Fabricated group anchor spiral anchor bearing platform foundation structure
By adopting assembled assembly mechanism and fixing mechanism in the group anchor spiral anchor support base structure, the problems of anchor body offset and structural instability during construction are solved, and higher load-bearing capacity and structural stability are achieved.
Patent Information
- Application Number
- CN202420758492.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-04-12
AI Technical Summary
During the construction process, the existing group anchor spiral anchor foundation is prone to deviating the anchor body due to the use of large machinery, causing load-bearing capacity errors, and uneven settlement occurs in geological changes or extreme climates, affecting the stability of the infrastructure.
The assembled group anchor spiral anchor base structure is adopted. By installing an assembly mechanism on the support, the group spiral anchor is fixed at the position. The assembly base and fixing mechanism are used to connect the anchor cable to ensure the perpendicularity and stability of the anchor cable, prevent the anchor body from being offset, and transmit the pulling force through the anchor cable to generate resistance to pulling force.
It effectively prevents the anchor body from shifting, improves the accuracy of load-bearing capacity, enhances the stability of the infrastructure, adapts to different upper load conditions, and maintains the stability of the structure in the face of geological changes or extreme climates.
Smart Images

Figure CN222666854U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of spiral anchor cap foundation, in particular to an assembled group-anchor spiral anchor cap foundation structure. Background Art
[0002] At present, the common foundation forms in power transmission lines include: step foundation, plate foundation, inclined foundation, rock foundation and pile foundation. Among them, step foundation, plate foundation and inclined foundation are also called "large excavation" foundation, which has large excavation volume, high cost and long construction period. Pile foundation consists of piles and caps, and piles can be cast-in-place piles, precast concrete piles, screw piles and other types.
[0003] Pile foundation has the advantages of high bearing capacity and strong adaptability, but pile foundation construction usually requires large machinery; for cast-in-place piles, the pile body must reach the designed bearing capacity before the cap can be cast, and the construction period is long. In addition, when drilling and piling the group-anchor spiral anchor pile foundation, the use of large machinery can easily cause the group spiral anchor to deviate to a certain extent, resulting in errors in the compressive bearing capacity and the tensile bearing capacity, and at the same time affect the pouring of the group-anchor spiral anchor pile foundation. The two are prone to incoordination when adapting to different upper load conditions. When the group-anchor spiral anchor pile foundation encounters changes in geological conditions or extreme climate events, uneven settlement occurs, resulting in instability of the cap foundation structure.
[0004] Therefore, in view of the shortcomings of the prior art, it is necessary to provide an assembled group anchor spiral anchor cap foundation structure to solve the shortcomings of the prior art. Utility Model Content
[0005] The utility model aims to avoid the deficiencies of the prior art and provide an assembled group-anchor spiral anchor foundation structure, in which the group spiral anchor is fixed in position by an assembly mechanism installed on the foundation, the position of the group spiral anchor is determined to prevent the spiral anchor body from shifting, the assembly base in the assembly mechanism is fixed to the ground by a detachable fixing mechanism, the assembly sleeve arranged on the assembly base fixes the drilling position of the group spiral anchor, and cooperates with the through hole in the internal toughened layer of the foundation to prevent the shifting, when subjected to upward pull force, the upward pull force acts on the anchor cable through the foundation, and is transmitted to the group spiral anchor through the anchor cable, the group spiral anchor squeezes the upper soil to generate pull-out force to offset the upward pull load, and the upward pull load generated by the inclination of the towering structure is also balanced by the pull-out bearing capacity of the group spiral anchor to achieve the purpose of stability.
[0006] The above-mentioned purpose of the utility model is achieved through the following technical means.
[0007] Provided is an assembled group-anchor spiral anchor cap foundation structure, comprising a cap, the cap is arranged below the ground plane, an assembly mechanism is installed on the cap, and fixing mechanisms are arranged around the assembly mechanism;
[0008] The assembly mechanism includes an assembly base, which is arranged on the top of the pedestal. Two groups of channels are opened on the assembly base. Assembly sleeves are installed inside the channels. The assembly sleeves pass through the pedestal. Anchor cables are arranged inside the assembly sleeves. A connecting head is connected below the anchor cables. A group of spiral anchors are arranged below the connecting head.
[0009] Specifically, the assembly sleeve includes a cement molded part, and an auxiliary sleeve is integrally formed at the bottom of the cement molded part, and the auxiliary sleeve passes through the pedestal and the assembly base.
