Formwork erecting structure of wall body at underground continuous wall in basement

By using wooden formwork and support keel frame components in the basement, the problem of narrow space and gaps in the wall formwork support space in the basement is solved in the traditional way, and the close fit between the wall and the underground continuous wall and the construction efficiency are improved.

CN222667590UActive Publication Date: 2025-03-25THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420567997.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2025-03-25
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

The traditional method of supporting wall formwork at the underground continuous wall in the basement room makes the formwork close to the underground continuous wall, the space is small, and the construction is difficult. There is also a gap between the wall and the underground continuous wall, which is difficult to meet the construction requirements.

Method used

A formwork support structure is adopted, including a lower formwork assembly and an upper formwork assembly. The lower formwork assembly is composed of continuously laid wooden formwork and a support keel frame assembly. The support keel frame assembly includes vertical columns, transverse main keel sets, vertical secondary keels and inclined support keels. The wooden formwork is supported through these components to form a tightly fit wall casting space.

Benefits of technology

It solves the problems of space and clearance caused by traditional formwork support methods, realizes the close fit between the wall and the underground continuous wall, simplifies the construction process, improves construction efficiency, and saves time, labor and materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222667590U_ABST
    Figure CN222667590U_ABST
Patent Text Reader

Abstract

The utility model discloses a formwork erecting structure of a wall body at the position of an underground diaphragm wall in a basement, the underground diaphragm wall is arranged on the outer side of the basement and is tightly attached to the basement, the formwork erecting structure comprises a lower formwork assembly, the lower formwork assembly comprises a plurality of wood formworks, the wood formworks are continuously laid in the trend of the underground diaphragm wall, and the lower formwork assembly is connected with the underground diaphragm wall. The plurality of wood formworks and the underground diaphragm wall are arranged at intervals and jointly form a wall body pouring space, a supporting keel frame assembly is arranged on the side face of the plurality of continuously laid wood formworks, the supporting keel frame assembly is located in a basement and fixed to the indoor ground, and the wall body pouring space is tightly attached to the underground diaphragm wall; the defect that in a traditional formwork double-side mold closing erecting mode, the space close to one side of the underground diaphragm wall is narrow, and consequently formwork erecting construction is difficult is overcome, construction is easy and convenient, and time, labor and materials are saved; the defect that a gap exists between the wall body and the underground diaphragm wall in a traditional formwork erecting mode is overcome, and the wall body and the underground diaphragm wall are tightly attached.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a template supporting structure for a wall body at an underground continuous wall in a basement. Background Art

[0002] The underground continuous wall is a foundation project that uses a trenching machine on the ground to dig a long and narrow deep trench along the peripheral axis of the deep excavation project under the condition of mud wall protection. After the trench is cleared, a steel cage is suspended in the trench, and then underwater concrete is poured using the conduit method to form a unit trench section. This process is carried out section by section to build a continuous reinforced concrete wall underground as a water interception, anti-seepage, load-bearing and water retaining structure.

[0003] A basement refers to a room whose floor is more than half of the room's clear height below the outdoor ground level. Multi-story and high-rise buildings require a deeper foundation. To make use of this height, a basement is built under the ground floor of the building. This can not only increase the usable area, but also save the backfill soil in the center of the house, which is relatively economical. Building a basement below the ground floor of a house can improve the efficiency of building land use. Some high-rise buildings have a great burial depth, and making full use of this depth to build a basement has both good economic and usage effects.

[0004] Most of the walls of the basement are cast with concrete, and the walls are generally tightly fitted with the underground continuous wall. The walls of the basement need to be supported by formwork during construction. The traditional formwork support method is double-sided mold clamping. However, double-sided mold clamping will make the formwork on one side close to the underground continuous wall, which will lead to a narrow space that is not conducive to formwork support construction. After the wall is cast, it is extremely inconvenient to remove the formwork. There will be a gap between the wall and the underground continuous wall, which is difficult to meet the construction requirements and has many defects.

