Blowing device for wire and cable production

By designing a blower sleeve and an inner sleeve in the blower for wire and cable production, the air circulation is driven and the fan blade is driven, combined with the air outlet and auxiliary blowing pipe, the problem of inconsistent blowing efficiency at the upper and lower ends of the cable is solved, and uniformity and efficient cooling of the outer surface of the cable are achieved.

CN222600588UActive Publication Date: 2025-03-11WEIHAI KUNYU CABLE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420651661.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2025-03-11
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

Existing blowing devices for wire and cable production are difficult to achieve consistency in the upper and lower end blowing efficiency on fast-moving cables, resulting in uneven cooling effects on the external surface of the cable.

Method used

A blower device for wire and cable production is designed. A blower sleeve is used to connect to the outside of the cable, and an inner sleeve is installed inside the blower sleeve. The inner sleeve drives the gas to flow, and the gas pushes the fan blade to rotate, improving the gas flowability, and at the same time, the gas is uniformly driven to the outside of the cable through the air outlet and auxiliary blowing pipe.

Benefits of technology

The uniformity and synchronization of the external blowing effect of the cable surface is achieved, the efficiency of cable cooling treatment is improved, and the smoothness and quality of the external surface of the cable is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222600588U_ABST
    Figure CN222600588U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of wire and cable preparation, and discloses a blowing device for wire and cable production, which comprises a support plate, the upper end of the support plate is fixedly connected with a protective sleeve, the side surface of the protective sleeve is fixedly connected with a bracket, and the top end of the bracket is provided with a gas transmission sleeve. And fans are installed in the two sides of the gas transmission sleeve, rolling wheels are installed at the two ends of the upper portion of the supporting plate, a cable is placed on the upper portions of the rolling wheels, and a gas transmission pipe is fixedly connected to the middle of the lower end of the gas transmission sleeve. According to the blowing device for wire and cable production, the blowing sleeve is connected to the exterior of a cable in a sleeving mode, meanwhile, the inner sleeve drives gas conveyed into the blowing sleeve to provide a moving space when blowing towards the exterior of the cable, the gas drives fan blades to rotate, and the fan blades prolong the circulation time of the gas in the blowing sleeve; and meanwhile, after the air outlet holes drive the air to be blown to the outside of the cable, the uniformity and synchronism of the air during blowing are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of preparation of electric wires and cables, in particular to a blowing device for producing electric wires and cables. Background Art

[0002] With the development of wire and cable production technology, the production speed of cables is getting faster and faster, but the drying and uniformity of the cable surface has become a bottleneck. The production of wires and cables is that the copper wire is coated with a layer of insulation through an extruder, then cooled in a water tank, and then dried evenly by a blowing device before being rolled. The degree of drying of the cable surface affects the smoothness of the cable appearance. Therefore, in the preparation process of wires and cables, it is necessary to use a blowing device to drive the gas to the cable wire for cooling treatment.

[0003] In the process of cable and wire preparation, in order to maintain the cable preparation efficiency, the cable needs to be kept in a state of rapid transportation continuously. Therefore, when the outside of the cable is blown, the outside of the fast-moving cable needs to be blown. However, in the blowing device, the blowing device will drive the gas from the upper end to the lower end, which will cause the gas to contact the upper part of the cable first, resulting in different blowing efficiencies at the upper and lower ends of the cable, thus affecting the cooling effect of the cable surface. For this reason, we proposed a blowing device for wire and cable production. Utility Model Content

[0004] In view of the shortcomings of the existing blowing devices for the production of wires and cables, the utility model provides a blowing device for the production of wires and cables, which has a blowing sleeve that is sleeved on the outside of the cable, and an inner sleeve is installed inside the blowing sleeve. The inner sleeve drives the gas to flow, and when the gas is transmitted to the inside of the blowing sleeve, the fan blades are pushed to rotate, thereby improving the gas flowability inside the blowing sleeve. At the same time, the gas is evenly driven to be transmitted to the outside of the cable through the air outlet, thereby improving the advantage of more uniform blowing effect on the cable surface, thereby solving the problems raised in the above-mentioned background technology.

