Concrete permeable rate detection equipment
By designing clamping components and sealing systems, the existing concrete water permeability detection equipment has been solved, and the effect of simplifying operation and improving detection accuracy has been achieved.
Patent Information
- Application Number
- CN202420256701.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-02-02
AI Technical Summary
The existing concrete water permeability detection equipment is cumbersome to operate, and insufficient sealing leads to water leakage, affecting the detection accuracy.
A concrete water permeability detection device is designed, using a clamping assembly, including a first shield and a second shield, which fills the gaps through a sealing gasket and a sealing strip to avoid water overflow, and transports water to the bottom of the concrete test block through a delivery pipe. .
Simplify the detection operation, improve the sealing, avoid water overflow, and ensure the accuracy of water permeability detection.
Smart Images

Figure CN222506099U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete detection, in particular to a concrete water permeability detection device. Background Art
[0002] Before pouring concrete, test blocks need to be made to test the strength and permeability of the concrete. Common concrete test blocks are mainly in the shape of cubes and cylinders. Cubic concrete test blocks are used for compression tests, while cylindrical concrete test blocks are used for permeability tests.
[0003] The existing concrete water permeability testing equipment is relatively cumbersome to use. It is necessary to first connect the cylindrical concrete test block to the mold through hydraulic equipment to prevent water from penetrating from the gap between the concrete test block and the testing equipment. Otherwise, due to insufficient sealing, water will seep out of the concrete test block, affecting the detection accuracy of the water permeability. Then, the mold containing the cylindrical concrete test block is placed in the testing equipment to start the testing work. After the test is completed, it is necessary to first take the mold containing the cylindrical concrete test block out of the testing equipment, and then separate the mold from the cylindrical concrete test block through hydraulic equipment. Utility Model Content
[0004] Based on this, the purpose of the utility model is to provide a concrete water permeability detection device to solve the technical problem that the detection operation is relatively complicated.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a concrete water permeability detection device, comprising a table body and a water tank, a clamping assembly is arranged on the top of the table body, and the clamping assembly comprises a first shield, a first sealing gasket is connected inside the first shield, and a first sealing strip is connected to the outer surface of the first sealing gasket, a second shield is connected to one side of the outer surface of the first shield, and a second sealing gasket is connected inside the second shield, a second sealing strip is connected to the back of the second sealing gasket, a groove is arranged at the bottom of the second sealing gasket, an observation port is arranged at the top of the first shield, and a conveying pipe runs through the bottom of the first shield.
[0006] By adopting the above technical solution, the second protective cover is first rotated to open, and then the concrete test block is placed inside the first protective cover and the second protective cover is closed. At this time, the gap between the concrete test block and the two protective covers is filled by the first sealing pad and the second sealing pad, and the gap between the two sealing pads is filled by the first sealing strip and the second sealing strip, thereby preventing water from overflowing through the gap between the concrete test block and the two protective covers to affect the water permeability detection. At the same time, water is transported to the bottom of the concrete test block through the delivery pipe. When the water permeability of the concrete test block is high, water passes through the concrete test block and overflows from the top of the concrete test block. The water can be observed through the observation port. When the water permeability of the concrete test block is low, water cannot pass through the concrete test block, so no water can be seen during observation.
[0007] Furthermore, the first shield is fixedly connected to the table body via bolts, and the second shield is rotatably connected to the first shield via a hinge.
[0008] By adopting the above technical solution, the staff rotates the second protective cover to open it, then puts the concrete test block into the first protective cover, and then closes the second protective cover.
[0009] Furthermore, the first sealing strip is matched with the second sealing strip, and the cross-sections of the first sealing strip and the second sealing strip are both serrated.
[0010] By adopting the above technical solution, the gap between the concrete test block and the two shields is filled by the first sealing pad and the second sealing pad, and the gap between the two sealing pads is filled by the first sealing strip and the second sealing strip.
[0011] Furthermore, the first sealing gasket, the second sealing gasket, the first sealing strip and the second sealing strip are all made of rubber material.
[0012] By adopting the above technical solution, the first sealing pad, the second sealing pad, the first sealing strip and the second sealing strip can prevent water from overflowing through the gap between the concrete test block and the two shields to affect the water permeability detection.
[0013] Furthermore, a fastener is connected to one side of the first shield.
[0014] By adopting the above technical solution, the staff closes the second protective cover and fastens the fasteners to complete the limiting between the first protective cover and the second protective cover. The staff releases the fasteners, and then the staff turns and opens the second protective cover to take out the concrete test block.
[0015] Furthermore, the fastener is rotatably connected to the first shield, and the fastener is detachably connected to the second shield.
[0016] By adopting the above technical solution, the staff puts the concrete test block into the first protective cover, and then the staff closes the second protective cover and fastens the fasteners to complete the limiting between the first protective cover and the second protective cover.
[0017] Furthermore, the water tank is located below the table body, a hand valve is connected to the outer surface of the water tank, a water pump is installed on one side of the water tank, and a solenoid valve is connected to the water outlet of the water pump through a pipeline.