[0005] Therefore, there is an urgent need for a formwork supporting structure for the wall at the underground continuous wall in the basement to solve the above technical problems. Utility Model Content

[0006] The utility model aims to solve the above-mentioned problems, thereby providing a formwork supporting structure for the wall at the underground continuous wall in the basement, which solves the defect of the traditional formwork double-sided mold supporting method that the space next to one side of the underground continuous wall is small, resulting in difficulty in formwork supporting construction. The construction is simple and convenient, saving time, labor and materials, and improving construction efficiency; it solves the defect of the traditional formwork double-sided mold supporting method that there is a gap between the wall and the underground continuous wall, so that the wall and the underground continuous wall are closely fitted, meeting the construction requirements.

[0007] The utility model solves the above problems and adopts the following technical solutions:

[0008] A formwork support structure for a wall at an underground continuous wall in a basement, wherein the underground continuous wall is arranged on the outside of the basement and is closely fitted with the basement, the formwork support structure comprises a lower formwork assembly, the lower formwork assembly comprises a plurality of wooden formworks, the plurality of wooden formworks are continuously laid along the direction of the underground continuous wall, the plurality of wooden formworks are spaced apart from the underground continuous wall, the plurality of wooden formworks and the underground continuous wall together form a wall casting space, a supporting keel frame assembly is arranged on the side of the plurality of continuously laid wooden formworks, the supporting keel frame assembly is located in the basement and fixed on the indoor floor of the basement, and the wall casting space is closely fitted with the underground continuous wall; the supporting keel frame assembly comprises a plurality of vertical columns, a plurality of A transverse main keel group and a plurality of vertical secondary keels are formed, a plurality of vertical columns are evenly spaced along the direction of continuously laying a plurality of wooden formworks, a plurality of transverse main keel groups are spaced along the height direction of the vertical columns, and each transverse main keel group is arranged along the direction of the continuously arranged plurality of vertical columns, a plurality of vertical secondary keels are evenly spaced along the length direction of the transverse main keel group, keel connecting fasteners are connected between the vertical secondary keels and the transverse main keel group, a plurality of inclined supporting keels are connected to one of the transverse main keel groups, the plurality of inclined supporting keels are fixed on the indoor floor of the basement, and the plurality of inclined supporting keels are evenly spaced along the length direction of the transverse main keel group.

[0009] As a preferred embodiment, a further technical solution of the utility model is:

[0010] Furthermore, it also includes an upper formwork assembly, which is located above the lower formwork assembly and the underground continuous wall. The upper formwork assembly includes a plurality of inner formworks and a plurality of outer formworks, which are continuously laid along the direction of the wall casting space, the plurality of inner formworks and the plurality of outer formworks are spaced from each other and located on both sides of the wall casting space, the plurality of inner formworks are butted up and down with a plurality of wooden formworks, the supporting keel frame assembly is arranged on the side surfaces of the plurality of inner formworks, and the fastening assembly connected to the supporting keel frame assembly is arranged on the side surfaces of the plurality of outer formworks. The fastening assembly includes a plurality of vertical poles and a plurality of groups of transverse strut groups. The plurality of vertical poles are evenly spaced along the direction of the continuously laid plurality of outer formworks. The plurality of groups of transverse strut groups are spaced along the height direction of the vertical poles, and each group of transverse strut groups is arranged along the entire length of the continuously arranged plurality of vertical poles. The transverse strut groups correspond to the transverse main keel groups one by one. The transverse strut groups and the transverse main keel groups are commonly connected with tension screw members. The fastening assembly is connected to the supporting keel frame assembly through the tension screw members. The plurality of inner formworks and the plurality of outer formworks jointly extend the wall casting space upward.

[0011] Furthermore, it also includes a slope protection wall arranged on the outside of the underground continuous wall, and a plurality of top support assemblies are arranged between the transverse support rod group at the lower part of the upper formwork assembly and the slope protection wall, and the plurality of top support assemblies are evenly spaced along the length direction of the transverse support rod group; the top support assembly includes a top support steel pipe, and steel pipe wire supports are installed in both ends of the top support steel pipe, one of the steel pipe wire supports is abutted on the transverse support rod group, and the other steel pipe wire support is abutted on the slope protection wall.

[0012] Furthermore, a disc-type scaffolding is provided in the basement, and the supporting keel frame also includes a plurality of horizontal supporting keels, and the plurality of horizontal supporting keels are all fixed on a transverse main keel group connected to the inclined supporting keel, and the plurality of horizontal supporting keels are evenly spaced along the length direction of the transverse main keel group, and each horizontal supporting keel is fixed to the disc-type scaffolding by a steel pipe connecting fastener.

