Supporting operation platform
By designing a support operation platform, the problems of insufficient safety and low construction efficiency of construction workers in the trench in the old-town renovation projects of municipal roads have been solved, and the effect of improving construction safety and efficiency has been achieved.
Patent Information
- Application Number
- CN202421231937.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-05-31
AI Technical Summary
In municipal road renovation projects, when construction workers connect and install corrugated pipes in the grooves, the safety is insufficient, and due to the deep grooves and high water content of the soil, the construction efficiency is low, the cost is high, and the environmental protection is poor.
A support operating platform is designed, including a first climbing frame, a first support frame, a second climbing frame and a lifting wire rope. These components form an operating platform to provide convenient up and down movement and support, and improve construction safety and efficiency.
Through the support operation platform, the safety and construction efficiency of construction personnel are improved, construction costs are reduced, and environmental protection is improved.
Smart Images

Figure CN222649404U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of municipal construction, in particular to a supporting operation platform. Background Art
[0002] In the municipal road renovation project, modern municipal road engineering drainage measures and aesthetic requirements are high, usually using buried pipe drainage method; digging trenches and installing corrugated pipes is a routine process for laying buried pipe drainage.
[0003] In the municipal road renovation project, the longest length of the corrugated pipe is 12 meters. With the demand for drainage length, it is necessary to connect it in the trench. At present, when construction workers go down into the trench and step on the soil to connect and install the corrugated pipe, if there is no guard plate installed on both sides of the trench or the guard plate is installed unstable, the construction safety is insufficient. In addition, due to the deep trench, it is inconvenient for construction workers to go up and down. In addition, due to the abundant groundwater and high water content in the soil, the legs of construction workers are easy to sink into the soil when they step on it. It is necessary to lay wooden templates at the bottom of the trench to allow construction workers to step on it. Otherwise, the corrugated pipe in the trench cannot be connected and installed. The construction efficiency of the rectification process is slow, the cost is high, and the environmental protection is poor.
[0004] Therefore, there is a need for a support operation platform that is convenient for construction workers to move up and down, improves construction safety, is convenient for supporting construction workers, and improves construction efficiency. Utility Model Content
[0005] In order to solve the above problems, the utility model proposes a support operation platform, which has the characteristics of being convenient for construction workers to construct, improving construction efficiency and being highly safe.
[0006] In order to achieve the above purpose, the utility model proposes the following specific solutions:
[0007] A support operation platform comprises a first climbing frame, wherein the first climbing frame comprises a first supporting channel steel, a first connecting channel steel, a second supporting channel steel, a second connecting channel steel and a third supporting channel steel, wherein one side of the first supporting channel steel is welded and connected with a first connecting channel steel, one side of the first connecting channel steel is welded and connected with a second supporting channel steel, one side of the second supporting channel steel is welded and connected with a second connecting channel steel, one side of the second connecting channel steel is welded and connected with a third supporting channel steel, a first climbing rod is fixedly connected between the first supporting channel steel and the second supporting channel steel, and the second supporting channel steel and the third supporting channel steel are fixedly connected with a first climbing rod. A second climbing pole is fixedly connected between the channel steels, and multiple climbing poles are provided for the first climbing pole and the second climbing pole. A first pedal is inserted between the lower end of the first supporting channel steel and the lower end of the second supporting channel steel, and a second pedal is inserted between the lower end of the second supporting channel steel and the lower end of the third supporting channel steel. A first supporting frame is fixedly connected to one side of the first climbing frame, and a second climbing frame is fixedly connected to one end of the first supporting frame. The first climbing frame and the second climbing frame have the same structure. Lifting wire ropes are installed on the tops of the first climbing frame and the second climbing frame, and laying pipes are provided on the inner sides of the lower ends of the first climbing frame and the second climbing frame.
[0008] As a preferred technical solution for a supporting operating platform of the utility model, a plug-in groove is provided on the lower end side wall of the first supporting channel steel, and the first pedal is plugged into the inner side of the plug-in groove. There are multiple plug-in grooves, and the first supporting channel steel, the second supporting channel steel and the third supporting channel steel have the same structure.
[0009] As an optimal technical solution for a support operating platform of the utility model, a first connecting buckle is provided at the top of the lifting wire rope, a second connecting buckle is provided at the lower end of the lifting wire rope, a U-shaped buckle is provided on the inner side of the second connecting buckle, and the number of the lifting wire ropes is four.
[0010] As a preferred technical solution for a supporting operating platform of the utility model, a limiting rod is fixedly provided at the lower end of the U-shaped buckle, a mounting hole is opened on the upper side wall of the first supporting channel steel, and the limiting rod is inserted into the inner side of the mounting hole.
