Infrared starting structure of electric energy meter

By using infrared sensors as the power-on mechanism in the smart power meter, sending signals only when needed, the problem of high power consumption during battery power supply in the prior art is solved, and an ultra-low power consumption and high reliability power meter design is achieved.

CN222545400UActive Publication Date: 2025-02-28JIANGSU KAOU WANHONG ELECTRON
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323569788.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2025-02-28
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

Existing smart energy meters need to be dormant during battery power to reduce power consumption, but this design increases circuit complexity and power consumption.

Method used

An infrared sensor is used as the power-on mechanism, which only sends a trigger signal when it is necessary to turn on, and does not consume power in standby state.

Benefits of technology

The ultra-low power meter design is realized without increasing hardware costs, improving reliability and avoiding the possible false triggering problems caused by physical keys.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222545400U_ABST
    Figure CN222545400U_ABST
Patent Text Reader

Abstract

The utility model discloses an infrared starting structure of an electric energy meter. The infrared starting structure comprises an electric energy meter main body, an RTC real-time clock module, an infrared sensor and a starting locking module, the electric energy meter main body is connected with the RTC real-time clock module, the infrared sensor and the starting-up locking module and supplies power to the RTC real-time clock module, the infrared sensor and the starting-up locking module; the RTC module is used for tracking and recording the current date and time of the electric energy meter main body; the infrared sensor is used for detecting whether an infrared signal irradiates the electric energy meter main body or not; the starting locking module controls the power supply starting of the electric energy meter main body according to a signal received by the infrared sensor; the power-on locking module is controlled through an infrared power-on circuit; the infrared sensor only sends the trigger signal when the electric energy meter needs to be started, and does not consume electric energy in the standby state, so that ultra-low power consumption is conveniently and simply realized, the infrared sensor is used as a starting mechanism of the electric energy meter main body, and extra hardware cost and extra circuit design are not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to electric energy meters, and in particular to an infrared start-up structure of an electric energy meter. Background Art

[0002] Existing smart energy meters require battery power to maintain the normal operation of their RTC real-time clocks before on-site installation or during a power outage. Therefore, reducing battery power consumption during this period of battery power supply is an important issue in the current design of smart energy meters. At present, the mainstream approach is to put the smart meter in a sleep state during the battery power supply period to reduce the overall power consumption of the system, and then wake up the system through external power-on and query buttons. This not only increases the complexity of the circuit, but also increases power consumption due to the need to maintain the system in a sleep state. Utility Model Content

[0003] The utility model aims to provide an infrared power-on structure for an electric energy meter, which uses an infrared sensor to replace a traditional power-on button, thereby greatly reducing battery power consumption and extending battery life.

[0004] To achieve the above purpose, the technical solution adopted by the utility model is: an infrared power-on structure of an electric energy meter, including an electric energy meter body, an RTC real-time clock module, an infrared sensor and a power-on locking module;

[0005] The electric energy meter body is respectively connected to the RTC real-time clock module, the infrared sensor and the power-on locking module, and supplies power to them;

[0006] The RTC real-time clock module is used to track and record the current date and time of the electric energy meter body;

[0007] The infrared sensor is used to detect whether an infrared signal is irradiated onto the main body of the electric energy meter;

[0008] The power-on locking module controls the power supply start-up of the electric energy meter body according to the signal received by the infrared sensor;

[0009] The power-on locking module is controlled by an infrared power-on circuit.

[0010] Preferably, the power source of the electric energy meter body includes a power supply battery.

[0011] Preferably, the infrared power-on circuit comprises an LED lamp, a capacitor, a first resistor, a first transistor, a first diode, a second transistor and a second resistor;

[0012] The LED lamp, the first resistor, the first transistor, the first diode, the second transistor and the second resistor are sequentially arranged in series;

[0013] The capacitor is arranged in parallel on one side of the LED lamp;

[0014] The other end of the second resistor is connected to the electric energy meter body.

[0015] In a preferred solution, one pin of the first transistor is connected to a third resistor, and the other pin is connected in parallel to a second diode and a fourth resistor.