[0013] Furthermore, a plurality of vertical tie columns are vertically pre-buried on the indoor floor of the basement, the plurality of vertical tie columns correspond one to one with a plurality of inclined support keels, and steel pipe connecting fasteners connected to the inclined support keels are installed on the vertical tie columns.

[0014] Furthermore, a plurality of implant components are provided at the lower portion of the supporting keel frame assembly, and the plurality of implant components are all fixed in the underground continuous wall through the wall casting space, and the plurality of implant components are evenly spaced along the direction of the wall casting space. The implant components include an implant connecting rod, and an implant hole is provided on the underground continuous wall. The end of the implant connecting rod passes through the transverse main keel group, the wooden formwork and the wall casting space in turn and is inserted into the implant hole, and the end of the implant connecting rod is fixed in the implant hole. A limiting plate is installed on the other end of the implant connecting rod and is threadedly connected with a fastening nut, and the fastening nut fastens the limiting plate to the side of the transverse main keel group.

[0015] Furthermore, the transverse main keel group includes two first main keels, the two first main keels are adjacent to each other up and down, keel connecting fasteners are installed on the two first main keels, and the two keel connecting fasteners are connected to the vertical secondary keels.

[0016] Furthermore, the transverse strut group includes two first struts, which are adjacent to each other up and down, and the tension screw rod component includes a tension connecting rod, which is placed between the two first struts and one of its ends passes through the wall casting space and is placed between the two first main keels. Fastening plates are installed on both ends of the tension connecting rod, and fastening nuts are threadedly connected to both ends of the tension connecting rod. The fastening nuts fasten the fastening plates to the sides of the two first struts or the two first main keels.

[0017] Compared with the prior art, the utility model adopting the above technical solution has the following outstanding features:

[0018] The utility model continuously lays wooden formworks in the basement, that is, on the inner side of the underground continuous wall along the direction of the underground continuous wall. The continuously laid wooden formworks are arranged at intervals from the underground continuous wall and together form a wall casting space. A supporting keel frame assembly fixed to the indoor ground is arranged on the indoor side of the continuously laid wooden formworks. The continuously laid wooden formworks are supported by the supporting keel frame assembly, thereby realizing the formwork support construction of the wall at the underground continuous wall in the basement, and then the wall is arranged in the wall casting space and closely fits the side of the underground continuous wall. This solves the problem of the traditional double-sided mold support method of the formworks being close to the underground continuous wall. In order to solve the problem of difficulty in installing the formwork due to the narrow space on one side, only one-side formwork is needed in the basement to complete the installation of the wall formwork at the underground continuous wall in the basement. Not only is the construction simple and convenient, but the single-sided formwork saves time, effort and materials, thus improving the construction efficiency. After the wall pouring construction is completed, only the single-sided formwork in the basement needs to be removed, which saves construction costs while ensuring the construction progress. At the same time, the defect of a gap between the wall and the underground continuous wall in the traditional double-sided formwork support method is solved, so that the wall and the underground continuous wall fit closely, meeting the construction requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the main structure of the utility model;

[0020] Figure 2 It is a schematic diagram of the side view structure of the utility model;

[0021] In the figure: 1. underground continuous wall; 2. wooden formwork; 3. indoor floor; 4. vertical column; 5. horizontal main keel group; 6. vertical secondary keel; 7. keel connecting fastener; 8. inclined supporting keel; 9. outer formwork; 10. inner formwork; 11. vertical column; 12. horizontal support rod group; 13. tension screw member; 14. slope protection wall; 15. top support steel pipe; 16. steel pipe wire support; 17. disc-type scaffolding; 18. horizontal supporting keel; 19. vertical tie column; 20. implanted member. DETAILED DESCRIPTION

[0022] The following description of the embodiments will help the public better understand the present invention, but the specific embodiments given by the applicant cannot and should not be regarded as limitations on the technical solution of the present invention. Any changes to the definitions of components or technical features and / or formal rather than substantive changes to the overall structure should be regarded as the scope of protection defined by the technical solution of the present invention.

