Tungsten alloy pipe spiral hole machining device

By designing a tungsten alloy pipe spiral hole processing device including a chuck, a drilling assembly and a first placement seat, the problem of spiral hole processing on the tungsten alloy pipe is solved, and effective spiral hole processing is achieved, ensuring uniform arrangement and quality of the holes.

CN222660217UActive Publication Date: 2025-03-25ZHEJIANG HENGCHENG CEMENTED CARBIDE CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421806295.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2025-03-25
Estimated Expiration
2034-07-29

AI Technical Summary

Technical Problem

It is difficult to effectively process spiral holes on tungsten alloy tubes in prior art. Conventional drilling equipment leads to drill bit offset and drilling failure due to the high density and hardness of tungsten alloy tubes.

Method used

A tungsten alloy tube spiral hole processing device is designed, including a chuck, a drilling assembly and a first placement seat. By providing guide holes and pressing blocks on the first placement seat, the drill bit does not shift during the drilling process and stabilizes its position by pressing the tungsten alloy tube.

Benefits of technology

Effective spiral hole processing of tungsten alloy tubes is achieved, avoiding drill bit offset and drilling failure, and ensuring uniform arrangement and quality of holes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222660217U_ABST
    Figure CN222660217U_ABST
Patent Text Reader

Abstract

The utility model particularly relates to a tungsten alloy pipe spiral hole machining device. A tungsten alloy pipe spiral hole machining device comprises a chuck, a drilling assembly and a plurality of first containing bases, the first containing bases and the drilling assembly are arranged on a moving table, the moving table is located on the axial side of the chuck and can move in the axial direction of the chuck, the first containing bases are provided with positioning grooves with upward openings, and the first containing bases are located in the positioning grooves. The first containing base is located on the axial side of the chuck, the drilling assembly comprises a drill bit, the drill bit is located on one side of the first containing base, the first containing base is provided with a guide hole allowing the drill bit to penetrate through, the guide hole is communicated with the positioning groove, and a pressing block is arranged above the first containing base and used for pressing a tungsten alloy pipe workpiece. The spiral drilling machine has the advantage of being capable of drilling the tungsten alloy pipe in a spiral mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model particularly relates to a tungsten alloy tube spiral hole processing device. Background Art

[0002] Tungsten alloy has the characteristics of high density, high radiation shielding and environmental protection, and is the first choice for manufacturing medical radiation shielding parts. Some medical tungsten alloy tubes need to be provided with multiple spirally evenly arranged through holes on the circumferential outer wall. The through holes can be matched with medical equipment and used for the passage of isotopes.

[0003] When processing the through hole of the above-mentioned tungsten alloy tube, due to the high density and hardness of the tungsten alloy tube, conventional drilling equipment is difficult to use. For example, the Chinese patent application number 201420723202.4 discloses a new type of steel pipe drilling machine with a chuck; the patent clamps the steel pipe with a chuck and realizes the drilling of the steel pipe through the upper drilling machine. However, since the tungsten alloy tube is round, has high density and high strength, the drill bit of the drilling machine cannot instantly drill a small hole in the tungsten alloy rod when it contacts the tungsten alloy tube, and the drill bit is prone to deviation, resulting in drilling failure. Utility Model Content

[0004] The utility model aims to provide a tungsten alloy tube spiral hole processing device which can perform spiral drilling on the tungsten alloy tube.

[0005] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a tungsten alloy tube spiral hole processing device, comprising a chuck, a drilling assembly and a plurality of first placement seats, the first placement seat and the drilling assembly are arranged on a movable platform, the movable platform is located on the axial side of the chuck, the movable platform can move along the axial direction of the chuck, the first placement seat is provided with a positioning groove opening upward, the first placement seat is located on the axial side of the chuck, the drilling assembly comprises a drill bit, the drill bit is located on one side of the first placement seat, the first placement seat is provided with a guide hole for the drill bit to pass through, the guide hole is connected to the positioning groove, a pressure block is provided above the first placement seat, and the pressure block is used to press the tungsten alloy tube workpiece.

[0006] In actual operation, the chuck clamps the tungsten alloy tube workpiece, and then the pressing block is pressed down so that the tungsten alloy tube workpiece is pressed tightly in the positioning groove of the first placement seat, and then the drill bit of the drilling assembly extends into the guide hole and moves toward the tungsten alloy tube workpiece to achieve the drill bit drilling holes in the tungsten alloy tube workpiece. After completing a set of drilling holes, the drill bit moves away from the tungsten alloy tube workpiece, the chuck rotates the angle of the tungsten alloy tube, and the moving table moves a short distance along the axial direction of the chuck, and then the drill bit drills the tungsten alloy tube workpiece again, and the above operation is repeated, so as to process multiple spirally arranged through holes on the tungsten alloy tube workpiece.

