Sampling and drilling device for road and bridge concrete quality detection

By designing a drilling device with a protective cover and rotary machinery, the problem of insufficient protection of mud and dust in the prior art is solved, and a cleaner operating environment and a more efficient drilling and sampling process is achieved.

CN222618261UActive Publication Date: 2025-03-14西安市政道桥建设集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420875790.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-03-14
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

The existing sampling drilling device for road bridge concrete quality testing lacks the function of slurry dust protection, which causes operators to be contaminated by mud during the drilling process, affecting operation efficiency.

Method used

A sampling drilling device including a base, a first slide, a protective cover and a drill rod is designed to drive the protective cover downward by rotating the second rocker, and to prevent sputtering of mud and dust through the cooperation of the drill rod with the protective cover.

Benefits of technology

It effectively prevents sputtering of mud and dust, keeps the working environment clean and tidy, and improves drilling sampling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222618261U_ABST
    Figure CN222618261U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of drilling, in particular to a sampling and drilling device for road and bridge concrete quality detection, which comprises a base and a first sliding plate, two first support rods and two second support rods are respectively mounted in the base, the first sliding plate is slidably sleeved on the outer sides of the two first support rods, and the second sliding plate is sleeved on the outer sides of the two second support rods. The outer sides of the two first supporting rods and the second supporting rod are slidably sleeved with a second sliding plate, a protective cover is installed on one side of the first sliding plate, a first through hole is formed in the top end of the protective cover, a drill rod is movably installed on one side of the bottom of the second sliding plate, and the bottom end of the drill rod penetrates out of the protective cover through the first through hole; and a second lead screw is movably mounted in the base, and the second lead screw and the interior of the first sliding plate are in engaged connection through threads. Dust and mud generated in the drilling process can be blocked by the protective cover, the situation that the mud and the dust scatter all around is avoided, it is guaranteed that the working environment is clean and tidy, and the drilling and sampling efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of drilling, in particular to a sampling drilling device for road and bridge concrete quality detection. Background Art

[0002] Roads and bridges are mostly built with concrete made by mixing cement, sand, stone and water. Since the quality of concrete is closely related to safety hazards, it is often necessary to use a sampling drilling device to drill holes in the concrete to take samples in order to test its quality.

[0003] An existing sampling drilling device for road and bridge concrete quality inspection lacks mud dust protection function during use. When the operator uses the drilling device to drill and sample, the intense friction between the drill bit and the concrete requires the use of cooling water to cool the drill bit. Therefore, the water and the dust generated by the drilling are mixed to form mud. The mud will splash everywhere through the rotation of the drill bit, and the mud will pollute the operator and affect the drilling operation.

[0004] For this purpose, a sampling drilling device for road and bridge concrete quality detection is proposed. Utility Model Content

[0005] The purpose of the utility model is to provide a sampling and drilling device for road and bridge concrete quality inspection to solve the problems raised in the above-mentioned background technology. To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a sampling and drilling device for road and bridge concrete quality inspection, comprising a base and a first slide plate, two first support rods and two second support rods are respectively installed inside the base, the outer sliding sleeves of the two first support rods are provided with a first slide plate, and the outer sliding sleeves of the two first support rods and the second support rods are provided with a second slide plate, a protective cover is installed on one side of the first slide plate, a first through-hole is opened at the top of the protective cover, a drill rod is movably installed on one side of the bottom of the second slide plate, and the bottom end of the drill rod passes through the interior of the protective cover through the first through-hole, a second screw rod is movably installed inside the base, and the second screw rod is connected to the interior of the first slide plate by threaded engagement, a second rocker is installed on the top of the base, and the output end of the second rocker is connected to the top of the second screw rod.

[0006] Preferably, a second through hole is formed inside the second slide plate, and the second screw rod is movably installed inside the second through hole.

[0007] Preferably, a driving motor is installed on one side of the top end of the second slide plate, and the output end of the driving motor is connected to the top end of the drill rod.

[0008] Preferably, a non-slip pad is installed at the bottom of the protective cover, and cutting teeth are installed at the bottom of the drill rod.

[0009] Preferably, four fixed casters are installed at the bottom of the base, and the four fixed casters are respectively located at four corners of the bottom of the base.

[0010] Preferably, a first screw rod is movably installed inside the base, and the first screw rod is connected to the second slide plate through threaded engagement.

[0011] Preferably, a first rocker is installed on the top of the base, and an output end of the first rocker is connected to the top end of the first screw rod.

[0012] Preferably, a generator is installed on one side of the top of the base, and a handle is installed on one side of the base, and the generator is used in conjunction with the drive motor.

