Safety protection equipment for railway manual hole digging pile

By designing a railway artificial hole-drilling pile safety protection equipment including bottom support frame, top support frame, steel protective net and other components, the problem of lack of effective safety protection during manual hole-drilling piles during railway construction is solved, and the protection height is adjustable and the position of the slag bucket is limited is achieved, which significantly improves construction safety.

CN222632900UActive Publication Date: 2025-03-18SHAANXI RAILWAY INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520255166.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-18
Publication Date
2025-03-18
Estimated Expiration
2035-02-18

AI Technical Summary

Technical Problem

The lack of effective safety protection measures during manual hole-dig piles during railway construction, resulting in the construction workers facing a major safety threat when they encounter collapse of the hole wall or the drop of slag.

Method used

A safety protection equipment for artificial bored piles of railways was designed, including bottom support frame, top support frame, support rod, bottom frame, steel protective net, overpopulation, protective cover, block and handle. Through the synergy of these components, the function of adjustable protection height, limited upper and lower positions of the slag bucket, and the function of easy adjustment of support height is realized.

Benefits of technology

This equipment not only realizes adjustable protection height, ensuring that construction workers are effectively protected during the excavation process and reducing the chance of injury, but also limits the upper and lower positions of the dump trucks, reducing the risk of accidents, and improving the stability and load-bearing capacity of the equipment by adjusting the support height.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222632900U_ABST
    Figure CN222632900U_ABST
Patent Text Reader

Abstract

The utility model discloses railway manual hole digging pile safety protection equipment, and relates to the technical field of protection equipment, the railway manual hole digging pile safety protection equipment comprises a bottom support frame, a top support frame is arranged above the bottom support frame, and a bottom frame is arranged below the bottom support frame; an adjusting assembly facilitating height adjustment of the protective net is arranged at the top end of the bottom supporting frame. According to the railway manual hole digging pile safety protection equipment, through the arrangement of the bottom supporting frame, the winch, the supporting rod, the top supporting frame, the first pulleys, the bottom frame and the steel protection net, when the equipment is used, the bottom frame is lowered into a pile hole through slings, and a constructor for hole digging can directly descend to the bottom of the pile hole by standing on the bottom frame; the pile hole inner protection frame composed of the bottom frame and the steel protection net can block the head of a constructor, the probability that the constructor is injured is reduced, the function that the protection height can be adjusted is achieved, and the problems that in the device excavating process, safety protection measures are simple, and the protection effect is poor are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of protective equipment, in particular to a safety protective equipment for railway artificial bored piles. Background Art

[0002] When railway construction is carried out in places with complex terrain and it is difficult to operate machine digging, special construction workers are needed to manually dig bored piles. Manual bored piles are dug manually. During the excavation process, workers only have safety helmets as a protective measure. Once the hole wall collapses or debris falls, it poses a great threat to the safety of the workers below. The lack of necessary safety protection equipment can improve the safety of construction.

[0003] Now, a new type of railway artificial bored pile safety protection equipment is proposed to solve the above problems. Utility Model Content

[0004] The utility model aims to provide a railway artificial bored pile safety protection device to solve the problems of simple safety protection measures and poor protection effect in the excavation process proposed in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a railway bored pile safety protection device, comprising a bottom support frame, a top support frame is arranged above the bottom support frame, support rods are vertically welded at the four corners of the bottom end of the top support frame, a bottom frame is arranged below the bottom support frame, a square tube is welded at the middle position inside the bottom frame, two groups of positioning bolts are inserted on the right side of the square tube, a support column is vertically arranged inside the square tube, a bottom support plate is welded at the bottom end of the support column, a plurality of groups of positioning screw eyes are arranged inside the support column, and an adjustment component for adjusting the height of the protective net is arranged at the top of the bottom support frame.

[0006] The adjustment assembly includes four groups of winches, which are respectively installed at the four corners of the top of the bottom support frame, two groups of first pulleys are respectively installed on the left and right sides of the top support frame, two groups of pulley support frames are welded between the front and rear ends inside the top support frame, two groups of second pulleys are installed on the inner side of the pulley support frame, two groups of third pulleys are installed on the top of the pulley support frame, two groups of lifting rings are respectively welded on both sides of the top of the bottom frame, a sling is arranged between the winches and the lifting rings, a steel protective net is welded to the bottom end of the bottom frame, a passage is opened on the right side of the top of the steel protective net, a protective cover is hinged on the right side of the top of the steel protective net, two groups of blocking blocks are welded on the right side of the protective cover, and a handle is welded on the right side of the top of the protective cover.

[0007] As a further technical solution of the utility model, the bottom end of the support rod is connected to the top end of the bottom support frame, and the vertical center lines of the bottom support frame, the top support frame and the bottom frame coincide with each other.