[0007] The drilling assembly is any existing device that can drill holes in tungsten alloy tubes, and is equipped with a pusher for pushing the drill bit to move.

[0008] In this solution, a guide hole is arranged on the first placement seat, so that when the drill bit contacts the tungsten alloy tube, the drill bit is difficult to deviate, and the drill bit will not shake during the drilling process, so that the drill bit can drill a small hole in the tungsten alloy tube instantly; at the same time, this solution presses the tungsten alloy tube by a pressing block to avoid a large vibration amplitude of the tungsten alloy tube when drilling, ensuring that the drill bit can drill the tungsten alloy tube smoothly.

[0009] Preferably, a second placement seat is provided on the movable platform, the second placement seat is located on the axial side of the first placement seat and is spaced apart from the first placement seat, the second placement seat is provided with a V-shaped groove or an arc groove for contacting the outer wall of the tungsten alloy tube workpiece; the first placement seat is provided with a make way space for making way for the drill bit.

[0010] The second placement seat is provided with a V-shaped groove or an arc groove to further position and support the tungsten alloy tube; the first placement seat is also provided with a space for the drill bit to facilitate the discharge of debris, thereby ensuring that the tungsten alloy tube will not deviate and improving the drilling efficiency of the drill bit.

[0011] Preferably, the drilling assembly comprises a driver and at least two drill bits, and the driver drives the at least two drill bits to rotate synchronously.

[0012] One driver can drive at least two drill bits to rotate, which can save installation space, and at least two drill bits can improve drilling efficiency. The synchronous rotation of the drill bits can be achieved through the transmission of gears.

[0013] Preferably, the movable platform is provided with a slide rail extending along the drilling direction of the drill bit, and the drilling assembly is slidably mounted on the slide rail; the drilling assembly is equipped with a pusher, and the drill bit of the drilling assembly can move closer to or away from the tungsten alloy tube workpiece under the action of the pusher.

[0014] The pusher applies thrust, and the slide rail guides the drilling assembly, so that the drill bit can drill into the tungsten alloy tube workpiece.

[0015] Preferably, the movable platform is slidably mounted on a base, the base extends along the axial direction of the chuck, and mutually matching sliding grooves and sliding protrusions extending into the sliding grooves and slidably engaging with the sliding grooves are provided between the base and the movable platform.

[0016] The sliding fit between the sliding groove and the sliding protrusion ensures that the moving platform will not deviate when moving along the axial direction of the chuck.

[0017] Preferably, the base is provided with a screw extending in the axial direction of the chuck, the movable platform is provided with a matching portion matching with the thread of the screw, and the screw is driven by a motor.

[0018] The rotation of the screw is achieved through a motor, and the rotation of the screw thereby achieves the movement of the mobile platform, wherein the motor may be a servo motor, so that the moving distance of the mobile platform can be accurately controlled.

[0019] Preferably, the invention further comprises a loading platform arranged on one side of the chuck, wherein the tungsten alloy tube workpiece is clamped by a clamping jaw between the loading platform and the chuck, and the clamping jaw is equipped with a moving mechanism, and the clamping jaw completes the loading and unloading of the tungsten alloy tube workpiece under the action of the moving mechanism; the clamping jaw comprises a first clamping jaw and a second clamping jaw, and the first clamping jaw and the second clamping jaw are vertically arranged and can be interchanged with each other.

[0020] The first clamp and the second clamp can complete one clamp loading and one clamp unloading, which has higher working efficiency. The first clamp and the second clamp can be clamped by a clamping cylinder, and the position exchange of the first clamp and the second clamp can be achieved by a rotating cylinder.

[0021] The utility model has the advantage of being able to drill holes in tungsten alloy tubes. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the utility model.

[0023] Figure 2 for Figure 1 Enlarged view of point A.

[0024] Figure 3 It is a schematic diagram of the structure between the mobile station and the base.

[0025] Figure 4 Schematic diagram of the structure of the clamp.

[0026] Figure 5 This is a schematic diagram of the structure of the tungsten alloy tube during processing.

[0027] Figure 6 for Figure 5 Schematic diagram of the structure after removing the tungsten alloy tube and chuck.

[0028] Figure 7 This is a schematic diagram of the structure of the tungsten alloy tube during processing.

