Prestressed pipe pile connector
Through the mechanical connection method of the prestressed pipe pile connection head, the problem of poor connection strength and life caused by the welding connection method due to false welding and missing welding is solved, and higher connection reliability and higher construction efficiency are achieved.
Patent Information
- Application Number
- CN202420745822.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-04-10
AI Technical Summary
The welding connection methods of existing prestressed pipe piles are prone to false welding and missing welding, resulting in poor connection strength and life.
The prestressed pipe pile connection head is used to connect the two prestressed pipe piles into one through mechanical connection, including the first end plate, the second end plate, the connecting part, the connecting hole, the elastic universal ball, the annular clamping groove and the fixing assembly to ensure the reliability of the connection.
The reliability of the connection between two prestressed pipe piles is improved, the labor intensity of workers is reduced, and the construction efficiency is improved, avoiding the problem of poor connection strength and life caused by false welding and missing welding methods due to welding connection methods.
Smart Images

Figure CN222594809U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building components, in particular to a prestressed pipe pile connector. Background Art
[0002] During the use of prestressed pipe piles, it is necessary to select prestressed pipe piles of different lengths according to different usage requirements, which requires that the prestressed pipe piles be connected to each other to form a longer pile body.
[0003] At present, welding is usually used to connect two prestressed pipe piles. Specifically, steel plates are provided at both ends of the prestressed pipe piles, and then the steel plates at both ends of the two prestressed pipe piles are welded into one. However, the welding method is prone to cold welding and leaking welding, which leads to poor connection strength and life.
[0004] Therefore, the above problems need to be solved urgently. Utility Model Content
[0005] The purpose of the utility model is to provide a prestressed pipe pile connector to avoid the problems of poor connection strength and life due to false welding, leaking welding and the like in the welding connection method, thereby improving the reliability of the connection between the two prestressed pipe piles, reducing the labor intensity of workers and improving construction efficiency.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] A prestressed pipe pile connector, used to connect two prestressed pipe piles into one, the prestressed pipe pile connector comprising:
[0008] A first end plate and a second end plate are respectively arranged at two ends of the prestressed pipe pile;
[0009] A connecting member, detachably disposed on the first end plate;
[0010] A connecting hole is provided on the second end plate, and the connecting member can be adapted and snap-fitted with the connecting hole;
[0011] A plurality of elastic universal balls are arranged on the connecting member, and the plurality of elastic universal balls are evenly distributed around the connecting member;
[0012] An annular clamping groove is provided on the inner wall of the connecting hole, and a plurality of elastic universal balls can fall into the annular clamping groove and be clamped with the annular clamping groove;
[0013] The fixing assembly is disposed between the first end plate and the second end plate and is configured to fix the first end plate and the second end plate together.
[0014] Preferably, the end of the connecting piece is configured to be tapered.
[0015] Preferably, the fixing assembly comprises:
[0016] A first fixing portion, wherein the prestressed pipe pile is extended in a ring shape from the outer side of the first end plate to form the first fixing portion;
[0017] A second fixing portion, wherein the prestressed pipe pile is extended in a ring shape from the outer side of the second end plate to form the second fixing portion, and the first fixing portion and the second fixing portion can be fitted together to form a fixing member;
[0018] A hoop, comprising an annular fixing groove, wherein the hoop can be held around the outer periphery of the fixing member and enable the fixing member to be adapted and engaged with the fixing groove;
[0019] The limiting member is configured to lock the clamp onto the fixing member.
[0020] Preferably, the limiting member comprises:
[0021] Bolts and nuts, wherein the bolts can penetrate through both ends of the clamp and be threadedly connected with the nuts.
[0022] Preferably, the notches on both sides of the annular fixing groove are chamfered to form guide surfaces.
[0023] Preferably, the connecting member can be screwed onto the first end plate, and the connecting member is located at the center of the first end plate.
[0024] Beneficial effects of the utility model:
[0025] The prestressed pipe pile connecting head provided by the utility model realizes the connection of two prestressed pipe piles by means of mechanical connection, which can avoid the problems of poor connection strength and life due to false welding, leaking welding and the like in the welding connection method, thereby improving the reliability of the connection between the two prestressed pipe piles, reducing the labor intensity of workers and improving construction efficiency.
