Network bridge capable of being installed in efficient and modularized mode

By designing an efficient and modularly installed network bridge, using the combination of bridge modules and disassembly and assembly devices, the problems of low installation efficiency and inconvenient maintenance of traditional network bridges are solved, and more efficient installation and maintenance are achieved.

CN222484195UActive Publication Date: 2025-02-14YUYAO SUNPLN COMM EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421135549.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-02-14
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

The traditional network bridge is designed as an integrated structure, and the installation process is inefficient and difficult to maintain, and cannot meet the installation and maintenance needs of the increase in the number of modern network equipment.

Method used

Design an efficient modularly installed network bridge, adopting the combination of the first bridge, the second bridge, the connecting block, the disassembly and assembly device and the locking device. Through the modular design and the optimization of the disassembly and assembly device, the rapid assembly and assembly module of the bridge module can be realized. Disassemble.

Benefits of technology

It improves the installation efficiency and maintenance convenience of the network bridge. The modular design allows each part to be installed independently. The disassembly and assembly device simplifies the installation process and reduces maintenance complexity and time cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222484195U_ABST
    Figure CN222484195U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of network equipment layout and installation, in particular to an efficient modularized installation network bridge, which comprises a first bridge, a second bridge, a first connecting block, a second connecting block, a dismounting and mounting device and a locking device, and is characterized in that the first connecting block is arranged on the bottom wall of one end of the first bridge, and the second connecting block is arranged on the bottom wall of the other end of the second bridge; the second connecting block is installed on the bottom wall of one end of the second bridge frame, a groove is formed in the top end of the second connecting block, the groove is matched with the first connecting block, the positioning block drives the sliding plate to slide in the sliding groove to compress the positioning spring, then the first connecting block on the first bridge frame enters the groove, then the positioning block is loosened, and the first bridge frame is connected with the second bridge frame. The two sets of positioning springs stretch to drive the sliding plate to move in the sliding groove in the direction of the first connecting block till the positioning block enters the positioning groove, the positioning block and the positioning groove are supported under the supporting of the two sets of positioning springs, and it is guaranteed that the first connecting block and the second connecting block are stably connected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of network equipment layout and installation, in particular to a network bridge frame with efficient modular installation. Background Art

[0002] As we all know, network bridge is a system for managing cables and wires, mainly including bridge, support, installation accessories and other accessories. It can arrange cables and wires of different types and kinds in a small space in an orderly manner, and is convenient for management and maintenance. Bridge is widely used in equipment installation in power, communication, computer, rail transportation, petrochemical and other industries.

[0003] With the rapid development of information technology, the number of network devices is increasing, which puts higher requirements on the installation and maintenance of network bridges. The traditional network bridge design is usually an integrated structure, which needs to be cut and spliced ​​according to the actual situation on site during installation, which is inefficient and difficult to maintain. Therefore, it is necessary to design an efficient modular installation network bridge to improve installation efficiency and maintenance convenience. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies of the prior art, the utility model provides a network bridge with efficient modular installation.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a network bridge with efficient modular installation, comprising a first bridge, a second bridge, a first connecting block, a second connecting block, a disassembly and assembly device and a locking device, wherein the first connecting block is installed on the bottom wall at one end of the first bridge, and the second connecting block is installed on the bottom wall at one end of the second bridge, a groove is provided on the top of the second connecting block, and the groove is adapted to the first connecting block, the disassembly and assembly device comprises a square groove, a positioning block, a positioning groove, a slide plate, a slide groove and a positioning spring, the bottom wall of the second connecting block is laterally provided with two groups of symmetrically designed square grooves, the positioning block is movably installed in the square groove, the side wall of the first connecting block on one side close to the second connecting block is provided with the positioning groove, the positioning groove is adapted to the positioning block, the upper and lower side walls of the square groove are provided with the slide groove, the positioning spring is installed in the slide groove, the slide plate is fixedly installed on one end of the positioning spring close to the positioning groove, the slide plate is slidably connected to the slide groove, and the slide plate is fixedly connected to the upper and lower side walls of the positioning block.

[0008] In order to facilitate locking the positioning block, the utility model is improved in that the locking device includes a locking groove, a locking block, a limit plate, a first bevel gear, a second bevel gear, a pulling column and a pulling block. The bottom end of the positioning groove is provided with the locking groove, and the first bevel gear is installed in the locking groove. A accommodating cavity is provided directly below the groove in the second connecting block, and the limit plate is slidably installed in the accommodating cavity. A guide groove is provided at the top of the limit plate, and a locking block is installed on the limit plate passing through the guide groove. Two groups of the second bevel gears are fixedly installed on the left and right sides of the top wall of the locking block, and a pulling column is fixedly installed on the bottom end of the limit plate. The pulling column passes through the bottom wall of the second connecting block and a pulling block is installed.

