Width widening structure for filling engineering
By adopting a width structure in the new roadbed of high-fill roadbed, including retaining wall structure and reinforcement components, the problem of unstable connection between the new and old interfaces is solved, and the safety and stability and drainage performance of the new roadbed are improved.
Patent Information
- Application Number
- CN202421087044.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-05-17
AI Technical Summary
The connection between the old and new interfaces of high-fill roadbeds is unstable, which can easily reduce the safety and stability of the newly built roadbeds.
A width structure is adopted, including a retaining wall structure, a filler body, a first reinforcement assembly and a second reinforcement assembly. The retaining wall structure consists of slope retaining wall, horizontal baffle, one-way geogrid, foot wall and drainage ditch. The first reinforcement component connects the old and new interfaces through reinforcement rods and reinforcement plates, and the second reinforcement component passes through anchor plates and anchor rods. and reinforcement baffle enhance the connection between slope retaining wall and filler body.
By enhancing the slope stability of the new roadbed and the connection stability of the new and old interfaces, the collapse or slippage of the new roadbed is reduced, and the safety stability and drainage performance of the new roadbed are improved.
Smart Images

Figure CN222499877U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of geotechnical engineering technology, and in particular to a widening structure used in filling engineering. Background Art
[0002] Railways are an important part of my country's land transportation. With the accelerating pace of people's lives and the rapid development of society, people's demand for railway transportation is increasing, so it is necessary to expand the capacity of existing railways.
[0003] In the process of railway expansion, the widening of the fill roadbed is involved. Currently, steps are dug on the existing roadbed slope and then filled according to the width of the new roadbed, and the interface between the new and old slopes is reinforced, so that the connection between the new and old slopes is stable. However, when the height of the fill slope is high, the interface between the new and old slopes is long, so it is easy to have unstable connection between the new and old interfaces, which leads to a decrease in the safety and stability of the new roadbed, and thus affects the safety of railway operation.
[0004] With respect to the above-mentioned related technologies, the inventors believe that there is an unstable connection problem between the new and old interfaces of the high fill roadbed, which can easily reduce the safety and stability of the newly built roadbed. Utility Model Content
[0005] In order to solve the problem that the connection between the new and old interfaces of high fill roadbed is unstable and easily reduces the safety and stability of the newly built roadbed, the present application provides a width-supporting structure for fill engineering.
[0006] The present application provides a support width structure for filling engineering, which adopts the following technical solution:
[0007] A sidewall structure for fill engineering, comprising a retaining wall structure, a fill body arranged inside the retaining wall structure, a first reinforcement component for connecting the fill body to the existing roadbed slope, and a second reinforcement component for connecting the retaining wall structure to the fill body; the retaining wall structure comprises a slope retaining wall abutting the newly built roadbed slope, a horizontal baffle abutting the top of the newly built roadbed, a one-way geogrid arranged at the bottom of the newly built roadbed, a foot wall arranged at one end of the slope retaining wall away from the horizontal baffle, and a drainage ditch adjacent to the foot wall, the horizontal baffle is connected to the slope retaining wall, and the end of the horizontal baffle away from the slope retaining wall is laid on the horizontal plane of the existing roadbed, and the first reinforcement component comprises a reinforcement rod, one end of which is arranged in the fill body, and the other end of which is arranged in the existing roadbed.
[0008] By adopting the above technical solution, one end of the horizontal baffle is set on the horizontal plane of the existing roadbed, so that the existing roadbed shares part of the vertical pressure on the horizontal baffle, thereby reducing the phenomenon that the newly built roadbed is separated from the existing roadbed due to vertical pressure. The setting of unidirectional geogrids, slope retaining walls and foot walls increases the slope stability of the newly built roadbed, thereby reducing the phenomenon of collapse or sliding of the newly built roadbed, thereby improving the safety and stability of the newly built roadbed. The setting of drainage ditches improves the drainage performance of the newly built roadbed and reduces the impact of rainwater accumulation on the stability of the newly built roadbed.
[0009] Optionally, both ends of the reinforcement rod are connected to reinforcement plates, and the reinforcement plates are arranged perpendicular to the reinforcement rod.
