Anti-skid plastic runway
By using the structural design of permeable brick layer, rubber particle base layer and EPDM particle surface layer in the plastic runway, the problem of poor anti-slip performance of the plastic runway in rainy days or humid environments is solved, and the effect of effectively reducing water accumulation and improving anti-slip performance is achieved.
Patent Information
- Application Number
- CN202420803098.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The existing plastic tracks have poor anti-slip performance in rainy or humid environments, which are prone to accumulation of water and cause slippage, increasing the risk of sports personnel being injured.
The structural design of permeable brick layer, rubber particle base layer and EPDM particle surface layer is adopted. The permeable brick layer guides water through drainage ditch. The particulate matter on the rubber particle base layer and EPDM particle surface layer has a rough surface structure, breaking the water membrane structure and promoting water penetration.
Effectively reduce water accumulation on the surface of the plastic track, improve anti-slip performance, and reduce the risk of sports personnel being injured.
Smart Images

Figure CN222685172U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of sports equipment, and in particular to an anti-skid plastic track. Background Art
[0002] With the development of the sports industry, plastic tracks have become one of the standard configurations of sports venues.
[0003] Plastic track is also called track and field track. It is generally made of polyurethane prepolymer, mixed polyether, waste tire rubber, EPDM rubber particles or PU particles, pigments, additives, and fillers. It has good wear resistance and certain UV resistance. However, the anti-skid performance of these materials is not ideal; especially in rainy days or wet environments, the surface of the track is prone to water accumulation, making the surface of the track slippery and increasing the risk of injury to athletes. Utility Model Content
[0004] In order to improve the anti-skid performance of a plastic track in rainy days or wet environments, the present application provides an anti-skid plastic track.
[0005] The present application provides an anti-skid plastic track, which adopts the following technical solution:
[0006] A skid-resistant plastic track is laid on a concrete base, and a drainage ditch is arranged on one side of the skid-resistant plastic track; along the direction away from the concrete base, the skid-resistant plastic track comprises a waterproof base coating, a permeable brick layer, a rubber particle base layer and an EPDM particle surface layer in sequence; the permeable brick layer is paved with a plurality of permeable bricks, and water in the rubber particle base layer and the EPDM particle surface layer penetrates into the permeable brick layer, and the permeable brick layer is used to divert water to the drainage ditch.
[0007] By adopting the above technical solution, the permeable bricks in the permeable brick layer have good water permeability, and the water in the rubber particle bottom layer and the EPDM particle surface layer can be discharged to the drainage ditch in time, thereby reducing the accumulation of water on the surface of the plastic track and improving the anti-skid performance of the plastic track in rainy days or after rain. The particles in the rubber particle bottom layer and the EPDM particle surface layer have a rough surface structure, which can break the water film structure outside the water body, so that the water in the rubber particle bottom layer and the EPDM particle surface layer can penetrate into the permeable brick layer in time.
[0008] Optionally, a plurality of drainage grooves distributed at intervals are provided on one side of the permeable brick layer close to the concrete base layer, and the drainage grooves are connected to the drainage ditch.
[0009] By adopting the above technical solution, a drainage groove is opened at the bottom of the permeable brick layer, so that the moisture in the permeable brick layer is discharged to the drainage ditch through the drainage groove, thereby reducing the surface water of the plastic track and improving the anti-slip performance of the plastic track.
[0010] Optionally, a plurality of limiting grooves are provided on one side of the permeable brick layer close to the rubber particle bottom layer, and the limiting grooves are used to accommodate the rubber particle bottom layer.
[0011] By adopting the above technical solution, the rubber particle bottom layer is partially arranged in the limiting groove, so that the permeable brick layer and the rubber particle bottom layer are interlocked with each other, thereby improving the overall connection strength of the plastic track.
[0012] Optionally, a plurality of absorbent cotton strips are further included, wherein the absorbent cotton strips are arranged in the drainage groove and are connected to the drainage groove.
