Surveying and mapping board for highway bridge investigation and design
By designing a surveying and mapping board with articulated shaft and movable shaft, the problem of inconvenient adjustment of the height and inclination of the existing surveying and mapping board is solved, convenient sitting and standing surveying and portability are achieved, and the convenience and comfort of the surveying and mapping board are improved.
Patent Information
- Application Number
- CN202420988625.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-05-09
AI Technical Summary
The existing surveying and mapping boards are inconvenient to adjust the height and inclination easily when used, and are not suitable for staff to perform sit-up surveying and mapping, which affects the convenience and comfort of the surveying and mapping boards.
A surveying and mapping plate including a first support frame and an anti-slip seat plate is designed. Through the combination of the articulated shaft and the movable shaft, the height and inclination are easily adjusted, and the folding and carrying of the surveying and mapping plate is facilitated through the structure of the annular frame and the slot.
It realizes convenient height and inclination control of the surveying and mapping board, facilitates staff to conduct sitting and standing surveying, and improves the adjustment convenience and comfort of the surveying and mapping board.
Smart Images

Figure CN222604114U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of surveying and mapping boards, in particular to a surveying and mapping board for highway bridge survey and design. Background Art
[0002] Surveying and mapping literally means measuring and drawing. It is based on computer technology, optoelectronic technology, network communication technology, space science, and information science, with global navigation satellite positioning system, remote sensing, and geographic information system as the technical core. It selects existing feature points and boundaries on the ground and obtains graphics and positions reflecting the current status of the ground and related information through measurement methods for the use of engineering construction, planning and design, and administrative management. Surveying and mapping refers to the measurement, collection, and mapping of the shape, size, spatial position, and attributes of natural geographical elements or artificial facilities on the surface. With the development of social economy, the country has begun to vigorously carry out infrastructure construction. Generally, before the construction of highway bridges, it is necessary to survey the construction site, and surveying and mapping personnel will draw surveying drawings for design. Outdoor surveying and mapping generally uses surveying and drawing boards and support frames. Usually, surveying and mapping boards are large, which are very inconvenient to use outdoors.
[0003] For example, a portable surveying and mapping board for highway bridge survey and design disclosed in the authorization announcement number CN216331104U relates to the field of engineering surveying and mapping technology, including a bottom plate, a top plate is hinged at one end of the top outer wall of the bottom plate, and a storage slot is opened on the outer wall of one side of the bottom plate, a surveying and mapping slot is opened on the outer wall of one side of the top plate, and a magnetic suction plate is fixed on the inner wall of one side of the surveying and mapping slot, button magnets are magnetically attracted to the four corners of the outer wall of one side of the magnetic suction plate, and a limiting frame is welded to the outer wall of the other side of the top plate;
[0004] Although it realizes that the bottom plate and the top plate can be attracted together by the first magnet block and the second magnet block, so that the bottom plate and the top plate are not easy to open after being folded, and it is more convenient to lift, and when drawing after the bottom plate and the top plate are unfolded, the insertion rod can be inserted into the ground, so that the bottom plate is more stable and painting is more convenient, and the drawing paper can be stored in the bottom plate through the storage slot. When surveying and mapping personnel go out, there is no need to carry extra drawing paper, which is more convenient, but it does not solve the problem that the existing surveying and mapping board is not conducive to convenient height and inclination control and adjustment when in use, it is not convenient for staff to perform sitting and standing surveying and mapping, and it is not conducive to folding and carrying the surveying and mapping board, which greatly affects the convenience of adjusting the surveying and mapping board and the comfort during surveying and mapping. Utility Model Content
[0005] The purpose of the utility model is to provide a surveying and mapping board for highway bridge survey and design, so as to solve the problems raised in the above-mentioned background technology that the surveying and mapping board is not convenient for convenient height and inclination control and adjustment, is not convenient for workers to perform sitting and standing surveying, is not conducive to folding and carrying the surveying and mapping board, and affects the convenience of adjusting the surveying and mapping board and the comfort during surveying.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a surveying and mapping board for highway bridge survey and design, comprising a first support frame and an anti-skid seat plate, two groups of anti-skid seat plates are installed inside the first support frame, a second support frame is arranged outside the first support frame, a hinge shaft is symmetrically installed on the top of the first support frame on one side of the anti-skid seat plate, and the first support frame is movably connected to the second support frame through the hinge shaft, a first support shaft is installed inside the second support frame, a second support shaft is movably installed inside the first support frame on one side of the hinge shaft, a support plate is arranged on the top of the second support shaft, a support platform is arranged on the top of the support plate, a surveying and mapping board body is arranged on the outer wall of the support platform, a first connecting shaft is symmetrically installed on one side of the surveying and mapping board body close to the support platform, and the surveying and mapping board body is movably connected to the support platform through the first connecting shaft, a support block is installed on the outer wall of the surveying and mapping board body on one side of the first connecting shaft, a ring frame is movably installed on the outer wall of the support block, a plurality of groups of card slots with equal spacing are symmetrically arranged on the surface of the support platform on one side of the ring frame, and the ring frame is movably connected to the card slots.
