Steel beam attachment type lifting operation safety protection platform for high-rise building

By designing structures such as clamps, springs and drawstrings on the safety protection platform of steel beams for high-rise buildings, staff are reminded to bind protective ropes before high-altitude operations, which solves the problem that the staff cannot effectively remind them to bind protective ropes in the existing technology, and improves the safety awareness and operation safety of staff.

CN222667552UActive Publication Date: 2025-03-25FUJIAN LUBAN CONSTR TECH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421445667.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-03-25
Estimated Expiration
2034-06-24

AI Technical Summary

Technical Problem

The existing safety protection platform for attached steel beams for high-rise buildings cannot effectively remind staff to bind protective ropes before operating at high altitudes, resulting in safety hazards.

Method used

A protective platform including structures such as clamps, springs and draw ropes is designed. By setting up structures such as protective ropes, plugs and clamps, the staff must take out the insertion blocks on the side wall of the protective rope from the long block before opening the turning door, and fix the insertion blocks with the clamps again when closing the turning door to remind the staff to bind the protective rope.

Benefits of technology

Through this design, the staff can be effectively reminded to bind protective ropes before performing high-altitude operations, reducing safety accidents caused by forgetting to bind and improving staff's safety awareness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222667552U_ABST
    Figure CN222667552U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel beam attachment type lifting operation safety protection platform for a high-rise building, which comprises a protection platform body, the protection platform body is of a frame-shaped structure, the inner wall of the protection platform body is symmetrically and fixedly connected with two groups of fixing rods, the side wall of each fixing rod is rotatably connected with a revolving door, and the revolving door is fixedly connected with the protection platform body. A long block is fixedly connected to the inner side wall of each rotating door, a long groove is formed in the top of each long block, a clamping plate is slidably connected to the inner wall of each long groove, a sliding groove is formed in the side wall of each long groove, a sliding plate is slidably connected to the inner wall of each sliding groove, and a rope carrying box is fixedly installed on the inner wall of the protection platform body. Before a worker opens the rotating door, the inserting block on the side wall of the protection rope must be taken out from the long block, the arrangement is used for reminding the worker whether the human body and the protection rope are bound or not during operation so as to prevent the worker from accidentally falling off during high-altitude operation, and a certain reminding effect is achieved for the worker.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of safety protection platforms, in particular to a steel beam attached lifting operation safety protection platform for high-rise buildings. Background Art

[0002] An attached lifting operation safety protection platform refers to a lifting equipment and device that is set up at a certain height and attached to the engineering structure, relying on its own lifting equipment and devices. The safety protection platform can climb or descend layer by layer with the engineering structure, and has functions such as safety protection and synchronous lifting. The safety protection platform is a type of external protective scaffolding for high-rise buildings that has emerged in recent years. Because it can slowly climb or descend along the exterior facade of the building structure, it is often used when constructing high-rise buildings.

[0003] In order to increase the working speed, some workers often forget to tie the safety rope to their bodies before leaving the safety protection platform when performing aerial operations, thus neglecting their own safety. Therefore, it is necessary to remind the workers to tie the safety rope in advance when performing aerial operations. However, the existing high-rise building steel beam attached lifting operation safety protection platform sets the safety rope in the corner of the inner wall of the platform or in a relatively hidden position, which cannot achieve the purpose of reminding the workers. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes a steel beam attached lifting operation safety protection platform for high-rise buildings.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A steel beam attached lifting operation safety protection platform for high-rise buildings comprises a protection platform body, the protection platform body is a frame-shaped structure, the inner wall of the protection platform body is symmetrically fixedly connected with two groups of fixing rods, each of the fixing rod side walls is rotatably connected with a revolving door, each of the revolving door inner wall is fixedly connected with a long block, each of the long blocks is provided with a long groove on the top, each of the long groove inner wall is slidably connected with a clamping plate, each of the long groove side walls is provided with a slide groove, each of the slide groove inner wall is slidably connected with a slide plate, a rope carrying box is fixedly installed on the inner wall of the protection platform body, and the inner wall of the rope carrying box is symmetrically installed with protection ropes.

[0007] Preferably, each of the side walls of the slide plate is fixedly connected to a pillar, and the other end of each of the pillars is fixedly connected to an adjacent side wall of the clamping plate.