[0010] By adopting the above technical solution, the provision of the reinforcement plate increases the force-bearing area of the first reinforcement component, thereby improving the reinforcement effect of the reinforcement rod, and further improving the connection stability between the newly built roadbed and the existing roadbed.
[0011] Optionally, the reinforcement rod is arranged perpendicularly to the new and old interfaces between the newly constructed roadbed and the existing roadbed.
[0012] By adopting the above technical solution, the vertical arrangement of the reinforcement rods and the new and old interfaces is beneficial to improving the reinforcement effect of the reinforcement rods on the newly built roadbed and reducing the slippage of the newly built roadbed at the new and old interfaces.
[0013] Optionally, there are multiple reinforcement rods, and a connecting rod is provided between two upper and lower adjacent reinforcement rods, and two ends of the connecting rod are respectively connected to the two upper and lower adjacent reinforcement rods.
[0014] By adopting the above technical solution, the connecting rod connects the upper and lower adjacent reinforcement rods, so that a whole structure is formed between the multiple first reinforcement components, which is beneficial to improve the overall stability of the new and old boundaries, and further improves the stability of the newly built roadbed.
[0015] Optionally, the second reinforcement assembly includes an anchor plate abutting against the slope retaining wall and an anchor rod arranged on the anchor plate, the anchor rod passes through the slope retaining wall and is inserted into the fill body, and the anchor rod is arranged perpendicular to the slope retaining wall.
[0016] By adopting the above technical solution, the anchor rods inserted into the built-up body and the anchor plates connected to the anchor rods improve the connection stability between the slope retaining wall and the built-up body, thereby improving the overall stability of the newly built roadbed.
[0017] Optionally, a reinforcement baffle is connected to one end of the anchor rod away from the anchor plate, and there are multiple reinforcement baffles, which are evenly distributed on the anchor rod.
[0018] By adopting the above technical solution, the setting of the reinforcement baffle increases the force-bearing area of the anchor rod, thereby improving the connection stability of the anchor rod to the slope retaining wall and the fill body, thereby further improving the overall stability of the newly built roadbed.
[0019] Optionally, the reinforcement baffle is arranged to be inclined, and the end of the reinforcement baffle away from the anchor rod is inclined toward the direction close to the anchor plate.
[0020] By adopting the above technical solution, the inclined reinforcement baffle further improves the reinforcement effect of the anchor rod, increases the connection stability between the reinforcement baffle and the anchor rod, and reduces the occurrence of breakage of the reinforcement baffle during the force process, thereby improving the service life and reinforcement effect of the reinforcement baffle.
[0021] Optionally, one end of the anchor rod away from the anchor plate is connected to a reinforcement vertical pile, and one end of the reinforcement vertical pile away from the anchor rod is inserted into the ground.
[0022] By adopting the above technical solution, the setting of the reinforced vertical piles reduces the slippage of the newly built roadbed, thereby further improving the stability and safety of the newly built roadbed.
[0023] In summary, this application has the following beneficial technical effects:
[0024] 1. The setting of horizontal baffles, one-way geogrids, slope retaining walls and foot walls increases the slope stability of the newly built roadbed, thereby reducing the collapse or sliding of the newly built roadbed, and further improving the safety and stability of the newly built roadbed;
[0025] 2. The setting of the reinforcement rod increases the stability of the new and old interfaces, the setting of the reinforcement plate increases the force-bearing area of the first reinforcement component, thereby improving the reinforcement effect of the reinforcement rod, and the setting of the connecting rod forms an integral structure between the vertically adjacent reinforcement rods, thereby further improving the connection stability between the new roadbed and the existing roadbed;
[0026] 3. The setting of anchor plates and anchor rods improves the connection stability between the slope retaining wall and the compacted body. The setting of reinforced baffles increases the contact area between the anchor rods and the compacted body, thereby improving the connection effect of the anchor rods. The setting of reinforced vertical piles further improves the stability of the newly built roadbed, thereby further improving the safety of the newly built roadbed. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a cross-sectional structural diagram of a dam width structure used in filling engineering;
[0028] Figure 2 is a schematic cross-sectional structural diagram of a first reinforcement component;
[0029] Figure 3It is a schematic diagram of the cross-sectional structure of the second reinforcement component.
