Rest station

By designing a rest station that includes transparent walls and viewing space, combining air purification, temperature regulation and entertainment equipment, the problem of people lacking effective rest and relaxation when they are tired or stressed is solved, and the user's comprehensive relaxation and rest effect is achieved.

CN222595657UActive Publication Date: 2025-03-11SHENZHEN MICRO SPACE CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420213948.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2025-03-11
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

In daily life and work environments, when people feel tired or stressed, the lack of effective rest and relaxation facilities affects their work and study efficiency.

Method used

A rest station including transparent walls and an outside viewing space was designed. Users can rest in the rest space, while viewing the external scenery through transparent walls, and use terminal equipment such as air purification equipment, temperature adjustment equipment and entertainment equipment to achieve all-round relaxation and rest.

Benefits of technology

By providing a multi-functional rest space, users can not only get physical rest, but also mentally relax, which is more conducive to re-entering work or study.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222595657U_ABST
    Figure CN222595657U_ABST
Patent Text Reader

Abstract

The utility model provides a rest station which comprises a first wall body and a second wall body, a space defined by the first wall body is a rest space, and the first wall body is a transparent wall body; the second wall body is arranged on the outer side of the first wall body, the interlayer space between the second wall body and the first wall body is an ornamental space, and when a user feels tired or has large pressure, the user can enter the rest space to have a rest, due to the fact that the first wall body is a transparent wall body, and the second wall body is arranged on the outer side of the first wall body; and the interlayer space between the second wall body and the first wall body is the ornamental space, so that the user who has a rest in the rest space can also enjoy the scenery in the ornamental space through the first wall body, the user can be relaxed in spirit, and therefore, by arranging the rest station, the body of the user can have a rest in the rest space, and the user can enjoy the scenery in the ornamental space. And the spirit of the user can be relaxed, so that the user can be more favorably put into work or study again.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of urban service facilities, and in particular to a rest stop. Background Art

[0002] Nowadays, urban people are facing increasingly heavy burdens and great mental stress. Therefore, in daily life and work environment, when people feel tired or stressed, they need a rest stop to restore brain fatigue and release stress in their hearts, which is more conducive to people getting back to work or study. Utility Model Content

[0003] The present application discloses a rest stop, which can be more conducive to people returning to work or study.

[0004] In order to achieve the above-mentioned purpose, the present application discloses a rest stop, comprising: a first wall and a second wall, the space enclosed by the first wall is a rest space, and the first wall is a transparent wall; the second wall is arranged on the outside of the first wall, and the mezzanine space between the second wall and the first wall is a viewing space.

[0005] Optionally, a rest platform is provided in the rest space, and the rest platform is used to divide the rest space into a rest area and an installation area. In the height direction of the rest station, the installation area is located below the rest area, and the installation area is used to install terminal equipment.

[0006] Optionally, the terminal device includes an entertainment device, an air purification device and a temperature adjustment device, and buttons corresponding to the entertainment device, the air purification device and the temperature adjustment device are provided in the rest area.

[0007] Optionally, an air circulation device is provided in the rest space, and an air inlet and an air outlet of the air circulation device are both connected to the external environment.

[0008] Optionally, a heating element is provided on the rest platform, and the heating element is used to heat the rest platform.

[0009] Optionally, the first wall and / or the second wall comprises a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer.

[0010] Optionally, an opening of the space enclosed by the second wall is shared with an opening of the space enclosed by the first wall.

[0011] Optionally, in the height direction of the rest area, the first wall and the second wall are of equal height and the top of the second wall is transparent, and green plants are arranged in the viewing space.

[0012] Optionally, a virtual reality device is provided in the viewing space.

[0013] Optionally, the rest stop is a fully assembled rest stop.

