Material placing frame for speed chain production line

By designing the disassembly and assembly mechanism on the double-speed chain production line, the disassembly connection between the placement frame and the fluent strip is achieved, which solves the problem that the damaged fluent strip cannot be disassembled and replaced separately in the prior art, and improves the operation convenience.

CN222521288UActive Publication Date: 2025-02-25XIAMEN INOXIN AUTOMATION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421078496.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-02-25
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

The existing double-speed chain production line cannot be disassembled and replaced separately for material placement racks, resulting in difficulty in repairing and replacement.

Method used

A material placement rack including a placement rack, a fluent strip and a material box is designed, and the disassembly connection between the placement rack and the fluent strip is achieved through a disassembly and assembly mechanism. The disassembly and assembly mechanism consists of a first plug rod assembly, a second plug rod assembly and a bolt assembly for pre-connection, limiting and fixed installation.

Benefits of technology

Through the design of the disassembly and assembly mechanism, the smooth disassembly and replacement of individually damaged fluent strips is achieved, improving the operator's operating convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222521288U_ABST
    Figure CN222521288U_ABST
Patent Text Reader

Abstract

The utility model discloses a material placing rack for a speed chain production line, which comprises a placing rack, a fluent strip and a material box, the placing rack is detachably connected with the fluent strip through a dismounting mechanism, and the dismounting mechanism comprises a first inserting rod assembly, a second inserting rod assembly and a bolt assembly. The first inserting rod assembly is used for pre-connecting the containing frame and the fluent strip, the second inserting rod assembly is used for limiting the position of the fluent strip in the pre-connected state, and by arranging the disassembling and assembling mechanism, a first inserting hole and a first inserting rod in the clamped state pre-connect the first mounting frame and the containing frame; and a second inserting rod and a second inserting hole in a clamping state limit the position of the fluent strip in a pre-connected state, then a bolt in a tightening state is used for fastening and mounting the second mounting frame and the placing frame, and the placing frame and the fluent strip in the pre-connected state are fixedly mounted, so that the independently damaged fluent strip can be conveniently disassembled, assembled, replaced or overhauled, and the working efficiency is improved. And the operation of operators is also facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of placing racks, in particular to a material placing rack for a double-speed chain production line. Background Art

[0002] When processing the tooling plate, it needs to be transported through the double-speed chain production line. The double-speed chain production line uses the double-speed chain as the driving medium and the motor as the power source to drive the tooling plate to move. Usually, a material placement rack is set on the double-speed chain production line for placing tools.

[0003] The existing material placement rack for the double-speed chain production line is provided with multiple groups of flow bars on the placement rack, and multiple material boxes are placed on each group of flow bars. The flow bars can assist the material boxes in loading or unloading, but the multiple groups of flow bars are installed on the placement rack through a fixed structure. When the flow bars are used for a period of time, they need to be inspected and maintained, and the installed flow bars are not convenient for operators to inspect and maintain, and when one of the multiple groups of flow bars is damaged and needs to be replaced, it is impossible to disassemble and assemble one of the groups of flow bars separately. Utility Model Content

[0004] The purpose of the utility model is to provide a material placement rack for a double-speed chain production line to solve the problem raised in the above background technology that when one of the multiple groups of flow bars is damaged and needs to be replaced, it is impossible to disassemble and assemble one of the groups of flow bars separately.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a material placement rack for a double-speed chain production line, comprising a placement rack, a flow strip and a material box, wherein the placement rack and the flow strip are detachably connected via a disassembly and assembly mechanism;

[0006] The disassembly and assembly mechanism comprises a first plug rod assembly, a second plug rod assembly and a bolt assembly;

[0007] The first insertion rod assembly is used to pre-connect the placement rack with the flow strip;

[0008] The second plunger assembly is used to limit the position of the fluent strip in the pre-connected state;

[0009] The bolt assembly is used to fix the placement rack and the flow strip in a pre-connected state.

[0010] Preferably, the first insertion rod assembly includes a first mounting frame, a first insertion rod and a first insertion hole;

[0011] The first mounting frame is detachably connected to the placement frame, the first insertion rod is fixedly connected to the end of the first mounting frame, and the first insertion hole is opened at the end of the outer wall of the placement frame and completely penetrates through it.