[0030] Explanation of the reference numerals in the accompanying drawings: 1. retaining wall structure; 11. slope retaining wall; 12. horizontal baffle; 13. one-way geogrid; 14. foot wall; 15. drainage ditch; 2. fill body; 3. first reinforcement component; 31. reinforcement rod; 32. reinforcement plate; 33. connecting rod; 4. second reinforcement component; 41. anchor plate; 42. anchor rod; 43. reinforcement baffle; 44. reinforcement vertical pile. DETAILED DESCRIPTION
[0031] The following is combined with Figure 1-3 This application is described in further detail.
[0032] The embodiment of the present application discloses a width-supporting structure for use in filling projects.
[0033] Reference Figure 1 A width-supporting structure for fill engineering includes a retaining wall structure 1, a fill 2 arranged inside the retaining wall structure 1, a first reinforcement component 3 for connecting the fill 2 with the existing roadbed slope, and a second reinforcement component 4 for connecting the retaining wall structure 1 with the fill 2. The retaining wall structure 1 includes a slope retaining wall 11 fixedly abutting against the slope of the newly built roadbed, a horizontal baffle 12 fixedly abutting against the top of the newly built roadbed, a one-way geogrid 13 fixedly arranged at the bottom of the newly built roadbed, a foot wall 14 fixedly arranged at one end of the slope retaining wall 11 away from the horizontal baffle 12, and a drainage ditch 15 adjacent to the foot wall 14, the horizontal baffle 12 is fixedly connected to the slope retaining wall 11, and the end of the horizontal baffle 12 away from the slope retaining wall 11 is laid on the horizontal plane of the existing roadbed. In the embodiment of the present application, the slope retaining wall 11, the horizontal baffle 12 and the foot wall 14 are all reinforced concrete structures, and the fill 2 is lightweight concrete.
[0034] Reference Figure 2 The first reinforcement assembly 3 includes a reinforcement rod 31, one end of which is inserted into the fill 2, and the other end is inserted into the existing roadbed. The reinforcement rod 31 is vertically arranged at the old and new interfaces of the existing roadbed and the newly built roadbed. Both ends of the reinforcement rod 31 are fixedly connected with reinforcement plates 32, and the reinforcement plates 32 are vertically arranged with the reinforcement rods 31. There are multiple reinforcement rods 31, and a connecting rod 33 is fixedly arranged between two upper and lower adjacent reinforcement rods 31, and the two ends of the connecting rod 33 are respectively fixedly connected with the two upper and lower adjacent reinforcement rods 31.
[0035] Reference Figure 3 The second reinforcement component 4 includes an anchor plate 41 fixedly abutted against the slope retaining wall 11 and an anchor rod 42 fixedly arranged on the anchor plate 41. The anchor rod 42 passes through the slope retaining wall 11 and is inserted into the compacted body 2. The anchor rod 42 is fixedly connected to the slope retaining wall 11 and the compacted body 2 respectively, and the anchor rod 42 is arranged vertically to the slope retaining wall 11.
[0036] One end of the anchor rod 42 away from the anchor plate 41 is connected to a reinforcement baffle 43, and the number of the reinforcement baffles 43 is multiple, and the multiple reinforcement baffles 43 are evenly distributed on the anchor rod 42. In the embodiment of the present application, the number of the reinforcement baffles 43 is two, and the two reinforcement baffles 43 are symmetrically arranged on the anchor rod 42. The reinforcement baffle 43 is inclined, and the end of the reinforcement baffle 43 away from the anchor rod 42 is inclined toward the direction close to the anchor plate 41.
[0037] One end of the anchor rod 42 away from the anchor plate 41 is fixedly connected to a reinforcement vertical pile 44 , and one end of the reinforcement vertical pile 44 away from the anchor rod 42 is inserted into the ground.
