Hole-forming and lime-filling integrated machine for lime pile construction

By designing an integrated hole-forming and ash filling machine for lime pile construction, the problems of unstable hole-forming and discontinuous construction technology in the existing technology are solved, and efficient and high-quality construction of lime piles is achieved, construction efficiency is improved and labor costs are reduced.

CN222649938UActive Publication Date: 2025-03-21CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421599649.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2025-03-21
Estimated Expiration
2034-07-08

AI Technical Summary

Technical Problem

The existing lime pile hole formation device cannot guarantee the verticality of pile formation, and the construction process is discontinuous, which affects construction efficiency.

Method used

A integrated machine for hole-forming and ash filling is designed, including a crawler chassis, lime bucket, discharge port, suspension, hole-forming pile pipe and vertical hydraulic cylinder, to realize continuous hole-forming and ash filling of lime piles and ensure the stable vertical movement of the hole-forming pile pipe.

Benefits of technology

The efficient, high-quality and fully mechanized construction of lime piles has been achieved, construction efficiency has been improved, labor costs have been reduced, and hole-forming quality and construction continuity have been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222649938U_ABST
    Figure CN222649938U_ABST
Patent Text Reader

Abstract

The utility model discloses a hole-forming and ash-filling integrated machine for lime pile construction, which comprises a crawler-type chassis used for walking on the ground, and a cab is arranged at the front end of the crawler-type chassis; the lime hopper is arranged on the crawler-type chassis and located behind the cab; the discharging opening is formed in the lower end of the lime hopper, the opening end of the discharging opening faces and is provided with a lime discharging nozzle, and an electromagnetic valve is arranged in the lime discharging nozzle; the suspension is horizontally arranged at the front end of the crawler-type chassis; the pore-forming pile pipe is vertically connected to the front end of the suspension in a sliding manner; and the vertical hydraulic cylinder is arranged on the suspension frame and used for controlling the hole-forming pile pipe to vertically slide. By arranging the construction machine integrating hole forming and ash filling, continuous hole forming and ash filling of the lime pile can be achieved, the construction technology is more continuous, the construction efficiency is improved, meanwhile, stable vertical movement of a hole forming pile pipe can be guaranteed, the hole forming quality is guaranteed, and the construction efficiency is improved. The method is used for achieving efficient, high-quality and full-mechanical construction of a large number of rows of lime piles.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a hole-forming and lime-filling integrated machine used for lime pile construction. Background Art

[0002] Lime piles refer to pile columns formed by pouring quicklime blocks into holes drilled in the foundation manually or mechanically, which serve to improve the bearing capacity of the foundation.

[0003] Chinese patent CN202122261341.2 discloses an indoor lime pile drilling device suitable for venues with extra-large floor surfaces. When driving piles, gravity is used to make the bored pile pipe vertical, and the bored pile pipe is pressed into the foundation soil by knocking it with a bucket. Then, the bucket is lifted to pull out the bored pile pipe with a steel wire rope to complete the lime pile drilling work.

[0004] The drilling device in the related art uses an excavator to pressurize the bored pile pipe to drill a hole, which cannot ensure the verticality of the pile. At the same time, other machinery is needed to inject lime blocks into the hole at a later stage. The construction process is discontinuous, which affects the construction efficiency and needs to be improved. Utility Model Content

[0005] In view of the deficiencies in the prior art, the purpose of the utility model is to provide an integrated hole-forming and lime-filling machine for lime pile construction, which has the effect of improving construction quality and construction efficiency.

[0006] The above technical purpose of the utility model is achieved through the following technical solutions: a hole-forming and lime-filling integrated machine for lime pile construction, comprising:

[0007] A crawler chassis is used for walking on the ground, and a cab is provided at the front end;

[0008] A lime hopper is arranged on the crawler chassis and is located behind the cab;

[0009] A discharge port is arranged at the lower end of the lime hopper and extends to the front of the crawler chassis after passing under the cab. The opening end of the discharge port faces downward and is provided with an ash discharge nozzle, and a solenoid valve is arranged inside the ash discharge nozzle.

[0010] A suspension is horizontally arranged at the front end of the crawler chassis;

[0011] A hole forming pile pipe is vertically slidably connected to the front end of the suspension;

[0012] A vertical hydraulic cylinder is arranged on the suspension and is used to control the vertical sliding of the bored pile pipe.