[0011] As an optimal technical solution for a supporting operating platform of the utility model, the first support frame includes a support tube and a connecting plate, one end of the support tube is fixedly connected to the inner side of the first supporting channel steel, and a connecting plate is inserted into the inner side of the other end of the support tube, and one end of the connecting plate is fixedly connected to the second climbing frame. The first support frame is symmetrically provided with two, and a threaded hole is opened on the side wall of one end of the support tube. A tightening bolt is threadedly connected to the inner side of the threaded hole, and the tightening bolt is located on one side of the connecting plate.
[0012] As a preferred technical solution for a supporting operating platform of the utility model, a second support frame is provided below the first support frame, one end of the second support frame is fixedly connected to the inner side of the first supporting channel steel, and the other end of the second support frame is fixedly connected to the second climbing frame, and two second support frames are symmetrically provided.
[0013] As a preferred technical solution for a support operation platform of the utility model, the second support frame has the same structure as the first support frame, and the second support frame is located above the laying pipe.
[0014] As a preferred technical solution for a supporting operating platform of the utility model, baffles are symmetrically fixed on both side walls of the first pedal, and the second pedal has the same structure as the first pedal.
[0015] Compared with the existing technology, the utility model has the following beneficial effects:
[0016] The utility model provides a first climbing frame, a first supporting frame, a second climbing frame and a lifting wire, and provides a first climbing frame and a second climbing frame with the same structure, which are connected by the first supporting frame and the second supporting frame to form an operating platform. A lifting wire is provided on the top. When construction personnel need to go down the trench to install pipelines, the supporting operating platform can be lifted by the lifting equipment and then lowered to the inner side of the trench. Construction personnel can conveniently go down to the inner side of the trench to perform construction operations through the first climbing rod or the second climbing rod inside the first climbing frame, which is convenient for going up and down. By plugging the first pedal or the second pedal at the bottom of the first climbing frame, it is convenient for construction personnel to step on the pedal to perform pipeline installation construction, so as to avoid the situation that the construction efficiency is affected when there is a lot of water inside the trench, and two climbing frames with the same structure are supported and protected on the inner wall of the trench to avoid trench collapse, thereby improving the construction safety of construction personnel, having strong practicality, and the overall operating platform can be lifted or lowered by the lifting equipment, so that the operation is convenient.
[0017] And by setting up the first support frame and the second support frame, the connecting plate of the first support frame can move inside the support tube, one end of which is connected to the first climbing frame, and the other end is connected to the second climbing frame. The distance between the two climbing frames can be adjusted by adjusting the position of the connecting plate on the inner side of the support tube. After adjustment, the two can be fixed by tightening the tightening bolts. The same applies to the second support frame, so that the width of the operating platform can be adjusted according to the width of the groove, and the adjustment is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to better describe the technical solution of the utility model in detail, the present invention is further explained below in conjunction with the accompanying drawings and embodiments.
[0019] Figure 1 It is a schematic diagram of the overall structure provided by the utility model;
[0020] Figure 2 It is a three-dimensional cross-sectional view of the utility model;
[0021] Figure 3 For the utility model Figure 1 The enlarged schematic diagram of point A in the middle;
[0022] Figure 4 For the utility model Figure 1 The enlarged schematic diagram of point B in the middle;
[0023] Figure 5 For the utility model Figure 2 Enlarged schematic diagram of point C in the middle.
[0024] In the figure: 1. first climbing frame; 11. first supporting channel steel; 111. plug-in slot; 112. mounting hole; 12. first connecting channel steel; 13. second supporting channel steel; 14. second connecting channel steel; 15. third supporting channel steel; 16. first climbing pole; 17. second climbing pole; 18. first pedal; 181. baffle; 19. second pedal; 2. first supporting frame; 21. supporting tube; 211. threaded hole; 212. tightening bolt; 22. connecting plate; 3. second supporting frame; 4. second climbing frame; 5. lifting wire rope; 51. first connecting buckle; 52. U-shaped buckle; 521. limiting rod; 53. second connecting buckle; 6. laying pipe. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Example
[0027] See also Figure 1-5 As shown, the utility model provides the following technical solutions: a support operation platform, including a first climbing frame 1, the first climbing frame 1 includes a first supporting channel steel 11, a first connecting channel steel 12, a second supporting channel steel 13, a second connecting channel steel 14 and a third supporting channel steel 15, which can be referred to in the attached Figure 1 , Attachment Figure 2 With attached Figure 3A first connecting channel steel 12 is welded and connected on one side of the first supporting channel steel 11, a second supporting channel steel 13 is welded and connected on one side of the first connecting channel steel 12, a second connecting channel steel 14 is welded and connected on one side of the second supporting channel steel 13, a third supporting channel steel 15 is welded and connected on one side of the second connecting channel steel 14, that is, two connecting channels and supporting channels are symmetrically welded on both sides of the third supporting channel steel 15, and the welding method is convenient to manufacture, a first climbing rod 16 is fixedly connected between the first supporting channel steel 11 and the second supporting channel steel 13, a second climbing rod 17 is fixedly connected between the second supporting channel steel 13 and the third supporting channel steel 15, and a plurality of the first climbing rods 16 and the second climbing rods 17 are provided, which is convenient for construction The workers can move up and down to facilitate the climbing up and down of the trench; a first supporting frame 2 is fixedly connected to one side of the first climbing frame 1, and a second climbing frame 4 is fixedly connected to one end of the first supporting frame 2. The first climbing frame 1 and the second climbing frame 4 have the same structure. A lifting wire rope 5 is installed on the top of the first climbing frame 1 and the second climbing frame 4 for connecting an external crane. A laying pipe 6 is provided on the inner side of the lower end of the first climbing frame 1 and the second climbing frame 4; the scheme uses a support operation platform composed of two climbing frames. When the construction workers install the pipeline inside the trench, the climbing frame is lowered to the inside of the trench. The construction workers can move up and down conveniently through the climbing poles on the climbing frame. At the same time, the trench is supported by the climbing frames on both sides to improve the construction safety and convenience.
