Green building material handrail for high-rise building

By designing a combined connection method of fixed guardrails, flip guardrails and anti-breaking ribs in the railings of high-rise buildings, the safety hazards of railings tilting and breaking under severe weather or impact are solved, and higher structural strength and stability are achieved.

CN222667398UActive Publication Date: 2025-03-25SICHUAN HANTING CONSTR ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421454289.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2025-03-25
Estimated Expiration
2034-06-25

AI Technical Summary

Technical Problem

The railings of existing high-rise buildings may be tilted, broken or other damage under severe weather conditions or accidental impact, resulting in safety hazards.

Method used

A green building material railing including a fixed guardrail and a flip guardrail is designed, and is connected to the wall through a first fixed combination connector and a second fixed combination connector, and is combined with the first railing break-proof rib and the second railing break-proof rib to enhance structural strength.

Benefits of technology

The connection strength between the railing and the wall is improved, preventing the railing from being torn or knocked off, and enhancing the stability and safety of the overall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222667398U_ABST
    Figure CN222667398U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building railings, and provides a green building material railing for a high-rise building, which comprises a fixed guardrail and a turnover guardrail, the fixed guardrail is connected with a wall body through a first fixed combination connector, the turnover guardrail is connected with the wall body through a second fixed combination connector, and the fixed guardrail is connected with the wall body through a second fixed combination connector. The turnover guardrail is connected with the fixed guardrail through a hinge, a first guardrail anti-breaking rib is arranged in the fixed guardrail, the first guardrail penetrates through the first guardrail anti-breaking rib to be fixedly connected with the fixed guardrail, a second guardrail anti-breaking rib is arranged in the turnover guardrail, and the second guardrail penetrates through the second guardrail anti-breaking rib to be fixedly connected with the turnover guardrail. The guardrail is simple in structure and convenient to use, the connecting strength of the fixed guardrail and the turnover guardrail and the wall body is improved, the first guardrail anti-breaking rib and the second guardrail anti-breaking rib are arranged to prevent the guardrail from being pulled apart or broken by collision, and the overall structural strength is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building railings, in particular to a green building material railing for high-rise buildings. Background Art

[0002] Balconies in residential buildings are usually equipped with safety guardrail structures to prevent people or objects on the balcony from falling. Usually, the safety guardrail is completely fixed to the balcony wall to improve the safety index.

[0003] As disclosed in application number: CN202220976295.6, a green building material railing for high-rise buildings includes a frame arranged on a balcony, wherein a bottom railing, a middle railing, a fixed window and a single-opening door and window are arranged in the frame, the bottom railing is arranged at the bottom of the frame and closes the accommodating space at the bottom of the frame, the single-opening door and window are arranged on the upper part of the bottom railing and fixed on one side of the inner wall of the frame, the middle railing is arranged on the upper part of the bottom railing and fixed on the other side of the inner wall of the frame, a fixed window is arranged on the upper part of the middle railing, a flip guardrail is arranged on the outer side of the middle railing, the flip guardrail is arranged on the side close to the single-opening door and window, and one end of the flip guardrail is rotatably connected to the middle railing by a pin.

[0004] However, in order to ensure the safety of high-rise building roofs, the railing design must have sufficient wind resistance and the ability to withstand external impact. The current design fails to meet these requirements, so under severe weather conditions or accidental impacts, the railing may tilt, break or otherwise be damaged, causing safety hazards. Utility Model Content

[0005] In order to solve the problem that the railings may tilt, break or be otherwise damaged under severe weather conditions or accidental collisions, thereby causing safety hazards, the utility model provides a green building material railing for high-rise buildings to solve this problem.

[0006] In order to achieve the above object, the utility model provides the following technical solutions:

[0007] A green building material railing for high-rise buildings comprises: a fixed guardrail and a flip guardrail, wherein the fixed guardrail is connected to a wall via a first fixed combined connector, the flip guardrail is connected to the wall via a second fixed combined connector, the flip guardrail and the fixed guardrail are connected via a hinge, a first railing anti-breaking rib is arranged in the fixed guardrail, the first railing passes through the first railing anti-breaking rib and is fixedly connected to the fixed guardrail, a second railing anti-breaking rib is arranged in the flip guardrail, the second guardrail passes through the second railing anti-breaking rib and is fixedly connected to the flip guardrail.