[0038] The implementation principle of the widening structure for filling engineering in the embodiment of the present application is as follows: one end of the horizontal baffle 12 is set on the horizontal plane of the existing roadbed, so that the existing roadbed shares part of the vertical pressure on the horizontal baffle 12. The arrangement of the one-way geogrid 13, the slope retaining wall 11 and the foot wall 14 increases the slope stability of the newly built roadbed, thereby reducing the phenomenon of collapse or slippage of the newly built roadbed, and further improving the safety and stability of the newly built roadbed. The reinforcement rod 31 vertically arranged at the old and new interface in the first reinforcement component 3 increases the stability of the old and new interface. The arrangement of the reinforcement plate 32 increases the force-bearing area of the first reinforcement component 3, thereby improving the reinforcement effect of the reinforcement rod 31. The arrangement of the connecting rod 33 forms an integral structure between the vertically adjacent reinforcement rods 31, thereby further improving the connection stability between the newly built roadbed and the existing roadbed. The second reinforcement component 4 improves the connection stability between the slope retaining wall 11 and the compacted body 2 by arranging the anchor plate 41 and the anchor rod 42. The arrangement of the reinforcement baffle plate 43 increases the contact area between the anchor rod 42 and the compacted body 2, thereby improving the connection effect of the anchor rod 42. The arrangement of the reinforcement vertical piles 44 further improves the stability of the newly built roadbed, thereby further improving the safety of the newly built roadbed.
[0039] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A width-supporting structure for filling engineering, characterized in that: The invention comprises a retaining wall structure (1), a fill (2) arranged inside the retaining wall structure (1), a first reinforcement component (3) for connecting the fill (2) with an existing roadbed slope, and a second reinforcement component (4) for connecting the retaining wall structure (1) with the fill (2); the retaining wall structure (1) comprises a slope retaining wall (11) abutting against the newly built roadbed slope, a horizontal baffle (12) abutting against the top of the newly built roadbed, a one-way geogrid (13) arranged at the bottom of the newly built roadbed, and a second reinforcement component (4) arranged at the bottom of the retaining wall structure (1). A foot wall (14) at one end of the slope retaining wall (11) away from the horizontal baffle (12) and a drainage ditch (15) adjacent to the foot wall (14); the horizontal baffle (12) is connected to the slope retaining wall (11); the end of the horizontal baffle (12) away from the slope retaining wall (11) is laid on a horizontal plane of an existing roadbed; and the first reinforcement component (3) comprises a reinforcement rod (31); one end of the reinforcement rod (31) is arranged in the compacted body (2) and the other end is arranged in the existing roadbed.
2. The width-supporting structure for filling engineering according to claim 1 is characterized in that: Both ends of the reinforcement rod (31) are connected to reinforcement plates (32), and the reinforcement plates (32) are arranged perpendicular to the reinforcement rod (31).
3. The width-supporting structure for filling engineering according to claim 2 is characterized in that: The reinforcement rod (31) is arranged perpendicularly to the new and old interfaces of the newly built roadbed and the existing roadbed.
4. The width-supporting structure for filling engineering according to claim 3 is characterized in that: There are a plurality of reinforcement rods (31), a connecting rod (33) is provided between two upper and lower adjacent reinforcement rods (31), and two ends of the connecting rod (33) are respectively connected to the two upper and lower adjacent reinforcement rods (31).
5. The width-supporting structure for filling engineering according to claim 1 is characterized in that: The second reinforcement assembly (4) comprises an anchor plate (41) abutting against the slope retaining wall (11) and an anchor rod (42) arranged on the anchor plate (41); the anchor rod (42) passes through the slope retaining wall (11) and is inserted into the built-up body (2); the anchor rod (42) is arranged perpendicular to the slope retaining wall (11).
6. The width-supporting structure for filling engineering according to claim 5 is characterized in that: One end of the anchor rod (42) away from the anchor plate (41) is connected to a reinforcement baffle (43), and there are a plurality of reinforcement baffles (43), which are evenly distributed on the anchor rod (42).
7. The sidewall structure for filling engineering according to claim 6 is characterized in that: The reinforcement baffle (43) is arranged in an inclined manner, and an end of the reinforcement baffle (43) away from the anchor rod (42) is inclined in a direction close to the anchor plate (41).
8. The sidewall structure for filling engineering according to claim 7 is characterized in that: One end of the anchor rod (42) away from the anchor plate (41) is connected to a reinforcement vertical pile (44), and one end of the reinforcement vertical pile (44) away from the anchor rod (42) is inserted into the ground.