Cast-in-place pile sediment thickness detection tool
By designing a detection tool including a support frame, a winding wheel assembly, a press plate and a plug rod, the problems of low efficiency and inaccurate data measurement of the deposited pile in the prior art are solved, and efficient and accurate measurement of the deposited pile thickness is achieved.
Patent Information
- Application Number
- CN202421403328.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-06-19
AI Technical Summary
The prior art is difficult to efficiently and accurately measure the thickness of the cast pile slag, and the measurement tools cannot ensure the verticality of the insertion rod, resulting in low measurement efficiency and inaccurate data.
A detection tool including a support frame, a winding wheel assembly, a pressing plate and a plug rod is designed. Through the cooperation of the wire rope and the limit rod, the verticality of the insertion sediment is ensured, and the retraction and release efficiency of the wire rope is accelerated through the arrangement of the large winding wheel.
It realizes rapid and accurate measurement of sediment thickness, improves measurement efficiency, reduces errors, ensures vertical insertion of the insertion rod, and improves the reliability of measurement data.
Smart Images

Figure CN222560852U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, and relates to a tool for detecting the thickness of cast-in-place pile sediment. Background Art
[0002] With the development of economy, there are more and more high-rise buildings, and the application of underwater cast-in-place piles is becoming more and more common. The thickness of pile bottom sediment is one of the main factors affecting the vertical bearing capacity of pile foundation. Too thick pile bottom sediment can easily cause the foundation settlement to exceed the design value, thus causing safety and quality accidents.
[0003] Since the sediment at the bottom of the pile is located underwater and cannot be seen by visual inspection, although there are very advanced sediment measuring instruments, they are expensive and can only be used for random inspections in important projects, and have not yet been popularized. In addition, when the current measuring tools are inserted into the sediment, their verticality cannot be ensured, resulting in frequent discrepancies in the measured values. Multiple measurements are required, which is inefficient, and the actual data of the sediment thickness is not clear, which can cause misjudgment. Utility Model Content
[0004] In view of the technical problems in the prior art, the utility model provides a bored pile sediment thickness detection tool, comprising a support frame installed above the pile hole, a winding wheel assembly, a pressure plate and an insertion rod, the winding wheel assembly is rotatably installed on the support frame, the winding wheel assembly is respectively connected to the pressure plate and the insertion rod through a wire rope, the winding wheel assembly comprises a first large winding wheel, a second large winding wheel, a rotating handle and a limiting rod, the first large winding wheel and the second large winding wheel have the same diameter and are relatively spaced apart, the first large winding wheel and the second large winding wheel are respectively rotatably connected to the two sides of the support frame through a rotating shaft, the rotating handle The hand is installed on one side of the support frame and is fixedly connected to the rotating shaft of the first large reel. The limit rod is slidably installed at the end of the first large reel away from the rotating handle. A limit hole corresponding to the limit rod is opened on the second large reel. When the limit rod cooperates with the limit hole, the first large reel and the second large reel rotate synchronously under the drive of the rotating handle, otherwise the second large reel does not rotate. A guide through hole is provided on the pressure plate, and the insertion rod is slidably installed in the guide through hole. The first large reel is fixedly connected to the insertion rod by a steel wire rope, and the second large reel is fixedly connected to the pressure plate by a steel wire rope.
[0005] Furthermore, a hanger is provided on the pressure plate, and the connection points between the hanger and the pressure plate are symmetrically arranged on the edge of the pressure plate. A through hole is provided in the center of the hanger, and the wire rope on the first large reel passes through the through hole and is fixedly connected to the inserted rod, and the wire rope on the second large reel is fixedly connected to the edge of the through hole.
[0006] Furthermore, the guide through holes include a plurality of guide through holes, the plurality of guide through holes are symmetrically arranged about the center of the pressure plate, the insertion rods correspond to the guide through holes one by one, and the plurality of insertion rods are fixedly connected to the steel wire rope through auxiliary ropes.
[0007] Furthermore, the limiting rod and the limiting hole are respectively located at the center of the first large reel and the second large reel.
[0008] Furthermore, a limit block is provided on the insertion rod, the size of the limit block is larger than the diameter of the guide through hole, and the limit block is located below the pressure plate.