[0013] By adopting the above technical solution, the absorbent cotton strips can absorb moisture, reduce water accumulation on the surface of the plastic track, and improve the anti-slip performance of the plastic track.
[0014] Optionally, a plurality of drainage pipes are further included. The drainage pipes are arranged in the drainage grooves. The drainage pipes are connected to the drainage ditches. A plurality of water-permeable holes are opened on the side of the drainage pipes away from the concrete base.
[0015] By adopting the above technical solution and installing a drainage pipe in the drainage ditch, the occurrence of the drainage ditch being blocked by the adhesive between the permeable brick layer and the concrete base layer can be reduced.
[0016] Optionally, a geotextile is also included, and the geotextile is wrapped around the outer circumference of the drainage pipe.
[0017] By adopting the above technical solution and wrapping the geotextile around the outer periphery of the drainage pipe, the occurrence of the adhesive between the permeable brick layer and the concrete base layer blocking the drainage ditch can be reduced, which is beneficial to maintaining the drainage performance of the plastic track.
[0018] Optionally, it further comprises a plurality of water-blocking strips, wherein the water-blocking strips are fixed on the permeable brick layer and buried in the rubber particle bottom layer.
[0019] By adopting the above technical solution, the water barrier strips can allow the water in the plastic track to penetrate downward into the permeable brick layer and be discharged, thereby improving the drainage performance of the plastic track.
[0020] Optionally, the elevation of the concrete base increases gradually in a direction away from the drainage ditch.
[0021] By adopting the above technical solution and carrying out slope treatment on the concrete base, it is beneficial to the drainage of water inside the plastic track.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. The permeable bricks in the permeable brick layer have good water permeability, which can discharge the water in the rubber particle bottom layer and the EPDM particle surface layer into the drainage ditch in time; thereby reducing the accumulation of water on the surface of the plastic runway and improving the anti-slip performance of the plastic runway in rainy days or after rain;
[0024] 2. By opening a drainage groove at the bottom of the permeable brick layer, the water in the permeable brick layer is discharged to the drainage ditch through the drainage groove; thereby improving the drainage efficiency of the plastic runway, further reducing the occurrence of water accumulation on the surface of the plastic runway, and improving the anti-slip performance of the plastic runway;
[0025] 3. The water-blocking strips are used to separate water bodies, thereby reducing the occurrence of water flowing along the permeable brick layer and the EPDM particle bottom layer; allowing the water in the plastic track to penetrate downward into the permeable brick layer and be discharged, thereby improving the drainage performance of the plastic track. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a cross-sectional view of the anti-skid plastic track structure in Example 1.
[0027] Figure 2 It is a schematic diagram of the anti-skid plastic track structure in Example 1.
[0028] Figure 3 It is a cross-sectional view of the anti-skid plastic track structure in Example 2.
[0029] Figure 4 It is a schematic diagram of the anti-skid plastic track structure in Example 2.
[0030] Figure 5 It is a cross-sectional view of the anti-skid plastic track structure in Example 3.
[0031] Figure 6 It is a cross-sectional view of the anti-skid plastic track structure in Example 4.
[0032] Explanation of the reference numerals: 1. Concrete base layer; 2. Drainage ditch; 3. Waterproof base coating layer; 4. Permeable brick layer; 41. Drainage trough; 42. Limiting groove; 5. Rubber particle base layer; 6. EPDM particle surface layer; 7. Marking layer; 8. Water-absorbing cotton strip; 9. Drainage pipe; 91. Permeable hole; 10. Geotextile; 11. Water-proof strip. DETAILED DESCRIPTION
[0033] The following is combined with Figure 1-6 This application is described in further detail.
[0034] The present application embodiment discloses an anti-skid plastic track. Figure 1 The anti-skid plastic track is laid on a concrete base 1, a drainage ditch 2 is arranged on one side of the anti-skid plastic track, and a permeable cover plate is arranged at the mouth of the drainage ditch 2.
