Intelligent socket with power consumption detection, timing and reservation functions
By integrating control modules, switches and timers in the socket, the PLC controller is used to detect the load side energy consumption in real time and automatically power outage, the problem of traditional sockets lacking automatic power outage and energy consumption viewing functions is solved, and safety is improved.
Patent Information
- Application Number
- CN202420468190.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-03-11
AI Technical Summary
Traditional sockets lack automatic power outage function, which causes manual power outage of the load end when working or charging, and it is impossible to intuitively view the power usage, which poses safety hazards such as short circuits in heating and fire.
A smart socket is designed, including a control module, switch and timer, which detects the energy consumption at the load side in real time through the PLC controller, and automatically power off according to the timer settings, and provides reservation function to realize human-computer interaction.
Real-time energy consumption detection and automatic power outage at the load end of the electrical appliance are realized, effectively preventing safety hazards such as short circuits and line fire caused by continuous work.
Smart Images

Figure CN222463693U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of sockets, and in particular relates to an intelligent socket with power consumption detection, timing and reservation functions. Background Art
[0002] Currently on the market, a corresponding separate switch button is usually set for a two-pin socket or a three-pin socket on a socket, and the power-on state of the corresponding socket is controlled by the switch button to avoid repeated plugging and unplugging of the plug.
[0003] However, when the load end of the socket is working and charging, since the load electrical appliances do not have an automatic power-off function, it is often necessary to manually cut off the power of the electrical appliances according to the working time of the load end. When users use traditional sockets, the power usage and energy consumption of the load end cannot be viewed intuitively. When the load end is a product such as a rechargeable battery, it is very easy to cause a short circuit due to heat after charging overload and long-term overload operation, causing safety hazards such as fire.
[0004] Therefore, in view of the above problems, it is urgent to design a smart socket that can not only detect the energy consumption of the electrical load end by itself, but also has a timing function to realize automatic power off of the electrical load end. Utility Model Content
[0005] The purpose of the utility model is to provide a smart socket with power consumption detection, timing and reservation functions to solve the problems raised in the above background technology. The following technical solution is provided: A smart socket with power consumption detection, timing and reservation functions, comprising:
[0006] The shell has a wire connected to one side thereof, and the shell is divided into a control part and a load part; the load part is provided with a socket for connecting the load, and the control part is provided with a control module, a switch and a timer, and the wire, the switch and the socket are connected in parallel; the control module is used to detect and display the power consumption of the load at the socket and to control the on and off of the switch, and the control module can be customized for appointment, one end of the timer is connected to the control module, and the timer is used to stimulate the control module to disconnect the switch.
[0007] In this technical solution, when using this product, first connect the wire to the 220V AC power supply, then manually press the switch to connect the wire to the socket, and then connect the load end of the electrical appliance to the socket;
[0008] When the electrical appliance starts to work, the control module detects and displays the energy consumption of the load end of the electrical appliance in real time;
[0009] When the load end of an electrical appliance needs to be disconnected at a time, the user can manually adjust the timer to perform timing operations. When the timer ends, the timer generates an electrical signal and stimulates the control module. The control module controls the switch to disconnect and realize the power-off operation of the electrical appliance. The operator can customize the control module to make an appointment for it, thereby realizing human-computer interaction between the socket body and the operator.
[0010] In any of the above technical solutions, further, the control module includes:
[0011] PLC controller, one end of the PLC controller is connected to the display screen, and one side of the PLC controller is also connected to a buzzer, and the PLC controller performs energy consumption detection on the current passed through the socket;
[0012] The control module also includes a DC power supply, one end of which is connected to the PLC controller, and the DC power supply is used to supply power to the PLC controller, the display screen and the buzzer.
[0013] In this technical solution, the PLC controller adopts a single-chip microcomputer model STC8G3K, and the DC power supply supplies 6V DC power to the PLC controller, buzzer and display screen. The PLC controller controls the display screen to display the real-time power consumption of the load end through coding.