[0009] Furthermore, the steel wire rope is provided with scale lines.
[0010] Furthermore, a limiting ring is provided on the support frame, the limiting ring is coaxially arranged with the pile hole and is located below the large reel, and the two steel wire ropes pass through the limiting ring and are fixedly connected with the pressure plate and the insertion rod respectively.
[0011] Beneficial effects:
[0012] 1. In the utility model, the thickness of the sediment can be measured conveniently and quickly through the arrangement of the first large reel, the second large reel, the pressure plate, the insertion rod, the rotating handle, the wire rope, the limit rod and the limit hole. Combined with the arrangement of the guide through hole and the sliding installation of the insertion rod in the guide through hole, the verticality of the insertion rod into the sediment can be ensured, so that the measurement data is more accurate. At the same time, there is no need for repeated measurements, and the measurement efficiency is high. Specifically, when in use, the support frame is first fixedly installed above the pile hole, and the wire ropes on the first large reel and the second large reel are respectively connected with the insertion rod and the pressure plate to ensure that the two wire ropes are as close to the center of the pile hole as possible. Then the insertion rod is slidably matched with the guide through hole on the pressure plate, and the limit rod is matched with the limit hole, so that the first large reel and the second large reel are in the effect of the rotating handle. The handle is then turned to release the wire rope, until the bottom of the plunger is in contact with the lower surface of the sediment, and the distance between the lower surface of the sediment and the first large reel is confirmed by adding the length of the wire rope released from the first large reel and the length of the plunger. Finally, the thickness of the sediment can be obtained by the difference between the two distances. In this process, two wire ropes can be released synchronously to measure two sets of data respectively, which can reduce the time required for separate measurements. In addition, under the restrictions of the pressure plate and the guide through hole, the angle at which the plunger enters the sediment is always vertical.
[0013] 2. In the utility model, the setting of the hanger, the perforation and the limit of the hanger connection position can prevent the pressure plate from being deflected when being lowered, ensuring that the pressure plate is in horizontal contact with the sediment, so that the entry angle of the insertion rod is vertical, further making the measurement data more accurate, and also facilitating the calculation of the distance between the bottom end of the wire rope and the lower surface of the pressure plate, which is part or all of some other fixed data.
[0014] 3. In the present invention, multiple guide holes and multiple matching insertion rods are provided, so that multiple sets of data can be measured simultaneously. By taking the average value of the multiple sets of data, errors can be reduced and the measurement accuracy can be further improved.
[0015] 4. In the present invention, the limiting rod and the limiting hole are respectively located at the center of the first large reel and the second large reel, which can facilitate the rapid coordination of the two. At the same time, the limiting rod can be used to improve the supporting strength between the first large reel and the second large reel.
[0016] 5. In the utility model, the setting of the limit block and its position restriction can prevent the insertion rod from detaching from the pressure plate from above when the first reel rotates alone, ensuring that the insertion rod is always relatively vertical to the pressure plate under the guiding limit of the guide through hole. In addition, the lifting of the limit block can also be used to drive the pressure plate to move up synchronously; by setting the scale dimension line, the release length of the wire rope can be quickly read.
[0017] 6. In the present invention, the position of the two steel wire ropes can be limited by setting the limit ring, ensuring that the pressure plate and the insertion rod move along the center of the pile hole, avoiding the pressure plate from touching the inner wall of the pile hole, and further improving the measurement accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 This is a schematic diagram of the installation structure of the utility model when the plunger is inserted into the sediment;
[0021] Figure 3 It is a schematic diagram of the installation structure when the limiting rod of the utility model is separated from the limiting hole.