[0023] See also Figure 1 to Figure 2 As shown, the technical solution of the utility model is as follows:

[0024] A formwork support structure for a wall at an underground continuous wall in a basement, wherein the underground continuous wall 1 is arranged on the outside of the basement and is tightly fitted with the basement, the formwork support structure comprises a lower formwork assembly, the lower formwork assembly comprises a plurality of wooden formworks 2, the plurality of wooden formworks 2 are continuously laid along the direction of the underground continuous wall 1, the number of wooden formworks 2 is determined according to the area of ​​the wall at the underground continuous wall 1 in the basement, the plurality of wooden formworks 2 are spaced apart from the underground continuous wall 1, the plurality of wooden formworks 2 and the underground continuous wall 1 together form a wall casting space, the spacing between the wooden formworks 2 and the underground continuous wall 1 is the wall casting space and the thickness of the wall, a supporting keel frame assembly is arranged on the side of the plurality of continuously laid wooden formworks 2, and the supporting keel frame assembly is arranged on the side of the plurality of continuously laid wooden formworks 2. The keel support frame assembly is located in the basement and fixed on the indoor floor 3 of the basement. The continuously laid wooden formwork 2 is supported by the keel support frame assembly, and the wall casting space is closely fitted with the underground continuous wall 1. The wall is cast in the wall casting space to achieve close fit between the wall and the underground continuous wall 1 to meet the construction requirements. The keel support frame assembly includes a plurality of vertical columns 4, a plurality of groups of transverse main keel groups 5 and a plurality of vertical secondary keels 6. The plurality of vertical columns 4 are evenly spaced along the direction of the continuously laid plurality of wooden formworks 2. The plurality of groups of transverse main keel groups 5 are spaced along the height direction of the vertical columns 4, and each group of transverse main keel groups 5 is arranged along the direction of the plurality of continuously arranged vertical columns 4. A plurality of vertical secondary keels 6 are evenly spaced along the length direction of the transverse main keel group 5. The number of vertical columns 4, the transverse main keel group 5 and the vertical secondary keels 6, the spacing between two adjacent vertical columns 4, two adjacent transverse main keel groups 5 and two adjacent vertical secondary keels 6 are determined according to the area of ​​the wall and the construction requirements. A keel connecting fastener 7 is connected between the vertical secondary keel 6 and the transverse main keel group 5. The vertical secondary keel 6 is connected to the transverse main keel group 5 through the keel connecting fastener 7, which ensures that the vertical secondary keel 6 is connected to the transverse main keel group 5. Firmness: a plurality of inclined supporting keels 8 are connected to one group of transverse main keel groups 5, and the plurality of inclined supporting keels 8 are fixed on the indoor floor 3 of the basement. The plurality of inclined supporting keels 8 are evenly spaced along the length direction of the transverse main keel group 5. The number of inclined supporting keels 8 and the distance between two adjacent inclined supporting keels 8 are determined according to construction requirements. The vertical columns 4, the transverse main keel group 5 and the vertical secondary keels 6 are supported by the plurality of inclined supporting keels 8, so as to realize the top support of the supporting keel frame assembly to the wooden formwork 2.

[0025] The upper formwork assembly is also included, and the upper formwork assembly is located above the lower formwork assembly and the underground continuous wall 1. The upper formwork assembly includes a plurality of inner formworks 10 and a plurality of outer formworks 9. The plurality of inner formworks 10 and the plurality of outer formworks 9 are continuously laid along the direction of the wall casting space. The plurality of inner formworks 10 and the plurality of outer formworks 9 are spaced from each other and are located on both sides of the wall casting space. The plurality of inner formworks 10 are connected to the plurality of wooden formworks 2 up and down, and the supporting keel frame assembly is arranged on the side of the plurality of inner formworks 10. On the surface, a fastening assembly connected to the supporting keel frame assembly is arranged on the side of several outer formworks 9, and the inner formwork 10 and the outer formwork 9 laid continuously are supported by the cooperation of the supporting keel frame assembly and the fastening assembly. The fastening assembly includes several vertical uprights 11 and several groups of transverse support rods 12. The several vertical uprights 11 are evenly spaced along the direction of the continuously laid outer formworks 9, and the several groups of transverse support rods 12 are spaced along the height direction of the vertical uprights 11, and each group of transverse support rods 12 is spaced apart. The rod groups 12 are all arranged along the direction of several vertical poles 11 arranged continuously. The transverse bracing rod groups 12 correspond to the transverse main keel groups 5 one by one. The transverse bracing rod groups 12 and the transverse main keel groups 5 are commonly connected with the tension screw components 13. The fastening components are connected to the supporting keel frame components through the tension screw components 13. Several inner templates 10 and several outer templates 9 jointly extend the wall casting space upward. The number of inner templates 10 and outer templates 9 is determined according to the area of ​​the wall casting space extending upward. In addition, the vertical The number of vertical columns 4, transverse brace groups 12 and tension screw members 13 are all determined according to the area of ​​the wall casting space extending upward, and the spacing between two adjacent vertical columns 4, two adjacent transverse brace groups 12 and two adjacent tension screw members 13 is determined according to the construction requirements; by connecting the upper formwork assembly to the lower formwork assembly, the wall casting space adjacent to the underground continuous wall 1 is extended upward, and the wall is increased accordingly, thereby realizing the overall casting construction of the wall in the basement that is closely fitted with the underground continuous wall 1.