[0007] Preferably, a movable shaft is installed at the center position of the bottom end of the support platform, a sleeve is installed at the top end of the support plate on one side of the movable shaft, and the movable shaft extends to the outside of the sleeve, and bolts are provided on the surface of the sleeve, and the bolts extend to the surface of the movable shaft.
[0008] Preferably, support arms are symmetrically mounted on the bottom end of the support plate on one side of the second support shaft, and hooks are mounted on the ends of the support arms away from the second support shaft.
[0009] Preferably, a third support shaft is movably installed inside the second support frame on one side of the hook, and the hooks are all connected to the third support shaft.
[0010] Preferably, a buckle is provided on the surface of the support arm on one side of the hook, a fourth connecting shaft is installed on one end of the buckle close to the support arm, and the buckle is movably connected to the support arm through the fourth connecting shaft.
[0011] Preferably, a first limiting arm is provided on the outer wall of the supporting arm, a second connecting shaft is installed at one end of the first limiting arm close to the supporting arm, and the first limiting arm is movably connected to the supporting arm through the second connecting shaft.
[0012] Preferably, a third connecting shaft is installed at one end of the first limiting arm away from the second connecting shaft, and the first limiting arm is movably connected to the second supporting frame via the third connecting shaft.
[0013] Preferably, a second limiting arm is installed on the outer wall of the second supporting frame on one side of the first supporting shaft, and both ends of the second limiting arm are fixedly connected to the second supporting frame.
[0014] Compared with the prior art, the beneficial effects of the utility model are: the surveying board not only realizes the convenient height and inclination control and adjustment of the surveying board for highway bridge survey and design, which is convenient for the staff to conduct sit-down surveying and mapping, but also facilitates the folding and carrying of the surveying board, thereby improving the convenience of adjusting the surveying board and the comfort during surveying and mapping. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the three-dimensional structure of the third support shaft of the utility model;
[0017] Figure 3 This is a front view structural schematic diagram of the utility model;
[0018] Figure 4 It is a side view structural schematic diagram of the utility model;
[0019] Figure 5 It is a side view enlarged structural diagram of the surveying and mapping board body of the utility model;
[0020] Figure 6 For the utility model Figure 1 The enlarged structural diagram at A in the middle;
[0021] Figure 7 This is a schematic diagram of the three-dimensional structure of the support plate of the utility model;
[0022] Figure 8 It is a schematic diagram of the three-dimensional structure of the first limiting arm of the utility model.