[0022] Description of reference numerals:
[0023] 1. Support frame; 2. Pressure plate; 21. Guide through hole; 3. Insert rod; 4. First large reel; 5. Second large reel; 6. Turning handle; 7. Limit rod; 8. Limit hole; 9. Wire rope; 10. Hanger; 11. Limit block; 12. Limit ring; 13. Water hole. DETAILED DESCRIPTION
[0024] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0025] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0026] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0027] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0028] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0029] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0030] The utility model provides a tool for detecting the thickness of cast-in-place pile sediment. Figure 1 , Figure 2 and Figure 3 As shown, it includes a support frame 1 installed above the pile hole, a winding wheel assembly, a pressure plate 2 and an insertion rod 3, wherein the pressure plate 2 can float on the surface of the sediment, and the insertion rod 3 can be quickly inserted into the sediment. In order to prevent the influence of water accumulation above the sediment on the contact between the pressure plate 2 and the sediment, a water hole 13 can be appropriately opened on the pressure plate 2. The winding wheel assembly is rotatably installed on the support frame 1. The winding wheel assembly is respectively connected to the pressure plate 2 and the insertion rod 3 through a wire rope 9. The winding wheel assembly includes a first large winding wheel 4, a second large winding wheel 5, a rotating handle 6 and a limiting rod 7. The diameters of the first large winding wheel 4 and the second large winding wheel 5 are equal, and they are relatively spaced. The first large winding wheel 4 and the second large winding wheel 5 are respectively connected to the support frame through a rotating shaft 1 is rotatably connected on both sides, the rotating handle 6 is installed on one side of the support frame 1 and is fixedly connected to the rotating shaft of the first large reel 4, the limiting rod 7 is slidably installed at the end of the first large reel 4 away from the rotating handle 6, and the second large reel 5 is provided with a limiting hole 8 corresponding to the limiting rod 7. When the limiting rod 7 cooperates with the limiting hole 8, the first large reel 4 and the second large reel 5 rotate synchronously under the drive of the rotating handle 6, otherwise the second large reel 5 does not rotate, the pressing plate 2 is provided with a guide through hole 21, the insertion rod 3 is slidably installed in the guide through hole 21, the first large reel 4 is fixedly connected to the insertion rod 3 through a steel wire rope 9, and the second large reel 5 is fixedly connected to the pressing plate 2 through a steel wire rope 9.
[0031] The slag thickness can be measured conveniently and quickly by setting the first large reel 4, the second large reel 5, the pressure plate 2, the insertion rod 3, the rotating handle 6, the wire rope 9, the limiting rod 7 and the limiting hole 8. Combined with the guide through hole 21 and the setting that the insertion rod 3 is slidably installed in the guide through hole 21, the verticality of the insertion rod 3 in the sediment can be ensured, making the measurement data more accurate. At the same time, there is no need for repeated measurements, and the measurement efficiency is high. The setting of the large reel can speed up the efficiency of retracting and releasing the wire rope 9, thereby indirectly improving the measurement efficiency. Specifically, when in use, the support frame 1 is first fixedly installed above the pile hole, and the wire ropes 9 on the first large reel 4 and the second large reel 5 are respectively connected with the insertion rod 3 and the pressure plate 2 to ensure that the two wire ropes 9 are as close to the center of the pile hole as possible. Then the insertion rod 3 is slidably matched with the guide through hole 21 on the pressure plate 2, and the limiting rod 7 is matched with the limiting hole 8, so that the first A large reel 4 and a second large reel 5 rotate synchronously under the action of the rotating handle 6 and release the wire rope 9 until the contact between the pressure plate 2 and the upper surface of the sediment is stopped. At this time, the distance between the upper surface of the sediment and the second large reel 5 can be confirmed by the length of the wire rope 9 released on the second large reel 5 and some other fixed data. Then the cooperation between the limit rod 7 and the limit hole 8 is released, and the wire rope 9 continues to be released by rotating the handle 6 until the bottom of the insertion rod 3 is stopped from contacting the lower surface of the sediment. At this time, the distance between the lower surface of the sediment and the first large reel 4 can be confirmed by the length of the wire rope 9 released on the first large reel 4 plus the length of the insertion rod 3. Finally, the thickness of the sediment can be obtained by the difference between the two distances. In this process, two wire ropes 9 can be released synchronously to measure two sets of data respectively, which can reduce the time required for separate measurement. In addition, under the restriction of the pressure plate 2 and the guide through hole 21, the angle at which the insertion rod 3 enters the sediment is always vertical.