[0008] Preferably, the first fixed combination connector and the second fixed combination connector have the same structure, four groups of first fixed combination connectors are provided, and the four groups of first fixed combination connectors are respectively arranged at the four corners of the fixed guardrail, and two groups of second fixed combination connectors are provided, and the two groups of second fixed combination connectors are respectively arranged at the two ends of the upper part of the flip guardrail.

[0009] Preferably, the first fixed combined connector includes: a connecting tube, mounting screws and an auxiliary reinforcement mounting plate, the front end of the connecting tube is fixedly connected to the fixed guardrail, a mounting hole is provided in the connecting tube, the mounting screws are connected to the inside of the wall through the mounting hole, the auxiliary reinforcement mounting plate is mounted on the connecting tube, and the auxiliary reinforcement mounting plate is fixedly connected to the outer wall of the wall.

[0010] Preferably, adjacent connecting through pipes are fixedly connected via reinforcing arms.

[0011] Preferably, the first railing anti-breaking ribs and the second railing anti-breaking ribs have the same structure.

[0012] Preferably, the two ends of the first railing anti-breaking ribs are fixedly connected to the fixed guardrail by reinforcing screws, a reinforcing sleeve is provided on the outside of the reinforcing screws, one end of the reinforcing sleeve extends into the fixed guardrail, and the other end of the reinforcing sleeve extends into the first railing anti-breaking ribs, and the first railing anti-breaking ribs are provided with a through hole for accommodating the first railing to pass through.

[0013] Preferably, a mounting hole is provided at the bottom of the fixed guardrail.

[0014] Preferably, a support platform used in conjunction with the flip guardrail is provided on the upper portion of the fixed guardrail, the support platform is angular, one end of the support platform is fixedly connected to the fixed guardrail, and the other end of the support platform is used to receive the flip guardrail.

[0015] The advantages of the utility model are: the utility model can make the fixed guardrail fixedly connected to the wall surface and the fixed guardrail fixedly connected to the inside of the wall by setting the first fixed combined connector, thereby improving the connection strength between the fixed guardrail and the wall; by setting the second fixed combined connector, the flip guardrail can be fixedly connected to the wall surface and the flip guardrail fixedly connected to the inside of the wall, thereby improving the connection strength between the flip guardrail and the wall; by setting the first railing anti-breaking ribs and the second railing anti-breaking ribs, the railing can be prevented from being torn or broken, thereby improving the overall strength of the structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:

[0017] Figure 1 This is a structural schematic diagram of the utility model from angle 1;

[0018] Figure 2 This is a structural schematic diagram of the utility model from angle 2;

[0019] Figure 3 It is a structural schematic diagram of the first fixed combined connector of the utility model;

[0020] Figure 4 It is a structural schematic diagram of the reinforcing arm of the utility model;

[0021] Figure 5 This is a schematic diagram of the structure of the first railing to prevent broken tendons in the utility model;

[0022] Figure 6 It is a structural schematic diagram of a fixed guardrail of the utility model.

[0023] Description of reference numerals:

[0024] 1. Fixed guardrail; 2. Flip guardrail; 3. First fixed combination connector; 4. Second fixed combination connector; 5. Hinge; 6. First railing anti-breaking rib; 7. First railing; 8. Second railing anti-breaking rib; 9. Second guardrail; 31. Connecting through pipe; 32. Mounting screws; 33. Auxiliary reinforcement mounting plate; 34. Reinforcement arm; 61. Reinforcement screws; 62. Reinforcement sleeve; 11. Mounting hole; 12. Support platform. DETAILED DESCRIPTION

[0025] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0026] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0028] Embodiment 1, combined with Figure 1 and Figure 2 To explain:

[0029] A green building material railing for high-rise buildings, comprising: a fixed guardrail 1 and a flip guardrail 2, wherein the fixed guardrail 1 is connected to a wall via a first fixed combined connector 3, the flip guardrail 2 is connected to the wall via a second fixed combined connector 4, the flip guardrail 2 and the fixed guardrail 1 are connected via a hinge 5, a first railing anti-breaking rib 6 is arranged in the fixed guardrail 1, a first railing 7 passes through the first railing anti-breaking rib 6 and is fixedly connected to the fixed guardrail 1, a second railing anti-breaking rib 8 is arranged in the flip guardrail 2, and a second guardrail 9 passes through the second railing anti-breaking rib 8 and is fixedly connected to the flip guardrail 2.