[0009] In order to facilitate the docking of the first bridge frame and the second bridge frame, the utility model is improved in that a docking groove is provided on the side wall of the first bridge frame at one end close to the second bridge frame, and a docking block is installed on the side wall of the second bridge frame at one end close to the first bridge frame, and the docking block is adapted to the docking groove.

[0010] Preferably, the utility model is improved in that the docking block and the docking groove are both semi-cylindrical in design.

[0011] In order to facilitate locking of the second bevel gear, the utility model is improved in that a locking spring is sleeved on the outer wall of the pulling column.

[0012] In order to facilitate pulling the two groups of positioning blocks at the same time, the utility model is improved in that a pulling plate is installed at one end of the two groups of positioning blocks away from the positioning groove.

[0013] In order to facilitate pulling the pull plate, the utility model is improved in that a pull ring is installed on the outer wall of the pull plate.

[0014] In order to improve the anti-slip property of the pull ring, the utility model is improved in that the pull ring is provided with anti-slip grooves.

[0015] (III) Beneficial effects

[0016] Compared with the prior art, the utility model provides a network bridge with efficient modular installation, which has the following beneficial effects:

[0017] The network bridge with efficient modular installation is equipped with a disassembly and assembly device. The design of the disassembly and assembly device makes the assembly and disassembly of the bridge module simpler and faster. The modular design itself allows each part to be installed independently, and the disassembly and assembly device further simplifies this process, thereby greatly improving the overall installation efficiency. This advantage is particularly evident in large projects. Since the bridge modules can be easily disassembled and assembled, when a part needs to be repaired or replaced, it can be quickly located and disassembled without affecting the normal operation of other parts. This convenience greatly reduces the complexity and time cost of maintenance work and improves maintenance efficiency.

[0018] This efficient modularly installed network bridge, through the provided locking device, enables the two sets of second bevel gears to mesh and connect with the first bevel gears under the support of the locking spring, and performs secondary locking on the disassembly and assembly device, which can ensure that the connections between the various modules of the network bridge are tighter and more stable, thereby enhancing the stability and load-bearing capacity of the entire bridge structure. This stability is particularly important when carrying a large number of cables and network equipment, and can effectively prevent loosening or deformation due to vibration or external force. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the first bridge and the second bridge separated from each other in the utility model;

[0020] Figure 2 This is a half-cut three-dimensional structural schematic diagram of the first connecting block and the second connecting block of the utility model;

[0021] Figure 3 For the utility model Figure 2 A schematic diagram of the structure at the local A of the enlarged part;

[0022] Figure 4 It is a schematic diagram of the overall three-dimensional structure of the utility model.

[0023] In the figure: 1. first bridge; 2. second bridge; 3. first connecting block; 4. second connecting block; 5. groove; 6. square groove; 7. positioning block; 8. positioning groove; 9. slide plate; 10. slide groove; 11. positioning spring; 12. locking groove; 13. locking block; 14. limit plate; 15. first bevel gear; 16. second bevel gear; 17. pulling column; 18. pulling block; 19. accommodating chamber; 20. guide groove; 21. docking groove; 22. docking block; 23. locking spring; 24. pulling plate; 25. pulling ring. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-4 , a network bridge with efficient modular installation, comprising a first bridge 1, a second bridge 2, a first connecting block 3, a second connecting block 4, a disassembly and assembly device and a locking device, the first connecting block 3 is installed on the bottom wall at one end of the first bridge 1, the second connecting block 4 is installed on the bottom wall at one end of the second bridge 2, a groove 5 is opened on the top of the second connecting block 4, the groove 5 is adapted to the first connecting block 3, the disassembly and assembly device comprises a square groove 6, a positioning block 7, a positioning groove 8, a slide plate 9, a slide groove 10 and a positioning spring 11, the bottom wall of the second connecting block 4 is transversely opened with two groups of symmetrically designed square grooves 6, the positioning block 7 is movably installed in the square groove 6, the side wall of the first connecting block 3 close to the second connecting block 4 is opened with the positioning groove 8, the positioning groove 8 is adapted to the positioning block 7, the upper and lower side walls of the square groove 6 are opened with the slide groove 10, the positioning spring 11 is installed in the slide groove 10, the positioning spring 11 is close to the positioning spring The slide plate 9 is fixedly installed at one end of the positioning groove 8, and the slide plate 9 is slidably connected with the slide groove 10, and the slide plate 9 is fixedly connected with the upper and lower side walls of the positioning block 7. In this embodiment, when in use, the two groups of positioning blocks 7 are first pulled, and the positioning blocks 7 drive the slide plate 9 to slide in the slide groove 10 to compress the positioning spring 11, and then the first connecting block 3 on the first bridge frame 1 is aligned with the groove 5 opened on the second connecting block 4 at the bottom of the second bridge frame 2, so that the first connecting block 3 enters the groove 5, and then the positioning block 7 is released, and the two groups of positioning springs 11 are extended, driving the slide plate 9 to move in the slide groove 10 toward the first connecting block 3 until the positioning block 7 enters the positioning groove 8. Under the support of the two groups of positioning springs 11, the positioning block 7 and the positioning groove 8 are supported to ensure that the connection between the first connecting block 3 and the second connecting block 4 is stable, that is, the installation of the first bridge frame 1 and the second bridge frame 2 is completed, and then the disassembly and assembly device is secondary locked by the locking device to ensure that the positioning block 7 and the positioning groove 8 are firmly positioned.