[0032] In the present invention, preferably, Figure 1 and Figure 2 As shown, a hanger 10 is provided on the pressure plate 2, and the connection points between the hanger 10 and the pressure plate 2 are symmetrically arranged at the edge of the pressure plate 2. A through hole is provided at the center of the hanger 10, and the steel wire rope 9 on the first large reel 4 passes through the through hole and is fixedly connected to the inserted rod 3, and the steel wire rope 9 on the second large reel 5 is fixedly connected to the edge of the through hole.
[0033] In this embodiment, the hanger 10, the perforations and the connection position restrictions of the hanger 10 can prevent the pressure plate 2 from tilting when being lowered, ensuring that the pressure plate 2 is in horizontal contact with the sediment, thereby making the entry angle of the insertion rod 3 vertical, further making the measurement data more accurate, and also facilitating the calculation of the distance between the bottom end of the wire rope 9 and the lower surface of the pressure plate 2, which is part or all of some other fixed data.
[0034] In the present invention, preferably, Figure 1 and Figure 2As shown, the guide through hole 21 includes a plurality of guide through holes 21 which are symmetrically arranged about the center of the pressure plate 2. The insertion rods 3 correspond to the guide through holes 21 one by one. The plurality of insertion rods 3 are fixedly connected to the steel wire rope 9 through auxiliary ropes. When an auxiliary rope is present, in order to ensure the measurement accuracy, the distance between the top end of the insertion rod 3 and the bottom end of the steel wire rope 9 needs to be calculated. When the steel wire rope 9 tightens the insertion rod 3, this distance is a constant, so it can be calculated in advance.
[0035] In this embodiment, by providing a plurality of guide through holes 21 and a plurality of matching insertion rods 3, a plurality of groups of data can be measured simultaneously. By taking the average value of the plurality of groups of data, the error can be reduced and the measurement accuracy can be further improved.
[0036] In the present invention, preferably, Figure 1 and Figure 3 As shown, the limiting rod 7 and the limiting hole 8 are located at the center of the first large reel 4 and the second large reel 5 respectively.
[0037] In this embodiment, by arranging the limiting rod 7 and the limiting hole 8 at the center of the first large reel 4 and the second large reel 5 respectively, the two can be quickly matched, and the limiting rod 7 can be used to improve the supporting strength between the first large reel 4 and the second large reel 5.
[0038] In the present invention, preferably, Figure 1 and Figure 2 As shown, a limit block 11 is provided on the insertion rod 3, and the size of the limit block 11 is larger than the diameter of the guide through hole 21. The limit block 11 is located below the pressure plate 2. In actual use, in order to reduce measurement data and errors, the thickness of the sediment can be directly calculated by using the length of the wire rope 9 that the first large reel 4 continues to lower after the pressure plate 2 contacts the upper surface of the sediment, the length of the insertion rod 3, and the distance from the top end of the limit block 11 to the bottom end of the wire rope 9. This calculation method can avoid the error existing in the synchronous release process of the first large reel 4 and the second large reel 5. Specifically, before the limit rod 7 and the limit hole 8 cooperate, ensure that the limit block 11 is in contact with the bottom surface of the pressure plate 2. Suppose the total length of the insertion rod 3 is H, the distance from the top end of the limit block 11 to the bottom end of the wire rope 9 is h, and the length of the wire rope 9 that the first large reel 4 continues to lower after the pressure plate 2 contacts the upper surface of the sediment is L, then the thickness of the sediment S=H-h+L.
[0039] In this embodiment, the setting of the limit block 11 and its position restriction can prevent the insertion rod 3 from detaching from the pressure plate 2 from above when the first reel rotates alone, ensuring that the insertion rod 3 is always relatively vertical to the pressure plate 2 under the guiding limit of the guide through hole 21. In addition, the lifting of the limit block 11 can also be used to drive the pressure plate 2 to move upward synchronously, and at the same time, the weight of the insertion rod 3 can be increased, thereby increasing the speed at which the long rod 3 is inserted into the sediment.
[0040] In the present invention, preferably, Figure 1 As shown, the steel wire rope 9 is provided with scale lines.
[0041] In this embodiment, the release length of the steel wire rope 9 can be quickly read by setting the scale dimension lines.