[0012] Preferably, one end of the flow strip is fixedly connected to the end of the first mounting frame, and the first socket is used for inserting the first insertion rod therein, and the first socket and the first insertion rod in the engaged state are used to pre-connect the first mounting frame with the placement frame.

[0013] Preferably, the second plug rod assembly includes a rotating member, a connecting member, a second plug rod, a spring, a connecting ring and a second plug hole;

[0014] The rotating member is rotatably connected to the end of the first plug rod, the connecting member is fixedly connected to the end of the rotating member, the second plug rod is slidably connected to the bent portion of the connecting member, the spring is sleeved on one end of the outer wall of the second plug rod, the connecting ring is fixedly connected to the end of the outer wall of the second plug rod, and the two ends of the spring are respectively fixedly connected to the connecting ring and the connecting member, and the second insertion hole is opened at the end of the outer wall of the placement rack and extends toward the inside thereof.

[0015] Preferably, the second insertion hole is used for inserting the second insertion rod therein, and the second insertion hole and the second insertion rod in the engaged state are used to lock and limit the rotation of the rotating member and the connecting member.

[0016] Preferably, the bolt assembly comprises a second mounting frame, a bolt hole and a bolt;

[0017] The second mounting frame is rotatably mounted on the other end of the flow strip, the bolt holes sequentially penetrate the second mounting frame and one end of the placement frame, the bolts are threadedly connected to the bolt holes, and the tightened bolts are used to fasten the second mounting frame and the placement frame.

[0018] Compared with the prior art, the beneficial effect of the utility model is: by setting up a disassembly and assembly mechanism, the first socket in the engaged state and the first plug rod pre-connect the first mounting frame and the placement frame, and the second plug rod and the second socket in the engaged state limit the position of the pre-connected fluent strip, and then the bolts in the tightened state fasten the second mounting frame and the placement frame to install them, so that the placement frame and the fluent strip in the pre-connected state are fixedly installed, thereby facilitating the disassembly, replacement or repair of a single damaged fluent strip, and also facilitating the operator to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the main structure of the utility model;

[0020] Figure 2 This is a schematic diagram of the disassembly and assembly mechanism structure of the utility model;

[0021] Figure 3 For the utility model Figure 2Schematic diagram of the structure of A in FIG.

[0022] Figure 4 This is a structural schematic diagram of the disassembly and assembly mechanism of the utility model from another perspective;

[0023] Figure 5 For the utility model Figure 4 Schematic diagram of the B structure.

[0024] In the figure: 1. placement rack; 2. smooth strip; 3. disassembly and assembly mechanism; 301. first mounting rack; 302. first plug rod; 303. rotating member; 304. connecting member; 305. second mounting rack; 306. bolt hole; 307. bolt; 308. second plug rod; 309. spring; 3010. connecting ring; 3011. first plug hole; 3012. second plug hole; 4. material box. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1-5 The utility model provides a technical solution for a material placement rack for a double-speed chain production line: a material placement rack for a double-speed chain production line, comprising a placement rack 1, a flow strip 2 and a material box 4, the placement rack 1 and the flow strip 2 are disassembled and connected through a disassembly mechanism 3;

[0027] The disassembly and assembly mechanism 3 includes a first plug rod assembly, a second plug rod assembly and a bolt assembly;

[0028] The first plug-in rod assembly is used to pre-connect the placement rack 1 with the flow strip 2;

[0029] The second plug rod assembly is used to limit the position of the fluent strip 2 in the pre-connected state;

[0030] The bolt assembly is used to fix and install the placement rack 1 and the flow strip 2 in a pre-connected state.

[0031] Please refer to Figure 3 , the first plug rod assembly includes a first mounting frame 301, a first plug rod 302 and a first plug hole 3011;

[0032] The first mounting frame 301 is detachably connected to the placement frame 1 , the first insertion rod 302 is fixedly connected to the end of the first mounting frame 301 , and the first insertion hole 3011 is opened at the end of the outer wall of the placement frame 1 and completely penetrates through it.