[0014] In any of the above technical solutions, further, the timer is connected to the PLC controller via a TTL interface, and one end of the TTL interface is electrically connected to a display screen, and the display screen is used to display the timing time of the timer and the energy consumption of the socket-connected load detected by the PLC controller;
[0015] When the timer ends, the electrical signal stimulates the PLC controller and starts the buzzer through the PLC controller;
[0016] The PLC controller receives the electrical signal excitation from the timer and controls the switch to be disconnected at the same time.
[0017] In the present technical solution, when the countdown of the timer ends, the electrical signal generated by the timer is transmitted to the PLC controller and the PLC controller controls the buzzer to produce a buzzer to remind the user that the timing is over. Different types of prompt sounds are compiled in the PLC controller at the factory, and the response type of the buzzer is set by the PLC controller.
[0018] And when the volume of the product needs to be reduced according to production needs, the timer and PLC controller can be integrated into one.
[0019] The beneficial effects of the utility model are: through the setting of the control module, real-time detection of the electric energy consumption at the load end of the electrical appliance is realized, and by setting the timer, the power supply of the load end electrical appliance can be autonomously controlled to be cut off, which can effectively prevent safety hazards such as short circuit and line fire caused by continuous operation of the electrical appliance. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the appearance of the utility model;
[0021] Figure 2 It is a planar structural diagram of the utility model;
[0022] Figure 3 It is an operation logic diagram of the utility model.
[0023] The reference numerals in the figure are: 10, housing; 11, control unit; 12, load unit; 20, socket; 30, wire; 40, control module; 41, DC power supply; 42, PLC controller; 43, display screen; 44, buzzer; 50, switch; 60, timer; 61, TTL interface. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0025] In the description of the present application, it should be noted that the terms used herein are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present application. For ease of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship. The technology, methods and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be regarded as part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, rather than as a limitation. Therefore, other examples of the exemplary embodiments may have different values. It should be noted that similar numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further discussed in subsequent drawings.
[0026] Embodiment 1:
[0027] like Figure 1 As shown, this embodiment provides a smart socket with power consumption detection, timing and reservation functions, including:
[0028] The shell 10 has a conductor 30 connected to one side of the shell 10. The shell 10 is divided into a control part 11 and a load part 12. The load part 12 is provided with a socket 20 for connecting the load. The control part 11 is provided with a control module 40, a switch 50 and a timer 60. The conductor 30, the switch 50 and the socket 20 are connected in parallel. The control module 40 is used to detect and display the power consumption of the load at the socket 20 and to control the on and off of the switch 50. One end of the timer 60 is connected to the control module 40, and the control module 40 can be customized. The timer 60 is used to stimulate the control module 40 to disconnect the switch 50.
[0029] In this technical solution, when using this product, first connect the wire 30 to the 220V AC power supply, then manually press the switch 50 to connect the wire 30 to the socket 20, and then connect the load end of the electrical appliance to the socket 20;
[0030] When the electrical appliance starts to work, the control module 40 detects and displays the energy consumption of the load end of the electrical appliance in real time;
[0031] When the load end of an electrical appliance needs to be disconnected at a time, the user can manually adjust the timer 60 to perform a timing operation on the timer 60. When the timer 60 ends, the timer 60 generates an electrical signal and stimulates the control module 40. The control module 40 controls the switch 50 to disconnect to realize the power-off operation of the electrical appliance. The operator can customize the control module 40 to make an appointment to realize the human-computer interaction between the socket body and the operator.
[0032] Embodiment 2:
[0033] like Figure 2 As shown, specifically, the control module 40 includes:
[0034] A PLC controller 42, one end of which is connected to a display screen 43, and one side of the PLC controller 42 is also connected to a buzzer 44, and the PLC controller 42 performs energy consumption detection on the current passed through the socket 20;
[0035] The control module 40 further includes a DC power supply 41 , one end of which is connected to a PLC controller 42 , and the DC power supply 41 is used to supply power to the PLC controller 42 , a display screen 43 , and a buzzer 44 .