[0026] In actual use, it is further convenient to lock the positioning block 7. In this embodiment, the locking device includes a locking groove 12, a locking block 13, a limiting plate 14, a first bevel gear 15, a second bevel gear 16, a pulling column 17 and a pulling block 18. The bottom end of the positioning groove 8 is provided with the locking groove 12, and the first bevel gear 15 is installed in the locking groove 12. A receiving cavity 19 is provided just below the groove 5 in the second connecting block 4, and the limiting plate 14 is slidably installed in the receiving cavity 19. A guide groove 20 is provided at the top of the limiting plate 14, and the locking block 13 is installed on the limiting plate 14 through the guide groove 20. The top wall of the locking block 13 is on the left Two groups of the second bevel gears 16 are fixedly installed on the right two sides, and a pulling column 17 is fixedly installed on the bottom end of the limit plate 14. The pulling column 17 passes through the bottom wall of the second connecting block 4 and is installed with a pulling block 18. After the first bridge frame 1 and the second bridge frame 2 are installed through the disassembly and assembly device, the pulling block 18 is manually pushed, and the pulling block 18 drives the pulling column 17, and the pulling column 17 drives the limit plate 14 to move in the accommodating cavity 19, and the limit plate 14 drives the locking block 13 to move in the direction of the positioning block 7 until the two groups of second bevel gears 16 enter the locking groove 12 through the guide groove 20, and mesh with the two ends of the first bevel gear 15, and the positioning of the positioning block 7 and the positioning groove 8 is secondary locked to prevent loosening.

[0027] In actual use, it is further convenient to dock the first bridge frame 1 and the second bridge frame 2. In this embodiment, a docking groove 21 is provided on the side wall of one end of the first bridge frame 1 close to the second bridge frame 2, and a docking block 22 is installed on the side wall of one end of the second bridge frame 2 close to the first bridge frame 1. The docking block 22 is adapted to the docking groove 21. When the first bridge frame 1 and the second bridge frame 2 are docked, the docking block 22 is docked with the docking groove 21 and slides, so that the first bridge frame 1 slides into the second bridge frame 2, and the installation of the first bridge frame 1 and the second bridge frame 2 is guided.

[0028] Preferably, in this embodiment, the docking block 22 and the docking groove 21 are both semi-cylindrical in design. The semi-cylindrical design has high structural strength, can withstand a certain pressure, and provides good resistance to deformation and flexure. This design helps to ensure that the docking block 22 and the docking groove 21 can operate safely and reliably in a variety of application environments. The design of the semi-cylindrical docking block 22 and the docking groove 21 makes the docking between them easier and more accurate. During the manufacturing and installation process, this design helps to reduce the complexity and difficulty of the operation and improve work efficiency.

[0029] In actual use, it is further convenient to lock the second bevel gear 16. In this embodiment, the outer wall of the pulling column 17 is provided with a locking spring 23, and the locking spring 23 is convenient for supporting the limit plate 14. The limit plate 14 supports the second bevel gear 16 through the locking block 13 to ensure the stable engagement of the second bevel gear 16 and the first bevel gear 15.

[0030] In actual use, it is further convenient to pull the two groups of positioning blocks 7 at the same time. In this embodiment, a pull plate 24 is installed at one end of the two groups of positioning blocks 7 away from the positioning groove 8, and the pull plate 24 facilitates pulling the two groups of positioning blocks 7 at the same time.