[0033] In this embodiment, the first mounting frame 301 is pre-connected with the placement frame 1 by inserting the first insertion rod 302 on the first mounting frame 301 into the first insertion hole 3011 so that the first insertion hole 3011 and the first insertion rod 302 are in a locked state.

[0034] Please refer to Figure 2 One end of the flow strip 2 is fixedly connected to the end of the first mounting frame 301, and the first socket 3011 is used for inserting the first insertion rod 302 therein, and the first socket 3011 and the first insertion rod 302 in the engaged state are used to pre-connect the first mounting frame 301 with the placement frame 1.

[0035] In this embodiment, the first insertion hole 3011 and the first insertion rod 302 in the engaged state pre-connect the first installation rack 301 and the placement rack 1 .

[0036] Please refer to Figure 3 The second plug rod assembly includes a rotating member 303, a connecting member 304, a second plug rod 308, a spring 309, a connecting ring 3010 and a second plug hole 3012;

[0037] The rotating member 303 is rotatably connected to the end of the first plug rod 302, the connecting member 304 is fixedly connected to the end of the rotating member 303, the second plug rod 308 is slidably connected to the bent portion of the connecting member 304, the spring 309 is sleeved on one end of the outer wall of the second plug rod 308, the connecting ring 3010 is fixedly connected to the end of the outer wall of the second plug rod 308, and the two ends of the spring 309 are respectively fixedly connected to the connecting ring 3010 and the connecting member 304, and the second socket 3012 is opened at the end of the outer wall of the placement rack 1 and extends inwardly thereof.

[0038] In this embodiment: by rotating the rotating member 303 by hand, the rotating member 303 in the rotating state drives the connecting member 304 to rotate ninety degrees, and the connecting member 304 in the ninety-degree rotating state drives the second plug rod 308 to contact and squeeze the outer wall of the vertical pole of the placement rack 1, so that the second plug rod 308 in the compressed state squeezes the spring 309, and the spring 309 is compressed. When the connecting member 304 drives the second plug rod 308 to separate from the outer wall of a vertical pole of the placement rack 1, the spring 309 in the reset state drives the second plug rod 308 to insert into the second socket 3012, so that the second socket 3012 in the engaged state and the second plug rod 308 lock and limit the rotation of the rotating member 303 and the connecting member 304.

[0039] Please refer to Figure 4 The second plug hole 3012 is used for inserting the second plug rod 308 therein, and the second plug hole 3012 and the second plug rod 308 in the engaged state are used to lock and limit the rotation of the rotating member 303 and the connecting member 304.

[0040] In this embodiment: the rotation of the rotating member 303 and the connecting member 304 is locked and limited by the second plug hole 3012 and the second plug rod 308 in the engaged state, so that the placement rack 1 and the flow strip 2 are pre-connected.

[0041] Please refer to Figure 2 , the bolt assembly includes a second mounting frame 305, a bolt hole 306 and a bolt 307;

[0042] The second mounting frame 305 is rotatably mounted on the other end of the flow strip 2, and the bolt hole 306 passes through the second mounting frame 305 and one end of the placement frame 1 in sequence. The bolt 307 is threadedly connected to the bolt hole 306, and the tightened bolt 307 is used to fasten the second mounting frame 305 and the placement frame 1.

[0043] In this embodiment: by abutting the second mounting frame 305 against the outer wall of another vertical pole of the placement frame 1, using a bolt 307 to penetrate the bolt hole 306, and the bolt 307 and the bolt hole 306 are threadedly connected, the tightened bolt 307 fastens the second mounting frame 305 and the placement frame 1, thereby fixing the placement frame 1 and the flow strip 2 in the pre-connected state.

[0044] Working principle: When the flow strip 2 needs to be installed, the first insertion rod 302 on the first mounting frame 301 is inserted into the first insertion hole 3011, so that the first insertion hole 3011 and the first insertion rod 302 in the engaged state pre-connect the first mounting frame 301 with the placement frame 1, and then the rotating member 303 is rotated by hand, and the rotating member 303 in the rotating state drives the connecting member 304 to rotate 90 degrees, and the connecting member 304 in the 90-degree rotation state drives the second insertion rod 308 to connect with the outer wall of the vertical pole of the placement frame 1. The second plug rod 308 is pressed against the spring 309, and the spring 309 is compressed. When the connecting member 304 drives the second plug rod 308 to separate from the outer wall of a vertical pole of the placement rack 1, the spring 309 in the reset state drives the second plug rod 308 to be inserted into the second plug hole 3012, so that the second plug hole 3012 and the second plug rod 308 in the engaged state lock and limit the rotation of the rotating member 303 and the connecting member 304, thereby pre-connecting the placement rack 1 with the flow strip 2.