[0029] Figure numbers: 1. loading platform; 2. moving assembly; 21. clamping jaw; 211. first clamping jaw; 212. second clamping jaw; 22. rotating part; 3. working box; 31. base; 311. sliding protrusion; 32. chuck; 4. moving platform; 41. screw; 5. drill bit; 51. driver; 511. slide rail; 521. driving gear; 522. driven gear; 6. pusher; 7. pressing block; 71. cylinder; 81. first placement seat; 811. positioning groove; 812. clearance space; 82. second placement seat; 821. V-shaped groove; 83. guide hole; 9. support plate; 100. tungsten alloy tube. DETAILED DESCRIPTION

[0030] The utility model is further described below based on the accompanying drawings and specific embodiments.

[0031] like Figure 1 As shown, this embodiment discloses a tungsten alloy tube spiral hole processing device, including a loading platform 1, on which the tungsten alloy tube 100 before processing and the tungsten alloy tube 100 after processing are placed; working boxes 3 are provided on the left and right sides of the loading platform 1, and the transfer and placement of the tungsten alloy tube 100 are realized between the loading platform 1 and the two working boxes 3 through a moving component 2 and a clamping jaw 21. Among them, the moving component 2 is any truss component that can be matched with the clamping jaw 21 so that the clamping jaw 21 can realize up and down, left and right, front and back movement.

[0032] like Figure 4 As shown, the clamping jaw 21 includes a first clamping jaw 211 and a second clamping jaw 212 which are arranged perpendicular to each other. An L-shaped rotating member 22 is arranged between the first clamping jaw 211 and the second clamping jaw 212. The rotating member 22 realizes the position exchange of the first clamping jaw 211 and the second clamping jaw 212 by a rotating cylinder (not shown in the figure). The first clamping jaw 211 and the second clamping jaw 212 are clamped or released by a clamping cylinder (not shown in the figure). Diamond-shaped openings are arranged at the ends of the first clamping jaw 211 and the second clamping jaw 212 to facilitate the clamping of the tungsten alloy tube 100.

[0033] like Figure 2 and Figure 3As shown, a chuck 32 and a base 31 are provided in the working box 3. The base 31 extends in the axial direction of the chuck 32. The chuck 32 is any existing three-jaw chuck that can clamp the tungsten alloy tube 100. A moving platform 4 is slidably provided on the base 31. The moving platform 4 is provided with a slide groove extending in the axial direction of the chuck 32. The base 31 is provided with a sliding protrusion 311 extending in the axial direction of the chuck 32. The cross-sectional shape of the sliding protrusion 311 is triangular and slidably cooperates with the slide groove. A screw 41 extending in the axial direction of the chuck 32 is provided below the moving platform 4. The lower end of the moving platform 4 is provided with a mating portion that is threadedly mated with the screw 41. A motor (not shown in the figure) is also provided in the working box. The output end of the motor is mated with the thread 41 to drive the screw 41 to rotate.

[0034] like Figure 2 , Figure 3 as well as Figures 5 to 7 As shown, two first placement seats 81 and two second placement seats 82 are provided on the moving platform 4, and the two first placement seats 81 are located between the two second placement seats 82. The first placement seat 81 and the second placement seat 82 are both arranged at intervals along the axial direction of the chuck 32, and the second placement seat 82 is provided with a V-shaped groove 821 that opens upward and penetrates along the axial direction of the chuck 32. When the tungsten alloy tube 100 is clamped by the chuck 32, the outer wall of the tungsten alloy tube 100 contacts the groove wall of the V-shaped groove 821. Each second placement seat 82 is provided with a pressing block 7, which can press the tungsten alloy tube 100, and the pressing block 7 is lifted and lowered by the cylinder 71. The first placement seat 81 is provided with a positioning groove 811 that opens upward, and the positioning groove 811 is an arc groove and can contact the outer wall of the tungsten alloy tube 100. A drilling assembly is provided on one side of the two first placement seats 81. The drilling assembly includes two drill bits 5. A guide hole 83 for the drill bit 5 to pass through is provided on the side wall of the first placement seat 81. The first placement seat 81 is also provided with a clearance space 812 for the drill bit to make way. A driver 51 is provided on the moving platform 4. The driver 51 is a motor. A driving gear 521 is connected to the output end of the driver 51. The driving gear 521 is meshed with two driven gears 522. The two driven gears 522 respectively drive a drill bit 5 to rotate. The drilling assembly is installed on a support plate 9. The support plate 9 is fixed on the moving platform 4. A slide rail 511 extending along the drilling direction of the drill bit 5 is provided on the support plate 9. The drilling assembly is slidably fitted on the slide rail 511. A pusher 6 is provided on the support plate 9. The pusher 6 is a cylinder. The driver 51 moves under the action of the pusher 6 to realize the drilling of the drill bit 5.