[0035] Reference Figure 1 , along the direction away from the concrete base 1, the anti-skid plastic track includes a waterproof base coat 3, a permeable brick layer 4, a rubber particle base layer 5, an EPDM particle surface layer 6, a marking layer 7 and a waterproof strip 11. In this embodiment, the anti-skid plastic track is also referred to as a plastic track.
[0036] Reference Figure 1 , the staff cleans the surface of the concrete base 1, and the staff can use a grinder to grind the surface of the concrete base 1; along the direction away from the drainage ditch 2, the elevation of the concrete base 1 increases gradually; that is, by performing slope treatment on the concrete base 1, it is beneficial to the drainage of the plastic track.
[0037] Reference Figure 1 Then, the staff rolls the waterproof coating onto the surface of the concrete base 1, and the waterproof coating solidifies and hardens to form a waterproof base coating 3.
[0038] Reference Figure 1 The permeable brick layer 4 is formed by laying a plurality of permeable bricks, and the permeable bricks and the concrete base layer 1 can be fixedly connected by cement mortar, glue, etc. The permeable bricks have good water permeability, so that the permeable brick layer 4 has good water permeability, and the water in the plastic runway can be discharged into the drainage ditch 2 in time.
[0039] Reference Figure 1 The rubber particle bottom layer 5 is formed by mixing rubber particles (generally particles from crushed rubber tires) and glue and paving them on the permeable brick layer 4.
[0040] Reference Figure 1 The EPDM particle surface layer 6 is formed by mixing and stirring EPDM (ethylene propylene diene monomer) rubber particles and glue and laying them on the rubber particle bottom layer 5.
[0041] Reference Figure 1 Finally, the staff uses marking paint to draw the runway line on the EPDM particle surface layer 6, thereby forming a marking layer 7.
[0042] Reference Figure 1 The particles in the rubber particle bottom layer 5 and the EPDM particle surface layer 6 have a rough surface structure, which can break the water film structure outside the water body; at the same time, the rubber particle bottom layer 5 and the EPDM particle surface layer 6 have abundant gaps. Therefore, the water in the rubber particle bottom layer 5 and the EPDM particle surface layer 6 can penetrate into the permeable brick layer 4 in time.
[0043] Reference Figure 1When rain falls on the surface of the plastic track, the water in the rubber particle bottom layer 5 and the EPDM particle surface layer 6 penetrates into the permeable brick layer 4, and the permeable brick layer 4 is used to divert the water to the drainage ditch 2; thereby reducing the accumulation of water on the surface of the plastic track and improving the anti-slip performance of the plastic track in rainy days or after rain.
[0044] Reference Figure 1 and Figure 2 The water barrier 11 is fixed on the permeable brick layer 4, and the water barrier 11 is buried in the rubber particle bottom layer 5. The water barrier 11 can be built with cement mortar, and the water barrier 11 is used to separate the water body. When rainwater falls on the plastic runway, the water barrier 11 can reduce the flow of water along the permeable brick layer 4 and the EPDM particle bottom layer; the water in the plastic runway penetrates downward into the permeable brick layer 4 and is discharged, thereby improving the drainage performance of the plastic runway.
[0045] Example 2
[0046] The difference between this embodiment 2 and embodiment 1 is that:
[0047] Reference Figure 3 and Figure 4 The permeable brick layer 4 is provided with a plurality of drainage grooves 41 at intervals on one side close to the concrete base layer 1, and the drainage grooves 41 are connected to the drainage ditch 2. The permeable brick layer 4 is provided with a plurality of limiting grooves 42 on one side close to the rubber particle bottom layer 5, and the limiting grooves 42 are used to accommodate the rubber particle bottom layer 5.
[0048] Reference Figure 3 and Figure 4 , the water in the permeable brick layer 4 is drained to the drainage ditch 2 through the drainage groove 41; thereby improving the drainage efficiency of the plastic track, further reducing the occurrence of water accumulation on the surface of the plastic track, and improving the anti-skid performance of the plastic track. At the same time, a limiting groove 42 for accommodating the rubber particle bottom layer 5 is provided on the surface of the permeable brick layer 4, so that the permeable brick layer 4 and the rubber particle bottom layer 5 are interlocked, improving the connection strength between the permeable brick layer 4 and the rubber particle bottom layer 5, thereby improving the overall stability of the plastic track.