[0010] Specifically, the fixing mechanism includes four groups of fixing rods, the top of the fixing rods penetrates the assembly base, the top of the fixing rods is installed with threaded rods, large-size nuts are threadedly installed on the threaded rods, and the bottom of the fixing rods is provided with inverted tooth limit blocks.
[0011] Specifically, a toughened layer is embedded inside the support, and a through hole is opened on the toughened layer, and the position of the through hole corresponds to the assembly sleeve.
[0012] Specifically, the bottom end of the anchor cable is filled with a cement slurry layer, and the bottom of the anchor cable is detachably connected to the connecting head.
[0013] The utility model fixes the position of the group spiral anchors through an assembly mechanism installed on the cap, determines the position of the group spiral anchors to prevent the spiral anchor bodies from shifting, an assembly base in the assembly mechanism is fixed to the ground through a detachable fixing mechanism, an assembly sleeve arranged on the assembly base fixes the drilling position of the group spiral anchors, cooperates with the through holes in the internal toughened layer of the cap to prevent the shifting, when subjected to an upward pull force, the upward pull force acts on the anchor cable through the cap, and is transmitted to the group spiral anchors through the anchor cable, the group spiral anchors squeeze the upper soil to generate a pull-out force to offset the upward pull load, and the upward pull load generated by the inclination of the towering structure is also balanced by the pull-out bearing capacity of the group spiral anchors to achieve the purpose of stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The present invention is further described with reference to the accompanying drawings, but the contents in the accompanying drawings do not constitute any limitation to the present invention.
[0015] Figure 1 It is a front view of an assembled group-anchor spiral anchor cap foundation structure of the utility model.
[0016] Figure 2 It is a partial enlarged view of a base structure A of an assembled group-anchor spiral anchor cap of the utility model.
[0017] from Figure 1 to Figure 2 Including:
[0018] 1. Platform;
[0019] 2. Assembly mechanism;
[0020] 3. Fixing mechanism;
[0021] 4. Assemble the base;
[0022] 5. Hole;
[0023] 6. Assemble the sleeve;
[0024] 7. Anchor cable;
[0025] 8. Connector;
[0026] 9. Group spiral anchor;
[0027] 10. Cement forming parts;
[0028] 11. Auxiliary casing;
[0029] 12. Fix the rod;
[0030] 13. Threaded rod;
[0031] 14. Large size nuts;
[0032] 15. Reverse tooth limit block;
[0033] 16. Tempered layer;
[0034] 17. Through hole;
[0035] 18. Cement slurry layer. DETAILED DESCRIPTION
[0036] The utility model is further described in conjunction with the following embodiments.
[0037] Example 1.
[0038] like Figure 1-2 As shown, an assembled group-anchor spiral anchor cap foundation structure comprises a cap 1, which is arranged below the ground plane, an assembly mechanism 2 is installed on the cap 1, and fixing mechanisms 3 are arranged around the assembly mechanism 2.
[0039] The assembly mechanism 2 installed on the platform 1 can rotate the group of spiral anchors 9 to a position for rapid positioning, and the fixing mechanism 3 installed on the assembly mechanism 2 can rapidly position the assembly mechanism 2 on the platform 1 .
[0040] The assembly mechanism 2 includes an assembly base 4, which is arranged on the top of the base 1. Two groups of channels 5 are opened on the assembly base. An assembly sleeve 6 is installed inside the channel 5. The assembly sleeve 6 passes through the base 1. An anchor cable 7 is arranged inside the assembly sleeve 6. A connector 8 is connected below the anchor cable 7. A group of spiral anchors 9 is arranged below the connector 8.
[0041] The two groups of holes 5 in the assembly base 4 provided in the assembly mechanism 2 can limit the rotation position of the group spiral anchor 9, and the assembly sleeve 6 installed in the hole 5 can play a guiding role, which is convenient for the vertical drilling and installation of the group spiral anchor 9. The anchor cable 7 in the assembly sleeve 6 is connected to the connector 8 on the group spiral anchor 9. After installation, the platform 1 will be subjected to an upward pull force, which acts on the anchor cable 7 through the platform 1 and is transmitted to the group spiral anchor 9 through the anchor cable 7. The group spiral anchor 9 squeezes the soil above to generate an anti-pull force to offset this upward pull load.