[0008] As a further technical solution of the utility model, the first pulley, the second pulley and the third pulley have the same specifications, and the first pulley, the second pulley and the third pulley are adapted to the sling.

[0009] As a further technical solution of the utility model, the lifting rings are symmetrically distributed about the vertical center line of the bottom frame, and the slings and lifting rings are movably connected.

[0010] As a further technical solution of the utility model, the passage passes through the upper and lower ends of the steel protective net, and the area of ​​the protective cover is larger than the opening of the passage.

[0011] As a further technical solution of the utility model, the bottom end of the blocking block is lower than the bottom end of the protective cover, and the steel protective net and the blocking block are not connected.

[0012] As a further technical solution of the utility model, the outer diameter of the support column is matched with the inner diameter of the square tube, and the square tube can slide up and down along the outside of the support column.

[0013] As a further technical solution of the utility model, the positioning bolts pass through the square tube and extend into the interior of the positioning screw eyes, and the positioning screw eyes are arranged at equal intervals.

[0014] Compared with the prior art, the utility model has the following beneficial effects: the railway artificial bored pile safety protection device not only realizes the function of adjustable protection height, but also realizes the function of limiting the upper and lower positions of the slag bucket, and also realizes the function of facilitating the adjustment of the support height;

[0015] (1) The bottom support frame, the winch, the support rod, the top support frame, the first pulley, the pulley support frame, the second pulley, the third pulley, the sling, the lifting ring, the bottom frame, the steel protective net, the manhole, the protective cover, the blocking block and the handle are provided. When in use, the bottom support frame, the support rod and the top support frame constitute a ground support frame, and the bottom frame and the steel protective net constitute a pile hole internal protective frame. The bottom frame is lowered into the pile hole by the sling. The construction workers who dig the hole can stand on the bottom frame and directly descend to the bottom of the pile hole. The bottom frame stops descending about 1.5 meters from the bottom of the pile hole, and the protective cover is opened by grabbing the handle. The diggers can go down from the manhole to the bottom of the steel protective net to dig the pile hole. As the digging progresses, the bottom frame is slowly lowered, and the excavated slag is lifted upward through the slag bucket. When the hole wall collapses or the slag bucket falls, the pile hole internal protective frame constituted by the bottom frame and the steel protective net can block the construction workers' heads, thereby reducing the probability of injury to the construction workers and realizing the function of adjustable protection height.

[0016] (2) By providing a manhole, a protective cover, and a blocking block, the manhole can be used not only for people to pass through, but also for lifting out the slag bucket. During the excavation process, the protective cover is closed, and the blocking block can support the protective cover to leave a gap for easy pushing from below. The slag bucket moves up and down along the manhole. After the path is limited, it is convenient to lift it out from the top, and it is also easy to judge from the bottom, and it is not easy to cause a smashing accident, thus realizing the function of limiting the upper and lower positions of the slag bucket;

[0017] (3) By providing a square tube, a support column, a bottom support plate, a positioning screw eye and a positioning bolt, when in use, the height of the support column can be adjusted according to the height of the excavator, the positioning bolt is pulled out, and the bottom support plate contacts the bottom of the pile hole. As the bottom frame rises and falls, the support column moves up and down along the inside of the square tube to be adjusted to a suitable height, and the positioning bolt is driven in. The positioning bolt is driven into the positioning screw eye at the corresponding position, and the height of the support column is limited. The support column cooperates with the four sets of slings above to further improve the stability and load-bearing capacity of the bottom frame, thereby realizing the function of facilitating the adjustment of the support height. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a front view structural schematic diagram of the utility model;

[0019] Figure 2 This is a schematic diagram of the top support frame of the utility model from a top view;

[0020] Figure 3 It is a schematic diagram of a partial cross-sectional structure of a bottom frame of the utility model when viewed from above;

[0021] Figure 4 It is a schematic diagram of the enlarged side view of the square tube of the utility model.

[0022] In the figure: 1. bottom support frame; 2. winch; 3. support rod; 4. top support frame; 5. first pulley; 6. pulley support frame; 7. second pulley; 8. third pulley; 9. sling; 10. lifting ring; 11. bottom frame; 12. steel protective net; 13. entrance; 14. protective cover; 15. blocking block; 16. handle; 17. square tube; 18. support column; 19. bottom support plate; 20. positioning screw eye; 21. positioning bolt. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Example: See Figure 1-4 A railway bored pile safety protection device comprises a bottom support frame 1, a top support frame 4 is arranged above the bottom support frame 1, support rods 3 are vertically welded at four corners of the bottom end of the top support frame 4, a bottom frame 11 is arranged below the bottom support frame 1, and an adjustment component for adjusting the height of the protection net is arranged at the top of the bottom support frame 1;