[0026] It also includes a slope protection wall 14 arranged on the outside of the underground continuous wall 1, and a plurality of top support assemblies are arranged between the transverse strut group 12 at the lower part of the upper formwork assembly and the slope protection wall 14. The plurality of top support assemblies are evenly spaced along the length direction of the transverse strut group 12, and the number of top support assemblies and the spacing between two adjacent groups of top support assemblies are determined according to the length of the transverse strut group 12 and the construction requirements; the top support assembly includes a top support steel pipe 15, and steel pipe wire supports 16 are installed in both ends of the top support steel pipe 15, one of the steel pipe wire supports 16 abuts against the transverse strut group 12, and the other steel pipe wire support 16 abuts against the slope protection wall 14; by arranging the top support assembly, the upper formwork assembly and the lower part of the outer formwork 9 are supported and reinforced, thereby reducing the risk of leakage of the wall during the pouring construction process.

[0027] A disc-type scaffolding 17 is arranged in the basement, and the supporting keel frame also includes a plurality of horizontal supporting keels 18, and the plurality of horizontal supporting keels 18 are all fixed on the transverse main keel group 5 connected to the inclined supporting keel 8, and the plurality of horizontal supporting keels 18 are evenly spaced along the length direction of the transverse main keel group 5. The number of horizontal supporting keels 18 and the spacing between two adjacent horizontal supporting keels 18 are determined according to the length of the transverse main keel group 5 and the construction requirements, and each horizontal supporting keel 18 is fixed to the disc-type scaffolding 17 by a steel pipe connecting fastener; by arranging a plurality of horizontal supporting keels 18 on the supporting keel frame assembly and connecting the disc-type scaffolding 17 through the horizontal supporting keels 18, the supporting force of the supporting keel frame assembly on the wooden formwork 2 is improved, and the risk of leakage of the wall during the pouring construction process is reduced.

[0028] A number of vertical tie columns 19 are vertically pre-buried on the indoor floor 3 of the basement, and the number of vertical tie columns 19 correspond to a number of inclined support keels 8 one by one. Steel pipe connecting fasteners connected to the inclined support keels 8 are installed on the vertical tie columns 19. The vertical tie columns 19 are used to improve the firmness of the inclined support keels 8 fixed to the indoor floor 3, and to improve the supporting force of the support keel frame assembly on the wooden formwork 2, thereby preventing the inclined support keels 8 from being displaced by the lateral force of concrete and causing leakage accidents.

[0029] A plurality of implant components 20 are also provided at the lower part of the supporting keel frame assembly. The plurality of implant components 20 are all fixed in the underground continuous wall 1 through the wall casting space. The plurality of implant components 20 are evenly spaced along the direction of the wall casting space. The number of implant components 20 and the spacing between two adjacent implant components 20 are determined according to the length of the wall casting space and the construction requirements. The implant components 20 include implant connecting rods. An implant hole is provided on the underground continuous wall 1. The ends of the implant connecting rods pass through the transverse main keel group 5, the wooden formwork 2 and the wall casting space in turn and are inserted into the implant holes. The ends of the implant connecting rods are fixed in the implant holes by anchor glue. A limit plate is installed on the other end of the implant connecting rod and is threadedly connected with a fastening nut. The fastening nut fastens the limit plate to the side of the transverse main keel group 5. By installing the implant components 20 fixed to the underground continuous wall 1 on the supporting keel frame assembly, the firmness of the lower part of the supporting keel frame assembly is improved, and the wooden formwork 2 is prevented from expanding and leaking.