[0013] In a preferred example, the utility model can be further configured as follows: the suspension includes a support frame, a slide and a horizontal hydraulic cylinder, the support frame is arranged in front of the crawler chassis, the slide is horizontally slidably connected to the support frame, the bored pile pipe is vertically slidably connected to the slide, and the horizontal hydraulic cylinder is used to control the horizontal sliding of the slide.

[0014] In a preferred example, the utility model can be further configured as follows: both ends of the slide seat are provided with end plates distributed on the front and rear sides of the support frame, a limit rod is horizontally arranged between the end plates and passes through the support frame, a scale is arranged on the limit rod, a bolt for contacting the inner wall of the support frame is threadedly connected to the limit rod, and a row of screw holes corresponding to the scale and for the bolts to be screwed into are arranged on the limit rod.

[0015] In a preferred example, the utility model can be further configured as follows: a cloth sleeve is provided at the lower end of the ash discharge nozzle, a counterweight ring is provided at the lower end of the cloth sleeve, and a driving member for controlling the vertical movement of the counterweight ring is provided on the ash discharge nozzle.

[0016] In a preferred example, the utility model can be further configured as follows: the driving member includes a driving frame and an electric cylinder, the driving frame is distributed on both sides of the counterweight ring, and is vertically slidably connected to the outer wall of the ash discharge nozzle, and the electric cylinder is used to control the vertical sliding of the driving frame.

[0017] In a preferred example, the utility model can be further configured as follows: a pair of tie rods are provided on the lower end surface of the front end of the suspension, the pair of tie rods are distributed on both sides of the bored pile pipe, and a guide ring for the bored pile pipe to pass through is provided between the lower ends of the pair of tie rods.

[0018] In a preferred example, the utility model can be further configured as follows: a cleaning ring is provided at the lower end of the guide ring to abut against the outer wall of the bored pile pipe.

[0019] In summary, the utility model has the following beneficial effects:

[0020] 1. By setting up a construction machine that integrates drilling and filling, continuous drilling and filling of lime piles can be achieved, making the construction process more continuous and improving construction efficiency. At the same time, it can ensure the stable vertical movement of the drilling pile pipe and the quality of drilling. It is used to achieve efficient, high-quality, and fully mechanized construction of a large number of rows of lime piles, greatly improving construction efficiency and reducing labor costs;

[0021] 2. By setting up a bored pile pipe with adjustable front and rear distances, rapid and stable construction of lime piles with different spacings can be achieved, ensuring construction quality and improving construction efficiency;

[0022] 3. By providing a guide ring with a cleaning function, the stable vertical movement of the bored pile pipe can be ensured, thereby ensuring the construction quality, and the self-cleaning of the bored pile pipe can be achieved, thereby ensuring the cleanliness of the bored pile pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of an embodiment;

[0024] Figure 2 It is a schematic structural diagram of the discharge port of the embodiment;

[0025] Figure 3 Schematic diagram of the structure of the suspension of the embodiment.

[0026] Figure numerals: 1. crawler chassis; 11. cab; 2. lime hopper; 3. discharge port; 31. ash discharge nozzle; 32. solenoid valve; 33. cloth sleeve; 34. counterweight ring; 35. drive member; 36. drive frame; 37. electric cylinder; 4. suspension; 41. support frame; 42. slide seat; 43. horizontal hydraulic cylinder; 44. end plate; 45. limit rod; 46. scale; 47. bolt; 48. screw hole; 5. bored pile pipe; 6. vertical hydraulic cylinder; 7. pull rod; 71. guide ring; 72. cleaning ring. DETAILED DESCRIPTION

[0027] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0028] like Figure 1 As shown, a hole-forming and lime-filling integrated machine for lime pile construction includes a crawler chassis 1, a lime hopper 2, a discharge port 3, a suspension 4, a hole-forming pile pipe 5 and a vertical hydraulic cylinder 6.

[0029] like Figure 1 As shown, the crawler chassis 1 is used for walking on the ground, and a cab 11 is provided at the front end for controlling the crawler chassis 1 to travel stably on the ground. The lime hopper 2 is provided on the crawler chassis 1 and is located behind the cab 11 for containing lime.

[0030] like Figure 1 , Figure 2 As shown, the discharge port 3 is arranged at the lower end of the lime hopper 2, and extends to the front of the crawler chassis 1 after passing under the cab 11. The opening end of the discharge port 3 faces downward, and is provided with an ash discharge nozzle 31, and an electromagnetic valve 32 is arranged inside the ash discharge nozzle 31.