[0026] The prestressed pipe pile connector provided by the utility model fixes the first end plate and the second end plate together through a fixing assembly, so that the first end plate and the second end plate can be fitted more firmly. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a cross-sectional view of the prestressed pipe pile connector provided by the utility model;
[0028] Figure 2 yes Figure 1 The enlarged view of point A in the middle;
[0029] Figure 3It is a structural schematic diagram of a connecting piece and a first end plate provided by the utility model.
[0030] In the figure:
[0031] 100. Prestressed pipe pile; 1. First end plate; 2. Second end plate; 3. Connector; 4. Connecting hole; 5. Elastic universal ball; 6. Annular snap-fit groove; 7. Fixing assembly; 71. First fixing part; 72. Second fixing part; 73. Hoop; 731. Guide surface. DETAILED DESCRIPTION
[0032] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0033] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0035] In the description of this embodiment, the terms "upper", "lower", "left", "right", etc., and the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of description and simplified operation, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0036] Based on the content mentioned above, at present, welding is usually used to connect two prestressed pipe piles. Specifically, steel plates are provided at both ends of the prestressed pipe piles, and then the steel plates at both ends of the two prestressed pipe piles are welded into one. However, the welding method is prone to cold welding and leaking welding, which leads to poor connection strength and life.
[0037] To solve the above problems, please refer to Figures 1 to 3 The present embodiment provides a prestressed pipe pile 100 connector, which is used to connect two prestressed pipe piles 100 into one. The prestressed pipe pile 100 connector includes a first end plate 1, a second end plate 2, a connector 3, a connecting hole 4, a plurality of elastic universal balls 5, an annular clamping groove 6 and a fixing assembly 7.
[0038] The first end plate 1 and the second end plate 2 are respectively arranged at the two ends of the prestressed pipe pile 100. The connector 3 is detachably arranged on the first end plate 1. The connecting hole 4 is arranged on the second end plate, and the connector 3 can be adapted and snap-fitted with the connecting hole 4. In the present embodiment, the connector 3 can be screwed on the first end plate 1, and the connector 3 is located at the center of the first end plate 1. It can be understood that the way in which the connector 3 is screwed to the first end plate 1 is more convenient for assembling the connector 3, and the connection is reliable. Of course, in other embodiments, an assembly hole adapted to the connector 3 can also be arranged on the first end plate 1, and the connector 3 can be inserted into the assembly hole after the adhesive is filled in the assembly hole, which will not be described in detail.
[0039] In order to facilitate the insertion of the connecting member 3 into the connecting hole 4, the end of the connecting member 3 is configured to be tapered.
[0040] A plurality of elastic universal balls 5 are arranged on the connecting member 3, and the plurality of elastic universal balls 5 are evenly distributed on the peripheral side of the connecting member 3. In the present embodiment, 8 elastic universal balls 5 are arranged. Of course, in other embodiments, the elastic universal balls 5 can be arranged to be 6, 4 or other numbers. It should be noted that the elastic universal balls 5 are prior art, and the specific model can be selected according to the actual application scenario. The present embodiment does not make specific requirements and restrictions on this. An annular snap-fit groove 6 is arranged on the inner wall of the connecting hole 4, and a plurality of elastic universal balls 5 can all fall into the annular snap-fit groove 6 and snap-fit with the annular snap-fit groove 6. The fixing assembly 7 is arranged between the first end plate 1 and the second end plate 2, and is configured to fix the first end plate 1 and the second end plate 2 together.
[0041] In practical applications, the connecting piece 3 on one prestressed pipe pile 100 is first aligned with the connecting hole 4 on the other prestressed pipe pile 100, and then the connecting piece 3 on one prestressed pipe pile 100 is gradually inserted into the connecting hole 4 on the other prestressed pipe pile 100 until a plurality of elastic universal balls 5 on the connecting piece 3 fall into the annular clamping groove 6, thereby realizing the connection of the two prestressed pipe piles 100, and finally the first end plate 1 and the second end plate 2 are fixed together by the fixing assembly 7, thereby completing the connection of the two prestressed pipe piles 100.
[0042] It can be understood that the above-mentioned prestressed pipe pile 100 connecting head realizes the connection of two prestressed pipe piles 100 by mechanical connection, which can avoid the problem of poor connection strength and life due to cold welding, leaking welding and other reasons in the welding connection method, thereby improving the reliability of the connection between the two prestressed pipe piles 100, and can also reduce the labor intensity of workers and improve construction efficiency.