[0014] Compared with the prior art, the beneficial effects of this application are:

[0015] Since the enclosed space is a rest space, the user can enter the rest space to rest when he feels tired or stressed. In addition, since the first wall is a transparent wall, the second wall is arranged outside the first wall, and the mezzanine space between the second wall and the first wall is a viewing space, the user resting in the rest space can also view the scenery in the viewing space through the first wall, so that the user can relax mentally. Therefore, by setting up a rest station, the user's body can be rested in the rest space, and the user's mind can be relaxed, which is more conducive to the user to get back to work or study. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0017] Figure 1 is a top view of a rest stop provided in an embodiment of the present application;

[0018] Figure 2 is a top view of another rest stop provided in an embodiment of the present application;

[0019] Figure 3 is a schematic diagram of a rest space provided in an embodiment of the present application;

[0020] Figure 4 is a top view of a rest space provided in an embodiment of the present application having a preparation area;

[0021] Figure 5 yes Figure 3 Enlarged view of point A in the middle.

[0022] Description of main reference numerals

[0023] 1-Rest stop;

[0024] 100-first wall; 110-resting space; 111-resting area; 112-installation area; 113-preparation area; 101-resting platform; 102-handrail; 103-storage table; 104-trash bin; 105-window;

[0025] 200-second wall; 210-viewing space;

[0026] 300-opening;

[0027] 400-pedal;

[0028] 500 - first exit;

[0029] 600-Second exit; 601-Door;

[0030] 700-Variable top shape;

[0031] 800-Roller. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0033] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0034] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0035] In addition, the terms "installed", "set", "provided with", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0036] In addition, the terms "first", "second", etc. are mainly used to distinguish different devices, elements or components (the specific types and structures may be the same or different), and are not used to indicate or imply the relative importance and quantity of the indicated devices, elements or components. Unless otherwise specified, "plurality" means two or more.

[0037] As described in the background technology of this application, in daily life and work environment, when people feel tired or stressed, they need a rest stop to restore the fatigue of the brain and release the pressure in their hearts, so as to engage in life and work more actively and efficiently.

[0038] In order to solve the technical problems mentioned in the background technology, the utility model provides a rest stop. When a user feels tired or stressed and enters the rest stop to rest, the viewing space in the rest stop can be used to provide the user with a landscape different from the external environment. The user resting in the rest space can also view the scenery in the viewing space through the first wall, so that the user can relax mentally, which is more conducive to the user getting back to work or study.

[0039] The technical solution of the present application will be further described below in conjunction with specific embodiments and drawings.

[0040] See also Figure 1 and Figure 2 The present embodiment provides a rest stop 1, which includes: a first wall 100 and a second wall 200, the space enclosed by the first wall 100 is a rest space 110, and the first wall 100 is a transparent wall; the second wall 200 is arranged on the outside of the first wall 100, and the mezzanine space between the second wall 200 and the first wall 100 is a viewing space 210.

[0041] The contour shapes of the first wall 100 and the second wall 200 may be the same or different, which is not limited here.

[0042] It is worth noting that the second wall 200 may completely enclose the first wall 100 or partially enclose the first wall 100 , as long as a sandwich space can be formed between the second wall 200 and the first wall 100 , which is not limited here.

[0043] It should be noted that the above-mentioned second wall 200 can be transparent, for example, the second wall 200 is a transparent glass wall (which can be colorless glass or colored glass) or a transparent acrylic wall (which can be colorless acrylic wall or colored acrylic wall), etc., or it can be opaque, for example, the second wall 200 is a wooden wall or a foam wall, etc., which is not limited here.

[0044] Since the enclosed space is the rest space 110, the user can enter the rest space 110 to rest when he feels tired or stressed. In addition, since the first wall 100 is a transparent wall, the second wall 200 is arranged on the outside of the first wall 100, and the mezzanine space between the second wall 200 and the first wall 100 is the viewing space 210, the user resting in the rest space 110 can also view the scenery in the viewing space 210 through the first wall 100, so that the user can relax mentally. Therefore, by setting up the rest station 1, the user's body can be rested in the rest space, and the user's mind can be relaxed, which is more conducive to the user to get back to work or study.

[0045] For example, green plants can be placed in the viewing space 210, so that the green plants can not only relieve eye fatigue and calm the user's mood to release the user's mental stress and relieve the user's fatigue, but also purify the air inside the rest stop 1 to provide fresh air for the user. Alternatively, the viewing space 210 can be placed with virtual reality equipment, so that the user can adjust the landscape in the viewing space 210 according to his or her preferences, thereby creating an exclusive rest space 110 for the user, thereby relaxing the user's mind.

