Building construction mechanical and electrical installation support hanger connecting piece
By designing a support hanger connecting piece with a combination of guide rods and springs in construction, the problem of disconnection between the support hanger and the wall due to wall vibration is solved, and the support hanger and the wall are improved. The effect of stability.
Patent Information
- Application Number
- CN202420643812.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-04-01
AI Technical Summary
The existing supporting hanger connection parts are disconnected from the wall due to wall vibration during construction, affecting stability.
A mechanical and electrical installation support hanger connection piece for construction construction is designed, using a combined structure of guide rods and springs. The vibration force is reduced through the extrusion and buffering effect of the spring and the stable connection between the support hanger and the wall is increased.
It effectively reduces the looseness between the connection between the wall and the support hanger, improves the stability of the support hanger and the wall, and avoids the disconnection problem caused by wall vibration.
Smart Images

Figure CN222480130U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electromechanical hoisting, in particular to a support and hanger connector for electromechanical installation in construction. Background Art
[0002] Support brackets are the general name for brackets and hangers. They play the functions of bearing the weight of various accessories and accessory media, restraining and limiting the unreasonable displacement of building components, and controlling the vibration of components in various construction links. They play an extremely important role in the safe operation of construction.
[0003] In the prior art, a support and hanger for mechanical and electrical installation in construction usually needs to be connected using a support and hanger connector during installation.
[0004] However, the relative position of the support bracket and the wall will be fixed after the existing support bracket connector is connected. When a large vibration occurs on the wall during construction, it will affect the stability of the connection between the support bracket and the wall, and may cause the support bracket to be disconnected from the wall.
[0005] Therefore, the utility model proposes a construction mechanical and electrical installation support and hanger connecting piece to solve the above-mentioned problem. Utility Model Content
[0006] The purpose of the utility model is to provide a support and hanger connector for mechanical and electrical installation in construction to solve the problems raised in the above-mentioned background technology.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction electromechanical installation support and hanger connection member, the construction electromechanical installation support and hanger connection member comprising: a wall, a first hanger is arranged at the bottom of the wall, a threaded rod is arranged in the first hanger, a second hanger is arranged on the end surface of the threaded rod, a connecting rod is sleeved on the surface of the threaded rod, and a placement groove is opened on the side of the first hanger;
[0008] A guide rod is provided with a spring 1 on the surface of the guide rod, a base is provided in the placement groove, a spring 2 is provided on the surface of the base, and a positioning plate is provided on the end surface of the spring 1.
[0009] Preferably, the end face of the threaded rod is fixedly connected to the end face of the second hanger, a positioning nut is screwed on the surface of the threaded rod, the positioning nut can be used to fix the connecting rod on the threaded rod, and a fixing plate is provided on the side of the second hanger.
[0010] Preferably, a through hole is provided on the surface of the first hanger, and the threaded rod can be inserted into the through hole provided on the surface of the first hanger, and a buffer pad is provided on the surface of the first hanger.
[0011] Preferably, a positioning ring is provided on the surface of the second hanger, a rotating rod is provided on the side of the positioning ring, a load-bearing plate is provided on the surface of the rotating rod, a support rod is provided at one end of the load-bearing plate, a mounting frame plate is provided on the surface of the support rod, the mounting frame plate is fixedly connected to the bottom of the wall, and the load-bearing plate and the mounting frame plate are rotatably connected through the support rod.
[0012] Preferably, one end of the guide rod is fixedly connected to the end surface of the placement slot, one end of the spring is fixedly connected to the end surface of the placement slot, and the other end of the spring is fixedly connected to the end surface of the positioning plate.
[0013] Preferably, the two end faces of the spring are fixedly connected to the surface of the base, the other end of the spring is fixedly connected to the surface of the fixed plate, the end face of the positioning plate is also fixedly connected to the surface of the fixed plate, and two groups of fixed plates are provided, and the two groups of fixed plates are symmetrically distributed about the second hanger.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] The utility model discloses a construction electromechanical installation support and hanger connecting piece. When in use, the second hanger is first inserted into the first hanger. Then, the positioning plate is fixed to the side of the second hanger. Through the spring one sleeved on the surface of the guide rod and the spring two arranged on the side of the base, when the side of the second hanger is vibrated, the spring one and the spring two can be squeezed. The squeezing buffer of the spring one and the spring two is utilized to reduce the vibration force during transmission, thereby reducing the loosening of the connection between the wall and the first hanger, thereby increasing the stability of the second hanger and the connecting rod during construction. In this way, the problem of affecting the stability of the connection between the support and hanger and the wall when a large vibration occurs on the wall during construction, which may cause the support and hanger to be disconnected from the wall, is avoided. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the structure of the utility model when the structure is tilted;
[0018] Figure 3 for Figure 2 The enlarged structural diagram at A in the middle;
[0019] Figure 4 It is a partial cross-sectional view of the structure of the utility model;
[0020] Figure 5 for Figure 4 Enlarged structural diagram at B in the middle.