[0013] Compared with the prior art, the utility model provides a sampling drilling device for road and bridge concrete quality detection, which has the following beneficial effects:

[0014] By providing a second rocker, a protective cover, a drill rod, a first perforation and a first slide plate, when drilling and sampling is performed, the protective cover can be driven to move downward by rotating the second rocker, so that the bottom of the protective cover fits with the concrete surface. When drilling, the bottom end of the drill rod will extend into the protective cover through the first perforation, so as to drill the concrete surface, and the dust and mud generated during the drilling process will be blocked by the protective cover, so as to avoid the situation where mud and dust are scattered, thereby ensuring a clean and tidy working environment and improving the efficiency of drilling and sampling. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a side view structural diagram of the main body of the utility model;

[0016] Figure 2 It is a schematic diagram of the structure when the utility model is used;

[0017] Figure 3 It is a schematic diagram of the top view structure of the utility model;

[0018] Figure 4 For this utility model Figure 1 Schematic diagram of the enlarged structure at point A in the middle.

[0019] In the figure: 1. base; 2. first screw rod; 3. second screw rod; 4. fixed caster; 5. first slide plate; 6. protective cover; 7. drill rod; 8. first support rod; 9. drive motor; 10. second slide plate; 11. second rocker; 12. first rocker; 13. generator; 14. handle; 15. second support rod; 16. anti-slip pad; 17. cutting teeth; 18. first through hole; 19. second through hole. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] Embodiment 1: Two first support rods 8 and two second support rods 15 are respectively installed inside the base 1, the outer sliding sleeves of the two first support rods 8 are provided with a first slide plate 5, and the outer sliding sleeves of the two first support rods 8 and the second support rods 15 are provided with a second slide plate 10, a protective cover 6 is installed on one side of the first slide plate 5, and a first through hole 18 is opened on the top of the protective cover 6, a drill rod 7 is movably installed on one side of the bottom of the second slide plate 10, and the bottom end of the drill rod 7 passes through the inside of the protective cover 6 through the first through hole 18, a second screw rod 3 is movably installed inside the base 1, and the second screw rod 3 is connected to the inside of the first slide plate 5 by threaded engagement, and a second rocker arm 11 is installed on the top of the base 1, and the output end of the second rocker arm 11 is connected to the top of the second screw rod 3.

[0022] Specifically, Figure 1 , Figure 2 and Figure 4 As shown, the second screw rod 3 can be driven to rotate by rotating the second rocker arm 11. Since the second screw rod 3 is connected to the first slide plate 5 by threaded engagement, and the first slide plate 5 has a sliding sleeve inside thereof arranged on the outside of the first support rod 8, when the second screw rod 3 rotates, the first slide plate 5 will slide up and down along the installation direction of the second screw rod 3 and the first support rod 8. Since a protective cover 6 is installed on one side of the first slide plate 5, when drilling sampling is performed, the protective cover 6 can be driven to move downward by rotating the second rocker arm 11, so that the bottom of the protective cover 6 is fitted with the concrete surface. Since a first through hole 18 is provided at the top of the protective cover 6, and the drill rod 7 is used in conjunction with the first through hole 18, when drilling, the bottom end of the drill rod 7 will extend into the protective cover 6 through the first through hole 18, thereby drilling a hole on the concrete surface. The dust and mud generated during the drilling process will be blocked by the protective cover 6, so as to avoid the situation where the mud and dust are scattered, thereby ensuring a clean and tidy working environment and improving the efficiency of drilling sampling.

[0023] Embodiment 2: A second through hole 19 is opened inside the second skateboard 10, and the second screw rod 3 is movably installed inside the second through hole 19, a driving motor 9 is installed on one side of the top of the second skateboard 10, and the output end of the driving motor 9 is connected to the top of the drill rod 7, a non-slip pad 16 is installed at the bottom of the protective cover 6, and a cutting tooth 17 is installed at the bottom of the drill rod 7, four fixed casters 4 are installed at the bottom of the base 1, and the four fixed casters 4 are respectively located at the four corners of the bottom of the base 1, a first screw rod 2 is movably installed inside the base 1, and the first screw rod 2 is connected to the second skateboard 10 by threaded engagement, a first rocker 12 is installed on the top of the base 1, and the output end of the first rocker 12 is connected to the top of the first screw rod 2, a generator 13 is installed on one side of the top of the base 1, and a handle 14 is installed on one side of the base 1, and the generator 13 is used in conjunction with the driving motor 9.

