water delivery valve (701) on the left side of the water delivery pipe (7) at the left end.