[0005] The utility model provides the following technical solution: a blowing device for the production of wires and cables, comprising a support plate, a protective sleeve is fixedly connected to the upper end of the support plate, a bracket is fixedly connected to the side of the protective sleeve, a gas transmission sleeve is installed on the top of the bracket, fans are installed inside the two sides of the gas transmission sleeve, rollers are installed at both ends of the upper part of the support plate, cables are placed on the upper part of the rollers, a gas transmission pipe is fixedly connected to the middle of the lower end of the gas transmission sleeve, a blowing sleeve is fixedly connected to the lower end of the gas transmission pipe, an inner sleeve is fixedly connected to the inside of the blowing sleeve, a cylinder is movably sleeved inside the inner sleeve, a fan blade is fixedly connected to the outside of the cylinder, an air outlet is opened on the inner side of the blowing sleeve, and an auxiliary blowing pipe is installed on the outside of the blowing sleeve.

[0006] Preferably, the protective sleeve is sleeved on the outside of the two sets of blowing sleeves, and the roller is arranged on the side of the protective sleeve.

[0007] Preferably, the fans are arranged in a horizontal direction, and the gas transmission pipe is arranged in the middle of the lower end of the gas transmission sleeve.

[0008] Preferably, the two groups of blowing sleeves are both sleeved on the outside of the cable, and air outlet holes are evenly opened on the inner side of the blowing sleeves.

[0009] Preferably, the fan blades are fitted onto one end of the interior of the blowing sleeve, and the fan blades are arranged at equal intervals outside the cylinder.

[0010] Preferably, one end of the inner sleeve is provided with an opening, and the opening faces the outside of the blowing sleeve.

[0011] Preferably, the auxiliary blowing pipe is installed on the outside of two groups of blowing sleeves, three groups of the auxiliary blowing pipe are installed, and the inner side of the auxiliary blowing pipe is arranged on the outside of the cable.

[0012] Compared with the existing blowing device for wire and cable production, the utility model has the following beneficial effects:

[0013] 1. The blowing device for wire and cable production is connected to the outside of the cable through a blowing sleeve. At the same time, the inner sleeve drives the gas transported to the inside of the blowing sleeve to provide activity space when blowing to the outside of the cable. At the same time, the gas drives the fan blades to rotate. The fan blades increase the circulation time of the gas inside the blowing sleeve. At the same time, the air outlet drives the gas to be blown to the outside of the cable, ensuring the uniformity and synchronization of the gas blowing.

[0014] 2. The blowing device for wire and cable production is installed on the outside of two groups of blowing sleeves through an auxiliary blowing pipe. At the same time, the blowing sleeve drives excess gas to the inside of the auxiliary blowing pipe, and then the auxiliary blowing pipe drives the gas to the outside of the cable installed between the two groups of blowing sleeves. When the outside of the cable is blown, the sufficiency of the gas blowing is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the main structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the cross-sectional structure of the main body of the utility model;

[0017] Figure 3 This is a schematic diagram of the cross-sectional structure of the middle part of the main body of the utility model;

[0018] Figure 4 This is a schematic diagram of the side sectional structure of the main body of the utility model;

[0019] Figure 5 This is an enlarged structural diagram of the utility model at A;

[0020] Figure 6 It is a schematic diagram of the enlarged structure of point B of the utility model.

