Automatic stacking device used after pipeline machining
By designing the automatic material coding device after pipeline processing, the conveyor belt, feed channel and finishing mechanism are used to realize the automatic transmission and finishing of steel pipes after rust removal, solving the problem of manual finishing and increasing the burden, and improving work efficiency and benefits.
Patent Information
- Application Number
- CN202421381295.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-06-17
AI Technical Summary
In the prior art, steel pipes after rust removal need to be manually taken out and sorted, which increases the burden on staff.
An automatic material coding device after pipeline processing is designed, including a conveyor belt, material conveyor, collection box and finishing mechanism. The steel pipe is conveyed to the collection box through the conveyor belt and material conveyor, and the finishing mechanism is organized.
The automatic transmission and finishing of steel pipes after rust removal is realized, reducing the burden of manual collection and finishing, and improving work efficiency and benefits.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pipeline processing equipment, and in particular relates to an automatic material stacking device after pipeline processing. Background Art
[0002] The steel pipe derusting machine is a combined derusting machine for cleaning the inner and outer walls of steel pipes. It cleans the outer surface of the steel pipe by shot blasting, and cleans the inner surface by shot peening, so that the surface oxide scale is removed. The machine mainly uses the high-speed shot stream thrown by the efficient and powerful shot blasting machine to blast the rotating workpiece surface and the inner cavity in the chamber to remove other sticky sand, rust layer, welding slag, oxide scale and other debris, so as to obtain a fine and smooth surface. It improves the adhesion between the paint film and the steel surface, and improves the fatigue strength and corrosion resistance of the steel, improves the intrinsic quality of the steel, and prolongs its service life.
[0003] At present, the steel pipes after rust removal are taken out manually or thrown on the ground mat, and then the rust-removed pipes are mostly stacked and sorted manually, which increases the burden on the staff.
[0004] Based on this, the applicant considered designing an automatic stacking device after pipeline processing. Utility Model Content
[0005] In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is: how to provide an automatic stacking device after pipeline processing.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] A device for automatically stacking materials after pipeline processing comprises a conveyor belt, a material conveying channel, a collection box and a sorting mechanism, the conveyor belt comprises a discharge end, the material conveying channel comprises a material receiving rack and a slide, the discharge end of the conveyor belt is connected to the material receiving rack of the material conveying channel, the collection box is arranged on the ground, the slide is located below the material receiving rack, one end of the slide is connected to the material receiving rack, and the other end is connected to the collection box, the sorting mechanism is installed in the collection box, and is used to apply thrust along the width direction of the collection box.
[0008] Compared with the prior art, the utility model has the following advantages:
[0009] By setting up the conveyor belt, feed channel, collection box and sorting mechanism, the rust-removed steel pipe can be conveyed to the collection box by the conveyor belt and feed channel, and sorted by the sorting mechanism, thereby reducing the burden of manual collection and sorting.
[0010] The above-mentioned automatic stacking device after pipeline processing has the advantages of simple structure and easy implementation. It is suitable for installation and use in the subsequent collection and sorting process of existing pipeline processing, and has low cost of use and can improve benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0012] Figure 2 for Figure 1 AA cross-sectional structure diagram;
[0013] Figure 3 It is a schematic diagram of the cross-sectional structure of the longitudinal material conveying channel on the conveyor belt;
[0014] Description of Reference Numerals
[0015] 100 conveyor belt, 110 discharge end;
[0016] 200 feeding channel, 210 collecting rack, 220 slideway;
[0017] 300 collection boxes;
[0018] 410 first limiting plate, 420 second limiting plate;
[0019] 510 first cylinder, 520 push plate;
[0020] 610 second cylinder, 620 push rod;
[0021] 700 connecting walls. DETAILED DESCRIPTION
[0022] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0023] When implementing: Figure 1-3 As shown, an automatic material coding device after pipeline processing includes a conveyor belt 100, a feed channel 200, a collection box 300 and a sorting mechanism, the conveyor belt 100 includes a discharge end 110, the feed channel 200 includes a receiving rack 210 and a slide 220, the discharge end 110 of the conveyor belt 100 is connected to the receiving rack 210 of the feed channel 200, the collection box 300 is set on the ground, the slide 220 is located below the receiving rack 210, one end of the slide 220 is connected to the receiving rack 210, and the other end is connected to the collection box 300, and the sorting mechanism is installed in the collection box 300, and is used to apply thrust along the width direction of the collection box 300.
[0024] Compared with the prior art, the utility model has the following advantages:
[0025] By setting up the conveyor belt 100, the material conveying channel 200, the collection box 300 and the sorting mechanism, the rust-removed steel pipe can be conveyed to the collection box 300 by the conveyor belt and the material conveying channel 200, and sorted by the sorting mechanism, thereby reducing the burden of manual collection and sorting.
[0026] The above-mentioned automatic stacking device after pipeline processing has the advantages of simple structure and easy implementation. It is suitable for installation and use in the subsequent collection and sorting process of existing pipeline processing, and has low cost of use and can improve benefits.
[0027] During implementation, the moving direction of the pipe after entering the collection box 300 is consistent with the length direction of the collection box 300 .
[0028] In this embodiment, Figure 1-3 As shown, the conveyor belt 100 is provided with a longitudinal material conveying channel for making the length direction of the pipeline consistent with the conveying direction of the conveyor belt 100 .
[0029] During implementation, the material receiving rack 210 has an inlet and an outlet, and the angle between the inlet direction of the inlet and the outlet direction of the outlet is ninety degrees. The pipeline is fed into the material receiving rack 210 from the inlet along its length direction, and then rolled out of the outlet through the outer tube wall of the pipeline along the transverse radial direction of the pipeline, thereby rolling into the slide 220 and the collection box 300.