[0049] Example 3
[0050] The difference between this embodiment 3 and embodiment 1 is that:
[0051] Reference Figure 5 The plastic track also includes a plurality of absorbent cotton strips 8, which are arranged in the drainage groove 41 and are connected to the drainage ditch 2. The absorbent cotton strips 8 have good water absorption performance, thereby further improving the drainage performance of the plastic track, reducing the accumulation of water on the surface of the plastic track, and improving the anti-skid performance of the plastic track.
[0052] Example 4
[0053] The difference between this embodiment 4 and embodiment 2 is that:
[0054] Reference Figure 6 The plastic track also includes a plurality of drainage pipes 9 and a geotextile 10. The drainage pipe 9 is arranged in the drainage groove 41, and the drainage pipe 9 is connected to the drainage ditch 2. A plurality of water-permeable holes 91 are provided on the side of the drainage pipe 9 away from the concrete base 1; the geotextile 10 is wrapped around the outer periphery of the drainage pipe 9. The drainage pipe 9 can reduce the occurrence of the adhesive between the permeable brick layer 4 and the concrete base 1 blocking the drainage groove 41, which is beneficial to maintaining the drainage performance of the plastic track. The geotextile 10 can reduce the occurrence of the adhesive between the permeable brick layer 4 and the concrete base 1 blocking the drainage groove 41, which is beneficial to maintaining the drainage performance of the plastic track.
[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An anti-skid plastic track, the anti-skid plastic track is laid on a concrete base (1), and a drainage ditch (2) is provided on one side of the anti-skid plastic track; the characteristics are: Along the direction away from the concrete base (1), the anti-skid plastic track comprises a waterproof base coating (3), a permeable brick layer (4), a rubber particle base layer (5) and an EPDM particle surface layer (6) in sequence; the permeable brick layer (4) is paved with a plurality of permeable bricks, and water in the rubber particle base layer (5) and the EPDM particle surface layer (6) penetrates into the permeable brick layer (4), and the permeable brick layer (4) is used to divert the water to the drainage ditch (2).
2. The anti-slip plastic track according to claim 1, characterized in that: A plurality of drainage grooves (41) are provided at intervals on one side of the permeable brick layer (4) close to the concrete base layer (1), and the drainage grooves (41) are connected to the drainage ditch (2).
3. The anti-slip plastic track according to claim 1, characterized in that: A plurality of limiting grooves (42) are provided on one side of the permeable brick layer (4) close to the rubber particle bottom layer (5), and the limiting grooves (42) are used to accommodate the rubber particle bottom layer (5).
4. The anti-slip plastic track according to claim 2, characterized in that: The anti-skid plastic track further comprises a plurality of water-absorbing cotton strips (8), wherein the water-absorbing cotton strips (8) are arranged in the drainage groove (41), and the water-absorbing cotton strips (8) are connected to the drainage groove (2).
5. The anti-slip plastic track according to claim 2, characterized in that: It also comprises a plurality of drainage pipes (9), wherein the drainage pipes (9) are arranged in the drainage groove (41), the drainage pipes (9) are connected to the drainage ditch (2), and a plurality of water permeable holes (91) are provided on a side of the drainage pipe (9) away from the concrete base layer (1).
6. The anti-slip plastic track according to claim 5, characterized in that: The anti-skid plastic track also includes a geotextile (10), wherein the geotextile (10) is wound around the outer circumference of the drainage pipe (9).
7. The anti-slip plastic track according to claim 1, characterized in that: It also comprises a plurality of water-blocking strips (11), wherein the water-blocking strips (11) are fixedly arranged on the water-permeable brick layer (4), and the water-blocking strips (11) are buried in the rubber particle bottom layer (5).
8. The anti-slip plastic track according to claim 1, characterized in that: The elevation of the concrete base layer (1) increases gradually in a direction away from the drainage ditch (2).