[0028] Reference Figure 2 and Figure 3 As shown, specifically, a first pedal 18 is plugged into the lower end of the first supporting channel steel 11 and the lower end of the second supporting channel steel 13, and a second pedal 19 is plugged into the lower end of the second supporting channel steel 13 and the lower end of the third supporting channel steel 15, and the pedals are convenient for construction workers to step on for support; baffles 181 are symmetrically fixed on both side walls of the first pedal 18, and the second pedal 19 has the same structure as the first pedal 18; a plug-in groove 111 is provided on the lower end side wall of the first supporting channel steel 11, and the first pedal 18 is plugged into the inner side of the plug-in groove 111, and a plurality of plug-in grooves 111 are provided, and the pedal can be conveniently plugged in and out to adjust the plug-in position, and the first supporting channel steel 11, the second supporting channel steel 13 and the third supporting channel steel 15 have the same structure; through the pedals set up in this scheme, construction workers plug the pedals into the inner sides of the plug-in grooves 111 at different heights, which is convenient for adjusting the pedal height according to the water accumulation inside the groove, and avoiding the situation where construction workers step on the mud during construction and cause inconvenience in operation.
[0029] Reference Figure 2 and Figure 5As shown, specifically, the first support frame 2 includes a support tube 21 and a connecting plate 22, one end of the support tube 21 is fixedly connected to the inner side of the first support channel steel 11, and the inner side of the other end of the support tube 21 is plugged with a connecting plate 22, and the connecting plate 22 can move inside the support tube 21, and one end of the connecting plate 22 is fixedly connected to the second climbing frame 4. The first support frame 2 is symmetrically provided with two, and a threaded hole 211 is opened on the side wall of one end of the support tube 21, and a tightening bolt 212 is threadedly connected to the inner side of the threaded hole 211. The tightening bolt 212 is located on one side of the connecting plate 22, and the connecting plate can be tightened by tightening the tightening bolt 212. 22 is tightly fixed; a second support frame 3 is provided under the first support frame 2, one end of the second support frame 3 is fixedly connected to the inner side of the first supporting channel steel 11, and the other end of the second support frame 3 is fixedly connected to the second climbing frame 4, and two second support frames 3 are symmetrically provided; the second support frame 3 has the same structure as the first support frame 2, and the second support frame 3 is located above the laying pipe 6; this solution can adjust the length of the overall first support frame 2 by adjusting the position of the connecting plate 22 on the inner side of the support tube 21, thereby facilitating the adjustment of the spacing between the two climbing frames, and facilitating the adjustment of the width of the overall operating platform according to the width of the groove, and is highly practical.
[0030] Reference Figure 1 and Figure 4 As shown, specifically, a first connecting buckle 51 is provided at the top of the lifting wire rope 5, which is connected to the external crane equipment. A second connecting buckle 53 is provided at the lower end of the lifting wire rope 5. A U-shaped buckle 52 is provided on the inner side of the second connecting buckle 53. There are four lifting wire ropes 5. The tops of the four wire ropes are connected together, a connecting buckle is provided at the connection, and a connecting buckle is provided at the lower end of each of the four wire ropes. A limiting rod 521 is fixedly provided at the lower end of the U-shaped buckle 52, and an installation hole 112 is provided on the upper side wall of the first supporting channel steel 11, and the limiting rod 521 is inserted into the inner side of the installation hole 112. According to this scheme, the overall operating platform can be lifted and lowered to the inner side of the groove by lifting equipment, which is convenient for construction personnel to use. It can be lifted when dismantled, and the operation is convenient.