[0025] See also Figure 1-4 A railway artificial bored pile safety protection device also includes an adjustment component, which includes four groups of winches 2, which are respectively installed at the four corners of the top of the bottom support frame 1, and two groups of first pulleys 5 are respectively installed on the left and right sides of the top support frame 4, and two groups of pulley support frames 6 are welded between the front and rear ends inside the top support frame 4. Two groups of second pulleys 7 are installed on the inner side of the pulley support frame 6, and two groups of third pulleys 8 are installed on the top of the pulley support frame 6. Two groups of lifting rings 10 are respectively welded on both sides of the top of the bottom frame 11, and a sling 9 is arranged between the winch 2 and the lifting ring 10. A steel protective net 12 is welded at the bottom end of the bottom frame 11, and a passage 13 is opened on the right side of the top of the steel protective net 12. A protective cover 14 is hinged on the right side of the top of the steel protective net 12, and two groups of blocking blocks 15 are welded on the right side of the protective cover 14, and a handle 16 is welded on the right side of the top of the protective cover 14;

[0026] The bottom end of the support rod 3 is connected to the top end of the bottom support frame 1, the vertical center lines of the bottom support frame 1, the top support frame 4, and the bottom frame 11 coincide with each other, the first pulley 5, the second pulley 7, and the third pulley 8 have the same specifications, the first pulley 5, the second pulley 7, the third pulley 8 and the sling 9 are adapted, the lifting ring 10 is symmetrically distributed about the vertical center line of the bottom frame 11, the sling 9 and the lifting ring 10 are movably connected, the protective component has high structural strength, and the height is adjustable;

[0027] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, the bottom frame 11 is lowered into the pile hole by the sling 9, and the construction workers who are digging the hole can directly descend to the bottom of the pile hole by standing on the bottom frame 11. The bottom frame 11 stops descending about one and a half meters away from the bottom of the pile hole, and the protective cover 14 is opened by grasping the handle 16. The digging workers can go down from the entrance 13 to the bottom of the steel protective net 12 to dig the pile hole. As the digging progresses, the bottom frame 11 is slowly lowered, and the excavated debris is lifted upward through the debris bucket. When the hole wall collapses, the debris bucket falls, etc., the pile hole protective frame composed of the bottom frame 11 and the steel protective net 12 can block the construction workers' heads, reducing the chance of injury to the construction workers.

[0028] The manhole 13 passes through the upper and lower ends of the steel protection net 12, the area of ​​the protection cover 14 is larger than the opening of the manhole 13, the bottom end of the blocking block 15 is lower than the bottom end of the protection cover 14, the steel protection net 12 and the blocking block 15 are not connected, the upper and lower positions of the slag bucket are limited, and the risks are easier to control;

[0029] Specifically, Figure 1 and Figure 3 As shown, during the excavation process, the protective cover 14 is closed, and the blocking block 15 can support the protective cover 14 to leave a gap so that it is convenient to push it open from the bottom. The slag bucket moves up and down along the passage 13. After the path is defined, it is convenient to lift it out from the top and it is easy to judge from the bottom, so accidents of being hit are not likely to occur.

[0030] A square tube 17 is welded at the middle position inside the bottom frame 11, and two groups of positioning bolts 21 are inserted on the right side of the square tube 17. A support column 18 is vertically arranged inside the square tube 17, and a bottom support plate 19 is welded at the bottom end of the support column 18. Multiple groups of positioning screw eyes 20 are arranged inside the support column 18. The outer diameter of the support column 18 is matched with the inner diameter of the square tube 17. The square tube 17 can slide up and down along the outside of the support column 18. The positioning bolts 21 penetrate the square tube 17 and extend into the interior of the positioning screw eyes 20. The positioning screw eyes 20 are arranged at equal intervals, which is convenient for adjusting the height of the bottom support;

[0031] Specifically, Figure 1 and Figure 4As shown, the positioning bolts 21 are pulled out, and the bottom support plate 19 contacts the bottom of the pile hole. As the bottom frame 11 rises and falls, the support column 18 moves up and down along the inside of the square tube 17, and is adjusted to a suitable height. The positioning bolts 21 are driven in, and the positioning bolts 21 are driven into the positioning screw eyes 20 at the corresponding positions. The height of the support column 18 is limited. The support column 18 cooperates with the four groups of slings 9 above to further improve the stability and load-bearing capacity of the bottom frame 11.