[0016] In a preferred solution, a fifth resistor is connected in parallel to one side of the second transistor.

[0017] In a preferred solution, a sixth resistor and a third transistor are connected in series on one side of the first diode; and a seventh resistor is connected in parallel on one side of the third transistor.

[0018] In a preferred solution, the first resistor is 2.4 kΩ; the second resistor is 1 MΩ; the third resistor is 100 kΩ; the fourth resistor is 5.1 kΩ; the fifth resistor is 10 kΩ; the sixth resistor is 3 kΩ; and the seventh resistor is 10 kΩ.

[0019] Due to the application of the above technical solution, the beneficial effects of the present application compared with the prior art are:

[0020] An infrared power-on structure of an electric energy meter of the present application is designed with an electric energy meter body, an RTC real-time clock module, an infrared sensor and a power-on locking module. Since the infrared sensor only sends a trigger signal when it needs to be powered on and does not consume electric energy in standby mode, ultra-low power consumption is conveniently and simply achieved without any additional hardware cost. By using an infrared sensor as the power-on mechanism of the electric energy meter body, no additional hardware cost and additional circuit design are required. This design also has high reliability. Since an infrared signal is used as a trigger signal, the problem of false triggering that may be caused by physical buttons is avoided. In addition, due to the working principle of the infrared sensor, it can work normally under various environmental conditions without the need for specific environmental conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Attached Figure 1 It is a schematic diagram of the infrared start-up structure of the electric energy meter of the utility model;

[0023] Attached Figure 2 It is a circuit diagram of the infrared start-up structure of the electric energy meter of the utility model;

[0024] Among them: 1. Electric energy meter body; 2. RTC real-time clock module; 3. Infrared sensor; 4. Power-on lock module; 5. LED light; 6. Capacitor; 7. First resistor; 8. First transistor; 9. First diode; 10. Second transistor; 11. Second resistor; 12. Third resistor; 13. Second diode; 14. Fourth resistor; 15. Fifth resistor; 16. Sixth resistor; 17. Third transistor; 18. Seventh resistor. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0027] In this application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the utility model and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0028] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in this utility model can be understood according to specific circumstances.

[0029] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0030] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0031] Embodiment 1

[0032] Attached Figure 1 , 2 The utility model discloses an infrared power-on structure for an electric energy meter, comprising an electric energy meter body 1, an RTC real-time clock module 2, an infrared sensor 3 and a power-on locking module 4;

[0033] The electric energy meter body 1 is respectively connected to the RTC real-time clock module 2, the infrared sensor 3 and the power-on locking module 4, and supplies power to them;

[0034] The RTC real-time clock module 2 is used to track and record the current date and time of the electric energy meter body 1;

[0035] The infrared sensor 3 is used to detect whether an infrared signal is irradiated onto the electric energy meter body 1;

[0036] The power-on locking module 4 controls the power supply start of the electric energy meter body 1 according to the signal received by the infrared sensor 3;

[0037] The power-on locking module 4 is controlled by an infrared power-on circuit.

[0038] In order to prevent the use of the electric energy meter body 1 from being affected by a power outage of the external power supply, the power supply of the electric energy meter body 1 includes a power supply battery, and the power supply battery is used as a backup power supply.

[0039] In order to realize the operation of the power-on locking module 4, the infrared power-on circuit includes an LED lamp 5, a capacitor 6, a first resistor 7, a first transistor 8, a first diode 9, a second transistor 10 and a second resistor 11;

[0040] The LED lamp 5, the first resistor 7, the first transistor 8, the first diode 9, the second transistor 10 and the second resistor 11 are sequentially arranged in series;

[0041] The capacitor 6 is arranged in parallel on one side of the LED lamp 5;

[0042] The other end of the second resistor 11 is connected to the electric energy meter body 1 .

[0043] One pin of the first transistor 8 is connected to a third resistor 12 , and the other pin is connected in parallel to a second diode 13 and a fourth resistor 14 .