[0008] Preferably, the other end of each of the protective ropes passes through the side wall of the rope carrying box and is fixedly connected to a locking buckle, and each of the side walls of the protective ropes is fixedly connected to an insertion block.

[0009] Preferably, the insert block is a T-shaped structure, and each side wall of the clamping plate slides against an adjacent side wall of the insert block.

[0010] Preferably, each of the pillar side walls is sleeved with a spring, one end of each of the springs is fixedly connected to the adjacent long slot side wall, and the other end of each of the springs is fixedly connected to the adjacent clamping plate side wall.

[0011] Preferably, each side wall of the slide plate is fixedly connected with a draw rope, and the other end of each draw rope passes through the long block and is fixedly connected with a draw ring.

[0012] Beneficial effects of the utility model:

[0013] 1. In the utility model, by setting structures such as a splint, a spring and a pull rope, pulling the pull ring drives the pillar to move, and then drives the splint to move. The spring is deformed during the movement of the pillar, and then, when there is no external interference, the splint can be driven to move quickly under the action of elasticity, and then the splint can quickly fix or separate the plug.

[0014] 2. In the utility model, by providing structures such as protective ropes, plug blocks and splints, the staff must take out the plug blocks on the side walls of the protective rope from the long blocks before opening the revolving door. To close the revolving door, the plug blocks must be fixed to the splints again before the revolving door can be completely closed. This setting is to remind the staff whether to bind the human body and the protective rope when performing operations, so as to prevent accidents from falling during high-altitude operations, which has a certain reminder effect on the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The utility model is a cross-sectional view of the internal structure of a steel beam attached lifting operation safety protection platform for high-rise buildings.

[0016] Figure 2 The utility model is a schematic diagram of the internal structure of a medium-long block of a steel beam-attached lifting operation safety protection platform for high-rise buildings.

[0017] Figure 3 for Figure 2 A magnified schematic diagram of the structure of part A.

[0018] Figure 4 The utility model is a schematic diagram of the internal structure of a steel beam attached lifting operation safety protection platform for high-rise buildings.

[0019] Figure 5 The utility model is a schematic diagram of the appearance of a steel beam attached lifting operation safety protection platform for high-rise buildings.

[0020] In the figure: 1 protective platform body, 2 fixing rod, 3 revolving door, 4 long block, 5 long slot, 6 slide slot, 7 slide plate, 8 clamping plate, 9 pillar, 10 spring, 11 pull rope, 12 pull ring, 13 rope carrying box, 14 protective rope, 15 plug block, 16 locking buckle. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] Reference Figure 1-Figure 5 A steel beam attached lifting operation safety protection platform for high-rise buildings includes a protection platform body 1. The protection platform body 1 is a frame-shaped structure. Two groups of fixed rods 2 are symmetrically fixedly connected to the inner wall of the protection platform body 1. Each fixed rod 2 is rotatably connected to a revolving door 3 on the side wall. A long block 4 is fixedly connected to the inner wall of each revolving door 3. A long groove 5 is opened on the top of each long block 4. A splint 8 is slidably connected to the inner wall of each long groove 5. A slide groove 6 is opened on the side wall of each long groove 5. A slide plate 7 is slidably connected to the inner wall of each slide groove 6. A rope box 13 is fixedly installed on the inner wall of the protection platform body 1. A protection rope 14 is symmetrically installed on the inner wall of the rope box 13. After the protection rope 14 is bound to the human body, it can provide certain protection for the staff.

[0023] Each side wall of the slide plate 7 is fixedly connected to a support column 9, and the other end of each support column 9 is fixedly connected to the side wall of the adjacent clamping plate 8, so that the clamping plate 8 can be moved when the slide plate 7 moves.

[0024] The other end of each protective rope 14 passes through the side wall of the rope carrying box 13 and is fixedly connected to a locking buckle 16. The side wall of each protective rope 14 is fixedly connected to an insert block 15, and the locking buckle 16 can be fixed to the locking insert block worn by the human body.

[0025] The insert block 15 is a T-shaped structure. The side wall of each clamp plate 8 slides against the adjacent side wall of the insert block 15. The side walls of the clamp plate 8 and the narrower part of the insert block 15 abut against each other, so that the insert block 15 will not be easily moved out of the long slot 5.