[0032] Working principle: When the utility model is in use, first, the bottom support frame 1, the support rod 3, and the top support frame 4 constitute a ground support frame, and the bottom frame 11 and the steel protection net 12 constitute a pile hole protection frame. The bottom frame 11 is lowered into the pile hole by the sling 9, and the construction personnel who dig the hole can directly descend to the bottom of the pile hole by standing on the bottom frame 11. The bottom frame 11 stops descending about one and a half meters from the bottom of the pile hole, and the protection cover 14 is opened by grabbing the handle 16. The hole diggers can go down from the entrance 13 to the bottom of the steel protection net 12 to dig the pile hole. As the excavation proceeds, the bottom frame 11 is slowly lowered, and the excavated debris is lifted upward through the debris bucket. When the hole wall collapses, the debris bucket falls, etc., the pile hole protection frame composed of the bottom frame 11 and the steel protection net 12 can block the construction personnel's heads, reducing the chance of injury to the construction personnel. In addition to being a passage for people to pass through, the passage 13 is also used for lifting out the slag bucket. During the excavation process, the protective cover 14 is closed, and the blocking block 15 can support the protective cover 14 to leave a gap so that it can be pushed open from the bottom. The slag bucket moves up and down along the passage 13. After the path is limited, it is convenient to lift it out from the top, and it is also easy to judge from the bottom, so it is not easy to cause a hit accident. According to the height of the excavator, the height of the support column 18 can be adjusted, and the positioning bolt 21 can be pulled out. The bottom support plate 19 contacts the bottom of the pile hole. As the bottom frame 11 rises and falls, the support column 18 moves up and down along the inside of the square tube 17 to an appropriate height, and the positioning bolt 21 is driven in. The positioning bolt 21 is driven into the positioning screw eye 20 at the corresponding position, and the height of the support column 18 is limited. The support column 18 cooperates with the four groups of slings 9 above to further improve the stability and load-bearing capacity of the bottom frame 11.

[0033] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-limiting from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A railway bored pile safety protection device, comprising a bottom support frame (1), characterized in that: A top support frame (4) is arranged above the bottom support frame (1), support rods (3) are vertically welded at four corners of the bottom end of the top support frame (4), a bottom frame (11) is arranged below the bottom support frame (1), a square tube (17) is welded at the middle position inside the bottom frame (11), two groups of positioning bolts (21) are inserted on the right side of the square tube (17), a support column (18) is vertically arranged inside the square tube (17), a bottom support plate (19) is welded at the bottom end of the support column (18), a plurality of groups of positioning screw eyes (20) are arranged inside the support column (18), and an adjustment component for adjusting the height of the protective net is arranged at the top end of the bottom support frame (1); The adjustment assembly comprises four groups of winches (2), the four groups of winches (2) being respectively mounted at the four corners of the top of the bottom support frame (1), two groups of first pulleys (5) being respectively mounted on the left and right sides of the top support frame (4), two groups of pulley support frames (6) being welded between the front and rear ends inside the top support frame (4), two groups of second pulleys (7) being mounted on the inner side of the pulley support frame (6), two groups of third pulleys (8) being mounted on the top of the pulley support frame (6), and the bottom frame (11 ) are respectively welded with two groups of lifting rings (10) on both sides of the top, a lifting rope (9) is arranged between the winch (2) and the lifting ring (10), a steel protective net (12) is welded to the bottom end of the bottom frame (11), a passage (13) is opened on the right side of the top of the steel protective net (12), a protective cover (14) is hinged on the right side of the top of the steel protective net (12), two groups of blocking blocks (15) are welded on the right side of the protective cover (14), and a handle (16) is welded on the right side of the top of the protective cover (14).

2. A railway bored pile safety protection device according to claim 1, characterized in that: The bottom end of the support rod (3) is connected to the top end of the bottom support frame (1), and the vertical center lines of the bottom support frame (1), the top support frame (4) and the bottom frame (11) coincide with each other.

3. The railway bored pile safety protection device according to claim 1 is characterized by: The first pulley (5), the second pulley (7), and the third pulley (8) have the same specifications, and the first pulley (5), the second pulley (7), the third pulley (8), and the sling (9) are compatible with each other.

4. The railway bored pile safety protection device according to claim 1 is characterized by: The lifting rings (10) are symmetrically distributed about the vertical center line of the bottom frame (11), and the slings (9) and the lifting rings (10) are movably connected.

5. The railway bored pile safety protection device according to claim 1 is characterized by: The passage (13) passes through the upper and lower ends of the steel protection net (12), and the area of ​​the protection cover (14) is larger than the opening of the passage (13).

6. The railway bored pile safety protection device according to claim 1 is characterized by: The bottom end of the blocking block (15) is lower than the bottom end of the protective cover (14), and the steel protective net (12) and the blocking block (15) are not connected.

7. The railway bored pile safety protection device according to claim 1 is characterized by: The outer diameter of the support column (18) is matched to the inner diameter of the square tube (17), and the square tube (17) can slide up and down along the outside of the support column (18).

8. The railway bored pile safety protection device according to claim 1 is characterized by: The positioning bolts (21) pass through the square tube (17) and extend into the interior of the positioning screw eyes (20), and the positioning screw eyes (20) are arranged at equal intervals.