[0031] like Figure 1 , Figure 3As shown, the suspension 4 is horizontally arranged at the front end of the crawler chassis 1, and the suspension 4 includes a support frame 41, a slide 42 and a horizontal hydraulic cylinder 43. The support frame 41 is arranged in front of the crawler chassis 1, the slide 42 is horizontally slidably connected to the support frame 41, and the horizontal hydraulic cylinder 43 is used to control the horizontal sliding of the slide 42.

[0032] like Figure 1 , Figure 3 As shown, the drilling pile pipe 5 is vertically slidably connected to the slide 42 and is used for drilling holes on the ground. The vertical hydraulic cylinder 6 is arranged on the slide 42 and is used to control the vertical sliding of the drilling pile pipe 5 for stable drilling on the ground.

[0033] like Figure 1 , Figure 3 As shown, both ends of the slide 42 are provided with end plates 44 distributed on the front and rear sides of the support frame 41, and a limit rod 45 is horizontally provided between the end plates 44 and penetrates the support frame 41. A scale 46 is provided on the limit rod 45, and a bolt 47 for contacting the inner wall of the support frame 41 is threadedly connected to the limit rod 45, and a row of screw holes 48 corresponding to the scale 46 and for the bolts 47 to be screwed in are provided on the limit rod 45.

[0034] When lime piles need to be constructed, the electromagnetic valve 32 in the ash discharge nozzle 31 is closed first, and then lime is added to the lime hopper 2, and the lime is automatically slid to the position of the discharge port 3. Then, according to the requirements of the drawing and the value of the scale 46, the bolts 47 are tightened in the corresponding screw holes 48, and the horizontal hydraulic cylinder 43 is used to control the sliding seat 42 to slide forward and backward, so that the bolts 47 are against the inner wall of the support frame 41, thereby adjusting the distance between the bored pile pipe 5 and the ash discharge nozzle 31, so that when drilling a new hole, the ash discharge nozzle 31 is located at the rear of the drilled hole.

[0035] Then, the vertical hydraulic cylinder 6 is controlled to drive the bored pile pipe 5 downward to make the bored pile pipe 5 cone into the soil, and then the vertical hydraulic cylinder 6 is controlled to drive the bored pile pipe 5 upward to return to the initial position, thereby completing the drilling operation.

[0036] Then the crawler chassis 1 is controlled to move forward a certain distance, which is the distance between the lime piles. At this time, the ash discharge nozzle 31 is aligned with the pile hole position that has been drilled on the ground, and then the solenoid valve 32 in the ash discharge nozzle 31 is opened to inject lime into the pile hole. After it is filled, the solenoid valve 32 is closed to complete the ash filling operation.

[0037] Then repeat the above steps again to complete the drilling of the pile hole of the next lime pile and the filling of lime, thereby completing the construction of rows of lime piles.

[0038] Therefore, by setting up a construction machinery that integrates hole drilling and mortar filling, continuous drilling and mortar filling of lime piles can be achieved, making the construction process more continuous and improving construction efficiency. At the same time, it can ensure the stable vertical movement of the bored pile pipe 5 and the quality of the hole drilling, and is used to achieve efficient, high-quality, and fully mechanized construction of large quantities of lime piles in rows, which greatly improves construction efficiency and reduces labor costs.

[0039] At the same time, by providing a bored pile pipe 5 with adjustable front and rear distances, the distance between the bored pile pipe 5 and the ash discharge nozzle 31 can be quickly adjusted, thereby achieving rapid and stable construction of lime piles with different distances, ensuring construction quality, and improving construction efficiency.

[0040] like Figure 1 , Figure 2 As shown, a cloth sleeve 33 is provided at the lower end of the ash discharge nozzle 31 , a counterweight ring 34 is provided at the lower end of the cloth sleeve 33 , and a driving member 35 for controlling the vertical movement of the counterweight ring 34 is provided on the ash discharge nozzle 31 .

[0041] like Figure 1 , Figure 2 As shown, the driving member 35 includes a driving frame 36 and an electric cylinder 37 . The driving frame 36 is distributed on both sides of the counterweight ring 34 and is vertically slidably connected to the outer wall of the ash discharge nozzle 31 . The electric cylinder 37 is used to control the vertical sliding of the driving frame 36 .

[0042] When lime needs to be injected into the pile hole, the electric cylinder 37 is used to control the driving frame 36 to move downward, and the driving frame 36 drives the counterweight ring 34 to move synchronously, and the cloth sleeve 33 is automatically unfolded. At this time, the cloth sleeve 33 surrounds the pile hole. Therefore, during the lime injection process, the lime is prevented from being blown away by the wind and diffused, thereby ensuring stable lime filling and reducing lime waste.