[0021] In the figure: 1. wall; 2. first hanger; 3. threaded rod; 4. second hanger; 5. connecting rod; 6. placement slot; 7. guide rod; 8. spring 1; 9. base; 10. spring 2; 11. positioning plate; 12. positioning nut; 13. buffer pad; 14. positioning ring; 15. rotating rod; 16. load-bearing plate; 17. support rod; 18. mounting frame plate; 19. fixing plate. DETAILED DESCRIPTION
[0022] In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] In the description of the present utility model, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.
[0026] Embodiment 1
[0027] See also Figures 1 to 5 The utility model provides a technical solution: a construction electromechanical installation support and hanger connection piece, the construction electromechanical installation support and hanger connection piece comprises: a wall surface 1, a first hanger 2 is arranged at the bottom of the wall surface 1, a threaded rod 3 is arranged in the first hanger 2, a second hanger 4 is arranged on the end face of the threaded rod 3, a connecting rod 5 is sleeved on the surface of the threaded rod 3, and a placement groove 6 is opened on the side of the first hanger 2; a guide rod 7, a spring 1 8 is sleeved on the surface of the guide rod 7, a base 9 is arranged in the placement groove 6, a spring 2 10 is arranged on the surface of the base 9, and a positioning plate 11 is arranged on the end face of the spring 1 8;
[0028] When in use, first insert the second hanger 4 into the first hanger 2, and then fix the positioning plate 11 on the side of the second hanger 4. Through the spring 1 8 sleeved on the surface of the guide rod 7 and the spring 2 10 set on the side of the base 9, when the side of the second hanger 4 is vibrated, the spring 1 8 and the spring 2 10 can be squeezed. The squeezing buffer of the spring 1 8 and the spring 2 10 is utilized to reduce the vibration force during transmission, thereby reducing the looseness of the connection between the wall 1 and the first hanger 2, thereby increasing the stability of the second hanger 4 and the connecting rod 5 during construction.
[0029] Embodiment 2
[0030] On the basis of the first embodiment, in order to install the second hanger 4, a first hanger 2 is provided, the end face of the threaded rod 3 is fixedly connected to the end face of the second hanger 4, a positioning nut 12 is screwed on the surface of the threaded rod 3, and the connecting rod 5 can be fixed on the threaded rod 3 by using the positioning nut 12, a fixing plate 19 is provided on the side of the second hanger 4, a positioning ring 14 is sleeved on the surface of the second hanger 4, a rotating rod 15 is provided on the side of the positioning ring 14, a bearing plate 16 is sleeved on the surface of the rotating rod 15, a support rod 17 is provided at one end of the bearing plate 16, a mounting frame plate 18 is sleeved on the surface of the support rod 17, the mounting frame plate 18 is fixedly connected to the bottom of the wall 1, the bearing plate 16 and the mounting frame plate 18 are rotatably connected through the support rod 17, a through hole is provided on the surface of the first hanger 2, the threaded rod 3 can be inserted into the through hole provided on the surface of the first hanger 2, and a buffer pad 13 is provided on the surface of the first hanger 2;
[0031] When in use, first insert the threaded rod 3 set on the end face of the second hanger 4 into the first hanger 2, then put the connecting rod 5 on the threaded rod 3, and fix the connecting rod 5 with the positioning nut 12. The positioning ring 14 cooperates with the setting of the load-bearing plate 16 to stabilize the installation of the second hanger 4 on the one hand, and on the other hand, the load-bearing plate 16, the mounting frame plate 18 and the positioning ring 14 are all rotatably connected, so that the second hanger 4 can play a role of rotation buffer after being vibrated. The setting of the buffer pad 13 can reduce the wear of the second hanger 4 and the connecting rod 5 and also play a buffering and shock-absorbing role.