[0030] In this way, by setting the first fixed combined connector 3, the fixed guardrail 1 can be fixedly connected to the wall surface, and the fixed guardrail 1 can be fixedly connected to the inside of the wall, thereby improving the connection strength between the fixed guardrail 1 and the wall; by setting the second fixed combined connector 4, the flip guardrail 2 can be fixedly connected to the wall surface, and the flip guardrail 2 can be fixedly connected to the inside of the wall, thereby improving the connection strength between the flip guardrail 2 and the wall; by setting the first railing anti-breaking ribs 6 and the second railing anti-breaking ribs 8, the railing can be prevented from being torn or broken, thereby improving the overall strength of the structure.

[0031] Embodiment 2, based on embodiment 1, combined with Figure 3 To explain:

[0032] The first fixed combined connector 3 and the second fixed combined connector 4 have the same structure, four groups of the first fixed combined connector 3 are provided, and the four groups of the first fixed combined connector 3 are respectively provided at the four corners of the fixed guardrail 1, and two groups of the second fixed combined connector 4 are provided, and the two groups of the second fixed combined connector 4 are respectively provided at the two ends of the upper part of the rollover guardrail 2. Such an arrangement reduces the production cost, and the structural installation stability is improved by providing the first fixed combined connector 3 and the second fixed combined connector 4.

[0033] The first fixed combined connector 3 includes: a connecting tube 31, mounting screws 32 and an auxiliary reinforcement mounting plate 33. The front end of the connecting tube 31 is fixedly connected to the fixed guardrail 1. A mounting hole is provided in the connecting tube 31. The mounting screws 32 are connected to the inside of the wall through the mounting hole. The auxiliary reinforcement mounting plate 33 is sleeved on the connecting tube 31, and the auxiliary reinforcement mounting plate 33 is fixedly connected to the outer wall of the wall.

[0034] In this way, the front end of the connecting pipe 31 is connected to the fixed guardrail 1 by welding, screwing or riveting, and the other end of the connecting pipe 31 extends into the wall. The connecting pipe 31 and the inside of the wall are fixedly connected by installing screws 32. The connecting pipe 31 and the wall surface are fixedly connected by providing an auxiliary reinforcement mounting plate 33, thereby improving the overall installation stability of the structure by the double fixed connection method.

[0035] Embodiment 3, based on embodiment 2, combined with Figure 4 To explain:

[0036] The adjacent connecting through pipes 31 are fixedly connected by the reinforcing arms 34. Such an arrangement can improve the connection strength between the adjacent connecting through pipes 31, prevent the connecting through pipes 31 from breaking individually, and improve the structural stability.

[0037] Embodiment 4, based on embodiment 3, combined with Figure 5 To explain:

[0038] The first railing anti-breaking rib 6 and the second railing anti-breaking rib 8 have the same structure. This arrangement reduces production costs.

[0039] The two ends of the first railing anti-breaking rib 6 are fixedly connected to the fixed guardrail 1 by reinforcing screws 61, and a reinforcing sleeve 62 is arranged on the outside of the reinforcing screw 61. One end of the reinforcing sleeve 62 extends into the fixed guardrail 1, and the other end of the reinforcing sleeve 62 extends into the first railing anti-breaking rib 6. The first railing anti-breaking rib 6 is provided with a through hole for accommodating the first railing 7 to pass through.

[0040] Embodiment 5, based on embodiment 4, combined with Figure 6 To explain:

[0041] The bottom of the fixed guardrail 1 is provided with a mounting hole 11. With such a configuration, the fixed guardrail 1 can be fixedly connected to the wall through the mounting hole 11, thereby improving the structural stability.

[0042] The upper part of the fixed guardrail 1 is provided with a support platform 12 used in conjunction with the flip guardrail 2. The support platform 12 is angular, one end of the support platform 12 is fixedly connected to the fixed guardrail 1, and the other end of the support platform 12 is used to receive the flip guardrail 2. In this way, the support platform 12 can prevent the flip guardrail 2 from breaking at the connection with the fixed guardrail 1, and the support platform 12 plays a role in supporting the flip guardrail 2, thereby improving safety.