[0046] In one possible embodiment, see Figure 3 A rest platform 101 is provided in the rest space 110, and the rest platform 101 is used to divide the rest space 110 into a rest area 111 and an installation area 112. In the height direction of the rest station 1, the installation area 112 is located below the rest area 111, and the installation area 112 is used to install terminal equipment.

[0047] Among them, the height direction of rest stop 1 is Figure 3 The direction indicated by the arrow X.

[0048] By setting a rest platform 101 in the rest space 110, the rest platform 101 divides the rest space 110 into a rest area 111 and an installation area 112, and in the height direction of the rest station 1, the installation area 112 is located below the rest area 111, so that the installation area 112 will not occupy too much horizontal space of the rest space 110, so as to avoid the installation area 112 occupying too much rest space 110, so that the area of ​​the rest area 111 is as large as possible, thereby improving the space utilization rate of the rest space 110. In addition, by setting the installation area 112 below the rest platform 101, the rest platform 101 can also be used to block the terminal equipment in the installation area 112, so as to avoid the visual clutter of the rest space 110, so as to improve the user's comfort in the rest space 110.

[0049] In addition, the material of the rest platform 101 can be any material such as wood, metal, acrylic, etc., which is not limited here.

[0050] In a possible embodiment, the terminal device includes an entertainment device, an air purification device, and a temperature adjustment device, and buttons corresponding to the entertainment device, the air purification device, and the temperature adjustment device are provided in the rest area.

[0051] It should be noted that the above-mentioned entertainment equipment may include but is not limited to music players, atmosphere lighting, smart fragrances, etc.; the above-mentioned air purification equipment may include but is not limited to diffuse supply equipment, negative ion generators, etc.; the above-mentioned temperature control equipment may include but is not limited to air conditioners, floor and wall auxiliary heating equipment, etc.

[0052] Since the terminal device includes entertainment equipment, air purification equipment and temperature adjustment equipment, and buttons corresponding to the entertainment equipment, air circulation equipment and temperature adjustment equipment are provided in the rest area 111, the user can use the buttons to adjust the entertainment equipment, air purification equipment and temperature adjustment equipment according to personal needs in the rest area 111.

[0053] For example, when the entertainment equipment includes a music player, adjustable lighting, and smart fragrance, the user can play music through the music player in the rest area 111 according to personal preferences. When the user is immersed in the music, the mood can be calmed. The user can also adjust the lighting and smart fragrance in the rest area 111 according to personal preferences to create a calm and comfortable atmosphere with the lighting and fragrance, so that the user can feel comfortable, cozy, and relaxed, thereby effectively alleviating the user's nervous mood.

[0054] In addition, users can also use air purification equipment to make the air quality inside the rest stop 1 higher than the external environment. For example, when the air purification equipment includes diffuse oxygen supply equipment and a high-concentration negative ion generator, users can use the diffuse oxygen supply equipment and the negative ion generator to increase the oxygen content inside the rest stop 1, thereby improving the air quality inside the rest stop 1, so as to improve the user's brain working ability, restore the user's brain fatigue, and increase dopamine secretion, thereby releasing the user's inner pressure and calming the user's mood.

[0055] In addition, users can also use temperature control equipment to adjust the temperature inside the rest stop 1. For example, they can use air conditioning to adjust the indoor temperature. When the temperature in the external environment is low, they can use floor and wall auxiliary heating equipment to heat the floor and walls, so that the inside of the rest stop 1 remains warm to improve the user's comfort.

[0056] In a possible embodiment, an air circulation device is provided in the rest space 110 , and an air inlet and an air outlet of the air circulation device are both connected to the external environment.

[0057] By arranging an air circulation device in the rest space 110, and connecting the air inlet and the air outlet of the air circulation device to the external environment, when the air quality inside the rest stop 1 is poor, the air in the external environment can be introduced into the internal space of the rest stop 1 by utilizing the air inlet of the air circulation system, and the poor quality indoor air can be discharged through the exhaust port, thereby exchanging the air in the external environment with the air inside the rest stop 1, so as to achieve the circulation of indoor and outdoor air and improve the quality of the air inside the rest stop 1.