[0030] The transverse main keel group 5 includes two first main keels, which are adjacent to each other up and down. Keel connecting fasteners 7 are installed on the two first main keels, and the two keel connecting fasteners 7 are connected to the vertical secondary keels 6. The above-mentioned structural setting improves the firmness of the connection between the transverse main keel group 5 and the vertical secondary keel 6.

[0031] The transverse strut group 12 includes two first struts, which are adjacent to each other up and down. The tension screw member 13 includes a tension connecting rod, which is placed between the two first struts and one of its ends passes through the wall casting space and is placed between the two first main purlins. Fastening plates are installed on both ends of the tension connecting rod, and fastening nuts are threaded on both ends of the tension connecting rod. The fastening nuts fasten the fastening plates to the sides of the two first struts or the two first main purlins. The transverse strut group 12, the tension screw member 13 and the transverse main purlin group 5 cooperate to achieve the top support and fixation of the outer formwork 9 and the inner formwork 10 located on both sides of the wall casting space, thereby avoiding the phenomenon of mold expansion and leakage.

[0032] The utility model continuously lays wooden formwork 2 in the basement, that is, on the inner side of the underground continuous wall 1 along the direction of the underground continuous wall 1. The continuously laid wooden formwork 2 is arranged at intervals from the underground continuous wall 1 and together forms a wall casting space. A supporting keel frame component fixed to the indoor ground 3 is arranged on the indoor side of the continuously laid wooden formwork 2. The continuously laid wooden formwork 2 is supported by the supporting keel frame component, thereby realizing the formwork support construction of the wall at the underground continuous wall 1 in the basement, and then the wall is arranged in the wall casting space and is closely fitted with the side of the underground continuous wall 1; it solves the problem of the traditional double-sided mold support method of the formwork being close to the underground In order to overcome the defect of difficulty in formwork installation caused by the narrow space on one side of the continuous wall 1, only one-side formwork is needed in the basement to complete the wall formwork installation of the underground continuous wall 1 in the basement. Not only is the construction simple and convenient, but the single-sided formwork saves time, labor and materials, thus improving the construction efficiency. After the wall pouring construction is completed, only the single-sided formwork in the basement needs to be removed, which saves construction costs while ensuring the construction progress. At the same time, the defect of a gap between the wall and the underground continuous wall 1 in the traditional double-sided formwork support method is solved, so that the wall and the underground continuous wall 1 fit closely, meeting the construction requirements.

[0033] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent changes made using the contents of the present utility model specification and its drawings are included in the scope of rights of the present utility model.

Claims

1. A formwork support structure for a wall at an underground continuous wall in a basement, wherein the underground continuous wall is arranged outside the basement and closely fits the basement, and is characterized by: The formwork support structure includes a lower formwork assembly, which includes a plurality of wooden formworks, which are laid continuously along the direction of the underground continuous wall, and which are spaced apart from the underground continuous wall. The wooden formworks and the underground continuous wall together form a wall casting space. A supporting keel frame assembly is arranged on the side of the continuously laid wooden formworks. The supporting keel frame assembly is located in the basement and fixed on the indoor floor of the basement. The wall casting space is closely fitted with the underground continuous wall. The supporting keel frame assembly includes a plurality of vertical columns, a plurality of groups of transverse main keels and a plurality of vertical secondary keels, and a plurality of vertical vertical The columns are evenly spaced along the direction of several continuously laid wooden formworks, several groups of transverse main keel groups are spaced along the height direction of the vertical columns, and each group of transverse main keel groups is arranged along the direction of several continuously arranged vertical columns, several vertical secondary keels are evenly spaced along the length direction of the transverse main keel group, keel connecting fasteners are connected between the vertical secondary keels and the transverse main keel group, several inclined supporting keels are connected to one group of the transverse main keel groups, the several inclined supporting keels are fixed on the indoor floor of the basement, and the several inclined supporting keels are evenly spaced along the length direction of the transverse main keel group.