[0018] By adopting the above technical solution, the staff turns on the water pump and the solenoid valve. After the water pump is started, the water in the water tank is sent into the pipe. Then the water flows through the pipe, the solenoid valve and the delivery pipe in sequence, so that the water is delivered to the bottom of the concrete test block. When the water permeability of the concrete test block is high, the water passes through the concrete test block.
[0019] Furthermore, the solenoid valve is connected to the delivery pipe through a pipeline.
[0020] By adopting the above technical solution, after the water pump is started, the water in the water tank is sent into the pipeline, and then the water flows through the pipeline, the solenoid valve and the delivery pipe in sequence.
[0021] In summary, the utility model mainly has the following beneficial effects:
[0022] The utility model arranges the clamping component, firstly rotates the second protective cover to open, then puts the concrete test block into the first protective cover and closes the second protective cover, at this time, fills the gap between the concrete test block and the two protective covers by the first sealing pad and the second sealing pad, and fills the gap between the two sealing pads by the first sealing strip and the second sealing strip, thereby preventing water from overflowing through the gap between the concrete test block and the two protective covers to affect the water permeability detection, and at the same time, water is transported to the bottom of the concrete test block through the delivery pipe, when the water permeability of the concrete test block is high, water passes through the concrete test block and overflows from the top of the concrete test block, and the water can be observed through the observation port, and when the water permeability of the concrete test block is low, water cannot pass through the concrete test block, so the water cannot be seen during observation; the detection operation is simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of the utility model;
[0024] Figure 2 This is a schematic diagram of the first shield structure of the utility model;
[0025] Figure 3 This is a schematic diagram of the second shield structure of the utility model;
[0026] Figure 4 For the utility model Figure 3 A magnified view of the structure at A;
[0027] Figure 5 For the utility model Figure 3 A magnified view of the structure at B in FIG.
[0028] Figure 6 It is a schematic diagram of the structure of the utility model when viewed from above.
[0029] In the figure: 1. table body; 2. water tank; 3. hand valve; 4. water pump; 5. clamping assembly; 501. first protective cover; 502. second protective cover; 503. first sealing gasket; 504. second sealing gasket; 505. observation port; 506. delivery pipe; 507. groove; 508. first sealing strip; 509. second sealing strip; 6. fastener; 7. pipeline; 8. solenoid valve. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. The embodiments described below with reference to the drawings are exemplary and are only used to explain the utility model, and cannot be understood as limiting the utility model.
[0031] The following describes an embodiment of the utility model based on its overall structure.
[0032] Embodiment 1:
[0033] A concrete permeability testing device, such as Figure 1-Figure 5 As shown, it includes a table body 1 and a water tank 2, and a clamping assembly 5 is arranged on the top of the table body 1.
[0034] Specifically, the clamping assembly 5 includes a first shield 501 connected to the top of the table body 1, the first shield 501 is fixedly connected to the table body 1 by bolts, a second shield 502 is connected to one side of the outer surface of the first shield 501, and the second shield 502 is rotatably connected to the first shield 501 by a hinge. The staff rotates the second shield 502 to open it, and then the staff puts the concrete test block into the first shield 501, and then the staff closes the second shield 502; a first sealing gasket 503 is connected to the inside of the first shield 501, and a first sealing strip 508 is connected to the outer surface of the first sealing gasket 503, a second sealing gasket 504 is connected to the inside of the second shield 502, and a second sealing strip 509 is connected to the back of the second sealing gasket 504, the first sealing strip 508 is adapted to the second sealing strip 509, and the cross-sections of the first sealing strip 508 and the second sealing strip 509 are both serrated, and the first sealing The pad 503, the second sealing pad 504, the first sealing strip 508 and the second sealing strip 509 are all made of rubber material. The gap between the concrete test block and the two protective covers is filled by the first sealing pad 503 and the second sealing pad 504, and the gap between the two sealing pads is filled by the first sealing strip 508 and the second sealing strip 509. A groove 507 is provided at the bottom of the second sealing pad 504. When the second protective cover 502 is closed, the delivery pipe 506 enters the groove 507. An observation port 505 is provided at the top of the first protective cover 501. When the water permeability of the concrete test block is high, water passes through the concrete test block and overflows from the top of the concrete test block. At this time, the staff can check the water through the observation port 505. A delivery pipe 506 runs through the bottom of the first protective cover 501. The water flows through the pipeline 7, the solenoid valve 8 and the delivery pipe 506 in sequence, so that the water is delivered to the bottom of the concrete test block.
[0035] See also Figure 1 and Figure 6In the above embodiment, the water tank 2 is located below the table body 1, and a hand valve 3 is connected to the outer surface of the water tank 2, through which water can be injected into the water tank 2; a water pump 4 is installed on one side of the water tank 2, and after the water pump 4 is started, the water in the water tank 2 is sent into the pipe 7; the water outlet of the water pump 4 is connected to the solenoid valve 8 through the pipe 7, and the solenoid valve 8 is connected to the delivery pipe 506 through the pipe 7, and the water flows through the pipe 7, the solenoid valve 8 and the delivery pipe 506 in sequence, so that the water is delivered to the bottom of the concrete test block.