[0023] In the figure: 1. first support frame; 2. anti-slip seat plate; 3. hinge shaft; 4. second support frame; 5. first support shaft; 6. second support shaft; 7. third support shaft; 8. support plate; 9. bushing; 10. movable shaft; 11. bolt; 12. support platform; 13. surveying and mapping board body; 14. support block; 15. first connecting shaft; 16. annular frame; 17. slot; 18. first limiting arm; 19. second connecting shaft; 20. support arm; 21. third connecting shaft; 22. fourth connecting shaft; 23. buckle; 24. hook; 25. second limiting arm. DETAILED DESCRIPTION
[0024] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose of the utility model, the specific implementation method, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0025] See also Figure 1-8The utility model provides an embodiment: a surveying and mapping board for highway bridge survey and design, comprising a first support frame 1 and an anti-skid seat plate 2, two groups of anti-skid seat plates 2 are installed inside the first support frame 1, a second support frame 4 is arranged outside the first support frame 1, a hinge shaft 3 is symmetrically installed at the top end of the first support frame 1 on one side of the anti-skid seat plate 2, and the first support frame 1 is movably connected to the second support frame 4 through the hinge shaft 3, a first support shaft 5 is installed inside the second support frame 4, a second support shaft 6 is movably installed inside the first support frame 1 on one side of the hinge shaft 3, a support plate 8 is arranged at the top end of the second support shaft 6, a support platform 12 is arranged at the top end of the support plate 8, a surveying and mapping board body 13 is arranged on the outer wall of the support platform 12, a first connecting shaft 15 is symmetrically installed on one side of the surveying and mapping board body 13 close to the support platform 12, and the surveying and mapping board body 13 is movably connected to the support platform 12 through the first connecting shaft 15;
[0026] A support block 14 is installed on the outer wall of the surveying and mapping board body 13 on one side of the first connecting shaft 15, and a ring frame 16 is movably installed on the outer wall of the support block 14. A plurality of groups of slots 17 with equal spacing are symmetrically arranged on the surface of the support platform 12 on one side of the ring frame 16, and the ring frame 16 is movably connected with the slots 17. A movable shaft 10 is installed at the center position of the bottom end of the support platform 12, and a shaft sleeve 9 is installed on the top of the support plate 8 on one side of the movable shaft 10, and the movable shaft 10 extends to the outside of the shaft sleeve 9, and the movable shaft 10 is slidably connected with the shaft sleeve 9, and a bolt 11 is arranged on the surface of the shaft sleeve 9, and the bolt 11 extends to the surface of the movable shaft 10;
[0027] When in use, first open the first support frame 1 and the second support frame 4, and under the support of the hinge shaft 3, the first support frame 1 and the second support frame 4 are opened to the maximum with the hinge shaft 3 as the axis, so as to facilitate the first support frame 1 and the second support frame 4 to support each other, and the second limit arm 25 supports the second support frame 4, and the movable shaft 10 is placed inside the shaft sleeve 9, and the bolt 11 is rotated. The bolt 11 is changed from a tightened state to a loosened state to facilitate the adjustment of the height of the movable shaft 10, and the movable shaft 10 drives the support platform 12 and the mapping board body 13 to adjust the height. When the adjustment is completed, the bolt 11 is rotated in the opposite direction to fix the movable shaft 10. Under the support of the support platform 12, the mapping board body 13 is fixed with the first connecting shaft 15 as the axis. The ring frame 16 is rotated, and under the active support of the ring frame 16 and the support block 14, the ring frame 16 is rotated to snap into the slot 17 to facilitate the support of the surveying and mapping board body 13, so as to facilitate the staff to survey and map on the surface of the surveying and mapping board body 13. When the angle of the surveying and mapping board body 13 needs to be adjusted, the ring frame 16 is rotated to facilitate the ring frame 16 to snap into the slots 17 with different spacings to adjust the inclination of the surveying and mapping board body 13. With the support of the anti-slip seat plate 2, it is convenient for the staff to sit and map the construction site, so as to improve the comfort during the surveying and mapping, and realize the convenient height and inclination control and adjustment of the surveying and mapping board for highway bridge survey and design, which is convenient for the staff to sit and map, and improves the convenience of adjusting the surveying and mapping board and the comfort during the surveying and mapping;