[0035] In actual use, the clamp 21 clamps the tungsten alloy tube 100 on the loading platform 1, moves the tungsten alloy tube 100 into the placement box 3 through the moving assembly, places the tungsten alloy rod 100 on the first placement seat 81 and the second placement seat 82, and moves the tungsten alloy tube 100 along the axial direction of the chuck 32 so that the chuck 32 can clamp the tungsten alloy tube 100. After that, the clamp 21 moves away from the first placement seat 81 and the second placement seat 82, the pressing block 7 presses down to press the tungsten alloy tube 100, the driver 51 drives the drill bit 5 to rotate, and the pusher 6 pushes the drilling assembly to move, so that the drill bit 5 moves in the guide hole 83, and the drill bit 5 performs drilling processing on the tungsten alloy tube 100. After the drilling process is completed, the drill bit 5 withdraws from the drilling, the pressing block 7 releases the tungsten alloy tube 100, and the movable table 4 moves a short distance along the axial direction of the chuck 32. The chuck 32 rotates the angle of the tungsten alloy tube 100 to adjust the drilling position of the tungsten alloy tube. Then, the pressing block 7 is tightened again, and the drill bit 5 drills again. The above operation is repeated to realize the processing of multiple spirally arranged through holes on the tungsten alloy tube 100.

Claims

1. A tungsten alloy tube spiral hole processing device, comprising a chuck, a drilling assembly and a plurality of first placement seats, characterized in that: The first placement seat and the drilling assembly are arranged on a movable platform, the movable platform is located on the axial side of the chuck, and the movable platform can move along the axial direction of the chuck. The first placement seat is provided with a positioning groove opening upward, the first placement seat is located on the axial side of the chuck, the drilling assembly includes a drill bit, the drill bit is located on one side of the first placement seat, the first placement seat is provided with a guide hole for the drill bit to pass through, the guide hole is connected with the positioning groove, and a pressure block is provided above the first placement seat, and the pressure block is used to press the tungsten alloy tube workpiece.

2. The tungsten alloy tube spiral hole processing device according to claim 1, characterized in that: The movable platform is provided with a second placement seat, which is located on the axial side of the first placement seat and spaced apart from the first placement seat, and the second placement seat is provided with a V-shaped groove or an arc groove for contacting the outer wall of the tungsten alloy tube workpiece; the first placement seat is provided with a clearance space for making way for the drill bit.

3. The tungsten alloy tube spiral hole processing device according to claim 1, characterized in that: The drilling assembly comprises a driver and at least two drill bits, and the driver drives the at least two drill bits to rotate synchronously.

4. The tungsten alloy tube spiral hole processing device according to claim 1, characterized in that: The movable platform is provided with a slide rail extending along the drilling direction of the drill bit, and the drilling assembly is slidably mounted on the slide rail; the drilling assembly is equipped with a pusher, and the drill bit of the drilling assembly can move close to or away from the tungsten alloy tube workpiece under the action of the pusher.

5. The tungsten alloy tube spiral hole processing device according to any one of claims 1 to 4, characterized in that: The movable platform is slidably mounted on the base, and the base extends along the axial direction of the chuck. A sliding groove that matches each other and a sliding protrusion that extends into the sliding groove and slidably matches with the sliding groove are provided between the base and the movable platform.

6. The tungsten alloy tube spiral hole processing device according to claim 5, characterized in that: The base is provided with a screw extending along the axial direction of the chuck, the moving platform is provided with a matching portion matched with the thread of the screw, and the screw is driven by a motor.

7. The tungsten alloy tube spiral hole processing device according to any one of claims 1 to 4, characterized in that: It also includes a loading platform arranged on one side of the chuck, and the tungsten alloy tube workpiece is clamped by a clamping jaw between the loading platform and the chuck, and the clamping jaw is equipped with a moving mechanism, and the clamping jaw completes the loading and unloading of the tungsten alloy tube workpiece under the action of the moving mechanism; the clamping jaw includes a first clamping jaw and a second clamping jaw, and the first clamping jaw and the second clamping jaw are vertically arranged and can be interchanged with each other.

Citation Information

Patent Citations

  • Novel steel tube drilling machine provided with chuck

    CN204294990U