[0058] In a possible embodiment, the air circulation system is arranged on the first wall 100, the air inlet is arranged in the rest area 111, and the air outlet is arranged in the installation area 112, so that the air inlet is as close to the user's head as possible, so that fresh air in the external environment can enter the rest area 111 through the air inlet for the user to breathe, and the turbid air in the rest stop 1 is discharged to the outside through the exhaust port in the installation area 112 away from the user, thereby forming the movement of air flow inside the rest stop 1 to improve the air quality inside the rest stop 1.

[0059] In a possible embodiment, a heating element is disposed on the rest platform 101 , and the heating element is used to heat the rest platform 101 .

[0060] By arranging a heater on the rest platform 101 , the rest platform 101 can be heated by the heater, so that when a user sits on the rest platform 101 , the temperature of the rest platform 101 can make the user feel comfortable, thereby further improving the user's relaxation level in the rest area 111 .

[0061] It should be noted that the above-mentioned heating element may include but is not limited to an electric heating wire or an electric heating plate and the like.

[0062] In a possible embodiment, the resting platform 101 is a wooden platform.

[0063] By making the rest platform 101 a wooden platform, compared with the use of metal plates as the rest platform 101 in the related art, not only can the heating effect of the rest platform 101 be more uniform when the heating element heats the rest platform 101, and the local temperature can be avoided as much as possible from being significantly higher than other areas, but the production cost of the rest station 1 can also be reduced and environmental protection requirements can be met.

[0064] In one possible embodiment, see Figure 3 The rest platform 101 is also provided with a foot pedal 400 movably connected to the rest platform 101 .

[0065] The footrest 400 may be slidably connected to the rest platform 101 or may be hinged to the rest platform 101, which is not limited here.

[0066] If the pedal 400 is slidably connected to the rest platform 101, when the user does not need to use the pedal 400, the pedal 400 is stacked on the lower part of the rest platform 101. When the user needs to use the pedal 400, the pedal 400 is relative to the rest platform 101 along the first direction (i.e., Figure 3 The footrest 400 slides in the direction indicated by the arrow Y in the middle and extends out of the rest platform 101, thereby expanding the area of ​​the rest platform 101 by using the footrest 400 so that the user can lie on the rest platform 101.

[0067] If the footrest 400 is hinged to the rest platform 101, when the user does not need to use the footrest 400, the footrest 400 is stacked at the bottom of the rest platform 101. When the user needs to use the footrest 400, the footrest 400 flips toward the plane where the rest platform 101 is located. In addition, the footrest 400 can stay at different angles to adapt to different postures of the user, thereby increasing the user's comfort.

[0068] It should be noted that the above-mentioned pedal 400 can be adjusted manually or electrically, which is not limited here.

[0069] In a possible embodiment, a detachable backrest is further provided on the rest platform 101 to meet the needs of different users.

[0070] In a possible embodiment, the first wall 100 and / or the second wall 200 includes a stacked first high-density inorganic material layer, a polymer damping layer, and a second high-density inorganic material layer.

[0071] It should be noted that the above-mentioned first wall 100 and / or second wall 200 include a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer. It should be understood that the first wall 100 or the second wall 200 includes a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer, or the first wall 100 and the second wall 200 both include a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer. This embodiment is described by taking the example that the first wall 100 and the second wall 200 both include a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer.

[0072] The density of the first high-density inorganic material layer and the second high-density inorganic material layer is greater than or equal to 18 kg / m 2 , the molecular weight of the polymer damping layer is greater than or equal to 10,000.

[0073] By making the first wall 100 and the second wall 200 include a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer, the first wall 100 and the second wall 200 can be provided with dense sound insulation material with smooth surface without pores, and because the first high-density inorganic material layer, the second high-density inorganic material layer and the polymer damping layer all have the characteristic of large unit dense surface density, they have good sound insulation effect, can isolate the noise in the external environment as much as possible, and maintain the quietness in the rest stop 1, so that users can relax in a quiet environment.

[0074] In another possible embodiment, a carbon sound insulation board or a sound insulation felt is disposed on the first wall 100 and / or the second wall 200 .

[0075] In one possible embodiment, see Figure 1 and Figure 2 The opening 300 of the viewing space 210 enclosed by the second wall 200 is shared with the opening 300 of the rest space 110 enclosed by the first wall 100 .