[0028] A support arm 20 is symmetrically installed at the bottom end of the support plate 8 on one side of the second support shaft 6, and a hook 24 is installed at one end of the support arm 20 away from the second support shaft 6. A third support shaft 7 is movably installed inside the second support frame 4 on one side of the hook 24, and the hooks 24 are all connected to the third support shaft 7. A buckle 23 is provided on the surface of the support arm 20 on one side of the hook 24, and a fourth connecting shaft 22 is installed at one end of the buckle 23 close to the support arm 20, and the buckle 23 is movably connected to the support arm 20 through the fourth connecting shaft 22, and the outer wall of the support arm 20 is provided with a A first limiting arm 18 is provided, and a second connecting shaft 19 is installed at one end of the first limiting arm 18 close to the supporting arm 20, and the first limiting arm 18 is movably connected to the supporting arm 20 through the second connecting shaft 19, and a third connecting shaft 21 is installed at one end of the first limiting arm 18 away from the second connecting shaft 19, and the first limiting arm 18 is movably connected to the second supporting frame 4 through the third connecting shaft 21, and a second limiting arm 25 is installed on the outer wall of the second supporting frame 4 on one side of the first supporting shaft 5, and both ends of the second limiting arm 25 are fixedly connected to the second supporting frame 4;
[0029] When in use, after the surveying and mapping is completed, the bolt 11 is rotated to facilitate the movable shaft 10 to be moved out from the inside of the shaft sleeve 9, and the buckle 23 is rotated by rotating the buckle 23, and the buckle 23 is rotated with the fourth connecting shaft 22 as the axis, so as to facilitate the buckle 23 to leave the surface of the third support shaft 7, and the second support frame 4 is operated to rotate, and the second support frame 4 is rotated with the hinge axis 3 as the axis, and the second support frame 4 drives the first limiting arm 18 to move through the third connecting shaft 21, and the first limiting arm 18 drives the support arm 20 and the support plate 8 to rotate through the second connecting shaft 19, and the support plate 8 rotates with the second support shaft 6 as the axis, and the support arm 20 drives the hook 24 to move, and the hook 24 is removed from the surface of the third support shaft 7, so as to facilitate the support plate 8 to be folded into the inside of the first support frame 1, and the first support frame 1 and the second support frame 4 are folded and stored, so as to realize the convenient folding and storage of the surveying and mapping board for highway bridge survey and design, and facilitate the folding and carrying of the surveying and mapping board.
[0030] Working principle: When in use, first open the first support frame 1 and the second support frame 4. Under the support of the hinge shaft 3, the first support frame 1 and the second support frame 4 are opened to the maximum with the hinge shaft 3 as the axis, so as to facilitate the first support frame 1 and the second support frame 4 to support each other. The second limit arm 25 supports the second support frame 4. By placing the movable shaft 10 inside the shaft sleeve 9 and rotating the bolt 11, the bolt 11 changes from a tightened state to a loosened state, so as to facilitate the adjustment of the height of the movable shaft 10, and the movable shaft 10 drives the support platform 12. The height of the surveying and mapping board body 13 is adjusted. When the adjustment is completed, the bolt 11 is rotated in the opposite direction to fix the movable shaft 10. Under the support of the support platform 12, the surveying and mapping board body 13 rotates around the first connecting shaft 15. Under the active support of the annular frame 16 and the support block 14, the annular frame 16 is rotated to snap into the slot 17 to facilitate the support of the surveying and mapping board body 13, so as to facilitate the staff to survey and map on the surface of the surveying and mapping board body 13. When the angle of the surveying and mapping board body 13 needs to be adjusted, the annular frame 16 is rotated to , to facilitate the annular frame 16 to be snapped into the slots 17 of different spacings, to adjust the inclination of the surveying and mapping board body 13, under the support of the anti-slip seat plate 2, it is convenient for the staff to sit and survey the construction site, to improve the comfort during surveying and mapping, when the surveying and mapping is completed, then by rotating the bolt 11, to facilitate the movable shaft 10 to move out from the inside of the shaft sleeve 9, rotate by rotating the buckle 23, the buckle 23 is rotated around the fourth connecting shaft 22, to facilitate the buckle 23 to leave the surface of the third support shaft 7, operate the second support frame 4 to rotate, the second The support frame 4 rotates around the hinge shaft 3, the second support frame 4 drives the first limit arm 18 to move through the third connecting shaft 21, the first limit arm 18 drives the support arm 20 and the support plate 8 to rotate through the second connecting shaft 19, the support plate 8 rotates around the second support shaft 6, the support arm 20 drives the hook 24 to move, and the hook 24 is removed from the surface of the third support shaft 7 to facilitate the support plate 8 to be folded into the interior of the first support frame 1, the first support frame 1 and the second support frame 4 are folded and stored to complete the use of the surveying and mapping board.