2. The formwork support structure for the underground continuous wall in the basement according to claim 1, characterized in that: The upper formwork assembly is also included, and the upper formwork assembly is located above the lower formwork assembly and the underground continuous wall. The upper formwork assembly includes a plurality of inner formworks and a plurality of outer formworks, and the plurality of inner formworks and the plurality of outer formworks are continuously laid along the direction of the wall casting space. The plurality of inner formworks and the plurality of outer formworks are spaced from each other and are located on both sides of the wall casting space. The plurality of inner formworks are butted up and down with the plurality of wooden formworks. The supporting keel frame assembly is arranged on the side surfaces of the plurality of inner formworks, and the side surfaces of the plurality of outer formworks are provided with fastening assemblies connected with the supporting keel frame assembly. The fastening assemblies The components include a plurality of vertical poles and a plurality of groups of transverse strut groups. The plurality of vertical poles are evenly spaced along the direction of the continuously laid plurality of outer formworks. The plurality of groups of transverse strut groups are spaced along the height direction of the vertical poles, and each group of transverse strut groups is arranged along the entire length of the continuously arranged plurality of vertical poles. The transverse strut groups correspond to the transverse main keel groups one by one. The transverse strut groups and the transverse main keel groups are commonly connected with tension screw components. The fastening components are connected to the supporting keel frame components through the tension screw components. The plurality of inner formworks and the plurality of outer formworks jointly extend the wall casting space upward.

3. The formwork support structure for the underground continuous wall in the basement according to claim 2, characterized in that: It also includes a slope protection wall arranged on the outside of the underground continuous wall, and a plurality of top support assemblies are arranged between the transverse support rod group at the lower part of the upper formwork assembly and the slope protection wall, and the plurality of top support assemblies are evenly spaced along the length direction of the transverse support rod group; the top support assembly includes a top support steel pipe, and steel pipe wire supports are installed in both ends of the top support steel pipe, one of the steel pipe wire supports is abutted on the transverse support rod group, and the other steel pipe wire support is abutted on the slope protection wall.

4. The formwork support structure for the underground continuous wall in the basement according to claim 1, characterized in that: A disc-type scaffolding is set up in the basement. The supporting keel frame also includes a plurality of horizontal supporting keels. The plurality of horizontal supporting keels are fixed on a transverse main keel group connected to the inclined supporting keel. The plurality of horizontal supporting keels are evenly spaced along the length direction of the transverse main keel group. Each horizontal supporting keel is fixed to the disc-type scaffolding by a steel pipe connecting fastener.

5. The formwork support structure for the underground continuous wall in the basement according to claim 1, characterized in that: A plurality of vertical tie columns are pre-buried vertically on the indoor floor of the basement, and the plurality of vertical tie columns correspond to a plurality of inclined supporting keels one by one. Steel pipe connecting fasteners connected to the inclined supporting keels are installed on the vertical tie columns.

6. The formwork support structure for the underground continuous wall in the basement according to claim 1, characterized in that: A plurality of implant components are also provided at the lower part of the supporting keel frame assembly. The plurality of implant components are all fixed in the underground continuous wall through the wall casting space. The plurality of implant components are evenly spaced along the direction of the wall casting space. The implant components include an implant connecting rod. An implant hole is provided on the underground continuous wall. The end of the implant connecting rod passes through the transverse main keel group, the wooden formwork and the wall casting space in turn and is inserted into the implant hole. The end of the implant connecting rod is fixed in the implant hole. A limit plate is installed on the other end of the implant connecting rod and is threadedly connected with a fastening nut. The fastening nut fastens the limit plate to the side of the transverse main keel group.

7. The formwork support structure for the underground continuous wall in the basement according to claim 2, characterized in that: The transverse main keel group includes two first main keels, which are adjacent to each other up and down. Keel connecting fasteners are installed on the two first main keels, and the two keel connecting fasteners are connected to the vertical secondary keels.

8. The formwork support structure for the underground continuous wall in the basement according to claim 7, characterized in that: The transverse strut group includes two first struts, which are adjacent to each other up and down. The tension screw rod component includes a tension connecting rod, which is placed between the two first struts and one of its ends passes through the wall casting space and is placed between the two first main keels. Fastening plates are installed on both ends of the tension connecting rod, and fastening nuts are threadedly connected to both ends of the tension connecting rod. The fastening nuts fasten the fastening plates to the sides of the two first struts or the two first main keels.