[0043] like Figure 1 , Figure 2 As shown, a pair of tie rods 7 are provided on the lower end surface of the front end of the suspension 4, and the pair of tie rods 7 are distributed on both sides of the bored pile pipe 5. A guide ring 71 for the bored pile pipe 5 to pass through is provided between the lower ends of the pair of tie rods 7, and a cleaning ring 72 that contacts the outer wall of the bored pile pipe 5 is provided at the lower end of the guide ring 71.

[0044] Therefore, by providing the guide ring 71 with a cleaning function, the stable vertical movement of the bored pile pipe 5 can be ensured when the bored pile pipe 5 slides vertically to ensure the construction quality, and the self-cleaning of the bored pile pipe 5 can be achieved to ensure the cleanliness of the bored pile pipe 5.

[0045] The specific embodiments are merely explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make modifications to the embodiments without any creative contribution as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.

Claims

1. An integrated hole-forming and lime-filling machine for lime pile construction, characterized in that: include: A crawler chassis (1) is used for walking on the ground, and a cab (11) is arranged at the front end; A lime hopper (2) is arranged on the crawler chassis (1) and is located behind the cab (11); A discharge port (3) is arranged at the lower end of the lime hopper (2), and extends to the front of the crawler chassis (1) after passing under the cab (11). The opening end of the discharge port (3) faces downward and is provided with an ash discharge nozzle (31). An electromagnetic valve (32) is provided inside the ash discharge nozzle (31); A suspension (4) is horizontally arranged at the front end of the crawler chassis (1); A hole forming pile pipe (5) is vertically slidably connected to the front end of the suspension (4); A vertical hydraulic cylinder (6) is arranged on the suspension (4) and is used to control the vertical sliding of the bored pile pipe (5).

2. The integrated hole-forming and lime-filling machine for lime pile construction according to claim 1, characterized in that: The suspension (4) comprises a support frame (41), a slide seat (42) and a horizontal hydraulic cylinder (43); the support frame (41) is arranged in front of the crawler chassis (1); the slide seat (42) is horizontally slidably connected to the support frame (41); the bored pile pipe (5) is vertically slidably connected to the slide seat (42); and the horizontal hydraulic cylinder (43) is used to control the horizontal sliding of the slide seat (42).

3. The hole-forming and lime-filling integrated machine for lime pile construction according to claim 2, characterized in that: Both ends of the slide seat (42) are provided with end plates (44) distributed on the front and rear sides of the support frame (41), and a limit rod (45) penetrating the support frame (41) is horizontally arranged between the end plates (44), and a scale (46) is arranged on the limit rod (45), and a bolt (47) for contacting the inner wall of the support frame (41) is threadedly connected to the limit rod (45), and a row of screw holes (48) corresponding to the scale (46) and for the bolts (47) to be screwed in are arranged on the limit rod (45).

4. The hole-forming and lime-filling integrated machine for lime pile construction according to claim 1, characterized in that: A cloth sleeve (33) is provided at the lower end of the ash discharge nozzle (31), a counterweight ring (34) is provided at the lower end of the cloth sleeve (33), and a driving member (35) for controlling the vertical movement of the counterweight ring (34) is provided on the ash discharge nozzle (31).

5. The hole-forming and lime-filling integrated machine for lime pile construction according to claim 4, characterized in that: The driving member (35) comprises a driving frame (36) and an electric cylinder (37); the driving frame (36) is distributed on both sides of the counterweight ring (34) and vertically slidably connected to the outer wall of the ash discharge nozzle (31); and the electric cylinder (37) is used to control the vertical sliding of the driving frame (36).

6. The integrated hole-forming and lime-filling machine for lime pile construction according to claim 1, characterized in that: A pair of tie rods (7) are provided on the lower end surface of the front end of the suspension (4), and the pair of tie rods (7) are distributed on both sides of the drilling pile pipe (5). A guide ring (71) for the drilling pile pipe (5) to pass through is provided between the lower ends of the pair of tie rods (7).

7. The integrated hole-forming and lime-filling machine for lime pile construction according to claim 6, characterized in that: The lower end of the guide ring (71) is provided with a cleaning ring (72) which abuts against the outer wall of the bore pile pipe (5).

Citation Information

Patent Citations

  • Indoor lime pile hole forming device suitable for super-large terrace venue

    CN216076966U