[0030] In this way, by setting up the longitudinal material conveying channel, the length direction of the pipe after processing and rust removal is consistent with the conveying direction when it enters the receiving rack 210 during the conveying process, which is convenient for subsequent entry into the collection box 300.
[0031] In this embodiment, Figure 1-3 As shown, it also includes a frame, the conveyor belt 100 is arranged on the frame, and the longitudinal material conveying channel includes a first limit plate 410 and a second limit plate 420, the first limit plate 410 and the second limit plate 420 are arranged opposite to each other and are respectively fixed to the two side edges of the frame, and a transportation channel is formed between the first limit plate 410 and the second limit plate 420.
[0032] In this way, by means of the provided frame, the first limit plate 410 and the second limit plate 420, the pipeline can be transported to the conveying channel 200 along the pipeline transport channel, and the length direction of the pipeline can be kept consistent with the conveying direction during transportation.
[0033] In this embodiment, Figure 1-3As shown, the sorting mechanism includes a first cylinder 510 and a push plate 520, the collection box 300 includes a first side wall and a second side wall relative to each other, the first cylinder 510 is installed on the first side wall of the collection box 300, the push plate 520 is arranged in the collection box 300 close to the first side wall, and is connected to the push rod of the first cylinder 510 in a transmission manner.
[0034] In this way, by setting the first cylinder 510 and the push plate 520, the pipes can be pushed flush by the first cylinder 510 and the push plate 520 after entering the collection box 300, so as to organize the pipes falling into the collection box 300, and the structure is relatively simple and the organizing effect is relatively stable.
[0035] During implementation, the first cylinder 510 can drive the push plate 520 to move toward the second side wall.
[0036] In this embodiment, Figure 1-3 As shown, the material receiving rack 210 is provided with a pushing mechanism for assisting in pushing the pipes in the material receiving rack 210 into the slideway 220 .
[0037] In this way, through the provided pushing mechanism, the pipe can be stably pushed into the slideway 220 after entering the receiving rack 210 .
[0038] In this embodiment, Figure 1-3 As shown, the pushing mechanism includes a second cylinder 610 and a pushing rod 620, the material receiving rack 210 includes a rear rack wall and a material receiving cavity, the second cylinder 610 is installed on the rear rack wall, the pushing rod 620 is installed in the material receiving cavity and is transmission-connected to the pushing rod of the second cylinder 610.
[0039] In this way, by providing the second cylinder 610 and the push rod 620, the pipe entering the material receiving rack 210 can be pushed into the slideway 220 by the push rod 620 driven by the second cylinder 610, and the pushing mechanism is relatively simple and reliable.
[0040] In this embodiment, Figure 1-3 As shown, the collection box 300 includes a connecting wall 700, one end of the slide 220 is connected to the material receiving rack 210, and the other end is connected to the connecting wall 700 of the collection box 300, and the angle formed between the connecting wall 700 and the bottom surface of the collection box 300 is fifty degrees.
[0041] In this way, by providing the connecting wall 700 , the connecting angle between the collecting box 300 and the slideway 220 is smoother, and the pipeline can enter the collecting box 300 more smoothly.
[0042] The above are only preferred implementations of the present invention. It should be pointed out that a number of modifications and improved technical solutions made by those skilled in the art without departing from the technical solution should also be deemed to fall within the scope of protection required by the claims.
Claims
1. An automatic stacking device after pipeline processing, characterized in that: It includes a conveyor belt, a material conveying channel, a collection box and a sorting mechanism, the conveyor belt includes a discharge end, the material conveying channel includes a material receiving rack and a slide, the discharge end of the conveyor belt is connected to the material receiving rack of the material conveying channel, the collection box is set on the ground, the slide is located below the material receiving rack, one end of the slide is connected to the material receiving rack, and the other end is connected to the collection box, the sorting mechanism is installed in the collection box, and is used to apply thrust along the width direction of the collection box.
2. The automatic stacking device after pipeline processing according to claim 1 is characterized by: The conveyor belt is provided with a longitudinal material conveying channel for making the length direction of the pipeline consistent with the conveying direction of the conveyor belt.
3. The automatic stacking device after pipeline processing according to claim 2 is characterized by: It also includes a frame, the conveyor belt is arranged on the frame, and the longitudinal material conveying channel includes a first limit plate and a second limit plate, the first limit plate and the second limit plate are arranged opposite to each other and are respectively fixed to the two side edges of the frame, and a transportation channel is formed between the first limit plate and the second limit plate.
4. The automatic stacking device after pipeline processing according to claim 1 is characterized by: The sorting mechanism includes a first cylinder and a push plate, the collection box includes a first side wall and a second side wall opposite to each other, the first cylinder is installed on the first side wall of the collection box, the push plate is arranged in the collection box near the first side wall and is transmission-connected to the push rod of the first cylinder.
5. The automatic stacking device after pipeline processing according to claim 1 is characterized by: The material receiving rack is provided with a pushing mechanism for assisting in pushing the pipe in the material receiving rack into the slideway.
6. The automatic stacking device after pipeline processing according to claim 5 is characterized by: The pushing mechanism includes a second cylinder and a pushing rod, the material receiving rack includes a rear rack wall and a material receiving cavity, the second cylinder is installed on the rear rack wall, the pushing rod is installed in the material receiving cavity and is transmission-connected with the pushing rod of the second cylinder.
7. The automatic stacking device after pipeline processing according to claim 1 is characterized by: The collection box body includes a connecting wall, one end of the slide is connected to the material receiving rack, and the other end is connected to the connecting wall of the collection box body, and the angle formed between the connecting wall and the bottom surface of the collection box body is fifty degrees.