[0045] Finally, the second mounting frame 305 is abutted against the outer wall of the other vertical pole of the placement rack 1, and the bolt 307 is passed through the bolt hole 306, and the bolt 307 is threadedly connected to the bolt hole 306, so that the tightened bolt 307 fastens the second mounting frame 305 and the placement rack 1, and then fixes the placement rack 1 and the flow strip 2 in the pre-connected state, thereby facilitating the disassembly, replacement or maintenance of the damaged flow strip 2 alone, and also facilitating the operator to operate.

[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A material placement rack for a double-speed chain production line, comprising a placement rack (1), a flow strip (2) and a material box (4), characterized in that: The placement rack (1) and the flow strip (2) are detachably connected via a disassembly and assembly mechanism (3); The disassembly and assembly mechanism (3) comprises a first plug rod assembly, a second plug rod assembly and a bolt assembly; The first insertion rod assembly is used to pre-connect the placement rack (1) with the flow strip (2); The second plug rod assembly is used to limit the position of the flow strip (2) in the pre-connected state; The bolt assembly is used to fix the placement rack (1) and the flow strip (2) in a pre-connected state.

2. A material placement rack for a double-speed chain production line according to claim 1, characterized in that: The first insertion rod assembly comprises a first mounting frame (301), a first insertion rod (302) and a first insertion hole (3011); The first mounting frame (301) is detachably connected to the placement frame (1), the first insertion rod (302) is fixedly connected to the end of the first mounting frame (301), and the first insertion hole (3011) is opened at the end of the outer wall of the placement frame (1) and completely penetrates.

3. A material placement rack for a double-speed chain production line according to claim 2, characterized in that: One end of the flow strip (2) is fixedly connected to the end of the first mounting frame (301), and the first insertion hole (3011) is used for inserting the first insertion rod (302) therein, and the first insertion hole (3011) and the first insertion rod (302) in the engaged state are used to pre-connect the first mounting frame (301) with the placement frame (1).

4. The material placement rack for the double-speed chain production line according to claim 2, characterized in that: The second plug rod assembly comprises a rotating member (303), a connecting member (304), a second plug rod (308), a spring (309), a connecting ring (3010) and a second plug hole (3012); The rotating member (303) is rotationally connected to the end of the first plug rod (302), the connecting member (304) is fixedly connected to the end of the rotating member (303), the second plug rod (308) is slidably connected to the bent portion of the connecting member (304), the spring (309) is sleeved on one end of the outer wall of the second plug rod (308), the connecting ring (3010) is fixedly connected to the end of the outer wall of the second plug rod (308), and the two ends of the spring (309) are respectively fixedly connected to the connecting ring (3010) and the connecting member (304), and the second insertion hole (3012) is opened at the end of the outer wall of the placement rack (1) and extends toward the inside thereof.

5. The material placement rack for the double-speed chain production line according to claim 4, characterized in that: The second insertion hole (3012) is used for inserting the second insertion rod (308) therein, and the second insertion hole (3012) and the second insertion rod (308) in the engaged state are used to lock and limit the rotation of the rotating member (303) and the connecting member (304).

6. The material placement rack for a double-speed chain production line according to claim 1, characterized in that: The bolt assembly comprises a second mounting frame (305), a bolt hole (306) and a bolt (307); The second mounting frame (305) is rotatably mounted on the other end of the flow strip (2), and the bolt hole (306) passes through the second mounting frame (305) and one end of the placement frame (1) in sequence. The bolt (307) is threadedly connected to the bolt hole (306), and the bolt (307) in a tightened state is used to fasten the second mounting frame (305) and the placement frame (1) for installation.