[0024] Specifically, Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the first screw rod 2 can be driven to rotate by rotating the first rocker 12. Since the first screw rod 2 and the second slide plate 10 are connected by threaded engagement, and the second slide plate 10 is internally slidably sleeved on the outside of the first support rod 8 and the second support rod 15, when the first screw rod 2 rotates, it will drive the second slide plate 10 to move up and down along the installation direction of the first support rod 8 and the second support rod 15. Since the second slide plate 10 is provided with a second through hole 19, the second through hole 19 can avoid being restricted by the second screw rod 3 during the movement of the second slide plate 10, so that the second slide plate 10 can be moved along the second screw rod 3. 3 moves normally on the outside, thereby controlling the rise and fall of the drill rod 7, so as to drill holes in the concrete surface. The generator 13 can power the drive motor 9, and the rotation of the output end of the drive motor 9 can drive the drill rod 7 to rotate. Since the bottom end of the drill rod 7 is equipped with a cutting tooth 17, the rotation of the drill rod 7 can drive the cutting tooth 17 to rotate, and the concrete layer can be cut by the rotation of the cutting tooth 17 to take samples. The fixed caster 4 installed at the bottom end of the base 1 can facilitate the movement of the entire device, and the handle 14 installed on one side of the base 1 can facilitate the operator to control the entire device.

[0025] Working principle: when in use, the entire fixed caster 4 is moved to the specified position, and then the fixed caster 4 is locked, and then the second screw rod 3 can be driven to rotate by rotating the second rocker 11. Since the second screw rod 3 and the first slide plate 5 are connected by threaded engagement, and the first slide plate 5 has a sliding sleeve arranged on the outside of the first support rod 8, when the second screw rod 3 rotates, the first slide plate 5 will slide up and down along the installation direction of the second screw rod 3 and the first support rod 8. Since a protective cover 6 is installed on one side of the first slide plate 5, when drilling sampling is performed, the protective cover 6 can be driven to move downward by rotating the second rocker 11, so that the bottom of the protective cover 6 fits with the concrete surface, and then the belt can be driven by rotating the first rocker 12 The second slide plate 10 is moved up and down along the installation direction of the first support rod 8 and the second support rod 15, so as to control the rise and fall of the drill rod 7. As the second slide plate 10 continues to descend, the bottom end of the drill rod 7 will extend into the protective cover 6 through the first through hole 18, so as to contact the concrete surface. The drill rod 7 can be driven to rotate by rotating the output end of the driving motor 9. Since the bottom end of the drill rod 7 is equipped with cutting teeth 17, the cutting teeth 17 can be driven to rotate by the rotation of the drill rod 7. The concrete layer can be cut by the rotation of the cutting teeth 17 for sampling. The dust and mud generated during the drilling process will be blocked by the protective cover 6 to avoid the scattering of mud and dust, thereby ensuring the cleanliness of the working environment and improving the efficiency of drilling sampling.

[0026] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A sampling and drilling device for road and bridge concrete quality inspection, comprising a base (1) and a first slide plate (5), characterized in that: Two first support rods (8) and two second support rods (15) are respectively installed inside the base (1); the outer sliding sleeves of the two first support rods (8) are provided with a first slide plate (5); the outer sliding sleeves of the two first support rods (8) and the second support rods (15) are provided with a second slide plate (10); a protective cover (6) is installed on one side of the first slide plate (5); a first through hole (18) is opened at the top of the protective cover (6); a drill rod (7) is movably installed on one side of the bottom of the second slide plate (10); the bottom end of the drill rod (7) passes through the inside of the protective cover (6) through the first through hole (18); a second screw rod (3) is movably installed inside the base (1); the second screw rod (3) is connected to the inside of the first slide plate (5) by threaded engagement; a second rocker (11) is installed on the top of the base (1); the output end of the second rocker (11) is connected to the top of the second screw rod (3).

2. According to claim 1, a sampling and drilling device for road and bridge concrete quality inspection is characterized in that: A second through hole (19) is provided inside the second slide plate (10), and the second screw rod (3) is movably mounted inside the second through hole (19).

3. The sampling and drilling device for road and bridge concrete quality inspection according to claim 1 is characterized in that: A driving motor (9) is installed on one side of the top end of the second slide plate (10), and the output end of the driving motor (9) is connected to the top end of the drill rod (7).

4. A sampling and drilling device for road and bridge concrete quality inspection according to claim 1, characterized in that: The bottom of the protective cover (6) is provided with an anti-slip pad (16), and the bottom of the drill rod (7) is provided with cutting teeth (17).

5. The sampling and drilling device for road and bridge concrete quality inspection according to claim 1 is characterized in that: Four fixed casters (4) are installed at the bottom of the base (1), and the four fixed casters (4) are respectively located at the four corners of the bottom of the base (1).

6. A sampling and drilling device for road and bridge concrete quality inspection according to claim 5, characterized in that: A first screw rod (2) is movably installed inside the base (1), and the first screw rod (2) is connected to the second slide plate (10) through threaded engagement.

7. A sampling and drilling device for road and bridge concrete quality inspection according to claim 5, characterized in that: A first rocker (12) is installed on the top of the base (1), and the output end of the first rocker (12) is connected to the top end of the first screw rod (2).

8. A sampling and drilling device for road and bridge concrete quality inspection according to claim 5, characterized in that: A generator (13) is installed on one side of the top of the base (1), and a handle (14) is installed on one side of the base (1). The generator (13) is used in conjunction with a drive motor (9).