[0021] In the figure: 1. support plate; 2. protective cover; 3. bracket; 4. gas transmission cover; 5. fan; 6. roller; 7. cable; 8. gas transmission pipe; 9. blowing cover; 10. inner cover; 11. cylinder; 12. fan blades; 13. air outlet; 14. auxiliary blowing pipe. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 , a blowing device for wire and cable production, comprising a support plate 1, a protective sleeve 2 is fixedly connected to the upper end of the support plate 1, the protective sleeve 2 maintains uniformity when driving the gas to circulate, a bracket 3 is fixedly connected to the side of the protective sleeve 2, the bracket 3 supports the position of a gas transmission sleeve 4, a gas transmission sleeve 4 is installed on the top of the bracket 3, the gas transmission sleeve 4 drives the position of a fan 5 to limit the position, fans 5 are installed inside the two sides of the gas transmission sleeve 4, the fan 5 drives the gas to be concentratedly transported to the inside of the gas transmission sleeve 4, rollers 6 are installed at both ends of the upper part of the support plate 1, the rollers 6 assist in supporting the position of the cable 7, the cable 7 is placed on the upper part of the roller 6, and the middle part of the lower end of the gas transmission sleeve 4 is fixedly connected to a gas transmission Tube 8, the gas transmission tube 8 drives the gas to be blown into the interior of the blowing sleeve 9, the lower end of the gas transmission tube 8 is fixedly connected with the blowing sleeve 9, the interior of the blowing sleeve 9 is fixedly connected with the inner sleeve 10, the inner sleeve 10 drives the gas to be transported in a centralized manner, the inner sleeve 10 is movably sleeved with a cylinder 11, the exterior of the cylinder 11 is fixedly connected with a fan blade 12, the gas blows the cylinder 11 and the fan blade 12 to rotate, and at the same time, the rotation of the cylinder 11 and the fan blade 12 can drive the gas to improve the uniformity when circulating, an air outlet 13 is opened on the inner side of the blowing sleeve 9, the air outlet 13 evenly blows the outside of the cable 7, an auxiliary blowing tube 14 is installed on the outside of the blowing sleeve 9, the auxiliary blowing tube 14 drives the gas to be evenly transported to between the two groups of blowing sleeves 9.

[0024] See also Figure 4The protective sleeve 2 is sleeved on the outside of the two groups of blowing sleeves 9, and the roller 6 is arranged on the side of the protective sleeve 2. The protective sleeve 2 is sleeved on the outside of the blowing sleeve 9, and the roller 6 is arranged on the side of the protective sleeve 2. The roller 6 can be used to perform auxiliary support and positioning processing on the cable 7 when it moves. At the same time, the protective sleeve 2 is arranged on the outside of the cable 7. The protective sleeve 2 can reduce the problem of heat loss when the blowing device is started.

[0025] See also Figure 1 The fan 5 is arranged in a horizontal direction, and the gas transmission pipe 8 is arranged in the middle of the lower end of the gas transmission sleeve 4. The fan 5 is arranged in a direction parallel to the horizontal plane. The fan 5 installed inside the gas transmission sleeve 4 is started, and the fan 5 drives the gas to flow. At the same time, the fan 5 drives the gas to be concentrated and transported to the inside of the gas transmission sleeve 4. At the same time, the gas can be transmitted to the inside of the gas transmission pipe 8. Through the diversion of the gas transmission pipe 8, the gas can be evenly transmitted to the inside of the blowing sleeve 9, and the blowing sleeve 9 can be used to blow the outside of the cable 7.

[0026] See also Figure 4 The two sets of blowing sleeves 9 are both sleeved on the outside of the cable 7, and the inner side of the blowing sleeve 9 is evenly provided with air outlet holes 13. When the blowing sleeve 9 is sleeved on the outside of the cable 7 and the inner side of the blowing sleeve 9 is provided with air outlet holes 13, the blowing sleeve 9 drives the gas to be transported inward through the air outlet holes 13, and then the air outlet holes 13 can drive the gas to be blown evenly on the outside of the cable 7, thereby improving the uniformity of gas transmission.

[0027] See also Figure 5 and Figure 6 The fan blades 12 are attached to one end of the inside of the blowing sleeve 9, and the fan blades 12 are arranged at equal intervals outside the cylinder 11. The fan blades 12 are attached to the inner side of the blowing sleeve 9, and at the same time, the fan blades 12 are arranged at equal intervals outside the cylinder 11. After the gas is transported to the inside of the blowing sleeve 9 through the gas transmission pipe 8, the fan blades 12 rotate under the push of the gas. At the same time, when the fan blades 12 rotate, the gas can be driven to circulate inside the blowing sleeve 9, thereby improving the gas circulation effect.

[0028] See also Figure 5 One end of the inner sleeve 10 is provided with an opening, and the opening faces the outside of the blowing sleeve 9. Through the opening at one end of the inner sleeve 10, when the gas is transported to the inside of the blowing sleeve 9, the gas circulates in the blowing sleeve 9 in advance, thereby improving the circulation effect of the gas circulation in the blowing sleeve 9. At the same time, when the blowing sleeve 9 drives the gas to be transmitted inwardly through the air outlet 13, the uniform transmission efficiency of the gas is improved.