[0036] In this technical solution, the PLC controller 42 uses a single chip microcomputer of model STC8G3K64, and the DC power supply 41 supplies 6V DC power to the PLC controller 42, buzzer 44 and display screen 43. The PLC controller 42 controls the display screen 43 through coding to display the real-time power consumption of the load end.
[0037] Embodiment 3:
[0038] like Figure 2As shown, specifically, the timer 60 is connected to the PLC controller 42 via the TTL interface 61, and one end of the TTL interface 61 is electrically connected to the display screen 43, and the display screen 43 is used to display the timing time of the timer 60 and the energy consumption of the load connected to the socket 20 detected by the PLC controller 42;
[0039] When the timer 60 ends, the electrical signal stimulates the PLC controller 42 and the buzzer 44 is activated through the PLC controller 42;
[0040] The PLC controller 42 receives the electrical signal from the timer 60 and controls the switch 50 to be turned off.
[0041] In the present technical solution, when the countdown of the timer 60 ends, the electrical signal generated by the timer 60 is transmitted to the PLC controller 42 and the PLC controller 42 controls the buzzer 44 to generate a buzzer to remind the user that the timing is over. Different types of prompt sounds are compiled in the PLC controller 42 at the factory, and the response type of the buzzer 44 is set by the PLC controller 42.
[0042] Furthermore, when the volume of the product needs to be reduced according to production requirements, the timer 60 and the PLC controller 42 can be integrated into one.
[0043] The embodiments of the present application are described above in conjunction with the accompanying drawings. In the absence of conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A smart socket with power consumption detection, timing and reservation functions, characterized in that: include: A housing (10), one side of the housing (10) is connected to a wire (30), the housing (10) is divided into a control part (11) and a load part (12); the load part (12) is provided with a socket (20) for connecting a load, the control part (11) is provided with a control module (40), a switch (50) and a timer (60), the wire (30), the switch (50) and the socket (20) are connected in parallel; the control module (40) is used to detect and display the power consumption of the load at the socket (20) and control the on and off of the switch (50), one end of the timer (60) is connected to the control module (40), and the control module (40) can be customized for reservation, and the timer (60) is used to stimulate the control module (40) to disconnect the switch (50).
2. The intelligent socket with power consumption detection, timing and reservation functions according to claim 1, characterized in that: The control module (40) comprises: A PLC controller (42), one end of the PLC controller (42) is connected to a display screen (43), and one side of the PLC controller (42) is also connected to a buzzer (44), and the PLC controller (42) performs energy consumption detection on the current passed through the socket (20).
3. The intelligent socket with power consumption detection, timing and reservation functions according to claim 2, characterized in that: The control module (40) further comprises a DC power supply (41), one end of which is connected to the PLC controller (42), and the DC power supply (41) is used to supply power to the PLC controller (42), the display screen (43) and the buzzer (44).
4. The intelligent socket with power consumption detection, timing and reservation functions according to claim 3, characterized in that: The timer (60) is connected to the PLC controller (42) via a TTL interface (61), and one end of the TTL interface (61) is electrically connected to the display screen (43). The display screen (43) is used to display the timing time of the timer (60) and the energy consumption of the load connected to the socket (20) detected by the PLC controller (42).
5. The intelligent socket with power consumption detection, timing and reservation functions according to claim 4, characterized in that: When the timer (60) expires, an electrical signal excites the PLC controller (42), and the buzzer (44) is activated through the PLC controller (42).
6. The intelligent socket with power consumption detection, timing and reservation functions according to claim 5, characterized in that: The PLC controller (42) receives the electrical signal excitation from the timer (60) and controls the switch (50) to be opened at the same time.