[0076] The fact that the opening 300 of the viewing space 210 enclosed by the second wall 200 and the opening 300 of the resting space 110 enclosed by the first wall 100 are shared should be understood as that the opening 300 of the viewing space 210 and the opening 300 of the resting space 110 are the same.

[0077] By sharing the opening 300 of the viewing space 210 enclosed by the second wall 200 and the opening 300 of the rest space 110 enclosed by the first wall 100, compared with the related art in which the opening 300 of the viewing space 210 enclosed by the second wall 200 and the opening 300 of the rest space 110 enclosed by the first wall 100 are not shared, the construction difficulty of the rest stop 1 can be reduced, thereby improving the construction efficiency and reducing the construction cost.

[0078] In one possible embodiment, see Figure 1 A sash window 105 is provided on the first wall 100, so that the user can open the sash window 105 to achieve connectivity between the rest space 110 and the viewing space 210. Compared with the related art in which the first wall 100 is not provided with a sash window 105, this embodiment provides a sash window 105 on the first wall 100, so that when the sash window 105 is opened, the internal space of the rest stop 1 is visually enlarged.

[0079] In one possible embodiment, see Figure 2A first exit 500 for users to enter the landscape area is provided on the first wall 100, a second exit 600 is provided on the second wall 200, and a door 601 is provided at the second exit 600. When the second exit 600 is in an open state, the viewing space 210 is connected to the external environment. When the second exit 600 is in a closed state, the door 601 isolates the viewing space 210 from the external environment, so that the user can enter the viewing space 210 to appreciate the landscape in the viewing space 210. After the appreciation is completed, the second exit 600 can be directly opened and leave the rest stop 1, and the second exit 600 can be closed after leaving.

[0080] In a possible embodiment, in the height direction of the rest area 111 , the first wall 100 and the second wall 200 are of equal height, the top of the second wall 200 is transparent, and green plants are arranged in the viewing space 210 .

[0081] By making the heights of the first wall 100 and the second wall 200 equal and the top of the second wall 200 transparent, the sunlight on the top of the rest area 111 can fully shine on the green plants in the viewing space 210, thereby maintaining the vitality of the green plants in the viewing space 210 and improving the aesthetics of the viewing space 210.

[0082] In a possible embodiment, a virtual reality device is provided in the viewing space 210 .

[0083] Since a virtual reality device is provided in the viewing space 210, the user can use the virtual display device to adjust the landscape of the landscape area according to his or her preferences, thereby creating an exclusive rest space 110 for the user, allowing the user to relax and thus making it easier for the user to get back to work or study.

[0084] In a possible embodiment, the rest stop 1 is a fully assembled rest stop 1 .

[0085] Since the rest stop 1 is a fully assembled rest stop 1, the rest stop 1 provided in this embodiment can be prefabricated and constructed in a factory and then transported to different locations by trucks, thereby saving site and construction costs to a great extent.

[0086] In addition, the materials such as polycarbonate plates and aluminum plates used in the construction of the rest stop 1 of this embodiment all have low carbon emission factors. The equipment inside the installation area 112 is designed for small spaces, and the construction method adopts a fully assembled type. The building scale is convenient for truck transportation, thereby achieving low energy consumption standards throughout the life cycle.

[0087] In one possible embodiment, see Figure 3The top of the rest stop 1 is also provided with a variable top shape 700, and the variable top shape 700 can be used to adjust the appearance of the rest stop 1, so that the rest stop 1 has a better visual effect.

[0088] In a possible embodiment, a body monitoring and analysis system is also provided in the rest area 111, so that the body monitoring and analysis system is used to monitor and analyze the physical condition of users in the rest area 111, so that the users can adjust their own conditions more specifically according to the data obtained from the monitoring and analysis, so as to recover their energy faster.

[0089] In one possible embodiment, see Figure 3 A handrail 102 , a storage table 103 and a trash can 104 are also provided on the side walls of the rest area 111 .

[0090] In a possible embodiment, the second wall 200 is a one-way hollow tempered glass so that the environment inside the rest stop 1 cannot be seen by people in the outside environment, thereby improving the privacy of the rest stop 1. In addition, the hollow tempered glass can not only reduce the self-weight of the rest stop 1, but also have a good heat insulation effect.