[0026] A spring 10 is sleeved on the side wall of each pillar 9, one end of each spring 10 is fixedly connected to the adjacent side wall of the long slot 5, and the other end of each spring 10 is fixedly connected to the adjacent side wall of the splint 8. The spring 10 can deform along with the pillar 9, and then when the pillar 9 is no longer disturbed by external force, it can drive the pillar 9 to move quickly under the action of elasticity, and then drive the splint 8 to move quickly.

[0027] A pull rope 11 is fixedly connected to the side wall of each slide plate 7. The other end of each pull rope 11 passes through the long block 4 and is fixedly connected to a pull ring 12. The pull ring 12 can pull the pull rope 11 more conveniently.

[0028] In the utility model, when the safety protection platform is used, the protection platform body 1 is raised or lowered by the lifting structure attached to the steel beam of the high-rise building, and the staff enters the protection platform body 1. When the protection platform body 1 rises to a height suitable for the staff to work, it is rotated from both sides to a suitable working position to open the corresponding revolving door 3. In order to open the revolving door 3, the staff needs to pull the pull ring 12, the pull ring 12 drives the pull rope 11 to move, the pull rope 11 drives the slide plate 7 to move, the slide plate 7 drives the pillar 9 to move, the pillar 9 drives the clamping plate 8 to move, and compresses the spring 10. At this time, the plug block 15 can move, and then the protection rope 14 can move. The protection rope 14 is taken out from the two long blocks 4, and the revolving door 3 is opened, and the operation can be carried out;

[0029] The utility model needs to take out the plug block 15 of the side wall of the protective rope 14 from the long block 4 before opening the revolving door 3, and closing the revolving door 3 also needs to fix the plug block 15 to the clamping plate 8 again before completely closing the revolving door 3. This setting is to remind the staff whether to bind the human body and the protective rope 14 when performing the operation to prevent accidental falling during high-altitude operation, which has a certain reminder effect on the staff.

[0030] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A steel beam attached lifting operation safety protection platform for high-rise buildings, comprising a protection platform body (1), characterized in that: The protective platform body (1) is a frame-shaped structure. Two groups of fixed rods (2) are symmetrically fixedly connected to the inner wall of the protective platform body (1). The side wall of each fixed rod (2) is rotatably connected to a revolving door (3). The inner wall of each revolving door (3) is fixedly connected to a long block (4). The top of each long block (4) is provided with a long groove (5). The inner wall of each long groove (5) is slidably connected to a clamping plate (8). The side wall of each long groove (5) is provided with a sliding groove (6). The inner wall of each sliding groove (6) is slidably connected to a sliding plate (7). A rope carrying box (13) is fixedly installed on the inner wall of the protective platform body (1). A protective rope (14) is symmetrically installed on the inner wall of the rope carrying box (13).

2. A steel beam attached lifting operation safety protection platform for high-rise buildings according to claim 1, characterized in that: Each side wall of the slide plate (7) is fixedly connected to a support column (9), and the other end of each support column (9) is fixedly connected to the adjacent side wall of the clamping plate (8).

3. A steel beam attached lifting operation safety protection platform for high-rise buildings according to claim 2, characterized in that: The other end of each of the protective ropes (14) passes through the side wall of the rope carrying box (13) and is fixedly connected to a locking buckle (16), and the side wall of each of the protective ropes (14) is fixedly connected to an insert block (15).

4. A steel beam attached lifting operation safety protection platform for high-rise buildings according to claim 3, characterized in that: The insert block (15) is a T-shaped structure, and the side wall of each clamping plate (8) slides against the side wall of the adjacent insert block (15).

5. A steel beam attached lifting operation safety protection platform for high-rise buildings according to claim 4, characterized in that: A spring (10) is sleeved on the side wall of each support (9), one end of each spring (10) is fixedly connected to the adjacent side wall of the long slot (5), and the other end of each spring (10) is fixedly connected to the adjacent side wall of the clamping plate (8).

6. A steel beam attached lifting operation safety protection platform for high-rise buildings according to claim 5, characterized in that: A drawstring (11) is fixedly connected to the side wall of each slide plate (7), and the other end of each drawstring (11) passes through the long block (4) and is fixedly connected to a draw ring (12).