[0044] A fifth resistor 15 is connected in parallel to one side of the second transistor 10 .

[0045] A sixth resistor 16 and a third transistor 17 are connected in series on one side of the first diode 9 ; a seventh resistor 18 is connected in parallel on one side of the third transistor 17 .

[0046] The first resistor 7 is 2.4 kΩ; the second resistor 11 is 1 MΩ; the third resistor 12 is 100 kΩ; the fourth resistor 14 is 5.1 kΩ; the fifth resistor 15 is 10 kΩ; the sixth resistor 16 is 3 kΩ; and the seventh resistor 18 is 10 kΩ.

[0047] When the electric energy meter body 1 is powered by a battery, except for the infrared sensor 3 and the RTC real-time clock module 2, all other circuits of the system are closed. The infrared sensor 3 detects whether there is an infrared signal irradiating the electric energy meter body 1. When an infrared signal is detected, the infrared sensor 3 transmits the signal to the power-on locking module 4, controls the power management system of the electric energy meter body 1 to turn on the power, and starts the main functional modules of the equipment, so that the electric energy meter body 1 enters a normal working state.

[0048] An infrared power-on structure of an electric energy meter of the present application is designed with an electric energy meter body 1, an RTC real-time clock module 2, an infrared sensor 3 and a power-on locking module 4. Since the infrared sensor 3 sends a trigger signal only when it needs to be powered on and does not consume electric energy in the standby state, ultra-low power consumption is conveniently and simply achieved without additional hardware costs. By using the infrared sensor 3 as the power-on mechanism of the electric energy meter body 1, no additional hardware costs and additional circuit designs are required. This design also has high reliability. Since the infrared signal is used as the trigger signal, the problem of false triggering that may be caused by physical buttons is avoided. In addition, due to the working principle of the infrared sensor 3, it can work normally under various environmental conditions without the need for specific environmental conditions.

[0049] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An infrared power-on structure for an electric energy meter, characterized in that: It includes an electric energy meter body, an RTC real-time clock module, an infrared sensor and a power-on locking module; The electric energy meter body is respectively connected to the RTC real-time clock module, the infrared sensor and the power-on locking module, and supplies power to them; The RTC real-time clock module is used to track and record the current date and time of the electric energy meter body; The infrared sensor is used to detect whether an infrared signal is irradiated onto the main body of the electric energy meter; The power-on locking module controls the power supply start-up of the electric energy meter body according to the signal received by the infrared sensor; The power-on locking module is controlled by an infrared power-on circuit.

2. The infrared start-up structure of an electric energy meter as claimed in claim 1, characterized in that: The power source of the electric energy meter body includes a power supply battery.

3. The infrared start-up structure of an electric energy meter as claimed in claim 1, characterized in that: The infrared power-on circuit includes an LED lamp, a capacitor, a first resistor, a first transistor, a first diode, a second transistor and a second resistor; The LED lamp, the first resistor, the first transistor, the first diode, the second transistor and the second resistor are sequentially arranged in series; The capacitor is arranged in parallel on one side of the LED lamp; The other end of the second resistor is connected to the electric energy meter body.

4. The infrared start-up structure of an electric energy meter as claimed in claim 3, characterized in that: One pin of the first transistor is connected to a third resistor, and the other pin is connected in parallel to a second diode and a fourth resistor.

5. The infrared start-up structure of an electric energy meter as claimed in claim 4, characterized in that: A fifth resistor is connected in parallel to one side of the second transistor.

6. The infrared start-up structure of an electric energy meter as claimed in claim 5, characterized in that: A sixth resistor and a third transistor are connected in series on one side of the first diode; and a seventh resistor is connected in parallel on one side of the third transistor.

7. The infrared start-up structure of an electric energy meter as claimed in claim 6, characterized in that: The first resistor is 2.4 kΩ; the second resistor is 1 MΩ; the third resistor is 100 kΩ; the fourth resistor is 5.1 kΩ; the fifth resistor is 10 kΩ; the sixth resistor is 3 kΩ; and the seventh resistor is 10 kΩ.