[0091] In a possible embodiment, the door at the opening 300 of the second wall 200 is a double-layer glass door.

[0092] In another possible embodiment, the opening 300 of the second wall 200 is provided with an electric atomization door.

[0093] In the natural state, the liquid crystal molecules inside the glass of the electric mist door are arranged irregularly, and the refractive index of the liquid crystal is lower than that of the polymer in the glass. The incident light is scattered in the polymer layer and appears milky white, that is, opaque. After power is turned on, the diffusely distributed liquid crystal molecules quickly change from irregular arrangement to directional regular arrangement, making the refractive index of the liquid crystal equal to that of the polymer, and the incident light can pass through completely, forming a transparent state, so that after the user enters the rest stop, the electric mist door is powered off, so that people in the outside space cannot see the environment inside the rest stop, thereby improving the privacy of the rest stop.

[0094] In a possible embodiment, a variable exterior decoration is provided on the outer side of the second wall 200 , so that the appearance of the rest stop 1 can be transformed, thereby improving the visual aesthetics of the rest stop 1 .

[0095] In a possible embodiment, the height of the rest area 111 is 1.7m-2.2m, the width of the rest platform 101 is 0.7m-1.7m, and the length of the rest platform 101 is 1.45m-2.1m, so that the rest space 110 can meet the space required for a full range of movements such as standing, sitting, stretching, standing up, squatting, etc. for a single person. In addition, the building size of the rest stop 1 is convenient for truck transportation.

[0096] In one possible embodiment, see Figure 4 A preparation area 113 is also provided in the rest space 110 for users to change clothes and shoes.

[0097] Of course, the height of the rest area 111, the width of the rest platform 101 and the length of the rest platform 101 are merely examples, and those skilled in the art should understand that the above values ​​are not limitations on the height of the rest area 111, the width of the rest platform 101 and the length of the rest platform 101, and the height of the rest area 111, the width of the rest platform 101 and the length of the rest platform 101 can also be adaptively adjusted according to actual conditions.

[0098] In one possible embodiment, see 3 and Figure 5 A plurality of rollers 800 are provided at the bottom of the rest station 1 to facilitate the movement of the rest station 1 .

[0099] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the rest stop of the present application, rather than to limit it. Although the rest stop of the present application has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some or all of the technical features therein can be replaced by equivalents. These modifications or replacements do not cause the essence of the corresponding technical solution to deviate from the scope of the technical solution of the embodiments of the present application.

Claims

1. A rest stop, characterized in that: include: a first wall, wherein the space enclosed by the first wall is a rest space, and the first wall is a transparent wall; The second wall is arranged outside the first wall, and the interlayer space between the second wall and the first wall is a viewing space.

2. The rest stop according to claim 1, characterized in that: A rest platform is provided in the rest space, and the rest platform is used to divide the rest space into a rest area and an installation area. In the height direction of the rest station, the installation area is located below the rest area, and the installation area is used to install terminal equipment.

3. The rest stop according to claim 2, characterized in that: The terminal device includes an entertainment device, an air purification device and a temperature adjustment device, and buttons corresponding to the entertainment device, the air purification device and the temperature adjustment device are arranged in the rest area.

4. The rest stop according to claim 1, characterized in that: An air circulation device is arranged in the rest space, and an air inlet and an air outlet of the air circulation device are both connected to the external environment.

5. The rest stop according to claim 2, characterized in that: The rest platform is provided with a heating element, and the heating element is used to heat the rest platform.

6. The rest stop according to claim 1, characterized in that: The first wall and / or the second wall comprises a stacked first high-density inorganic material layer, a polymer damping layer and a second high-density inorganic material layer.

7. The rest stop according to claim 1, characterized in that: The opening of the space enclosed by the second wall is shared with the opening of the space enclosed by the first wall.

8. The rest stop according to claim 1, characterized in that: In the height direction of the rest stop, the first wall and the second wall have the same height and the top of the second wall is transparent, and green plants are arranged in the viewing space.

9. The rest stop according to claim 1, characterized in that: Virtual reality equipment is arranged in the viewing space.

10. The rest stop according to claim 1, characterized in that The rest stop is a fully assembled rest stop.