[0031] The working principle and use process of the utility model are as follows: when the construction workers are carrying out the installation construction of the pipe 6 laid inside the groove, the operating platform composed of the first climbing frame 1 and the second climbing frame 4 is lowered to the inside of the groove through the external lifting equipment, so that the first climbing frame 1 and the second climbing frame 4 are respectively supported on the inner walls on both sides of the groove. The construction workers can move up and down on the inside of the groove through the climbing rods on the climbing frames. After moving to the bottom of the groove, the construction workers can step on the pedals to carry out construction. During construction, the inner wall of the groove can be supported by the climbing frames on both sides to improve the safety of construction. After the construction is completed, the operating platform can be lifted and taken out by the lifting equipment, which is easy to operate.
[0032] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A support operation platform, comprising a first climbing frame (1), characterized in that: The first climbing frame (1) comprises a first supporting channel steel (11), a first connecting channel steel (12), a second supporting channel steel (13), a second connecting channel steel (14) and a third supporting channel steel (15); the first supporting channel steel (11) is welded to one side with the first connecting channel steel (12); the first connecting channel steel (12) is welded to one side with the second supporting channel steel (13); the second supporting channel steel (13) is welded to one side with the second connecting channel steel (14); the second connecting channel steel (14) is welded to one side with the third supporting channel steel (15); a first climbing pole (16) is fixedly connected between the first supporting channel steel (11) and the second supporting channel steel (13); and the second supporting channel steel (13) and the third supporting channel steel (15) are fixedly connected to each other. A second climbing pole (17) is connected, and the first climbing pole (16) and the second climbing pole (17) are both provided with a plurality. A first pedal (18) is inserted between the lower end of the first supporting channel steel (11) and the lower end of the second supporting channel steel (13), and a second pedal (19) is inserted between the lower end of the second supporting channel steel (13) and the lower end of the third supporting channel steel (15). A first supporting frame (2) is fixedly connected to one side of the first climbing frame (1), and a second climbing frame (4) is fixedly connected to one end of the first supporting frame (2). The first climbing frame (1) and the second climbing frame (4) have the same structure. A lifting wire rope (5) is installed on the top of the first climbing frame (1) and the second climbing frame (4), and a laying pipe (6) is provided on the inner side of the lower end of the first climbing frame (1) and the second climbing frame (4).
2. A support operation platform according to claim 1, characterized in that: The lower end side wall of the first supporting channel steel (11) is provided with an insertion groove (111), and the first pedal (18) is inserted into the inner side of the insertion groove (111). There are a plurality of the insertion grooves (111), and the first supporting channel steel (11), the second supporting channel steel (13) and the third supporting channel steel (15) have the same structure.
3. A support operation platform according to claim 2, characterized in that: A first connecting buckle (51) is provided at the top of the lifting wire rope (5), a second connecting buckle (53) is provided at the lower end of the lifting wire rope (5), a U-shaped buckle (52) is provided on the inner side of the second connecting buckle (53), and the number of the lifting wire ropes (5) is four.
4. A support operation platform according to claim 3, characterized in that: A limiting rod (521) is fixedly provided at the lower end of the U-shaped buckle (52), a mounting hole (112) is provided on the upper side wall of the first supporting channel steel (11), and the limiting rod (521) is inserted into the inner side of the mounting hole (112).
5. A support operation platform according to claim 4, characterized in that: The first support frame (2) comprises a support tube (21) and a connecting plate (22), one end of the support tube (21) is fixedly connected to the inner side of the first support channel steel (11), the other end of the support tube (21) is plugged with a connecting plate (22) on the inner side, one end of the connecting plate (22) is fixedly connected to the second climbing frame (4), the first support frame (2) is symmetrically provided with two, a threaded hole (211) is opened on the side wall of one end of the support tube (21), the inner side of the threaded hole (211) is threadedly connected with a tightening bolt (212), and the tightening bolt (212) is located on one side of the connecting plate (22).
6. A support operation platform according to claim 5, characterized in that: A second support frame (3) is provided below the first support frame (2), one end of the second support frame (3) is fixedly connected to the inner side of the first support channel steel (11), and the other end of the second support frame (3) is fixedly connected to the second climbing frame (4), and two second support frames (3) are symmetrically provided.
7. A support operation platform according to claim 6, characterized in that: The second support frame (3) has the same structure as the first support frame (2), and the second support frame (3) is located above the laying pipe (6).
8. A support operation platform according to claim 7, characterized in that: Baffles (181) are symmetrically fixedly provided on both side walls of the first pedal (18), and the second pedal (19) has the same structure as the first pedal (18).