[0032] Embodiment 3
[0033] On the basis of the second embodiment, in order to improve the stability of the second hanger 4, a spring 1 8 and a spring 2 10 are provided, one end of the guide rod 7 is fixedly connected to the end face of the placement groove 6, one end of the spring 1 8 is fixedly connected to the end face of the placement groove 6, the other end of the spring 1 8 is fixedly connected to the end face of the positioning plate 11, the end face of the spring 2 10 is fixedly connected to the surface of the base 9, the other end of the spring 2 10 is fixedly connected to the surface of the fixing plate 19, the end face of the positioning plate 11 is also fixedly connected to the surface of the fixing plate 19, and the fixing plate 19 is provided with two groups, and the two groups of fixing plates 19 are symmetrically distributed about the second hanger 4;
[0034] When in use, the setting of the guide rod 7 can guide and limit the displacement of the spring 1 8 to avoid offset problems. Then, when the wall 1 vibrates, the elastic buffering of the spring 1 8 and the spring 2 10 itself can be used to reduce the impact force of the vibration on the second hanger 4, thereby preventing the second hanger 4 from being disconnected from the wall 1.
[0035] In actual use, first insert the second hanger 4 into the first hanger 2, and then fix the positioning plate 11 on the side of the second hanger 4, through the spring 1 8 sleeved on the surface of the guide rod 7 and the spring 2 10 set on the side of the base 9, when the side of the second hanger 4 is vibrated, the spring 1 8 and the spring 2 10 can be squeezed, and the squeezing buffer of the spring 1 8 and the spring 2 10 is utilized to reduce the vibration force during transmission, thereby reducing the looseness of the connection between the wall 1 and the first hanger 2, thereby increasing the stability of the second hanger 4 and the connecting rod 5 during construction, thus avoiding the problem that when a large vibration occurs on the wall 1 during construction, the stability of the connection between the support hanger and the wall 1 will be affected, which may cause the support hanger to be disconnected from the wall 1.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction mechanical and electrical installation support and hanger connector, characterized in that: The construction mechanical and electrical installation support and hanger connection member comprises: a wall surface (1), a first hanger (2) is arranged at the bottom of the wall surface (1), a threaded rod (3) is arranged inside the first hanger (2), a second hanger (4) is arranged on the end surface of the threaded rod (3), a connecting rod (5) is sleeved on the surface of the threaded rod (3), and a placement groove (6) is opened on the side of the first hanger (2); A guide rod (7) is provided with a spring 1 (8) on the surface of the guide rod (7), a base (9) is provided in the placement groove (6), a spring 2 (10) is provided on the surface of the base (9), and a positioning plate (11) is provided on the end surface of the spring 1 (8).
2. A construction mechanical and electrical installation support and hanger connector according to claim 1, characterized in that: The end face of the threaded rod (3) is fixedly connected to the end face of the second hanger (4); a positioning nut (12) is screwed onto the surface of the threaded rod (3); the positioning nut (12) can be used to fix the connecting rod (5) on the threaded rod (3); and a fixing plate (19) is arranged on the side of the second hanger (4).
3. A construction mechanical and electrical installation support and hanger connector according to claim 1, characterized in that: A through hole is provided on the surface of the first hanger (2), and the threaded rod (3) can be inserted into the through hole provided on the surface of the first hanger (2). A buffer pad (13) is provided on the surface of the first hanger (2).
4. A construction mechanical and electrical installation support and hanger connector according to claim 1, characterized in that: The surface of the second hanger (4) is provided with a positioning ring (14), the side of the positioning ring (14) is provided with a rotating rod (15), the surface of the rotating rod (15) is provided with a load-bearing plate (16), one end of the load-bearing plate (16) is provided with a supporting rod (17), the surface of the supporting rod (17) is provided with a mounting frame plate (18), the mounting frame plate (18) is fixedly connected to the bottom of the wall (1), and the load-bearing plate (16) and the mounting frame plate (18) are rotatably connected via the supporting rod (17).
5. A construction mechanical and electrical installation support and hanger connector according to claim 1, characterized in that: One end of the guide rod (7) is fixedly connected to the end surface of the placement groove (6), one end of the spring (8) is fixedly connected to the end surface of the placement groove (6), and the other end of the spring (8) is fixedly connected to the end surface of the positioning plate (11).
6. A construction mechanical and electrical installation support and hanger connector according to claim 1, characterized in that: The end face of the second spring (10) is fixedly connected to the surface of the base (9), the other end of the second spring (10) is fixedly connected to the surface of the fixing plate (19), the end face of the positioning plate (11) is also fixedly connected to the surface of the fixing plate (19), and the fixing plates (19) are provided in two groups, and the two groups of fixing plates (19) are symmetrically distributed about the second hanger (4).