[0036] Embodiment 2:
[0037] On the basis of the above-mentioned embodiment 1, although the detection operation can be made simple and convenient by setting the clamping assembly 5; if the limiting mechanism between the first protective cover 501 and the second protective cover 502 is automatic, it will lead to increased energy consumption of the equipment, and if the bolts are manually screwed in, the operation is more cumbersome; now, by setting the fastener 6, the first protective cover 501 and the second protective cover 502 can be quickly limited, and the operation is simple.
[0038] See also Figure 1 , Figure 3 and Figure 6 In the above embodiment, a fastener 6 is connected to one side of the first shield 501, the fastener 6 is rotatably connected to the first shield 501, and the fastener 6 is detachably connected to the second shield 502. The staff closes the second shield 502 and fastens the fastener 6 to complete the limiting between the first shield 501 and the second shield 502.
[0039] The implementation principle of the utility model is as follows: first, the staff rotates and opens the second protective cover 502, and then the staff puts the concrete test block into the first protective cover 501, and then the staff closes the second protective cover 502 and fastens the fastener 6 to complete the limit between the first protective cover 501 and the second protective cover 502. At this time, the gap between the concrete test block and the two protective covers is filled by the first sealing gasket 503 and the second sealing gasket 504, and the gap between the two sealing gaskets is filled by the first sealing strip 508 and the second sealing strip 509, so as to prevent water from overflowing through the gap between the concrete test block and the two protective covers and affecting the water permeability detection;
[0040] The staff turns on the water pump 4 and the solenoid valve 8. After the water pump 4 is started, the water in the water tank 2 is sent to the pipe 7. Then the water flows through the pipe 7, the solenoid valve 8 and the delivery pipe 506 in sequence, so that the water is delivered to the bottom of the concrete test block. When the water permeability of the concrete test block is high, the water passes through the concrete test block and overflows from the top of the concrete test block. At this time, the staff can check the water through the observation port 505. When the water permeability of the concrete test block is low, the water cannot pass through the concrete test block, so the staff cannot see the water at the observation port 505.
[0041] After the test is completed, the staff loosens the fastener 6, and then the staff turns to open the second protective cover 502 to take out the concrete test block. By taking out the concrete test block for testing, it can be checked to which specific position the water has penetrated. When the water in the water tank 2 is insufficient, the staff can inject water into the water tank 2 through the hand valve 3.
[0042] Although an embodiment of the utility model has been shown and described, this specific embodiment is only an explanation of the utility model and is not a limitation of the utility model. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contribution as needed without departing from the principles and purpose of the utility model. However, as long as they are within the scope of the claims of the utility model, they are protected by patent law.
Claims
1. A concrete water permeability testing device, comprising a table body (1) and a water tank (2), characterized in that: A clamping assembly (5) is arranged on the top of the table body (1), and the clamping assembly (5) includes a first protective cover (501), the first protective cover (501) is internally connected to a first sealing gasket (503), and the outer surface of the first sealing gasket (503) is connected to a first sealing strip (508), one side of the outer surface of the first protective cover (501) is connected to a second protective cover (502), and the second protective cover (502) is internally connected to a second sealing gasket (504), the back of the second sealing gasket (504) is connected to a second sealing strip (509), a groove (507) is provided at the bottom of the second sealing gasket (504), an observation port (505) is provided at the top of the first protective cover (501), and a conveying pipe (506) passes through the bottom of the first protective cover (501).
2. The concrete water permeability detection device according to claim 1, characterized in that: The first shield (501) is fixedly connected to the table body (1) via bolts, and the second shield (502) is rotatably connected to the first shield (501) via a hinge.
3. The concrete water permeability detection device according to claim 1, characterized in that: The first sealing strip (508) is matched with the second sealing strip (509), and the cross sections of the first sealing strip (508) and the second sealing strip (509) are both serrated.
4. The concrete water permeability detection device according to claim 3 is characterized in that: The first sealing gasket (503), the second sealing gasket (504), the first sealing strip (508) and the second sealing strip (509) are all made of rubber material.
5. The concrete water permeability detection device according to claim 1, characterized in that: A fastener (6) is connected to one side of the first protective cover (501).
6. The concrete water permeability detection device according to claim 5, characterized in that: The fastener (6) is rotatably connected to the first shield (501), and the fastener (6) is detachably connected to the second shield (502).
7. The concrete water permeability detection device according to claim 1, characterized in that: The water tank (2) is located below the table body (1); a hand valve (3) is connected to the outer surface of the water tank (2); a water pump (4) is installed on one side of the water tank (2); and a water outlet end of the water pump (4) is connected to a solenoid valve (8) via a pipe (7).
8. The concrete water permeability detection device according to claim 7, characterized in that: The solenoid valve (8) is connected to the delivery pipe (506) via a pipeline (7).