[0043] Working principle of the utility model: when the utility model is in use, when it is necessary to disassemble and assemble the flip guardrail 2, it is only necessary to remove the second fixed combination connector 4. The use of the flip guardrail 2 can reduce the risk of falling. The strength of the guardrail is strengthened by arranging the first railing anti-breaking ribs 6 and the second railing anti-breaking ribs 8 to prevent the guardrail from being torn off by external forces. The utility model has a reasonable structure and is easy to use. It improves the connection strength between the fixed guardrail 1 and the flip guardrail 2 and the wall. By arranging the first railing anti-breaking ribs 6 and the second railing anti-breaking ribs 8, the railing can be prevented from being torn off or broken, thereby improving the overall strength of the structure.

[0044] For those skilled in the art, the present invention is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic features of the present invention; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to include all changes within the meaning and scope of the equivalent elements of the claims. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any minor modifications, equivalent substitutions and improvements made to the above embodiments based on the technical essence of the present invention should be included in the protection scope of the technical solution of the present invention.

Claims

1. A green building material railing for high-rise buildings, characterized in that: include: A fixed guardrail (1) and a flip guardrail (2), wherein the fixed guardrail (1) is connected to a wall via a first fixed combined connector (3), the flip guardrail (2) is connected to the wall via a second fixed combined connector (4), the flip guardrail (2) and the fixed guardrail (1) are connected via a hinge (5), a first railing anti-breaking rib (6) is arranged in the fixed guardrail (1), a first railing (7) passes through the first railing anti-breaking rib (6) and is fixedly connected to the fixed guardrail (1), a second railing anti-breaking rib (8) is arranged in the flip guardrail (2), and a second guardrail (9) passes through the second railing anti-breaking rib (8) and is fixedly connected to the flip guardrail (2).

2. A green building material railing for high-rise buildings according to claim 1, characterized in that: The first fixed combined connector (3) and the second fixed combined connector (4) have the same structure. Four groups of the first fixed combined connector (3) are provided. The four groups of the first fixed combined connector (3) are respectively arranged at the four corners of the fixed guardrail (1). Two groups of the second fixed combined connector (4) are provided. The two groups of the second fixed combined connector (4) are respectively arranged at the two ends of the upper part of the flip guardrail (2).

3. A green building material railing for high-rise buildings according to claim 2, characterized in that: The first fixed combined connector (3) comprises: a connecting tube (31), a mounting screw (32) and an auxiliary reinforcement mounting plate (33); the front end of the connecting tube (31) is fixedly connected to the fixed guardrail (1); a mounting hole is provided in the connecting tube (31); the mounting screw (32) is connected to the inside of the wall through the mounting hole; the auxiliary reinforcement mounting plate (33) is sleeved on the connecting tube (31); and the auxiliary reinforcement mounting plate (33) is fixedly connected to the outer wall of the wall.

4. A green building material railing for high-rise buildings according to claim 3, characterized in that: Adjacent connecting through pipes (31) are fixedly connected via reinforcing arms (34).

5. The green building material railing for high-rise buildings according to claim 1, characterized in that: The first railing anti-breaking rib (6) and the second railing anti-breaking rib (8) have the same structure.

6. A green building material railing for high-rise buildings according to claim 5, characterized in that: The two ends of the first railing anti-breaking rib (6) are fixedly connected to the fixed guardrail (1) by means of reinforcing screws (61); a reinforcing sleeve (62) is arranged outside the reinforcing screw (61); one end of the reinforcing sleeve (62) extends into the fixed guardrail (1); the other end of the reinforcing sleeve (62) extends into the first railing anti-breaking rib (6); and a through hole for accommodating the first railing (7) to pass through is arranged on the first railing anti-breaking rib (6).

7. The green building material railing for high-rise buildings according to claim 1, characterized in that: The bottom of the fixed guardrail (1) is provided with a mounting hole (11).

8. The green building material railing for high-rise buildings according to claim 1, characterized in that: A support platform (12) for use with the flip guardrail (2) is arranged on the upper part of the fixed guardrail (1); the support platform (12) is angular, one end of the support platform (12) is fixedly connected to the fixed guardrail (1), and the other end of the support platform (12) is used to receive the flip guardrail (2).

Citation Information

Patent Citations

  • Green building material handrail for high-rise building

    CN217379577U