[0042] In the present invention, preferably, Figure 1 and Figure 3 As shown, the support frame 1 is also provided with a limiting ring 12, which is coaxially arranged with the pile hole and located below the large reel. The two steel wire ropes 9 pass through the limiting ring 12 and are fixedly connected to the pressure plate 2 and the insertion rod 3 respectively.
[0043] In this embodiment, by setting the limit ring 12, the positions of the two steel wire ropes 9 can be limited, ensuring that the pressure plate 2 and the insertion rod 3 move along the center of the pile hole, avoiding the pressure plate 2 from touching the inner wall of the pile hole, and further improving the measurement accuracy.
[0044] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0045] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A cast-in-place pile sediment thickness detection tool, comprising a support frame (1) installed above the pile hole, a winding wheel assembly, a pressure plate (2) and an insertion rod (3), wherein the winding wheel assembly is rotatably mounted on the support frame (1), and the winding wheel assembly is respectively connected to the pressure plate (2) and the insertion rod (3) through a steel wire rope (9), characterized in that: The winding wheel assembly comprises a first large winding wheel (4), a second large winding wheel (5), a rotating handle (6) and a limiting rod (7); the diameters of the first large winding wheel (4) and the second large winding wheel (5) are equal and are arranged with a relative interval; the first large winding wheel (4) and the second large winding wheel (5) are respectively connected to the two sides of the support frame (1) via a rotating shaft; the rotating handle (6) is installed on one side of the support frame (1) and is fixedly connected to the rotating shaft of the first large winding wheel (4); the limiting rod (7) is slidably installed on the end of the first large winding wheel (4) away from the rotating handle (6); the second large winding wheel (4) is connected to the first large winding wheel (4) and the second large winding wheel (5 ... The wheel (5) is provided with a limiting hole (8) corresponding to the limiting rod (7). When the limiting rod (7) cooperates with the limiting hole (8), the first large reel (4) and the second large reel (5) rotate synchronously under the drive of the rotating handle (6), otherwise the second large reel (5) does not rotate. The pressure plate (2) is provided with a guide hole (21), and the insertion rod (3) is slidably installed in the guide hole (21). The first large reel (4) is fixedly connected to the insertion rod (3) through a steel wire rope (9), and the second large reel (5) is fixedly connected to the pressure plate (2) through a steel wire rope (9).
2. A cast-in-place pile sediment thickness detection tool according to claim 1, characterized in that: A hanger (10) is provided on the pressure plate (2), and the connection point between the hanger (10) and the pressure plate (2) is symmetrically arranged on the edge of the pressure plate (2). A through hole is provided at the center of the hanger (10), and the steel wire rope (9) on the first large reel (4) passes through the through hole and is fixedly connected to the insertion rod (3), and the steel wire rope (9) on the second large reel (5) is fixedly connected to the edge of the through hole.
3. A cast-in-place pile sediment thickness detection tool according to claim 2, characterized in that: The guide through holes (21) include a plurality of guide through holes (21), the plurality of guide through holes (21) are symmetrically arranged about the center of the pressure plate (2), the insertion rods (3) correspond one to one with the guide through holes (21), and the plurality of insertion rods (3) are fixedly connected to the steel wire rope (9) via auxiliary ropes.
4. A cast-in-place pile sediment thickness detection tool according to any one of claims 1 to 3, characterized in that: The limiting rod (7) and the limiting hole (8) are respectively located at the center of the first large reel (4) and the second large reel (5).
5. A cast-in-place pile sediment thickness detection tool according to claim 4, characterized in that: The insert rod (3) is provided with a limit block (11), the size of the limit block (11) is larger than the diameter of the guide through hole (21), and the limit block (11) is located below the pressure plate (2).
6. A cast-in-place pile sediment thickness detection tool according to claim 5, characterized in that: The steel wire rope (9) is provided with scale lines.
7. A cast-in-place pile sediment thickness detection tool according to claim 1, characterized in that: The support frame (1) is also provided with a limiting ring (12), which is coaxially arranged with the pile hole and located below the large reel. The two steel wire ropes (9) pass through the limiting ring (12) and are respectively fixedly connected to the pressure plate (2) and the insertion rod (3).