[0031] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A surveying and mapping board for highway bridge survey and design, comprising a first support frame (1) and an anti-slip seat plate (2), characterized in that: Two groups of anti-slip seat plates (2) are installed inside the first support frame (1), and a second support frame (4) is arranged outside the first support frame (1). A hinge shaft (3) is symmetrically installed at the top of the first support frame (1) on one side of the anti-slip seat plate (2), and the first support frame (1) is movably connected to the second support frame (4) through the hinge shaft (3). A first support shaft (5) is installed inside the second support frame (4), and a second support shaft (6) is movably installed inside the first support frame (1) on one side of the hinge shaft (3). A support plate (8) is arranged at the top of the second support shaft (6), and a support platform (12) is arranged at the top of the support plate (8). A surveying and mapping board body (13) is arranged on the outer wall of the support platform (12); a first connecting shaft (15) is symmetrically mounted on one side of the surveying and mapping board body (13) close to the support platform (12); and the surveying and mapping board body (13) is movably connected to the support platform (12) via the first connecting shaft (15); a support block (14) is mounted on the outer wall of the surveying and mapping board body (13) on one side of the first connecting shaft (15); an annular frame (16) is movably mounted on the outer wall of the support block (14); a plurality of groups of card slots (17) at equal intervals are symmetrically mounted on the surface of the support platform (12) on one side of the annular frame (16); and the annular frame (16) is movably connected to the card slots (17).
2. The surveying and mapping board for highway bridge survey and design according to claim 1 is characterized by: A movable shaft (10) is installed at the center position of the bottom end of the support platform (12), a shaft sleeve (9) is installed at the top end of the support plate (8) on one side of the movable shaft (10), and the movable shaft (10) extends to the outside of the shaft sleeve (9), and a bolt (11) is provided on the surface of the shaft sleeve (9), and the bolt (11) extends to the surface of the movable shaft (10).
3. The surveying and mapping board for highway bridge survey and design according to claim 1 is characterized by: A support arm (20) is symmetrically mounted on the bottom end of the support plate (8) on one side of the second support shaft (6), and a hook (24) is mounted on one end of the support arm (20) away from the second support shaft (6).
4. The surveying and mapping board for highway bridge survey and design according to claim 3 is characterized by: A third support shaft (7) is movably mounted inside the second support frame (4) on one side of the hook (24), and the hook (24) is connected to the third support shaft (7).
5. The surveying and mapping board for highway bridge survey and design according to claim 4 is characterized by: A buckle (23) is provided on the surface of the support arm (20) on one side of the hook (24); a fourth connecting shaft (22) is installed on one end of the buckle (23) close to the support arm (20); and the buckle (23) is movably connected to the support arm (20) via the fourth connecting shaft (22).
6. The surveying and mapping board for highway bridge survey and design according to claim 5 is characterized by: A first limiting arm (18) is disposed on the outer wall of the support arm (20), a second connecting shaft (19) is installed at one end of the first limiting arm (18) close to the support arm (20), and the first limiting arm (18) is movably connected to the support arm (20) via the second connecting shaft (19).
7. The surveying and mapping board for highway bridge survey and design according to claim 6 is characterized by: A third connecting shaft (21) is installed at one end of the first limiting arm (18) away from the second connecting shaft (19), and the first limiting arm (18) is movably connected to the second support frame (4) via the third connecting shaft (21).
8. The surveying and mapping board for highway bridge survey and design according to claim 1 is characterized by: A second limiting arm (25) is mounted on the outer wall of the second supporting frame (4) on one side of the first supporting shaft (5), and both ends of the second limiting arm (25) are fixedly connected to the second supporting frame (4).
Citation Information
Patent Citations
Portable surveying and mapping board for highway bridge investigation and design
CN216331104U