[0029] See also Figure 3The auxiliary blowing pipe 14 is installed on the outside of the two groups of blowing sleeves 9. There are three groups of auxiliary blowing pipes 14. The inner side of the auxiliary blowing pipe 14 is set on the outside of the cable 7. The auxiliary blowing pipe 14 is installed on the outside of the blowing sleeve 9. At the same time, an opening is opened on the inner side of the auxiliary blowing pipe 14. When the blowing sleeve 9 drives the gas to flow, the excess gas can be guided and transmitted to the inside through the auxiliary blowing pipe 14. At the same time, the auxiliary blowing pipe 14 drives the gas to be transmitted to the outside of the cable 7 installed between the two groups of blowing sleeves 9, and then the auxiliary blowing pipe 14 drives the excess gas to blow the cable 7, thereby improving the utilization rate of resources.

[0030] Working principle: When in use, pass the cable 7 through the upper part of the roller 6 and through the inside of the blowing sleeve 9, and start the fan 5 at the same time. The fan 5 drives the gas to circulate, and the gas is transported to the inside of the blowing sleeve 9 through the gas transmission pipe 8, and the gas is transported to the inside of the inner sleeve 10 installed inside the blowing sleeve 9, and the fan blades 12 can be driven to rotate when the gas circulates. The rotation of the fan blades 12 can improve the circulation efficiency of the gas in the blowing sleeve 9, and then drive the uniformity of the gas transmission in the blowing sleeve 9, and the gas can be transmitted to the outside of the cable 7 through the air outlet 13 opened on the inner side of the blowing sleeve 9, and then the blowing sleeve 9 can drive the gas to blow the outside of the cable 7 evenly, and the excess gas can be guided and transmitted to between the two groups of blowing sleeves 9 through the auxiliary blowing pipe 14, thereby improving the blowing effect of the equipment and improving resource utilization.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A blowing device for producing electric wires and cables, comprising a support plate (1), a protective cover (2) being fixedly connected to the upper end of the support plate (1), a bracket (3) being fixedly connected to the side of the protective cover (2), a gas transmission cover (4) being installed at the top of the bracket (3), fans (5) being installed inside the two sides of the gas transmission cover (4), rollers (6) being installed at both ends of the upper part of the support plate (1), a cable (7) being placed on the upper part of the roller (6), characterized in that: A gas transmission pipe (8) is fixedly connected to the middle of the lower end of the gas transmission sleeve (4), a blowing sleeve (9) is fixedly connected to the lower end of the gas transmission pipe (8), an inner sleeve (10) is fixedly connected to the inside of the blowing sleeve (9), a cylinder (11) is movably sleeved inside the inner sleeve (10), a fan blade (12) is fixedly connected to the outside of the cylinder (11), an air outlet hole (13) is opened on the inner side of the blowing sleeve (9), and an auxiliary blowing pipe (14) is installed on the outside of the blowing sleeve (9).

2. The blowing device for producing electric wires and cables according to claim 1, characterized in that: The protective sleeve (2) is sleeved on the outside of the two sets of blowing sleeves (9), and the roller (6) is arranged on the side of the protective sleeve (2).

3. The blowing device for producing electric wires and cables according to claim 1, characterized in that: The fans (5) are arranged in a horizontal direction, and the gas transmission pipe (8) is arranged in the middle of the lower end of the gas transmission sleeve (4).

4. The blowing device for producing electric wires and cables according to claim 1, characterized in that: The two groups of blowing sleeves (9) are both sleeved on the outside of the cable (7), and the inner sides of the blowing sleeves (9) are evenly provided with air outlet holes (13).

5. The blowing device for producing electric wires and cables according to claim 1, characterized in that: The fan blades (12) are fitted on one end of the interior of the blowing sleeve (9), and the fan blades (12) are arranged at equal intervals outside the cylinder (11).

6. The blowing device for producing electric wires and cables according to claim 1, characterized in that: An opening is formed at one end of the inner sleeve (10), and the opening faces the outside of the blowing sleeve (9).

7. The blowing device for producing electric wires and cables according to claim 1, characterized in that: The auxiliary blowing pipe (14) is installed outside the two groups of blowing sleeves (9), and three groups of the auxiliary blowing pipe (14) are installed. The inner side of the auxiliary blowing pipe (14) is arranged outside the cable (7).