[0042] The assembly sleeve 6 includes a cement molded part 10, and an auxiliary sleeve 11 is integrally formed at the bottom of the cement molded part 10. The auxiliary sleeve 11 passes through the base 1 and the assembly base 4. The assembly sleeve 6 connects the base 1 and the assembly base 4 to facilitate the drilling of the anchor cable 7 and the group spiral anchor 9. At the same time, the guiding function of the auxiliary sleeve 11 vertically guides the anchor cable 7 and the group spiral anchor 9 to ensure the accuracy of the drilling position.
[0043] The fixing mechanism 3 includes four groups of fixing rods 12, the top of the fixing rod 12 passes through the assembly base 4, the top of the fixing rod 12 is installed with a threaded rod 13, the threaded rod 13 is threaded with a large-sized nut 14, and the bottom of the fixing rod 12 is provided with a reverse tooth limit block 15.
[0044] The fixing rod 12 is nailed around the assembly base 4, and the top of the fixing rod 12 is quickly assembled through a threaded rod 13 and a large-size nut 14. At the same time, the bottom of the fixing rod 12 nailed into the ground can provide pull-out resistance through the inverted tooth limit block 15.
[0045] A toughened layer 16 is embedded inside the base 1, and a through hole 17 is provided on the toughened layer 16. The position of the through hole 17 corresponds to the assembly sleeve 6. The through hole 17 provided in the toughened layer 16 can play a limiting role, limiting the position of the group spiral anchor 9 to prevent deviation during the drilling process.
[0046] The bottom end of the anchor cable 7 is filled with a cement slurry layer 18 , and the bottom of the anchor cable 7 is detachably connected to the connector 8 . The cement slurry layer 18 can play a fixing effect and improve the stability of the bottom of the anchor cable 7 and the connector 8 .
[0047] During the production process, the group spiral anchor 9 is fixed in position by the assembly mechanism 2 installed on the pedestal 1, and the position of the group spiral anchor 9 is determined to prevent the spiral anchor body from shifting. The assembly base 4 in the assembly mechanism 2 is fixed to the ground by the detachable fixing mechanism 3. The assembly sleeve 6 arranged on the assembly base 4 fixes the drilling position of the group spiral anchor 9, and cooperates with the through hole 17 in the toughened layer 16 inside the pedestal 1 to prevent the shift from occurring. When subjected to the upward pull force, the upward pull force acts on the anchor cable 7 through the pedestal 1, and is transmitted to the group spiral anchor 9 through the anchor cable 7. The group spiral anchor 9 squeezes the soil above to generate a pull-out force to offset the upward pull load. The pull-out load generated by the inclination of the tall structure is also balanced by the pull-out bearing capacity of the group spiral anchor 9 to achieve the purpose of stability.
[0048] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit the protection scope of the utility model. Although the utility model is described in detail with reference to the preferred embodiments, ordinary technicians in this field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the essence and scope of the technical solution of the utility model.
Claims
1. An assembled group-anchor spiral anchor cap foundation structure, characterized by: It includes a support platform, the support platform is arranged below the ground plane, an assembly mechanism is installed on the support platform, and a fixing mechanism is arranged around the assembly mechanism; The assembly mechanism includes an assembly base, which is arranged on the top of the pedestal. Two groups of channels are opened on the assembly base. Assembly sleeves are installed inside the channels. The assembly sleeves pass through the pedestal. An anchor cable is arranged inside the assembly sleeve. A connector is connected below the anchor cable, and a group of spiral anchors are arranged below the connector.
2. The assembled group-anchor spiral anchor cap foundation structure according to claim 1 is characterized by: The assembly sleeve comprises a cement molded part, and an auxiliary sleeve is integrally formed at the bottom of the cement molded part, and the auxiliary sleeve passes through the support platform and the assembly base.
3. The assembled group-anchor spiral anchor cap foundation structure according to claim 2 is characterized by: The fixing mechanism comprises four groups of fixing pins, the top of each fixing pin passes through the assembly base, a threaded rod is installed on the top of each fixing pin, a large-size nut is threadedly installed on the threaded rod, and a reverse tooth limit block is arranged at the bottom of each fixing pin.
4. The assembled group-anchor spiral anchor cap foundation structure according to claim 3 is characterized by: A toughened layer is embedded in the support platform, and a through hole is opened on the toughened layer. The position of the through hole corresponds to the assembly sleeve.
5. The assembled group-anchor spiral anchor cap foundation structure according to claim 4 is characterized by: The bottom end of the anchor cable is filled with a cement slurry layer, and the bottom of the anchor cable is detachably connected to the connecting head.