[0031] In actual use, it is further convenient to pull the pull plate 24. In this embodiment, a pull ring 25 is installed on the outer wall of the pull plate 24. The design of the pull ring 25 enables the pull plate 24 to be moved or fixed quickly and conveniently when it needs to be moved or fixed. The pull ring 25 provides a solid gripping point, making the operation more labor-saving and safe.

[0032] In actual use, the anti-slip property of the pull ring 25 is further improved. In the present embodiment, the pull ring 25 is provided with anti-slip grooves. The anti-slip grooves are used to increase the friction between the fingers and the pull ring 25 to prevent the pull ring 25 from falling off or operating errors caused by hand slipping during use. The design of the anti-slip grooves makes the surface of the pull ring 25 no longer smooth, but has a certain concave-convex feeling, so that the fingers can grasp the pull ring 25 more firmly when contacting it, and can maintain a good grip even when the hands are wet or there is oil on the surface of the pull ring 25.

[0033] In order to explain in detail the possible application scenarios, technical principles, specific schemes that can be implemented, and the purposes and effects that can be achieved, the following is a detailed description of the specific embodiments listed in conjunction with the accompanying drawings. The embodiments described herein are only used to more clearly illustrate the technical solutions of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A network bridge with efficient modular installation, comprising a first bridge (1), a second bridge (2), a first connection block (3), a second connection block (4), a disassembly device and a locking device, characterized in that: The first connecting block (3) is installed on the bottom wall of one end of the first bridge (1), and the second connecting block (4) is installed on the bottom wall of one end of the second bridge (2). A groove (5) is provided at the top of the second connecting block (4), and the groove (5) is adapted to the first connecting block (3). The disassembly and assembly device comprises a square groove (6), a positioning block (7), a positioning groove (8), a slide plate (9), a slide groove (10) and a positioning spring (11). Two groups of symmetrically designed square grooves (6) are transversely provided on the bottom wall of the second connecting block (4), and the positioning spring (11) is movably installed in the square groove (6). The first connecting block (3) is provided with a positioning groove (8) on a side wall close to the second connecting block (4), and the positioning groove (8) is adapted to the positioning block (7). The upper and lower side walls of the square groove (6) are provided with a sliding groove (10), and the positioning spring (11) is installed in the sliding groove (10). The sliding plate (9) is fixedly installed on one end of the positioning spring (11) close to the positioning groove (8), and the sliding plate (9) is slidably connected to the sliding groove (10), and the sliding plate (9) is fixedly connected to the upper and lower side walls of the positioning block (7).

2. According to the highly efficient modular installation network bridge frame of claim 1, it is characterized by: The locking device comprises a locking groove (12), a locking block (13), a limiting plate (14), a first bevel gear (15), a second bevel gear (16), a pulling column (17) and a pulling block (18); the locking groove (12) is provided at the bottom end of the positioning groove (8); the first bevel gear (15) is installed in the locking groove (12); a receiving cavity (19) is provided directly below the groove (5) in the second connecting block (4); The limit plate (14) is slidably installed, a guide groove (20) is provided at the top of the limit plate (14), a locking block (13) is installed on the limit plate (14) passing through the guide groove (20), two groups of the second bevel gears (16) are fixedly installed on the left and right sides of the top wall of the locking block (13), a pulling column (17) is fixedly installed on the bottom end of the limit plate (14), and a pulling block (18) is installed on the pulling column (17) passing through the bottom wall of the second connecting block (4).

3. According to claim 2, a network bridge with efficient modular installation, characterized in that: A docking groove (21) is provided on a side wall of one end of the first bridge frame (1) close to the second bridge frame (2), and a docking block (22) is installed on a side wall of one end of the second bridge frame (2) close to the first bridge frame (1), and the docking block (22) is adapted to fit the docking groove (21).

4. According to claim 3, a network bridge with efficient modular installation is characterized in that: The docking block (22) and the docking groove (21) are both semi-cylindrical in design.

5. The network bridge with efficient modular installation according to claim 4, characterized in that: The outer wall of the pulling column (17) is sleeved with a locking spring (23).

6. The network bridge with high efficiency modular installation according to claim 5, characterized in that: A pull plate (24) is installed at one end of the two groups of positioning blocks (7) away from the positioning groove (8).

7. The network bridge with high efficiency modular installation according to claim 6, characterized in that: A pull ring (25) is installed on the outer wall of the pull plate (24).

8. The network bridge with high efficiency modular installation according to claim 7, characterized in that: The pull ring (25) is provided with anti-slip grooves.