[0043] It can also be understood that by fixing the first end plate 1 and the second end plate 2 together through the fixing assembly 7, the first end plate 1 and the second end plate 2 can be more firmly fitted. Specifically, the fixing assembly 7 includes a first fixing portion 71, a second fixing portion 72, a clamp 73 and a limiter (not shown in the figure).
[0044] The prestressed pipe pile 100 is extended in an annular shape from the outer side of the first end plate 1 to form a first fixing portion 71. The prestressed pipe pile 100 is extended in an annular shape from the outer side of the second end plate 2 to form a second fixing portion 72. The first fixing portion 71 and the second fixing portion 72 can fit together to form a fixing member. It should be noted that the first fixing portion 71 is also the outermost part of the first end plate 1, and the two are integrally formed, with high structural strength. Similarly, the second fixing portion 72 is integrally formed with the second end plate 2.
[0045] The clamp 73 includes an annular fixing groove, and the clamp 73 can be clamped on the outer periphery of the fixing member, so that the fixing member and the fixing groove are adapted and snap-fitted. The limiter is configured to lock the clamp 73 on the fixing member. In this way, the two prestressed pipe piles 100 can be fixed together in the axial direction of the prestressed pipe piles 100, that is, the axial movement of the two prestressed pipe piles 100 during the construction process can be avoided, so that the connection of the two prestressed pipe piles 100 can be made more reliable.
[0046] It is understandable that the method of fixing the first fixing part 71 and the second fixing part 72 with the clamp 73 has a simple structure and is easy to operate. In this embodiment, the limiter includes a bolt and a nut, and the bolt can pass through the head and tail ends of the clamp 73 and be screwed with the nut. It is understandable that the screw connection method is easy to operate and the connection is reliable. Of course, in other embodiments, the limiter can also adopt a connecting structure composed of a clamping block and a clamping groove, which is not described in detail in this embodiment. In order to improve the convenience of matching the clamp 73 and the fixing member, the notches on both sides of the annular fixing groove are chamfered to form a guide surface 731. Such a configuration makes it easier to buckle the annular fixing groove on the fixing member for easy operation.
[0047] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A prestressed pipe pile connector, used to connect two prestressed pipe piles (100) into one, characterized in that: The prestressed pipe pile (100) connector comprises: A first end plate (1) and a second end plate (2), respectively arranged at two ends of the prestressed pipe pile (100); A connecting member (3) detachably arranged on the first end plate (1); A connecting hole (4) is provided on the second end plate, and the connecting piece (3) can be adapted to be snap-fitted with the connecting hole (4); A plurality of elastic universal balls (5) are arranged on the connecting member (3), and the plurality of elastic universal balls (5) are evenly distributed around the connecting member (3); An annular clamping groove (6) is arranged on the inner wall of the connecting hole (4), and a plurality of elastic universal balls (5) can all fall into the annular clamping groove (6) and be clamped with the annular clamping groove (6); The fixing assembly (7) is arranged between the first end plate (1) and the second end plate (2), and is configured to fix the first end plate (1) and the second end plate (2) together.
2. A prestressed pipe pile connector according to claim 1, characterized in that: The end of the connecting piece (3) is arranged in a conical shape.
3. The prestressed pipe pile connector according to claim 1, characterized in that: The fixing assembly (7) comprises: A first fixing portion (71), the prestressed pipe pile (100) extending outwardly from the first end plate (1) in an annular shape to form the first fixing portion (71); A second fixing portion (72), the prestressed pipe pile (100) extending outwardly from the second end plate (2) in an annular shape to form the second fixing portion (72), and the first fixing portion (71) and the second fixing portion (72) can be fitted together to form a fixing member; A hoop (73) comprising an annular fixing groove, wherein the hoop (73) is capable of holding the outer circumference of the fixing member and enabling the fixing member to be adapted and engaged with the fixing groove; The limiting member is configured to lock the clamp (73) onto the fixing member.
4. A prestressed pipe pile connector according to claim 3, characterized in that: The limiting member comprises: Bolts and nuts, the bolts being capable of penetrating both ends of the clamp (73) and being threadedly connected with the nuts.
5. The prestressed pipe pile connector according to claim 4, characterized in that: The notches on both sides of the annular fixing groove are chamfered to form guide surfaces (731).
6. The prestressed pipe pile connector according to claim 1, characterized in that: The connecting member (3) can be screwed onto the first end plate (1), and the connecting member (3) is located at the center of the first end plate (1).